Cox-Bazar District – Moheshkhali
-
Upload
cdmp-bangladesh -
Category
Documents
-
view
22 -
download
5
description
Transcript of Cox-Bazar District – Moheshkhali
District wise Scheme Summary District Upazilla Union Scheme Code
Project Title/Details
Budget Beneficiaries
Cox’ Bazar Moheshkhali Saplapur
CBZ 0613004 Maintenance of Saplapur Cyclone shelter cum High School.
1,272,550 1,800
Pre condition of the Saplapur Cyclone shelter
Damage condition of RCC Drop wall Damage condition of Drop wall & outer wall
Pre condition of the Saplapur Cyclone shelter
Condition of the Roof, in side of the Stair case wall.
Major Hazards and Impact of Saplapur Union.
Hazard
Flood, flash flood, Cyclone and Tidal surge:
People do not have easy access to cyclone shelter and hygienic sanitation facilities.
Impact:
Raised intervention shall ensure safe access to shelter during flood, Flash Flood, Cyclone and Tidal surge events.
Rational for the Maintenance of Cyclone shelter
This is the Existing Cyclone shelter which was constructed by the Gono Sashtha Kendra in 1991 after the devastating Super Cyclone.
After construction no maintenance have been done by any GO and NGO authority.
Presently condition of the shelter is not good enough. Mainly toilet is un useable, some door, window, plaster, drop wall, lime-tressing, floor, color is found damaged.
No water supply system is exist in the shelter.
If any initiative for maintenance is not taken for this shelter immediately then with in short time this structure will be totally un useable.