Course Title Speaker credentials Date 1st BEAM Plus New Buildings (NB) Training and Examination Materials Aspects (MA) for New Buildings Ms Yvonne Ieong Green Building Faculty Deputy Panel Chair of Material Aspects, Technical Review Committee, BEAM Society Limited 31 March 2017

Transcript of Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External...

Page 1: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Course Title

Speakercredentials

Date

1st BEAM Plus New Buildings (NB) Training and Examination

Materials Aspects (MA) for New Buildings

Ms Yvonne IeongGreen Building Faculty

Deputy Panel Chair of Material Aspects, Technical Review Committee, BEAM Society Limited

31 March 2017

Page 2: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus Materials Aspects

Principal Aims :

1. Promote Sustainable Use of Natural ResourcesTo use natural, sustainable, rapidly renewable material; to save natural

resources including using recycled content material and reused material to

achieve low environmental impacts, protect ozone layer & minimize

greenhouse gas.

2. Efficiency Use of MaterialsTo re-use of building elements, flexibility in design, off-site fabrication of

major building components, allows for deconstruction, and improves

durability and longevity of buildings.

3. Waste• Minimize waste generation.

• Encourage waste recycling.

• Conserve land filling space.

Page 3: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Greenhouse Effect

Source: http://climatechange.lta.org/get-started/learn/co2-methane-greenhouse-effect/

Page 4: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Deforestation

Rapid Urbanization

Use of Fossil Oil

Source: http://climate.nasa.gov/solutions/adaptation-mitigation/

http://m.phys.org/news/2013-09-poland-anchors-energy-strategy-coal.html

http://www.borgenmagazine.com/deforestation-new-threat-global-food-security/

Last viewed : 28/6/2016

Greenhouse Effect—Human activities

Decrease CO2 Sequestration

Release CO2

Page 5: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Ozone Depletion

Images source: http://climate.nasa.gov/news/2391/http://research.noaa.gov/News/NewsArchive/LatestNews/TabId/684/artmid/1768/articleid/10871/Antarctic-ozone-hole-similar-to-last-year.aspx lLast view: 24 May 2016

Page 6: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Wild Fire

Images source: http://news.berkeley.edu/2015/04/15/california-carbon/http://www.climate-change-guide.com/floods-and-climate-change.html#gallery[pageGallery]/8/Last view: 28/6/2016

Page 7: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building
Page 8: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Materials Aspects (MA)

BEAM PLUS FOR NEW

BUILDINGS

BEAM PLUS FOR

EXISTING BUILDINGS

(Comprehensive Scheme)

BEAM PLUS

INTERIORS

Page 9: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

9

Manual SA MA EU WU IEQ

New Buildings 25 % 8 % 35 % 12 % 20 %

Weights of Different Aspects

* MA is not a prerequisite item to obtain BEAM Plus grading at BEAM plus NBv.1.2

Page 10: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

NB Ma P1 Timber Used for Temporary Works

Objective: Encourage the well-managed use of timber.

Requirement: 100% fulfillment.

1. It is required no virgin forest products are used for temporary works during

construction. Wood products from well-managed or sustainable sources are

acceptable.

2. REUSE Timber is also acceptable.

Documentation and Photographic evidence demonstrating that:

1. NO virgin forest products were being used for temporary works,

2. The source of reuse material.

Exclusion: None

Remarks: BEAM Circular Letter: 2011.105

Sustainable timber shall be certified by Forest Stewardship Council (FSC), the American

Forest and Paper Association (AFPA) or “Known Licensed Sources”. (ArchSD General

Specification)

BEAM Plus NB Ma P1 Prerequisite

Page 11: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma P1 Prerequisite

Temporary Works including formwork, hoardings, walkways, etc.

NB Ma P1 Timber Used for Temporary Works

Source: http://www.cityu.edu.hk/CIVCAL/production/traditional/http://www.performancepanels.com/concrete-form-panelsLast view: 28 June 2016

Page 12: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

NB Ma P2 Use of Non-CFC Based Refrigerants

Objective:

Reduce the release of chlorofluorocarbon (CFC) into the atmosphere.

Requirement:

It is required that no chlorofluorocarbon (CFC)-based refrigerants is used in HVAC&R

systems.

Exclusion:

None

BEAM Plus NB Ma P2 Prerequisite

.

Remarks:

The Client shall submit a report by a suitably qualified person giving

details of the HVAC&R system installed and demonstrating that no

chlorofluorocarbon (CFC)-based refrigerants are being used in the

HVAC&R systems.

