Page 2: CREAConstructionEvent: PartL changes

Part L Where are we heading?

Page 3: CREAConstructionEvent: PartL changes

The Government has confirmed that from

2016 all new homes coming through the planning system must be built to a

zero carbon standard

and from 2019 all new non- domestic buildings must follow suit

Page 4: CREAConstructionEvent: PartL changes

How are we getting there?

Page 5: CREAConstructionEvent: PartL changes

What is next?

• 2013 regulations are a step on the way to full zero carbon compliance by 2016

Page 6: CREAConstructionEvent: PartL changes

What is Zero Carbon?

Page 7: CREAConstructionEvent: PartL changes
Page 8: CREAConstructionEvent: PartL changes
Page 9: CREAConstructionEvent: PartL changes
Page 10: CREAConstructionEvent: PartL changes

To achieve zero carbon certain Allowable Solutionswill be required to produce renewable energy,

Page 11: CREAConstructionEvent: PartL changes

Two optionsRoute A Local Planning Authority to develop policy using Third party providerOr Community Energy Fund. List of solutions and £ per tonne for carbon abatement Route B Private Energy FundVerification and Certification Scheme (ASVCS) to show investment will achieve carbon reductionAllowable Solutions Fund Holding to provide secure ”bank”

Page 12: CREAConstructionEvent: PartL changes

Cost of Zero Carbon Home

Page 13: CREAConstructionEvent: PartL changes

Priorities

Meet commitments of Climate Change Act 80% of 1990 levels by 2050Make carbon reduction affordableEncourage and re-vitalise building industryEnsure complianceDevelop resilient building industry

Page 14: CREAConstructionEvent: PartL changes

2013 Likely Proposals Domestic

New SAP calculation method ( now released)

Introduction of Fabric Energy Efficiency Standards FEES combined with

Carbon Compliance StandardsConsequential improvements ( approx 10% of cost) for Homes triggered by notifiable building work

Improved standards for new thermal elements in existing buildings

Owner operation manual

Page 15: CREAConstructionEvent: PartL changes

Non Domestic

New SBEM calculationNon domestic. Differentiated standards to remain but either11% through fabric and service improvementsor

20% improvement as above with PV array of 1.6% of floor area

Page 16: CREAConstructionEvent: PartL changes

SAPNew SAPc programme now available

Proposed that design stage and completion stage SAP calculationsSubmitted to Building Control.

Key feature U values to be scrutinised if below given values

Page 17: CREAConstructionEvent: PartL changes

Fabric Energy Efficiency Standards

Page 18: CREAConstructionEvent: PartL changes
Page 19: CREAConstructionEvent: PartL changes

NB Note general improvements

Page 20: CREAConstructionEvent: PartL changes

NB Effect of thermal bridging and triple glazing

Page 21: CREAConstructionEvent: PartL changes

Proposed limiting fabric parameters

Page 22: CREAConstructionEvent: PartL changes

Carbon Compliance

Page 23: CREAConstructionEvent: PartL changes

Comparison of CO2 targets (gas)

Page 24: CREAConstructionEvent: PartL changes
Page 25: CREAConstructionEvent: PartL changes
Page 26: CREAConstructionEvent: PartL changes
Page 27: CREAConstructionEvent: PartL changes

Non Domestic

Page 28: CREAConstructionEvent: PartL changes

Consequential Improvements

Page 29: CREAConstructionEvent: PartL changes
Page 30: CREAConstructionEvent: PartL changes
Page 31: CREAConstructionEvent: PartL changes

October 2012 Consequential improvements for domestic extensions / notifiable works come into force?

Domestic Triggers extensions/increase in habitable space/Boiler replacement/replacement of windows.

Non Domestic Triggers extensions/increase in habitable space/Fixed building services/controlled fittings

a) An assessment provided by an accredited Green Deal Assessor; or

b) A recommendations report associated with a valid Energy

Performance Certificate; or

c) SAP Appendix TFN.

Page 32: CREAConstructionEvent: PartL changes

Domestic. Capped at 10% of principal works

To include SAP measures

a. Loft insulation

b. Cavity wall insulation

c. Hot water cylinder insulation

d. Draughtproofing.Non DomesticSBEM Measures eligible for Green DealApproved Document List ADL2BControlled Services and FittingsWide variation so challenging… case studies focussed on services

Page 33: CREAConstructionEvent: PartL changes

New Thermal elements in existing buildings

Page 34: CREAConstructionEvent: PartL changes
Page 35: CREAConstructionEvent: PartL changes

Owner operation manual

Page 36: CREAConstructionEvent: PartL changes

Issues

Achieving Cost effective energy efficiency measures

Gap between design standards and built performanceLack of sufficient performance dataExisting stockFuel Factor ideally removed for Zero Carbon standard

Robust Calculation methodology

Page 37: CREAConstructionEvent: PartL changes

Performance gap

• Energy use/emissions 60-120% worse than predictions

• Why?• Lack of Knowledge

• • Willful or inadvertent deviation • Build quality• SAP shortcomings• Occupancy behaviour

Page 38: CREAConstructionEvent: PartL changes

Future Proposals

Page 39: CREAConstructionEvent: PartL changes

HMG intend to provide

• Regulation specific training programmes:Testing and evaluation skills development programmes

• Wider education and training programmes

• R+D how buildings actually perform• PAS Publicly Available Specification• Robust National Calculation Methodology• Quality Assurance process

Page 40: CREAConstructionEvent: PartL changes

Implications for Construction industry

Improved detailingImproved performance modellingHigher standards of constructionQuality assurance schemes

Page 41: CREAConstructionEvent: PartL changes

Passivhaus

Robust Methodology

Attention to detailQuality assurance

NoteThermal BridgesWindow U valueAirtightness

Page 42: CREAConstructionEvent: PartL changes

Passivhaus

Page 43: CREAConstructionEvent: PartL changes

Heat Loss Form Factor

Page 44: CREAConstructionEvent: PartL changes

Accredited detail

Page 45: CREAConstructionEvent: PartL changes

Enhanced construction detail

Page 46: CREAConstructionEvent: PartL changes

Passivhaus Detail

Page 47: CREAConstructionEvent: PartL changes

Things to do

• Analyse thermal performance very early in design process

• Design buildings as integrated low energy systems

• Learn from Passivhaus for fabric design and construction

• Improve infiltration rates• Upgrade existing buildings carefully

Page 48: CREAConstructionEvent: PartL changes

The future……is now