Course Title
Speakercredentials
Date
1st BEAM Plus New Buildings (NB) Training and Examination
Materials Aspects (MA) for New Buildings
Ms Yvonne IeongGreen Building Faculty
Deputy Panel Chair of Material Aspects, Technical Review Committee, BEAM Society Limited
31 March 2017
BEAM Plus Materials Aspects
Principal Aims :
1. Promote Sustainable Use of Natural ResourcesTo use natural, sustainable, rapidly renewable material; to save natural
resources including using recycled content material and reused material to
achieve low environmental impacts, protect ozone layer & minimize
greenhouse gas.
2. Efficiency Use of MaterialsTo re-use of building elements, flexibility in design, off-site fabrication of
major building components, allows for deconstruction, and improves
durability and longevity of buildings.
3. Waste• Minimize waste generation.
• Encourage waste recycling.
• Conserve land filling space.
Greenhouse Effect
Source: http://climatechange.lta.org/get-started/learn/co2-methane-greenhouse-effect/
Deforestation
Rapid Urbanization
Use of Fossil Oil
Source: http://climate.nasa.gov/solutions/adaptation-mitigation/
http://m.phys.org/news/2013-09-poland-anchors-energy-strategy-coal.html
http://www.borgenmagazine.com/deforestation-new-threat-global-food-security/
Last viewed : 28/6/2016
Greenhouse Effect—Human activities
Decrease CO2 Sequestration
Release CO2
Ozone Depletion
Images source: http://climate.nasa.gov/news/2391/http://research.noaa.gov/News/NewsArchive/LatestNews/TabId/684/artmid/1768/articleid/10871/Antarctic-ozone-hole-similar-to-last-year.aspx lLast view: 24 May 2016
Wild Fire
Images source: http://news.berkeley.edu/2015/04/15/california-carbon/http://www.climate-change-guide.com/floods-and-climate-change.html#gallery[pageGallery]/8/Last view: 28/6/2016
Materials Aspects (MA)
BEAM PLUS FOR NEW
BUILDINGS
BEAM PLUS FOR
EXISTING BUILDINGS
(Comprehensive Scheme)
BEAM PLUS
INTERIORS
9
Manual SA MA EU WU IEQ
New Buildings 25 % 8 % 35 % 12 % 20 %
Weights of Different Aspects
* MA is not a prerequisite item to obtain BEAM Plus grading at BEAM plus NBv.1.2
NB Ma P1 Timber Used for Temporary Works
Objective: Encourage the well-managed use of timber.
Requirement: 100% fulfillment.
1. It is required no virgin forest products are used for temporary works during
construction. Wood products from well-managed or sustainable sources are
acceptable.
2. REUSE Timber is also acceptable.
Documentation and Photographic evidence demonstrating that:
1. NO virgin forest products were being used for temporary works,
2. The source of reuse material.
Exclusion: None
Remarks: BEAM Circular Letter: 2011.105
Sustainable timber shall be certified by Forest Stewardship Council (FSC), the American
Forest and Paper Association (AFPA) or “Known Licensed Sources”. (ArchSD General
Specification)
BEAM Plus NB Ma P1 Prerequisite
BEAM Plus NB Ma P1 Prerequisite
Temporary Works including formwork, hoardings, walkways, etc.
NB Ma P1 Timber Used for Temporary Works
Source: http://www.cityu.edu.hk/CIVCAL/production/traditional/http://www.performancepanels.com/concrete-form-panelsLast view: 28 June 2016
NB Ma P2 Use of Non-CFC Based Refrigerants
Objective:
Reduce the release of chlorofluorocarbon (CFC) into the atmosphere.
Requirement:
It is required that no chlorofluorocarbon (CFC)-based refrigerants is used in HVAC&R
systems.
Exclusion:
None
BEAM Plus NB Ma P2 Prerequisite
.
Remarks:
The Client shall submit a report by a suitably qualified person giving
details of the HVAC&R system installed and demonstrating that no
chlorofluorocarbon (CFC)-based refrigerants are being used in the
HVAC&R systems.
• Man-made chemicals such
as chlorofluorocarbans
(CFC) have huge affect
on Ozone depletion.
Image source:
http://www.policyalmanac.org/environment/archive/ozone.shtml
(Last Viewed 12 June 2016)
NB Ma P2 Use of Non-CFC Based Refrigerants
BEAM Plus NB Ma P2 Prerequisite
Requirement:
It is required to implement with proof of documentation a waste management system providing for
the sorting, recycling and proper disposal of inert and non-inert construction / demolition materials.
