Previous | Next | Contents ESDEP WG 14 STRUCTURAL SYSTEMS: BUILDINGS Lecture 14.4: Crane Runway Girders OBJECTIVE/SCOPE To present the structural functions of the crane runway girder and to give design guidance on the girder and on its various components. PREREQUISITES Lectures 1B.5 : Introduction to Design of Industrial Buildings Lectures 6.6 : Buckling of Real Structural Elements Lectures 7.9 : Unrestrained Beams Lectures 8.4 : Plate Girder Behaviour and Design Lectures 11 : Connection Design: Static Loading RELATED LECTURES Lectures 12 : Fatigue Lecture 14.1.1 : Single Storey Buildings: Introduction and Primary Structure Lecture 14.1.2 : Single Storey Buildings: Envelope and Secondary Structure Lecture 14.3 : Analysis of Portal Frames: Plastic Analysis SUMMARY Crane runway girders are usually regarded as a part of the building structure and are designed accordingly. A more realistic approach is to regard the crane runway girders as a part of the mechanical transport system in which the dominant component is the crane itself. There is a very strong interaction between the moving and the stationary parts of the crane system. There can be no successful design of either the crane itself or the crane runway girders if they are treated as separated structures. The forces imposed on the girders by the crane are in part caused by the behaviour of the crane itself, especially in regard to the vertical and lateral Page 1 of 23 ESDEP LECTURE NOTE [WG14] 26/01/2009 http://www.esdep.org/members/master/wg14/l0400.htm

Transcript of cranes

Page 1: cranes

Previous | Next | Contents

ESDEP WG 14

STRUCTURAL SYSTEMS: BUILDINGS

Lecture 14.4: Crane Runway Girders OBJECTIVE/SCOPE

To present the structural functions of the crane runway girder and to give design guidance on the girder and on its various components.

PREREQUISITES

Lectures 1B.5: Introduction to Design of Industrial Buildings

Lectures 6.6: Buckling of Real Structural Elements

Lectures 7.9: Unrestrained Beams

Lectures 8.4: Plate Girder Behaviour and Design

Lectures 11: Connection Design: Static Loading

RELATED LECTURES

Lectures 12: Fatigue

Lecture 14.1.1: Single Storey Buildings: Introduction and Primary Structure

Lecture 14.1.2: Single Storey Buildings: Envelope and Secondary Structure

Lecture 14.3: Analysis of Portal Frames: Plastic Analysis

SUMMARY

Crane runway girders are usually regarded as a part of the building structure and are designed accordingly.

A more realistic approach is to regard the crane runway girders as a part of the mechanical transport system in which the dominant component is the crane itself.

There is a very strong interaction between the moving and the stationary parts of the crane system. There can be no successful design of either the crane itself or the crane runway girders if they are treated as separated structures.

The forces imposed on the girders by the crane are in part caused by the behaviour of the crane itself, especially in regard to the vertical and lateral

Page 1 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 2: cranes

stiffness of the girder. The transfer of the crane wheel reactions to the crane runway girder induces a complex pattern of stresses in the upper part of the girder and leads to early service failures if not taken into consideration in the design.

1. INTRODUCTION In designing cranes, rails, runway girders and the supporting structure, the most important parameters are the maximum and most frequently occurring weights to be lifted, the speed and acceleration and the free height below the crane. The maximum wheel loads are determined by the net capacity of the crane together with the dead weight of the crane and dynamic effects.

Handling facilities in simple portal frame buildings are often provided by light overhead travelling cranes carried on crane runway girders supported on brackets secured to the columns, see Figure 1a.

The maximum capacity of cranes supported in this manner is about 100kN. Above this capacity, it is better to provide a separate leg or to increase the depth of the column below the crane runway girder to give adequate support.

When an overhead travelling crane is introduced into a building, special care must be taken to ensure that the building is adequately braced in both directions. It is also worth mentioning that, where heavy cranes are involved,

Page 2 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 3: cranes

the crane runway girders may be subjected to severe fatigue conditions.

1.1 The Crane Runway Girder and the Structure

The support method of the crane runway girder depends on the magnitude of the reactions being transmitted, in relation to the strength of the structural framing of the building.

Some typical arrangements ranging from the lightest to the heaviest are shown in Figure 1. A separate crane column, as shown in Figures 1b and 1d is attractive for heavy cranes because it permits the effect of the crane to be considered isolated. However therein lies a danger, since the displacement of the building column could induce overstress in the connection between the two columns. A correct and more realistic approach is to analyse the columns as one.