Page 13: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

• Man-made chemicals such

as chlorofluorocarbans

(CFC) have huge affect

on Ozone depletion.

Image source:

http://www.policyalmanac.org/environment/archive/ozone.shtml

(Last Viewed 12 June 2016)

NB Ma P2 Use of Non-CFC Based Refrigerants

BEAM Plus NB Ma P2 Prerequisite

Page 14: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

It is required to implement with proof of documentation a waste management system providing for

the sorting, recycling and proper disposal of inert and non-inert construction / demolition materials.

NB Ma P3 Construction and Demolition Waste Management Plan

Objective:

Encourage best practices in the management of construction and demolition wastes,

including sorting, recycling and disposal of construction waste.

BEAM Plus NB Ma P3 Prerequisite

Remarks:

If the demolition works were not conducted by the project proponent AND it was completed before 01

April 2010, the BEAM assessor can consider to exclude all the demolition related credit in the BEAM

Plus assessment. However, relevant document shall be submitted to provide the completion date of the

demolition.

Development Bureau Technical Circular: 6/2010-Trip Ticket System for Disposal of Construction and

Demolition Materials

http://www.devb.gov.hk/filemanager/technicalcirculars/en/upload/308/1/C-2010-06-01.pdf

Page 15: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Construction waste constitutes around

40% of the total waste

The EPD predict all Hong Kong’s landfills will be full in 6-10 years

Information source: http://www.epd.gov.hk/epd/misc/cdm/info/dry%20run%20presentation%20revised.pdf,

http://www.epd.gov.hk/epd/misc/ehk97/ch5/p61ph_c.gif (Last Viewed 24th April 2014)

BEAM Plus NB Ma P3 Prerequisite

NB Ma P3 Construction and Demolition Waste Management Plan

Page 16: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma P3 Prerequisite

NB Ma P3 Construction and Demolition Waste Management Plan

Over 90% of construction waste are inert substances (惰性物料) and are known as

public fill. Public fill includes debris, rubble, earth and concrete which is suitable for

land reclamation and site formation. When properly sorted, materials such as

concrete and asphalt can be recycled for use in construction.

Information source:

http://www.epd.gov.hk/epd/misc/cdm/introd

uction.htm

(Last Viewed 12th June 2016)

Non-inert substances

(非惰性物料) in

construction waste

include bamboo,

timber, vegetation,

packaging waste and

other organic

materials.

Page 17: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Over 90% of construction waste are inert and are known as public fill.

Public fill includes debris, rubble, earth and concrete which is suitable for land

reclamation and site formation.

Public fill

Non-inert

waste The construction waste management

strategy of Environmental Protection Information source:

http://www.epd.gov.hk/epd/misc/cdm/introduction.htm, Environmental Protection Department (Last Viewed 24th April 2014)

BEAM Plus NB Ma P3 Prerequisite

NB Ma P3 Construction and Demolition Waste Management Plan

Page 18: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma P3 Prerequisite

On Site Waste Sorting

NB Ma P3 Construction and Demolition Waste Management Plan

Source:https://www.archsd.gov.hk/archsd/html/report2014/en/project-quality-management.htmlLast view: 28/6/2016

Page 19: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma P3 Prerequisite

NB Ma P3 Construction and Demolition Waste Management Plan

Page 20: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma P3 Prerequisite

NB Ma P3 Construction and Demolition Waste Management Plan

1. Nim Wan 稔灣

2. Ta Kwu Ling 打鼓嶺

3. Tseung Kwan O 將軍澳

NENT- North East New Territories LandfillSENT- South East New Territories LandfillWENT- West New Territories Landfill

Image source:

http://www.epd.gov.hk/epd/misc/cdm/management_intro.htm, Environmental Protection Department

(Last Viewed 24th April 2014)

Page 21: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

Provision of facilities for the collection, sorting, storage and disposal of waste and recovered

materials.

Min. 1.5M x 1.5M RS&MRR (Refuse Storage & Material Recovery Room) at each domestic

building or the domestic part of a composite building on a site of an area of 500 m2 or above.

NB Ma P4 Waste Recycling Facilities

Objective:

Reduce pressure on landfill sites and help to preserve non-renewable resources by promoting

recycling of waste materials.

BEAM Plus NB Ma P4 Prerequisite

Exclusion:

One single family domestic building with not more than 3 floors or domestic part of a composite

building for one single family with not more than 3 floors.