NB Ma P3 Construction and Demolition Waste Management Plan
Objective:
Encourage best practices in the management of construction and demolition wastes,
including sorting, recycling and disposal of construction waste.
BEAM Plus NB Ma P3 Prerequisite
Remarks:
If the demolition works were not conducted by the project proponent AND it was completed before 01
April 2010, the BEAM assessor can consider to exclude all the demolition related credit in the BEAM
Plus assessment. However, relevant document shall be submitted to provide the completion date of the
demolition.
Development Bureau Technical Circular: 6/2010-Trip Ticket System for Disposal of Construction and
Demolition Materials
http://www.devb.gov.hk/filemanager/technicalcirculars/en/upload/308/1/C-2010-06-01.pdf
Construction waste constitutes around
40% of the total waste
The EPD predict all Hong Kong’s landfills will be full in 6-10 years
Information source: http://www.epd.gov.hk/epd/misc/cdm/info/dry%20run%20presentation%20revised.pdf,
http://www.epd.gov.hk/epd/misc/ehk97/ch5/p61ph_c.gif (Last Viewed 24th April 2014)
BEAM Plus NB Ma P3 Prerequisite
NB Ma P3 Construction and Demolition Waste Management Plan
BEAM Plus NB Ma P3 Prerequisite
NB Ma P3 Construction and Demolition Waste Management Plan
Over 90% of construction waste are inert substances (惰性物料) and are known as
public fill. Public fill includes debris, rubble, earth and concrete which is suitable for
land reclamation and site formation. When properly sorted, materials such as
concrete and asphalt can be recycled for use in construction.
Information source:
http://www.epd.gov.hk/epd/misc/cdm/introd
uction.htm
(Last Viewed 12th June 2016)
Non-inert substances
(非惰性物料) in
construction waste
include bamboo,
timber, vegetation,
packaging waste and
other organic
materials.
Over 90% of construction waste are inert and are known as public fill.
Public fill includes debris, rubble, earth and concrete which is suitable for land
reclamation and site formation.
Public fill
Non-inert
waste The construction waste management
strategy of Environmental Protection Information source:
http://www.epd.gov.hk/epd/misc/cdm/introduction.htm, Environmental Protection Department (Last Viewed 24th April 2014)
BEAM Plus NB Ma P3 Prerequisite
NB Ma P3 Construction and Demolition Waste Management Plan
BEAM Plus NB Ma P3 Prerequisite
On Site Waste Sorting
NB Ma P3 Construction and Demolition Waste Management Plan
Source:https://www.archsd.gov.hk/archsd/html/report2014/en/project-quality-management.htmlLast view: 28/6/2016
BEAM Plus NB Ma P3 Prerequisite
NB Ma P3 Construction and Demolition Waste Management Plan
BEAM Plus NB Ma P3 Prerequisite
NB Ma P3 Construction and Demolition Waste Management Plan
1. Nim Wan 稔灣
2. Ta Kwu Ling 打鼓嶺
3. Tseung Kwan O 將軍澳
NENT- North East New Territories LandfillSENT- South East New Territories LandfillWENT- West New Territories Landfill
Image source:
http://www.epd.gov.hk/epd/misc/cdm/management_intro.htm, Environmental Protection Department
(Last Viewed 24th April 2014)
Requirement:
Provision of facilities for the collection, sorting, storage and disposal of waste and recovered
materials.
Min. 1.5M x 1.5M RS&MRR (Refuse Storage & Material Recovery Room) at each domestic
building or the domestic part of a composite building on a site of an area of 500 m2 or above.
NB Ma P4 Waste Recycling Facilities
Objective:
Reduce pressure on landfill sites and help to preserve non-renewable resources by promoting
recycling of waste materials.
BEAM Plus NB Ma P4 Prerequisite
Exclusion:
One single family domestic building with not more than 3 floors or domestic part of a composite
building for one single family with not more than 3 floors.
Remarks: (BEAM Circular Letter No: 2014.124)
for a domestic building or composite building on a site of an area of not more than 500 m2, the
provision of refuse storage and material recovery room on every floor of domestic building shall be
exempted in BEAM Plus Assessment.
As an indication the space requirements for commercial building, industrial building and a building
constructed or adapted for use principally as a church, a school, a carpark or similar buildings, are
2 m2 per 1,000 m2 of usable floor space.