Careful consideration should be given to the transfer of the horizontal forces from the top flange of the girder to the column. This connection should:

l safely resist the horizontal reactions l allow free rotation at the support of the crane runway girder l allow lateral adjustment of the crane runway girder after completion of the

building.

A very important aspect is the need for adjustment. It is impossible to erect building frames to the tolerance required by the crane manufacturer and it is therefore essential that the whole crane runway girder can be adjusted up to 10mm with respect to the building columns. Therefore, slotted holes and shims are required, as shown in Figure 2.

Page 3 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 4: cranes

Page 4 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 5: cranes

Free rotation at the supports of crane runway girders is important in order to prevent bending and torsional moments in the columns.

Rotation at the supports of a continuous girder can be realised by appropriate, flexible detailing as shown in Figure 3.

Rotation at the end of a simply supported girder results in a longitudinal movement of the top flange in relation to the centre line. The member which connects the top flange to the building column must therefore be capable of allowing free longitudinal movement without becoming overstressed. A simple flexible plate may be satisfactory when the movements are less than 1mm, but a connection with slotted holes is a safer solution in most cases (see detail B, Figure 2).

Another vital aspect is that the distance between the two columns of a portal frame at the height of the rail changes with the loading. The change in distance between two load cases can easily amount to 1/180 of the column-height. The wheel flange clearances must therefore be much larger than immediately

Page 5 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 6: cranes

expected (often 50 mm or more are recommended).

Longitudinal bracing of the building and crane runway girders can be arranged in several different ways:

l vertical bracing used as building and as crane runway girder bracing. l vertical bracing bays with direct connection to the brackets and positioned

in the plane of the crane runway girder (for heavy cranes). l vertical bracing in the planes of both crane runway girder and building

columns (for very heavy cranes only).

If the last method is used, there must be an effective restraint to the crane brackets to prevent torsion in the column. This restraint is normally obtained by a horizontal truss, as shown in Figure 4.

The ideal place for the braced bay is half-way between the expansion joints in the crane runway girder, or in the middle of the building, see Figure 5. This arrangement prevents the build up of axial compressive forces due to temperature rise, which could cause buckling of the crane runway girders. Furthermore, it forces the expansion in two directions, and thereby minimises the total movement. Only the columns below the crane runway girder are deformed. It is the magnitude of the secondary stresses associated with this deformation which limits the distance between the expansion joints. The maximum allowable distance between the expansion joints depends on the

Page 6 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 7: cranes

horizontal longitudinal displacement capacity of the columns bearing the crane runway girder - see Figure 5.

A method of transferring the axial forces in a simply-supported girder directly across the joint at the support is shown in Figure 2.3. The detail also shows an effective method of supporting the girders by using load bearing stiffeners. Attention has to be paid to the local eccentricity of the bearing stiffener with regard to the web of the bracket.

2. TYPE OF CRANES The most common types of cranes running on elevated runway girders are:

l Top running bridge cranes consisting of a single or a double girder spanning between the end carriages (Figure 6a).

l Underslung bridge crane with special end carriages where the wheels are running on the bottom flange of the runway girders (Figure 6b).

Page 7 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 8: cranes

2.1 Classification of Cranes

Loads from crane wheels have a static and a dynamic component. Both components are functions of time and vary with crane position and the magnitude of the load. The loads handled by the crane consist of a spectrum of light, medium and heavy loads. The dynamic forces due to acceleration and braking, hoisting and unevenness of the rails also vary from installation to installation.

To ensure economical design of cranes, they are normally divided into several classes depending on the frequency of their use, the average ratio of the loads

Page 8 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 9: cranes

lifted to the safe load, and the dynamic effects experienced in service. In this way it is possible to assess the fatigue risk to the crane and its runway girder during its design life.

Classification is based on two factors:

l Frequency of use. l State of loading (ratio of magnitude of actual or assumed load to the safe

working load).

Selection of values for frequency of use and state of loading determines the final classification of a crane.

3. CRANE RAILS The crane rail and its interaction with the top flange of the girder has a very strong influence on the performance of the crane. It is, therefore, important to know what type of crane is going to be applied when designing the crane rail and runway girder. Loading characteristics should be adopted which are in accordance with the crane which will probably be installed. These characteristics can be obtained from manufacturers manuals. In practice it is sometimes impossible to prepare the design of the crane and the crane runway girder at the same time because the crane is ordered much later than the building structure. The result may be a poor design leading to problems such as excessive wear of the crane rail and crane wheel flanges or fatigue cracking in the upper web of the girder.

