Crane Usage Register1 Configurations/12... · With the main buildings superstructure comprising of...

2
Crane Usage Register Increase productivity and reduce idle time by streamlining the Crane Management process. Zutec’s Crane Management capability allows for multiple stakeholders on projects to submit crane usage records, making the time allocation and invoicing seamless. Benefits Features Make informed decisions to ensure maximum crane time efficiency Insights & analytics Plant maintenance planning & downtime monitoring Data trail / auditability Calendar scheduling Mobile data capture Workflow approvals and collaboration Real-time reporting Replace paper-based processes [email protected] | www.zutec.com

Transcript of Crane Usage Register1 Configurations/12... · With the main buildings superstructure comprising of...

Page 1: Crane Usage Register1 Configurations/12... · With the main buildings superstructure comprising of a steel framed tower Zutec’s Crane Usage Register allow the Multiplex team to

Crane Usage Register

Increase productivity and reduce idle time by streamlining the Crane Management process. Zutec’s Crane Management capability allows for multiple stakeholders on projects to submit crane usage records, making the time allocation and invoicing seamless.

Benefits Features

Make informed decisions to ensure maximum crane time efficiency

Insights & analytics

Plant maintenance planning & downtime monitoring

Data trail / auditability

Calendar scheduling

Mobile data capture

Workflow approvals and collaboration Real-time reporting

Replace paper-based processes

[email protected] | www.zutec.com

Page 2: Crane Usage Register1 Configurations/12... · With the main buildings superstructure comprising of a steel framed tower Zutec’s Crane Usage Register allow the Multiplex team to

We Worked With

22 Bishopsgate is a commercial skyscraper currently under construction in the City of London financial district and is

set to stand 278m tall and 62 storeys. This prestigious project will be the second tallest building in the UK and is

designed to offer a flexible workspace for all sizes and scales of businesses to work in. The project was created in

response to the major shifts in the way people work and live, brought about by cultural, demographic and

technological advances in the world of work.

The 62-storey tower will be the first of its kind to house a fresh food market, innovation hub, gym, wellbeing retreat

and spa, curated ‘art walk’, business club, cycle hub, destination restaurant, as well as the London’s highest free public

viewing gallery. It will be the first UK tower to contain in excess of 100,000 sq ft of integrated amenity and social

spaces, creating an inspiring, healthy and energising workplace for a vibrant and diverse business workforce of 12,000

people.

With the main buildings superstructure comprising of a steel framed tower Zutec’s Crane Usage Register allow the

Multiplex team to log and track the usage of the 5 Tower Cranes across the site. Allowing them to reduce idle time,

with real time reporting, insights and analytics and also back charge subcontractors for their usage.

Zutec Delivered

Talk to Us

For more information on what Zutec can offer you.

22 Bishopsgate

Used to track the status of every facade element from manufacture to installation and final inspection

Zutec Digital O&M tool providedreal time reports on the handover documentation progress

Task Management Facade Progress Tracker Digital O&M Manuals

Zutec Enabled Project

The Task Management tool was used as the main Quality Assurance collaboration platform for the project

[email protected]

[email protected] | www.zutec.com