BEAM Plus NB Ma P4 Prerequisite
NB Ma P4 Waste Recycling Facilities
Source:http://www.epd.gov.hk/epd/SSDW/2008/eng/ch05.htmlhttp://www.epd.gov.hk/epd/english/environmentinhk/waste/prob_solutions/guidebook2006/ENG-Ch03-1.htmhttp://www.susdev.org.hk/susdevorg/archive2009/en/irdoc/irdoc_4.html
Requirement:
1 credit for the reuse of 30% or more of existing sub-structure and superstructure
(by mass or volume)
2 credits for 60% and more.
1 BONUS credit for 90% and more.
Remarks: BEAM Circular 2014.117
Major Elements of Sub-structure and superstructure.
NB Ma 1 Building Reuse 2 + 1 Bonus credit
Objective:
Encourage the reuse of major elements of existing buildings, to reduce demolition waste,
conserve resources and reduce environmental impacts during construction.
Exclusions:
Buildings on reclaimed land or greenfield sites.
BEAM Plus NB Ma 1
Reusing Building Structure
The Legislative Council
building, Central, Hong Kong
2015
Wai Yip Street, Kung Tong 2016
From Industrial to office
Source:https://en.wikipedia.org/wiki/Court_of_Final_Appeal_Buildinghttp://www.archdaily.com/788814/133-wai-yip-street-mvrdvLast view: 28/6/2016
Reusing Building Structure
Tea Ware Museum, Central, Hong Kong.
Completed in 1846, the Flagstaff House
was originally the home of the
commander-in-chief of the British Forces.
It was converted into a museum in 1984.
Sai Ying Pun Community Complex, Rehabilitation of the old mental hospital, Hong Kong.
The original arcade façade was built in 1897, and the new building addition was completed in 2001.
Source: http://www.amo.gov.hk/form/HIA_Report_Cotton%20Tree_%20Drive_%20FWPS.pdfhttp://www.amo.gov.hk/en/trails_west1.php?tid=20
Requirement:
1 credit for demonstrating the application of modular and standardised design should
over 50% of the major elements and modules.
NB Ma 2 Modular and Standardised Design – 1 credit
Objective:
Encourage increased use of modular and standardised components in building
design in order to enhance buildability and reduce waste.
Exclusions:
None.
BEAM Plus NB Ma 2
Structural elements:
Structural beams system
Concrete slab
Concrete flooring
Facade elements:
External wall
Bay-window unit
Cladding unit
Utility platform
Architectural/Internal
building elements:
Internal partition/wall panels
Door sets
Staircases
Building services elements:
Fire services
Sanitary fittings
Luminaires
Air-Conditioning components
Modular and Standardised Components
BEAM Plus NB Ma 2
External WallFaçade Units Source:
http://decor.966v.com/pic/29284-41960.html
http://www.gammonconstruction.com/tc/html/projects/projects-
31ba7a9d6e6047a78e070cce1a240431.html
Doorsets AC Units
Information and image source: http://www.hartandcooley.com/products/rzmcdst/rezzin-modular-core-diffuser,
http://www.sabmagazine.com/blog/2011/05/24/modular-exterior-cladding-systems/ and http://www.homedesignfind.com/green/elegant-and-economical-solar-
cladding-from-germany/ (Last Viewed 24th April 2014)
NB Ma 2 Modular and Standardised Design – 1 credit
BEAM Plus NB Ma 2
Standardisation is the use
of components, methods or
processes in which there is
regularity and repetition.
Efficiency is brought to the
construction industry
through standardised
components.
BEAM Plus NB Ma 2
NB Ma 2 Modular and Standardised Design – 1 credit
Source:http://www.marineinsight.com/marine-safety/sprinkler-system-automatic-fire-detection-alarm-and-extinguishing-system-on-ship/http://www.totousa.com/; http://www.westgeneral.com/ceiling/squareline.html; http://www.cp-lighting.co.uk/Lamps/LED-GLS last view: 28/6/2016
Requirement:
1 credit when the manufacture of 20% of prefabricated building elements, which listed in
corresponding submission template has been off-site.
2 credits when the prefabricated building element is 40% or above.
NB Ma 3 Prefabrication – 2 credits
Objective:
Encourage prefabrication building elements in order to reduce wastage of materials and
quantities of on-site waste.
Remarks:
The manufacturing plant shall be located within 800km from the site.
Exclusions:
None.
