Crane SafetyCrane Safety
Vincent J. Giblin, General President
![Page 2: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/2.jpg)
![Page 3: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/3.jpg)
![Page 4: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/4.jpg)
![Page 5: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/5.jpg)
![Page 6: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/6.jpg)
1926.550 Cranes and Derricks
b. Crawler, Locomotive and Truck Cranes
c. Hammerhead Tower Cranes
d. Overhead and Gantry
e. Derricks
f. Floating Cranes
g. Suspended Personnel Platforms
1926.550 Cranes and Derricks
b. Crawler, Locomotive and Truck Cranes
c. Hammerhead Tower Cranes
d. Overhead and Gantry
e. Derricks
f. Floating Cranes
g. Suspended Personnel Platforms
![Page 7: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/7.jpg)
1926.551 HELICOPTORS
1926.552 HOISTS AND ELEVATORS
1926.553 BASE-MOUNTED AND DRUM HOISTS
1926.554 OVERHEAD HOISTS
1926.555 CONVEYORS
1926.556 AERIAL LIFTS
1926.551 HELICOPTORS
1926.552 HOISTS AND ELEVATORS
1926.553 BASE-MOUNTED AND DRUM HOISTS
1926.554 OVERHEAD HOISTS
1926.555 CONVEYORS
1926.556 AERIAL LIFTS
![Page 8: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/8.jpg)
Must comply with the manufacturer’s specifications or have engineers determination
No attachments exceeding limitations
All ratings, capacities, warnings and instructions posted on equipment
All information visible to operator
Must comply with the manufacturer’s specifications or have engineers determination
No attachments exceeding limitations
All ratings, capacities, warnings and instructions posted on equipment
All information visible to operator
![Page 9: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/9.jpg)
ANSI hand signals posted on site
Competent person for inspections
Documented through annual inspections
Wire rope inspection criteria
Guarding of moving parts
Swing radius barricaded
ANSI hand signals posted on site
Competent person for inspections
Documented through annual inspections
Wire rope inspection criteria
Guarding of moving parts
Swing radius barricaded
![Page 10: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/10.jpg)
Monitor exhaust in enclosed spaces
Windows - safety glass with no distortion
Safe access to cab
Fire extinguisher - minimum 5BC
Powerline clearance 10 ft. minimum
Monitor exhaust in enclosed spaces
Windows - safety glass with no distortion
Safe access to cab
Fire extinguisher - minimum 5BC
Powerline clearance 10 ft. minimum
![Page 11: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/11.jpg)
Manufacturers approval for modifications
Employees clear of suspended loads
Must comply with ANSI B30.5 (except 5-2.1.5)
Must comply with PCSA #2 (Hydraulic)
Manufacturers approval for modifications
Employees clear of suspended loads
Must comply with ANSI B30.5 (except 5-2.1.5)
Must comply with PCSA #2 (Hydraulic)
![Page 12: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/12.jpg)
Powerline contact
Swing radius crushing
Structural failure
Rigging failure
Tipover
Powerline contact
Swing radius crushing
Structural failure
Rigging failure
Tipover
![Page 13: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/13.jpg)
Improper setup
Inadequate outrigger cribbing
Unstable ground (Utilities, uncompacted soil, etc.)
Unlevel crane (Reduction in capacities upto 50%)
Inspection failure - damaged components
Improper setup
Inadequate outrigger cribbing
Unstable ground (Utilities, uncompacted soil, etc.)
Unlevel crane (Reduction in capacities upto 50%)
Inspection failure - damaged components
![Page 14: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/14.jpg)
Overload
Mechanical failure
Hydraulic failure
Impact loading
Side loading
Wind
Overload
Mechanical failure
Hydraulic failure
Impact loading
Side loading
Wind
![Page 15: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/15.jpg)
Minimum clearance 10 ft. up 50kV plus 0.4 inches for each 1kV over 50 kV.
In transit with no load
4 ft. - upto 50kV
10 ft - 50kv to 345kV
16 ft - upto 750kV
Minimum clearance 10 ft. up 50kV plus 0.4 inches for each 1kV over 50 kV.
In transit with no load
4 ft. - upto 50kV
10 ft - 50kv to 345kV
16 ft - upto 750kV
![Page 16: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/16.jpg)
When the crane moves to within the booms length a designated signal person is
required !
When the crane moves to within the booms length a designated signal person is
required !
![Page 17: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/17.jpg)
Prohibited Zone
Upto 50 kV 10 ft.
50 to 200 kV 15 ft.
200 to 350 kV 20 ft.
350 to 500 kV 25 ft.
500 to 750 kV 35 ft.
750 to 1000 kV 45 ft.
Prohibited Zone
Upto 50 kV 10 ft.
50 to 200 kV 15 ft.
200 to 350 kV 20 ft.
350 to 500 kV 25 ft.
500 to 750 kV 35 ft.
750 to 1000 kV 45 ft.