Remarks: (BEAM Circular Letter No: 2014.124)

for a domestic building or composite building on a site of an area of not more than 500 m2, the

provision of refuse storage and material recovery room on every floor of domestic building shall be

exempted in BEAM Plus Assessment.

As an indication the space requirements for commercial building, industrial building and a building

constructed or adapted for use principally as a church, a school, a carpark or similar buildings, are

2 m2 per 1,000 m2 of usable floor space.

Page 22: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma P4 Prerequisite

NB Ma P4 Waste Recycling Facilities

Source:http://www.epd.gov.hk/epd/SSDW/2008/eng/ch05.htmlhttp://www.epd.gov.hk/epd/english/environmentinhk/waste/prob_solutions/guidebook2006/ENG-Ch03-1.htmhttp://www.susdev.org.hk/susdevorg/archive2009/en/irdoc/irdoc_4.html

Page 23: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

1 credit for the reuse of 30% or more of existing sub-structure and superstructure

(by mass or volume)

2 credits for 60% and more.

1 BONUS credit for 90% and more.

Remarks: BEAM Circular 2014.117

Major Elements of Sub-structure and superstructure.

NB Ma 1 Building Reuse 2 + 1 Bonus credit

Objective:

Encourage the reuse of major elements of existing buildings, to reduce demolition waste,

conserve resources and reduce environmental impacts during construction.

Exclusions:

Buildings on reclaimed land or greenfield sites.

BEAM Plus NB Ma 1

Page 24: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Reusing Building Structure

The Legislative Council

building, Central, Hong Kong

2015

Wai Yip Street, Kung Tong 2016

From Industrial to office

Source:https://en.wikipedia.org/wiki/Court_of_Final_Appeal_Buildinghttp://www.archdaily.com/788814/133-wai-yip-street-mvrdvLast view: 28/6/2016

Page 25: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Reusing Building Structure

Tea Ware Museum, Central, Hong Kong.

Completed in 1846, the Flagstaff House

was originally the home of the

commander-in-chief of the British Forces.

It was converted into a museum in 1984.

Sai Ying Pun Community Complex, Rehabilitation of the old mental hospital, Hong Kong.

The original arcade façade was built in 1897, and the new building addition was completed in 2001.

Source: http://www.amo.gov.hk/form/HIA_Report_Cotton%20Tree_%20Drive_%20FWPS.pdfhttp://www.amo.gov.hk/en/trails_west1.php?tid=20

Page 26: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

1 credit for demonstrating the application of modular and standardised design should

over 50% of the major elements and modules.

NB Ma 2 Modular and Standardised Design – 1 credit

Objective:

Encourage increased use of modular and standardised components in building

design in order to enhance buildability and reduce waste.

Exclusions:

None.

BEAM Plus NB Ma 2

Structural elements:

Structural beams system

Concrete slab

Concrete flooring

Facade elements:

External wall

Bay-window unit

Cladding unit

Utility platform

Architectural/Internal

building elements:

Internal partition/wall panels

Door sets

Staircases

Building services elements:

Fire services

Sanitary fittings

Luminaires

Air-Conditioning components

Modular and Standardised Components

Page 27: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma 2

External WallFaçade Units Source:

http://decor.966v.com/pic/29284-41960.html

http://www.gammonconstruction.com/tc/html/projects/projects-

31ba7a9d6e6047a78e070cce1a240431.html

Page 28: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Doorsets AC Units

Information and image source: http://www.hartandcooley.com/products/rzmcdst/rezzin-modular-core-diffuser,

http://www.sabmagazine.com/blog/2011/05/24/modular-exterior-cladding-systems/ and http://www.homedesignfind.com/green/elegant-and-economical-solar-

cladding-from-germany/ (Last Viewed 24th April 2014)

NB Ma 2 Modular and Standardised Design – 1 credit

BEAM Plus NB Ma 2

Page 29: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Standardisation is the use

of components, methods or

processes in which there is

regularity and repetition.

Efficiency is brought to the

construction industry

through standardised

components.

BEAM Plus NB Ma 2

NB Ma 2 Modular and Standardised Design – 1 credit

Source:http://www.marineinsight.com/marine-safety/sprinkler-system-automatic-fire-detection-alarm-and-extinguishing-system-on-ship/http://www.totousa.com/; http://www.westgeneral.com/ceiling/squareline.html; http://www.cp-lighting.co.uk/Lamps/LED-GLS last view: 28/6/2016

Page 30: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

1 credit when the manufacture of 20% of prefabricated building elements, which listed in

corresponding submission template has been off-site.

2 credits when the prefabricated building element is 40% or above.