BEAM Plus NB Ma 3
Image source: http://www.housingauthority.gov.hk/en/about-us/publications-and-statistics/housing-dimensions/article/20120106/infocus.html
(Last Viewed 24th April 2014)
In Hong Kong, Prefab construction is commonly used for
Public Housing
NB Ma 3 Prefabrication – 2 credits
BEAM Plus NB Ma 3
Major precast components used in housing projects in Hong Kong
Precast Facade Semi-precast slab Precast Staircases
Precast Bathroom Precast Kitchen Precast Structural Unit
Image source: (Top left ) https://www.housingauthority.gov.hk/en/business-partnerships/resources/prefabrication-in-housing-blocks/precast-facades/index.html
(Top middle) https://www.housingauthority.gov.hk/en/business-partnerships/resources/prefabrication-in-housing-blocks/semi-precast-slabs-optional/index.html
(Top right ) https://www.housingauthority.gov.hk/en/business-partnerships/resources/prefabrication-in-housing-blocks/precast-staircases/index.html
(Bottom left ) http://www.hkengineer.org.hk/program/articlephoto/cs_aug05_3.jpg
(Bottom middle) http://www.zn903.com/cecspoon/lwbt/Case_Studies/Tseung_Kwan_O_73A/Tseung_Kwan_O_73A.htm
(Bottom right ) http://c1038.r38.cf3.rackcdn.com/group1/building3981/media/190.jpg
Requirement:
1 credit for designs providing spatial flexibility that can adapt spaces for different use, and allows for
expansion to permit additional spatial requirements to be accommodated.
1 credit for flexible design of services that can adapt to change of layout and use.
1 credit for designs providing flexibility through the choice of building structural system that allows for
change in future use, and which is coordinated with interior planning modules.
NB Ma 4 Adaptability and Deconstruction – 3 credits
Objective:
Encourage the design of building interior elements and building services components that allow
modifications to space layout, and to reduce waste during churning, refurbishment and deconstruction.
Remarks:
At least, 50% for residential development and 70% for other building types, of the items listed in each
corresponding submission template should be achieved.
Sub-items shall be considered in the whole-building where applicable.
Exclusions:
None.
BEAM Plus NB Ma 4
BEAM Plus NB Ma 4
NB Ma 4 Adaptability and Deconstruction – 3 credits
Template
BEAM Plus NB Ma 4
NB Ma 4 Adaptability and Deconstruction – 3 credits
Template
BEAM Plus NB Ma 4
NB Ma 4 Adaptability and Deconstruction – 3 credits
Template
BEAM Plus NB Ma 4
Image source: (left ) http://assets.jaicrest.com.au/images/accessories/image001.jpg
(right ) http://assets.jaicrest.com.au/images/accessories/image002.jpg
(Last Viewed 29th June 2016)
Flexible Conduit
Requirement:
1 credit for demonstrating 2.5% of all building materials/products used in the project is
rapidly renewable materials.
2 credits where 5% of all building materials/products used in the project is rapidly
renewable materials.
NB Ma 5 Rapidly Renewable Materials – 2 credits
Objective:
Most building materials necessitate the consumption of large amounts of natural resources.
Rapidly renewable materials are materials that substantially replenish themselves faster than
traditional extraction demands. (i.e., planted and harvested in less than a 10 year cycle)
Rapidly renewable materials include, but are not limited to, bamboo, linoleum, cork, fast-
growing poplar, pine and products such as wheat straw cabinetry. require fewer inputs, have
reduced environmental impacts.
Remarks:
The unit shall be mass/volume/dollar value.
Definition:
Rapidly Renewable Materials--planted and harvested in less than a 10 year cycle.
BEAM Plus NB Ma 5
Bamboo
Extremely rapid growth
Up to 0.6 metre growth per day without
need for fertilizers pesticides or much water
A bamboo grove can release around
35 percent more oxygen into the air than a
similar-sized stand of trees.
BEAM Plus NB Ma 5
NB Ma 5 Rapidly Renewable Materials – 2 credits
Image source: http://www.yoyowall.com/wallpaper/bamboo-forest.html
(Last Viewed 29th June 2016)
BEAM Plus NB Ma 5
NB Ma 5 Rapidly Renewable Materials – 2 credits
Image credit : YI
Requirement:
At least 50% of all timber and composite timber products used in the project are from
sustainable source/recycled timber.
NB Ma 6 Sustainable Forest Products – 1 credit
Objective:
Encourage the use of timber from well-managed forests.