The crane rail must meet the requirements for protecting the top flange from wear and for distributing the wheel loads evenly over the greatest possible length of contact. The crane rail must therefore have:

l an adequate wear resistance. l a high flexural rigidity.

Two types of crane rail are shown in Figure 2:

l block rail. l specially rolled rail section.

3.1 Rail Splices

There are two types of splice:

l Splices which join individual lengths. l Expansion splices.

Longer rail lengths can be obtained rather by welding than by bolting. Welded splices are normally superior to bolted splices because the welded joint avoids a gap and gives a step-free running surface. Special care is required in the welding operation if there are high carbon and manganese contents in the steel.

Page 9 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 10: cranes

Expansion joints in rails must be provided on long runways when rails are fixed to the girders. They should coincide with joints in the main girder. A gradual transfer of wheel load from one rail to another is ensured if the ends of the rail are bevelled as shown in Figure 7.

3.2 Rail Fastenings

Various types of rail fastenings are shown in Figure 8. The traditional approach is to provide a fastening which restrains the rail in all directions. The fastening of block rails is always by shop welding. The fastening of specially rolled rail sections is normally obtained by a fully rigid clamp or by welding the rail to the flange of the crane runway girder.

Page 10 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 11: cranes

Welding has the advantage that the rail can be accurately located on the girder centreline due to the fact that lateral adjustment is possible. However the use of welding gives problems in some cases. For example:

l Renewal may be difficult. l In simply-supported joints crane runway girders occur at each support if

shop welded. l Site welding is necessary if continuous crane runway girders are used. This

problem is solved if site welding is located at positions where the bending

Page 11 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 12: cranes

moments are minimal, in which case the stress situation in the welds is less critical.

l The welds can induce fatigue cracks. l When higher strength steel has been specified, the welding operation is

more difficult.

Modern practice tends towards a fastening which gives partial restraint, as shown in Figure 8c. The rail is restrained in the vertical and lateral direction, but the clamps allow the rail to move in the longitudinal direction.

Figure 9 shows a very economical method, for heavy duty applications, of obtaining lateral restraint by site welding 'steering' plates between the clamps instead of using high strength bolts in the clamps to eliminate the possibility of movement. This type of fixing has to be checked for its influence on the fatigue of the crane runway girder.

4. LOADS ON THE CRANE RUNWAY GIRDER The static wheel loads are exceeded during operation of the crane as a result of impact, inertial effects and other dynamic effects. These effects can also result in lateral forces at the top of the crane rail. The main factors to be considered are:

l acceleration and deceleration of the crane bridge and the crab. l degree of control over the hoisting speed. l off-vertical lifting at the start of hoisting, see Figure 10. l tendency of the crane to travel obliquely, see Figure 11. l condition of the rail surface and the width of rail joints.

Page 12 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 13: cranes

These dynamic effects can be approximated by multiplying the static wheel loads with an appropriate factor which may range from 1,0 to 2,0.

Oblique travelling of the crane can also induce lateral loads, as shown in Figure 11. The forces on the rail are acting in opposite directions on each wheel of the end carriage and depend on the ratio of crane span to wheel base.

The longitudinal forces due to crane acceleration and braking should be verified by calculations, when data on masses of the moving parts and their accelerations are known.

The end stops placed on the crane runway girder must be designed to take the crane buffer force. The buffer force is calculated from the kinetic energy of the

Page 13 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 14: cranes

mass of the crane, but without the lifted load due to the fact that it is suspended from the ropes. Another approach is to use electronic devices to stop the cranes at the ends, yielding a more beneficial loading situation for the structure supporting the crane runway girder.

Other loads that need to be considered are:

l Catwalks and ladders attached to the girder. l Power supply cabling and cable trays.

For more quantitative information on loads to be taken into account in designing a crane runway girder, national codes or crane manufacturer's documentation should be referred to.

4.1 Transfer of Loads to the Top Flange

The loads transmitted to the rail produce a triaxial stress state in the flange and the upper part of the web. The stress components are:

l Compressive stress in the longitudinal direction of the flange. l Compressive stress in the web in the vertical direction. l Local bending stress in the flange in the longitudinal direction. l Local bending stress in the web in the transverse direction. l Shear stresses in the web.

To make a realistic assessment of the stresses, the following design hints could be given:

l Wheel load should be distributed over a length equal to twice the rail depth.

l The stresses in the web should be calculated with an assumption for the eccentricity of the wheel with respect to the centre of the web, which might occur at the supports or when the crane and/or the rail have seriously suffered wear. Eccentricity of the rail to the runway girder usually has to be prevented by connecting them together with very small tolerances (preferably shop welding).

l Welds connecting the flange to the web should be checked for a combination of vertical stresses and bending stresses due to eccentricity (of the wheel load) in addition to shear.

l To avoid the necessity to move the rail from its location above the web, alignment of the whole crane runway girder should be possible. Therefore, slotted holes and shims are applied, see Figure 2.

l If welded crane runway girders are used, a full penetration butt weld should be used for the top flange to web joint to give resistance to fatigue.

