Crab Cavities in IR1 and IR5 Some considerations on tunnel integration
description
Transcript of Crab Cavities in IR1 and IR5 Some considerations on tunnel integration
![Page 1: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/1.jpg)
Crab Cavities in IR1 and IR5Some considerations on tunnel integration
• What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade.
• What are the space and services requirements for crab cavities and related equipment.
R. Ostojic, LHC-CC09, 16-18 Sep 2009
![Page 2: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/2.jpg)
sLHC projects and design studies
CMS/ATLAS Upgrade Phase-1
2014
![Page 3: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/3.jpg)
LHC IR Upgrade – Phase-1Goal of the upgrade:
Enable focusing of the beams to b*=0.25 m in IP1 and IP5, and reliable operation of the LHC at 2 to 3 1034 cm-2s-1 on the horizon of the physics run in 2014.
Scope of the Project:1. Upgrade of ATLAS and CMS interaction regions. The interfaces between the
LHC and the experiments remain unchanged.2. The cryogenic cooling capacity and other infrastructure in IR1 and IR5
remain unchanged and will be used to the full potential.3. Replace the present triplets with wide aperture quadrupoles based on the
LHC dipole (Nb-Ti) cables cooled at 1.9 K.4. Upgrade the D1 separation dipoles, TAS and other beam-line equipment so
as to be compatible with the inner triplets.5. Modify matching sections to improve optics flexibility and machine
protection, and introduce other equipment relevant for luminosity increase to the extent of available resources.
![Page 4: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/4.jpg)
The ATLAS and CMS interaction regions
Dispersion suppressor Matching section Separation dipoles Final focus
Triplet• Position L* = 23 m• Quad gradient 120 T/m• Coil aperture 120 mm
• b*, L 25 cm, 2-3 1034cm-2s-1
• Dissipated power 500 W @ 1.9 K
![Page 5: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/5.jpg)
Triplet layout
LHC triplet
Phase-I triplet
Q1Q2aQ2bQ3CPQDXSD1
~66m
Q1Q2aQ2bQ3CPQDXSD1
~66m
![Page 6: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/6.jpg)
Constraints• Interfaces with the experiments: Very tight interfaces between the
triplet, TAS, shielding, vacuum and survey equipment, and beam instrumentation; no possibility of reducing L* (23m).
• Cryogenics: Ultimate cooling capacity is 500 [email protected] in each triplet. Replacement of triplets in IR1/5 requires at present warm-up of 4 sectors.
• Chromatic aberrations: Reduction of b* drives chromatic aberrations all around the LHC. A new optics solution for all arcs and insertions is necessary.
• Accessibility and maintenance: All electronics equipment for the triplets should be located in low-radiation areas. Severe space constraints around IP1 and IP5 for any new equipment. New magnets must be similar in size to the LHC main dipole.
• Upgrade implementation: during the extended shutdown, compatible with CERN-wide planning (Linac4 commissioning, phase-1 upgrade of the experiments).
![Page 7: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/7.jpg)
Protection against particle debris
Protection against particle debris is the single most serious issue of the upgrade.
• Energy deposition in the coils and magnet lifetime.
• Equipment protection in the tunnel (TAS, TAN).
• Protection of electronic equipment in underground areas.
• Maintenance and interventions …
All magnets built for a lifetime ~ 1000 fb-1,greater than the lifetime of ATLAS and
CMS before their phase-2 upgrade.
Max power density = 4.3 mW/cm3 (@2.5 1034)
Average dose 1.5 MGy/100 fb-
1
![Page 8: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/8.jpg)
Hadron fluence in IP1vertically averaged over the -60cm < y< 60cm interval (beam
axis at y=0)cm-2/100fb-1
109-1010 cm-2/100fb-1
as in UJ56
5 107 – 5 108 cm-2/100fb-1
![Page 9: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/9.jpg)
LHC tunnel in IR1
![Page 10: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/10.jpg)
Phase-1 Upgrade Equipment in IR1
Service module (QDXS)
DFXLink (DSX)
Length ~28 m
3 sharp (~ 1.5 m radius) bends plus some curves
DFX
Link Cryo
ServiceModule(QDXS)
DSX
![Page 11: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/11.jpg)
Phase-1 Upgrade Equipment in IR1
![Page 12: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/12.jpg)
LHC tunnel in IR5
![Page 13: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/13.jpg)
Phase-1 Upgrade Equipment in IR5
Length ~95 m
One 180 degree curve plus some longer curves
DFX
Link Cryo
ServiceModule(QDXS)
DSX
![Page 14: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/14.jpg)
Phase-1 Upgrade Equipment in IR5
Length ~50m
5 sharp bends
DFX
ServiceModule(QDXS)
DSX
![Page 15: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/15.jpg)
Phase-1 Upgrade Equipment in IR5
DFXPower convertors
DSX
![Page 16: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/16.jpg)
Phase-1 Upgrade Equipment in IR5
3.4m
3.15m
USC55
UL55
DFX
1.15m
TRANSPORT VOLUME
1.45m
![Page 17: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/17.jpg)
LHC tunnel in IR1
D11 D12 D2D1 CC
125 145
![Page 18: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/18.jpg)
Separation dipoles
(IPs 1,5,2,8)FACING LEAD END
RINGCENTER(IPs L)
COLD MASS SUPPLY(FOR TEST ATBNL ONLY)
E1/E2 - SHIELD RETURN/SUPPLY
E1/E2 - SHIELD SUPPLY/RETURN
RINGCENTER
(IPs R)
D2
D1, Phase-1 Upgrade
![Page 19: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/19.jpg)
Separation dipoles
• Potential problem with beam separation (too small for separate aperture magnets)• Yoke diameter too large
D1 Phase-1
(Phase-2)D11 D12
D2 (nom LHC)
Strength (Tm) 30 (70) 70 40 38.7
Field (T) 4 (7) 7 4 4.1
Operating temp (K) 1.9 1.9 4.5 4.5
Beam stay-clear (mm) 140 (134) 106 78 69/53
Coil aperture (mm) 180 130 100 80
Beam separation (mm) - 270 270 188
Eff. Coil-coil separation (mm) - 40 70 48
Yoke diameter (mm) 645 940 910 645
Cryostat diameter (mm) 914 914 914 914
![Page 20: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/20.jpg)
Crab cavity requirements
• Two strings of SC per IR side, about 20 m long.• Cavities cooled at 2 K.• Space for RF power tube and PS
– In RF shielded zone– ~ 8 racks per system– Minimal footprint 1.8x2 m– Two systems per IR side
• Power tubes and controls in low-radiation areas– But less than 100 m from CC
• Radiation hardness of in-tunnel equipment
![Page 21: Crab Cavities in IR1 and IR5 Some considerations on tunnel integration](https://reader036.fdocuments.in/reader036/viewer/2022062802/5681458c550346895db2774c/html5/thumbnails/21.jpg)
Some conclusions
• The Phase-1 Upgrade of the LHC interaction regions relies on the mature Nb-Ti magnet technology, while maximising the use of the existing infrastructure.
• Any new equipment in IR1 and IR5 (CC and separation dipoles) must conform in size with the transport zone.
• Phase-2 triplets will require new cryogenic plants in IR1 and IR5. Additional requirements from CC and separation dipoles need to be developed to optimize their design.
• It seems that additional tunnel alcoves in IR1 and IR5 for Phase-2 cryogenics and machine equipment (and moving power convertors from the RRs) is unavoidable.