Remarks:
The unit shall be mass/volume/dollar value.
Sustainable timber shall be certified by Forest Stewardship Council (FSC), the American
Forest and Paper Association (AFPA) or “Known Licensed Sources”.
Exclusions:
None.
BEAM Plus NB Ma 6
BEAM Plus NB Ma 6
NB Ma 6 Sustainable Forest Products – 1 credit
Image source:
(Top) http://www.homefrenzy.com/wp-content/uploads/2013/06/Pedrali-FSC-Logo.jpg
(bottom) http://www.gonpta.com/resource/resmgr/images/partner_afpa.jpg
Forest Stewardship Council (FSC)
- an international membership association, governed by its members.
- members may be organizational:
(i) representing their institution or organization; or
(ii) individual
BEAM Plus NB Ma 6
NB Ma 6 Sustainable Forest Products – 1 credit
Forest Stewardship Council (FSC)
Types of FSC Certificates:
(i) Forest Management Certification
(ii) Chain of Custody Certification
(iii)Controlled Wood
(iv)Special options for small, low intensity and community forest
operations
BEAM Plus NB Ma 6
NB Ma 6 Sustainable Forest Products – 1 credit
BEAM Plus NB Ma 6
NB Ma 6 Sustainable Forest Products – 1 credit
Requirement:
1 credit for use of recycled materials contributing to at least 10% of all materials used in site exterior
surfacing work, structures and features.
1 credit where at least 10% of all building materials used for façade and structural components are
recycled materials.
1 credit where at least 10% of all building materials used for interior non-structural components are
recycled materials.
NB Ma 7 Recycled Materials – 3 credits
Objective:
Promote use of recycled materials in order to reduce the consumption of virgin resources.
Remarks:
Materials which normally consist of recycled content will not be considered for this credit, for instance,
steel and glass.
Exclusions:
None.
BEAM Plus NB Ma 7
Examples of field application of Eco-Blocks
BEAM Plus NB Ma 7
NB Ma 7 Recycled Materials – 3 credits
Image source:
https://www.housingauthority.gov.hk/hdw/content/static/file/en/aboutus/events/qualityhousing/seminar/11PolyUProfCSPoon.pdf (p.10)
Requirement:
a. Refrigerants—1 Credit
a.1. using refrigerants with a value less than or equal to the threshold of the combined
contribution to ozone depletion Potentials and global warming potentials.
LCGWP + LCODP x 105 ≤ 775
a.2 For systems with different types of equipment, a weighted average of all air-conditioning
and refrigeration equipments shall be calculated using the following equation:
[ ∑ (LCGWP + LCODP X 105 ) x Qunit ] / Qtotal ≤ 775
b. Ozone depleting materials---1 Credit
All major thermal insulation and fire retardant materials specified in roof constructions, walls,
chilled water pipes, refrigerant pipes, ductwork, etc. that avoid the use of ozone depleting
substances in their manufacture, composition or use. Credit will be awarded where
demonstration of reasonable effort has been made to avoid the use of products that have
significant ozone depletion potential.
NB Ma 8 Ozone Depleting Substances – 2 credits Objective:
Reduce the release of chlorofluorocarbons (CFC) and hydro-chlorofluorocarbons into the
atmosphere.
BEAM Plus NB Ma 8
BEAM Plus NB Ma 8
NB Ma 8 Ozone Depleting Substances – 2 credits
• Remarks:
• Exclusion: small air-conditioning unit, other equipment such as standard refrigerators,
small water cooler and any other cooling equipment, that containing less than 0.23kg
of refrigerant.
Ozone Depleting Potential (ODP)
Ozone Depleting Potential (ODP) is the ratio of calculated ozone column change for each
mass unit of a gas emitted into the atmosphere relative to the calculated depletion for the
reference gas CFC 11 (ODP = 1.0). This allows different chemicals to be compared using a
common unit (CFC 11-equivalents). For example, Halon 2402(ODP = 6) is six times more
detrimental to the stratospheric ozone layer than CFC 11.
Source: http://scorecard.goodguide.com/chemical-profiles/def/odp.html
Global warming potential (GWP)
is a relative measure of how much heat a greenhouse gas traps in the atmosphere. It
compares the amount of heat trapped by a certain mass of the gas in question to the amount
of heat trapped by a similar mass of carbon dioxide. A GWP is calculated over a specific
time interval, commonly 20, 100 or 500 years. GWP is expressed as a factor of Carbon
Dioxide ( GWP is standardized to 1).
