CQ725A1 M504 to Schneider CL20000-25000 inverters wiring M504 to Schneider CL… · SEL 3505 RTAC...

1
SMART GRID ENERGY SolarVu Enclosure Modbus Communnication Setup 1. In the inverter front panel, navigate to “Settingand press OK 2. Navigate to “Comm Settings” and press OK 3. Navigate to “Modbus Settings” and press OK 4. Change Baudrate to “9600" 5. Change “Modbus Address” to match its inverter number, i.e. Assign Modbus Address 1 to inverter #1, Modbus Address 2 to inverter #2 etc. 6. Verify setting is correct and press “ESC” to return Jun 02, 2015 NW/TH 725 CQ725A1 M504 to Schneider CL20000-25000 inverters wiring A1 Jun 02, 2015 SolarVu Production - As Built © Cachelan Proprietary Information M504 to Schneider CL20000-25000 inverters wiring 1 2 3 4 17 18 19 20 5 6 7 8 9 10 11 12 13 14 15 16 Port1 Port2 Port3 Port4 To IO Power Port4 R232 1D+ 1D- 1C 1G 2D+ 2D- 2C 2G 3D+ 3D- 3C 3G 4D+ 4D- 4C 4G G Vin G Vo SolarVu Gateway Comm Board DB9 RJ45 RJ45 RJ45 RJ45 SolarVu Gateway M504 P1 P2 P3 P4 RJ45 *Not all devices inside SolarVu enclosure are shown MODBUS ETHERNET Schneider CL25000 Inverter #1 MODBUS ETHERNET Schneider CL25000 Inverter #2 MODBUS ETHERNET Schneider CL25000 Inverter #N RJ45 RJ45 RJ45 RJ45 RJ45 RJ45 RJ45 RJ45 RJ45 RJ45 RJ45 RJ45 Pin 1 1 2345678 1 2345678 T-568B T-568A 1 blue blue-white brown Pin Color To M504 Terminal D+ 4 blue 1 D‐ 5 blue‐white 2 GND 8 brown 3 T‐568B Pin Color To M504 Terminal D+ 4 blue 1 D‐ 5 blue‐white 2 GND 8 brown 3 T‐568A 1 ...... Use blue (D+), blue-white (D-) and brown (GND) for both T-568A and T-568B type cable Ethernet Ethernet Ethernet Modbus Terminator, plug it in to the last inverter in the network 2 Refer to Modbus Communication Setup to setup communication settings for each inverter 2 Signal Signal ENG/DRAW ISSUED 3575 14th Avenue Unit #7 Markham, ON L3R 0H6, Canada 905.470.8400 cachelan.com REV FILE REV DATE PROJECT SMART GRID ENERGY

Transcript of CQ725A1 M504 to Schneider CL20000-25000 inverters wiring M504 to Schneider CL… · SEL 3505 RTAC...

Page 1: CQ725A1 M504 to Schneider CL20000-25000 inverters wiring M504 to Schneider CL… · SEL 3505 RTAC Modbus Communnication Setup 1. In the inverter front panel, navigate to “Setting”

SMART GRID ENERGY

INTERNET

SolarVu Servers

Client Access

3G Cellular

SolarVu GATEWAY

SolarVu Enclosure

FIT Meter

Buffalo N300 Router

ROOFTOP ELECTRICAL ROOM

SEL 3505 RTAC

Modbus Communnication Setup

1. In the inverter front panel, navigate to “Setting” and press OK

2. Navigate to “Comm Settings” and press OK

3. Navigate to “Modbus Settings” and press OK

4. Change Baudrate to “9600"

5. Change “Modbus Address” to match its inverter number, i.e. Assign Modbus Address 1 to inverter #1, Modbus Address 2 to inverter #2 etc.

6. Verify setting is correct and press “ESC” to return

Jun 02, 2015 NW/TH

725CQ725A1 M504 to Schneider CL20000-25000 inverters wiring

A1 Jun 02, 2015 SolarVu

Production - As Built© Cachelan Proprietary Information

# 3505XDEX0XAXX 211X0XXXXXX KEY 2706

Client Access

UPS500VAUPS 32

COM1 COM2

COM4COM3 ETH1 ETH2

(Cu & Cu)

SEL3505 RTAC# 3505XDEX3XAX X213X0XXXXXX KEY 2765

COM1 COM2

COM4COM3 ETH2 ETH1

(Cu & Fibre)