NB Ma 3 Prefabrication – 2 credits

Objective:

Encourage prefabrication building elements in order to reduce wastage of materials and

quantities of on-site waste.

Remarks:

The manufacturing plant shall be located within 800km from the site.

Exclusions:

None.

BEAM Plus NB Ma 3

Page 31: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Image source: http://www.housingauthority.gov.hk/en/about-us/publications-and-statistics/housing-dimensions/article/20120106/infocus.html

(Last Viewed 24th April 2014)

In Hong Kong, Prefab construction is commonly used for

Public Housing

NB Ma 3 Prefabrication – 2 credits

BEAM Plus NB Ma 3

Page 32: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Major precast components used in housing projects in Hong Kong

Precast Facade Semi-precast slab Precast Staircases

Precast Bathroom Precast Kitchen Precast Structural Unit

Image source: (Top left ) https://www.housingauthority.gov.hk/en/business-partnerships/resources/prefabrication-in-housing-blocks/precast-facades/index.html

(Top middle) https://www.housingauthority.gov.hk/en/business-partnerships/resources/prefabrication-in-housing-blocks/semi-precast-slabs-optional/index.html

(Top right ) https://www.housingauthority.gov.hk/en/business-partnerships/resources/prefabrication-in-housing-blocks/precast-staircases/index.html

(Bottom left ) http://www.hkengineer.org.hk/program/articlephoto/cs_aug05_3.jpg

(Bottom middle) http://www.zn903.com/cecspoon/lwbt/Case_Studies/Tseung_Kwan_O_73A/Tseung_Kwan_O_73A.htm

(Bottom right ) http://c1038.r38.cf3.rackcdn.com/group1/building3981/media/190.jpg

Page 33: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

1 credit for designs providing spatial flexibility that can adapt spaces for different use, and allows for

expansion to permit additional spatial requirements to be accommodated.

1 credit for flexible design of services that can adapt to change of layout and use.

1 credit for designs providing flexibility through the choice of building structural system that allows for

change in future use, and which is coordinated with interior planning modules.

NB Ma 4 Adaptability and Deconstruction – 3 credits

Objective:

Encourage the design of building interior elements and building services components that allow

modifications to space layout, and to reduce waste during churning, refurbishment and deconstruction.

Remarks:

At least, 50% for residential development and 70% for other building types, of the items listed in each

corresponding submission template should be achieved.

Sub-items shall be considered in the whole-building where applicable.

Exclusions:

None.

BEAM Plus NB Ma 4

Page 34: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma 4

NB Ma 4 Adaptability and Deconstruction – 3 credits

Template

Page 35: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma 4

NB Ma 4 Adaptability and Deconstruction – 3 credits

Template

Page 36: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma 4

NB Ma 4 Adaptability and Deconstruction – 3 credits

Template

Page 37: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma 4

Image source: (left ) http://assets.jaicrest.com.au/images/accessories/image001.jpg

(right ) http://assets.jaicrest.com.au/images/accessories/image002.jpg

(Last Viewed 29th June 2016)

Flexible Conduit

Page 38: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

1 credit for demonstrating 2.5% of all building materials/products used in the project is

rapidly renewable materials.

2 credits where 5% of all building materials/products used in the project is rapidly

renewable materials.

NB Ma 5 Rapidly Renewable Materials – 2 credits

Objective:

Most building materials necessitate the consumption of large amounts of natural resources.

Rapidly renewable materials are materials that substantially replenish themselves faster than

traditional extraction demands. (i.e., planted and harvested in less than a 10 year cycle)

Rapidly renewable materials include, but are not limited to, bamboo, linoleum, cork, fast-

growing poplar, pine and products such as wheat straw cabinetry. require fewer inputs, have

reduced environmental impacts.

Remarks:

The unit shall be mass/volume/dollar value.

Definition:

Rapidly Renewable Materials--planted and harvested in less than a 10 year cycle.

BEAM Plus NB Ma 5

Page 39: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Bamboo

Extremely rapid growth

Up to 0.6 metre growth per day without

need for fertilizers pesticides or much water

A bamboo grove can release around

35 percent more oxygen into the air than a

similar-sized stand of trees.

BEAM Plus NB Ma 5

NB Ma 5 Rapidly Renewable Materials – 2 credits

Image source: http://www.yoyowall.com/wallpaper/bamboo-forest.html

(Last Viewed 29th June 2016)

Page 40: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma 5

NB Ma 5 Rapidly Renewable Materials – 2 credits

Image credit : YI

Page 41: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

At least 50% of all timber and composite timber products used in the project are from

sustainable source/recycled timber.