Source: https://en.wikipedia.org/wiki/Global_warming_potential
BEAM Plus NB Ma 8
NB Ma 8 Ozone Depleting Substances – 2 credits
Requirement:
1 credit for use of raw material (Constituents) and materials manufactured & locally within
800km from the site, which contribute to at least 10% of all building materials used in the
project.
2 credits for use of raw material (Constituents) and materials manufactured locally within
800km from the site, which contribute to at least 20% of all building materials used in the
project.
NB Ma 9 Regionally Manufactured Materials – 2 credits
Objective:
Encourage the use of materials manufactured locally so as to reduce the environmental
impacts arising from transportation.
Remarks:
Plumbing products, reused and salvage materials such as furniture may be included in the calculation,
but mechanical and electrical system components shall not be included.
BEAM Circular No. 2013.113
Exclusions:
None.
BEAM Plus NB Ma 9
52
BEAM Plus NB Ma 9
Image source: http://map.google.com
(Last Viewed 2010)
Requirement:
1 credit for demonstrating that at least 30% of demolition waste is recycled.
2 credits for demonstrating that at least 60%.
NB Ma 10 Demolition Waste Reduction – 2 credits Exclusion: Project where demolition is not required or is not under the Client’s
control.
Remarks:
Disposal of inert waste to public fill will NOT be considered. However, if there are
evidence that those waste to public fill was recycled, it can also be counted.
If the demolition works were not conducted by the project proponent AND it was
completed before 01 April 2010, the BEAM assessor can consider to exclude all the
demolition related credit in the BEAM Plus assessment. However, relevant document
shall be submitted to provide the completion date of the demolition.
For MA P3 - Supporting document for waste management in demolition stage should
be provided as evident
Objective: Encourage best practices in the management of waste, including sorting,
recycling and disposal of demolition waste.
BEAM Plus NB Ma 10
Requirement:
1. credit for demonstrating that at least 30% of construction waste is recycled.
2. credits for demonstrating that at least 60%.
NB Ma 11 Construction Waste Reduction – 2 credits
Remark:
The excavated waste will NOT be considered as construction waste.
The disposal of inert waste to public fill will NOT be considered also.
However, if there are evidence that wastes to public fill was recycled, it can also be counted.
Objective:
Encourage best practices in the management of waste, including sorting, recycling and
disposal of construction waste.
Exclusions:
None.
BEAM Plus NB Ma 11
Definition from Environmental
Protection Department
"Construction waste" means any
substance, matter or thing which is
generated as a result of construction
work and abandoned whether or not it
has been processed or stockpiled before
being abandoned, but does not include
any sludge , screenings or matter
removed in or generated from any
desludging, desilting or dredging
works.
Source: http://www.epd.gov.hk/epd/misc/cdm/introduction.htm, Environmental Protection Department
Images source: (top) https://www.recyclenow.com/sites/files/recyclenow/styles/custom_main/public/images/main/rubble.jpg?itok=lxKTPNMU
(bottom) http://www.epd.gov.hk/epd/sites/default/files/epd/english/environmentinhk/waste/images/wastemain_growing.jpg
NB Ma 11 Construction Waste Reduction – 2 credits
BEAM Plus NB Ma 11
BEAM Plus NB Ma 11
NB Ma 11 Construction Waste Reduction – 2 credits
BEAM Plus NB Ma 11
NB Ma 11 Construction Waste Reduction – 2 credits
Key Words
Supplementary Information
Materials Aspects (MA) 用材 (MA)1 Construction Waste 建築廢物
2 Waste Minimization 減廢 / 廢物減量
3 Waste Recycling 廢物回收 / 廢物循環再造
4 Ozone Depletion 臭氧層耗蝕 / 臭氧層損耗
5 Waste Management Plan 廢物管理計劃
6 Prefabrication 預製
7 Modular Design 模組化設計
8 Sustainable Timber 可持續木材
9 CFC 氟氯化碳
10 Structural Adaptability 結構可適應性
11 Global Warming Potential (GWP) 全球升溫潛能值
12 Ozone Depletion Potential (ODP) 臭氧破壞潛能值
1/F Jockey Club Environmental Building,
77 Tat Chee Road, Kowloon, Hong Kong
香港九龍塘達之路77號賽馬會環保樓1樓
T +852 3610 5700
F +852 3996 9108
www.beamsociety.org.hk