5. SELECTION OF THE CRANE RUNWAY GIRDER During the conceptual stage of the design of the crane runway girder the fundamental questions are:

Page 14 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 15: cranes

l Should a simply-supported or a continuous girder be used? l Should a solid web girder or a latticed girder be used? l Should a single or double web construction be used? l Should high strength steel be used?

In some countries, simply-supported girders are preferred; in others continuous girders. When continuous girders are used, special attention should be paid to:

l differential settlement between adjacent footings. This should be limited to L/600.

l erection, especially when site welding is adopted.

Figure 12 shows some cross-sections used for crane runway girders. For small spans and light-to-medium crane loads, it is normally possible to use rolled-beam sections. In some cases reinforcement may be necessary to give resistance to lateral forces (Figure 12a-c).

Page 15 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 16: cranes

Single web plate girders are suitable for the majority of heavier cranes. Their insufficient resistance to lateral forces is normally solved by introducing horizontal bracing, as shown in Figure 12d.

Plate box girders are popular for the crane itself but are seldom used for the crane girder. The rail must be situated directly over the inner web of the box girder, so that transverse flexural stresses in the top flange plate are avoided, as shown in Figure 12e.

High strength steel is seldom used in crane runway girders because fatigue considerations limit the permissible stresses quite severely and thus reduce the economical advantages (the fatigue strengths of mild and high strength steel for welded structures are the same). Additionally, deflection and lateral-

Page 16 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 17: cranes

torsional buckling considerations also prevent the designer from gaining advantage from using high strength steel.

5.1 Optimum Girder Proportions

A general set of rules to assist the choice of optimum depth of crane runway girders cannot be given due to the variety of load cases and the differences in the cross-sections normally used. As a rough guideline, the usual range of girder depth-to-span ratios is between 8 and 14. The deflection limitation may dictate a larger depth, especially where spans are long.

6. DESIGN OF THE CRANE RUNWAY GIRDER The design of crane runway girders has some special aspects which are not often present in the design consideration of other types of girder:

l combination of concentrated loads and bending moments. l combination of lateral loads and lateral-torsional buckling. l combination of web buckling and plate bending stresses due to torsion

induced by the rail eccentricity and lateral forces. l design is required against early fatigue failure.

The degree of refinement required in considering these special effects during design, depends very much on the class of the crane.

One of the most important decisions in connection with the design is to determine how far to go in minimising the mass of steel. Good design must take into consideration all costs during the design life of the crane installation. A very light design may promise a low first cost, but could give rise to large maintenance costs resulting from a need for frequent repairs.

6.1 Crane Runway Girder-to-Column Details

The predominant loading is vertical. The crane runway girder is normally directly supported by its seated connection on the column or by means of a bracket. The best way to secure a direct flow of stresses from the crane runway girder to the column or bracket below, with a minimum of eccentricity, is by means of welded brackets, as shown in Figure 2.

The next principal loading is transverse. Figure 13a shows a dangerous detail frequently used on lighter crane girders to resist lateral forces. Figure 13b illustrates the reversible strain to which the girder web is subjected - an action leading to the result shown in Figure 13c. The failure could easily be prevented by simply connecting the top flange directly to the column, as shown in Figure 14. The top flange acts as a horizontal beam delivering its reaction to the column.

Page 17 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 18: cranes

Page 18 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 19: cranes

Another effect caused by this bad detail is shown in Figure 15. The vertical deflection of the crane girder rotates its ends on the column seat. If the connection is not designed for that purpose the result is high shear on the upper fasteners, and local tension in the web, which could lead to failure in that area of the web.

Page 19 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 20: cranes

A continuous girder offers a possible solution to the rotation problem when a flexible detail as in Figure 3 is chosen.

6.2 Rigidity Requirements

The following maximum values for the deflection of the crane girder must normally not be exceeded in order to avoid undesirable dynamic effects and to secure the function of the crane:

l Vertical deflection at midspan, due to maximum wheel reactions without duty features L/700

l Horizontal deflection at midspan due to maximum wheel reactions multiplied by the duty factor L/600

In the absence of more detailed calculations it is acceptable to assume that the top flange resists the whole horizontal force. The rigidity requirement for horizontal deflection is essential to prevent oblique travelling of the crane.

