CR14 over Leading Creek - Big Tee Bridge Replacement, Randolph County, WV (03-21-12)
Transcript of CR14 over Leading Creek - Big Tee Bridge Replacement, Randolph County, WV (03-21-12)
BIG TEE BRIDGE REPLACEMENT
County Route 14 over Leading CreekRandolph County, WVState Project No. S342-14-0.06
Project Sponsor
West Virginia DOT, Division of Highways District 8
West Virginia DOTDivision of Highways District 8US 219 North Elkins, WV 26241-1516
Purpose of the Project
To replace the existing structure with a bridge that meets the requirements set forth by the West Virginia Bridge Design Manual and the Design Directives.
… and in a hurry
Project Site
Project Site
flow
flow
CR14 looking upstation (north)
West Elevation (looking downstream)
•Dave Scott•Ron Klavuhn•Stanford Mills•Lora Freeman
•Dave Morgan •Chad Mann•OBEC Consultants Salem, Oregon
Project Team
Owner Agency
WVDOH District 8
Contractor
C.L. Belt Construction
Substructure & Foundation Engineer
WVDOH District 8
Superstructure Designer/ Fabricator
U.S. Bridge
Project Timeline
Originally Programmed
1999
Funding Approved
Early 2009
Begin 07/09End 09/10
Adv 09/29/10Let 10/26/10Awd 10/28/10
Begin 02/11 End 11/11
Design Phase
Programming Phase
Bid Phase
ConstructPhase
13 months 1 month 9 months10 years
programmed as an ASAP project
ASAP Project
An ASAP Project is a fast-track project with limited details that is bid as lump sum. The contractor is responsible to apply for permits, to arrange for utility relocations, to make the material selections with the suppliers, and construct the project meeting the requirements, such as waterway opening, design loading, and general geometry.
Funding