SEL 735 Energy Meter # 0735AX00941EX XXXXX16101XXKEY 2215

SEL 2725 Switch# 2725S23X0 KEY 2730

100Base-LX10 SMF

LC-Tx/Rx

USB

ETH1

ETH2

CO

M1

CO

M3

CO

M2

CO

M4

OUT IN

OUT101

1

2

3

LAMP TEST

ETHERCAT

PORT 1

PORT 2

1 +/H2 -/N3 GND

A B C D

Empty Slots E to J

SEL-2242 ChassisSEL-2242 Chassis

SEL-2242 Chassis1: Slot A: SEL-2242 RTAC2: Slot B: SEL-2243 RTAC3: Slot C: SEL-2244-3 Digital Output Module4: Slot D: SEL-2244-2 Digital Input Module5: Slot E to J: Unused

CG50WeatherTrak

T T panel amb

Irradiance

WeatherTrak

Buffalo N300 Router

YF 405 3G Router

YF 405 3G Router

Acuvim II Energy Meter

5-Port Switch

8-Port Switch

Acuvim L Energy Meter

24VDC

30W

120VAC~

24VDC Power Supply

UPS

900 MHzWiMax

Antenna

GE MDS SD09MD-ECES-NNSNN928-960MHz WiMaxRadio/Modem(supplied by THESL,external enclosure)

Terminal

Plug

120VAC UPSCONTROL POWER

Made by APC # BE550G

SOLAR PVDNP3 DATABASE

MEASUREDSTATUSINPUTS

OUTPUTS

LDC Central Office

EnwinSCADA

From CustomerIPP Solar PV Site

Data Query

SCADA DATA Transfer Flow Diagram

ARUBA - RAPRemote Access Point

RAP - WG2

ARUBA For Enwin SCADA

GE MDS Radio / Modem

Receptacle

SolarVu SnocamJunction Box

SnoCamSnoCam

Terminal Board

Digi WR21 Cellular Router

ETH1ETH0

Digi WR21 For HONI SCADA

SolarVu Portal Data Transfer Diagram

Solar Panels

Inverter

AC Recombiner

480/600 VAC

Y Y

Solar Panel, String, Inverter 120 VAC COIL

Contactor

SEL735Energy Meter INPUT

Position SenseOUTPUTActuation

120 VAC Coil

SCADA Meter/Shutdown Enclosure

3x PT 360:120

3x CT 400:53

120VAC From UPS

64

SEL 735 # 0735AX00941EX XXXXX16101XXKEY 2215

INPUTPosition Sense

OUTPUTActuation

120 VAC Coil

3x PT 360:120

3x CT 400:5

64

M

64

M

Disconnect

350A / 600V

PCC

Y-Y Transformer

1

Drawing Note

450A

SolenoidActuator & Breaker

600VFused @ 450A

Fused DisconnectSwitch

SolarVuGateway

SolarVu GATEWAY

SolarVuGateway

K135

S ID=1

M

SolarVu M504-485 Comm Board - GE114

M504 to Schneider CL20000-25000 inverters wiring

1 2 3 4 17 18 19 205 6 7 8 9 10 11 12 13 14 15 16

Port1 Port2 Port3 Port4 To IO Power

Port4 R232

1D+ 1D- 1C 1G 2D+ 2D- 2C 2G 3D+ 3D- 3C 3G 4D+ 4D- 4C 4G G VinGVo

SolarVu Gateway Comm Board

DB9

RJ45 RJ45 RJ45 RJ45

SolarVuGateway

M504

P1 P2 P3 P4

RJ45

*Not all devices inside SolarVu enclosure are shown

MODBUS ETHERNET

Schneider CL25000Inverter #1

MODBUS ETHERNET

Schneider CL25000Inverter #2

MODBUS ETHERNET

Schneider CL25000Inverter #N

RJ45

RJ45

RJ45

RJ45

RJ45

RJ45

RJ45

RJ45

RJ45

RJ45

RJ45

RJ45

Pin 1 1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

T-568B T-568A

1

blu

e

blu

e-w

hite

bro

wn

Ĭ ÒŊŌMÕ Pin Color To M504 Terminal

D+ 4 blue 1

D‐ 5 blue‐white 2

GND 8 brown 3

T‐568B

Ĭ ÒŊŌMÕ Pin Color To M504 Terminal

D+ 4 blue 1

D‐ 5 blue‐white 2

GND 8 brown 3

T‐568A

1

......

Use blue (D+), blue-white (D-) andbrown (GND) for both T-568A and T-568Btype cable

Ethernet

Ethernet Ethernet

Modbus Terminator, plug it in to the last inverter in the network

2Refer to Modbus Communication Setup to setupcommunication settings for each inverter

2

Signal

Signal

ENG/DRAWISSUED

3575 14th Avenue Unit #7Markham, ON L3R 0H6, Canada905.470.8400 cachelan.com

REV

FILE

REV DATE PROJECT

SMART GRID ENERGY