The vertical deflection is normally limited to a value not greater than 25 mm to prevent excessive vibrations caused by the crane operation and crane travel.

6.3 Web Stiffeners

Page 20 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 21: cranes

It becomes uneconomical to use unstiffened webs when girder depths increase, because a relatively large proportion of the girder material is in the web. Web stiffeners serve the purpose of:

l preventing buckling in the web. l adding rotation capacity to the top flange.

Twisting of the top flange caused by lateral forces has to be resisted by the web alone, if no web stiffeners are present. When the girder is relatively deep and the lateral forces are high, it will not be possible to omit web stiffeners. The distance between the stiffeners must not be so large that twisting of the top flange becomes too large at the mid-point.

The method of attaching the stiffeners to the web and the flanges must be detailed carefully to prevent fatigue failure. Fatigue in the tensile flange can be averted by providing a gap of 4t between the end of the stiffener and the bottom flange, as shown in Figure 16. However there will still be a possibility of fatigue in the web at the termination of the stiffener.

However, the detail shown in Figure 17 is normally considered to be the best solution. The stiffener should be welded to the compression flange so that relative movement of the flange in relation to the web due to lateral forces is totally prevented. The stiffener should be coped a maximum of 200 mm.

Page 21 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 22: cranes

6.4 Lateral Forces and Lateral-Torsional Buckling

The simultaneous effects of torsion induced by lateral forces and lateral-torsional buckling can be considered in several ways. It is often difficult to decide how rigorously the structural calculations should be done. Lateral forces due to off-vertical lifting, inertial effects and oblique travelling can only be estimated approximately. Values obtained from relevant codes together with the use of duty factors given in the Codes is the only means at the designer's disposal.

Torsion in the section is caused by:

l lateral force acting at the rail head level. l eccentricity of the vertical force due to tolerances dependent on the

fabrication of the rail to the girder (see Section 4.1).

The geometry of the top flange should be chosen from those alternatives that offer the best torsional resistance and the best lateral stiffness.

6.5 Fatigue Considerations

Crane runway girders are subjected to repetitive stressing and unstressing. The number of stress cycles that certain parts of the crane runway girder is subjected to may be two to four times the number of crane passages because each passage of the wheels causes stress fluctuations. This effect is one of the reasons why special care must be paid to the detailing of the top part of the crane runway girder.

The number of the crane passages is not easy to estimate. For design purposes it is assumed that the number of stress fluctuations corresponds to the class of

Page 22 of 23ESDEP LECTURE NOTE [WG14]

26/01/2009http://www.esdep.org/members/master/wg14/l0400.htm

Page 23: cranes

the crane as specified in the Codes.

The critical details in fatigue design are the stiffener-to-flange, the stiffener-to-web, and the flange-to-web connections where severe concentrations of stresses exist. The following recommendations are made:

l welds attaching the stiffeners to the girder web should be terminated at a distance from the flanges to reduce the stress concentration (see Figure 17).

l welds connecting the web to the top flange should be full penetration butt welds, although fillet welds are sometimes used for light, primarily static cranes.

l flange reinforcement using cover plates leads to poorer fatigue life.

7. CONCLUDING SUMMARY Crane runway girders require a special care in design and detailing. They should be regarded as a mechanical item. The uncertainties, especially regarding the transverse loads and the transfer of forces to the girders, have to be clearly recognised. In the following some guidance in obtaining the proper design is given:

l Simplified calculations are adequate for light load cranes, but more rigorous analyses are required for heavy load cranes. The depth of structural investigations can be decided from the class of the crane.

l Although minimum weight design may provide an economical solution to many design problems, this is not the case in the design of crane runway girders where the overall costs must include the maintenance costs.

l Attention must be made to detailing which may reduce the fatigue life of the crane runway girder. This consideration applies especially to the top region of the girder.

l Welded fabrication should be given a more rigorous inspection than the rest of the building structure.

l No further welding attachments should be allowed during the lifetime of an intensively used crane girder.

8. ADDITIONAL READING 1. Petersen, C., Stahlbau, Friedr. Vieweg & Sohn, 1988. 2. Dubas, P. and Gehri, E., Stahlhochbau, Springs-Verlag, 1988. 3. Gorene, Crane Runway Girders, Steel Construction, Vol. 10, No 4. 4. Mueller, J. E., Lessons from Crane Runways, Steel Construction, Vol.10, No

4.

Previous | Next | Contents

Page 23 of 23ESDEP LECTURE NOTE [WG14]