![Page 18: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/18.jpg)
Running Rope (Removal)Running Rope (Removal) 6 broken wires (random) in 1 lay6 broken wires (random) in 1 lay 3 broken wires 1 strand 1 lay3 broken wires 1 strand 1 lay Wear equal to 1/3 original diameter of Wear equal to 1/3 original diameter of
outside wiresoutside wires Kinking, crushing, bird caging, Kinking, crushing, bird caging,
corrosion, etc. corrosion, etc. Heat damage (any source)Heat damage (any source)
Running Rope (Removal)Running Rope (Removal) 6 broken wires (random) in 1 lay6 broken wires (random) in 1 lay 3 broken wires 1 strand 1 lay3 broken wires 1 strand 1 lay Wear equal to 1/3 original diameter of Wear equal to 1/3 original diameter of
outside wiresoutside wires Kinking, crushing, bird caging, Kinking, crushing, bird caging,
corrosion, etc. corrosion, etc. Heat damage (any source)Heat damage (any source)
![Page 19: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/19.jpg)
Reduction in rope diameter Reduction in rope diameter (removal)(removal)
1/64 for rope upto 5/161/64 for rope upto 5/16 1/32 for rope upto 1/21/32 for rope upto 1/2 3/64 for rope upto 3/43/64 for rope upto 3/4 1/16 for rope upto 7/8 to 1 1/81/16 for rope upto 7/8 to 1 1/8 3/32 for rope upto 1 1/4 to 1 1/23/32 for rope upto 1 1/4 to 1 1/2
Reduction in rope diameter Reduction in rope diameter (removal)(removal)
1/64 for rope upto 5/161/64 for rope upto 5/16 1/32 for rope upto 1/21/32 for rope upto 1/2 3/64 for rope upto 3/43/64 for rope upto 3/4 1/16 for rope upto 7/8 to 1 1/81/16 for rope upto 7/8 to 1 1/8 3/32 for rope upto 1 1/4 to 1 1/23/32 for rope upto 1 1/4 to 1 1/2
![Page 20: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/20.jpg)
Standing RopeStanding Rope More than 2 broken wires in one lay More than 2 broken wires in one lay
(beyond end connections)(beyond end connections) More than 1 at the end connectionMore than 1 at the end connection
Standing RopeStanding Rope More than 2 broken wires in one lay More than 2 broken wires in one lay
(beyond end connections)(beyond end connections) More than 1 at the end connectionMore than 1 at the end connection
![Page 21: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/21.jpg)
Crane within 1% of level
Crane capacity reduced by 50%
Live boom machines prohibited
Boom angle indicator required
Anti two block device required
Crane within 1% of level
Crane capacity reduced by 50%
Live boom machines prohibited
Boom angle indicator required
Anti two block device required
![Page 22: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/22.jpg)
Controlled load lowering required (Free fall is prohibited)
Trial lift required
Loaded to anticipated weight
From ground to each anticipated location
Repeated after each move
Controlled load lowering required (Free fall is prohibited)
Trial lift required
Loaded to anticipated weight
From ground to each anticipated location
Repeated after each move
![Page 23: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/23.jpg)
Proof test required
At each jobsite, test platform to 125% of rated capacity -ANSI 200%
Hold suspended for 5 minutes
Pre-lift meeting required
Operator, signalperson, personnel to be lifted and supervision
Proof test required
At each jobsite, test platform to 125% of rated capacity -ANSI 200%
Hold suspended for 5 minutes
Pre-lift meeting required
Operator, signalperson, personnel to be lifted and supervision
![Page 24: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/24.jpg)
Winds shall not exceed 15 mph (ANSI)
Taglines shall be used
Operator must remain at controls at all times, when platform is occupied
Winds shall not exceed 15 mph (ANSI)
Taglines shall be used
Operator must remain at controls at all times, when platform is occupied
![Page 25: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/25.jpg)
1000
500
lbs
..
500
lbs
..
1000 lbs..
1000
300 300
1000
450 450
718 lbs..718
lbs.
.
1000
600 600
575 lbs..575
lbs.
.
![Page 26: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/26.jpg)
![Page 27: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/27.jpg)
![Page 28: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/28.jpg)
![Page 29: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/29.jpg)
![Page 30: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/30.jpg)
![Page 31: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/31.jpg)
![Page 32: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/32.jpg)
![Page 33: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/33.jpg)
![Page 34: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/34.jpg)
![Page 35: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/35.jpg)
![Page 36: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/36.jpg)
![Page 37: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/37.jpg)
![Page 38: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/38.jpg)
![Page 39: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/39.jpg)
![Page 40: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/40.jpg)
![Page 41: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/41.jpg)
Shackle use• Use only the proper pin, never replace with
a bolt.
• Never use a screw pin shackle if the pin can roll under load.
![Page 42: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/42.jpg)
![Page 43: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/43.jpg)
![Page 44: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/44.jpg)
![Page 45: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/45.jpg)
![Page 46: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/46.jpg)
One lay
![Page 47: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/47.jpg)
![Page 48: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/48.jpg)
![Page 49: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/49.jpg)
![Page 50: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/50.jpg)
![Page 51: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/51.jpg)
![Page 52: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/52.jpg)
Wire rope
![Page 53: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/53.jpg)
![Page 54: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/54.jpg)
Mechanical splice
![Page 55: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/55.jpg)
![Page 56: Crane Safety](https://reader036.fdocuments.in/reader036/viewer/2022062516/55cf92c5550346f57b996f91/html5/thumbnails/56.jpg)
END•This publication was made possible by grant numbers 5 U45 ES06182-13 AND 5 U45 ES09763-13 from the National Institute of Environmental Health Sciences (NIEHS), NIH. Its contents are solely the responsibility of the authors and do not necessarily represent the official views of the NIEHS, NIH.