NB Ma 6 Sustainable Forest Products – 1 credit

Objective:

Encourage the use of timber from well-managed forests.

Remarks:

The unit shall be mass/volume/dollar value.

Sustainable timber shall be certified by Forest Stewardship Council (FSC), the American

Forest and Paper Association (AFPA) or “Known Licensed Sources”.

Exclusions:

None.

BEAM Plus NB Ma 6

Page 42: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma 6

NB Ma 6 Sustainable Forest Products – 1 credit

Image source:

(Top) http://www.homefrenzy.com/wp-content/uploads/2013/06/Pedrali-FSC-Logo.jpg

(bottom) http://www.gonpta.com/resource/resmgr/images/partner_afpa.jpg

Page 43: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Forest Stewardship Council (FSC)

- an international membership association, governed by its members.

- members may be organizational:

(i) representing their institution or organization; or

(ii) individual

BEAM Plus NB Ma 6

NB Ma 6 Sustainable Forest Products – 1 credit

Page 44: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Forest Stewardship Council (FSC)

Types of FSC Certificates:

(i) Forest Management Certification

(ii) Chain of Custody Certification

(iii)Controlled Wood

(iv)Special options for small, low intensity and community forest

operations

BEAM Plus NB Ma 6

NB Ma 6 Sustainable Forest Products – 1 credit

Page 45: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma 6

NB Ma 6 Sustainable Forest Products – 1 credit

Page 46: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

1 credit for use of recycled materials contributing to at least 10% of all materials used in site exterior

surfacing work, structures and features.

1 credit where at least 10% of all building materials used for façade and structural components are

recycled materials.

1 credit where at least 10% of all building materials used for interior non-structural components are

recycled materials.

NB Ma 7 Recycled Materials – 3 credits

Objective:

Promote use of recycled materials in order to reduce the consumption of virgin resources.

Remarks:

Materials which normally consist of recycled content will not be considered for this credit, for instance,

steel and glass.

Exclusions:

None.

BEAM Plus NB Ma 7

Page 47: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Examples of field application of Eco-Blocks

BEAM Plus NB Ma 7

NB Ma 7 Recycled Materials – 3 credits

Image source:

https://www.housingauthority.gov.hk/hdw/content/static/file/en/aboutus/events/qualityhousing/seminar/11PolyUProfCSPoon.pdf (p.10)

Page 48: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

a. Refrigerants—1 Credit

a.1. using refrigerants with a value less than or equal to the threshold of the combined

contribution to ozone depletion Potentials and global warming potentials.

LCGWP + LCODP x 105 ≤ 775

a.2 For systems with different types of equipment, a weighted average of all air-conditioning

and refrigeration equipments shall be calculated using the following equation:

[ ∑ (LCGWP + LCODP X 105 ) x Qunit ] / Qtotal ≤ 775

b. Ozone depleting materials---1 Credit

All major thermal insulation and fire retardant materials specified in roof constructions, walls,

chilled water pipes, refrigerant pipes, ductwork, etc. that avoid the use of ozone depleting

substances in their manufacture, composition or use. Credit will be awarded where

demonstration of reasonable effort has been made to avoid the use of products that have

significant ozone depletion potential.

NB Ma 8 Ozone Depleting Substances – 2 credits Objective:

Reduce the release of chlorofluorocarbons (CFC) and hydro-chlorofluorocarbons into the

atmosphere.

BEAM Plus NB Ma 8

Page 49: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma 8

NB Ma 8 Ozone Depleting Substances – 2 credits

• Remarks:

• Exclusion: small air-conditioning unit, other equipment such as standard refrigerators,

small water cooler and any other cooling equipment, that containing less than 0.23kg

of refrigerant.

Page 50: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Ozone Depleting Potential (ODP)

Ozone Depleting Potential (ODP) is the ratio of calculated ozone column change for each

mass unit of a gas emitted into the atmosphere relative to the calculated depletion for the

reference gas CFC 11 (ODP = 1.0). This allows different chemicals to be compared using a

common unit (CFC 11-equivalents). For example, Halon 2402(ODP = 6) is six times more

detrimental to the stratospheric ozone layer than CFC 11.

Source: http://scorecard.goodguide.com/chemical-profiles/def/odp.html

Global warming potential (GWP)

is a relative measure of how much heat a greenhouse gas traps in the atmosphere. It

compares the amount of heat trapped by a certain mass of the gas in question to the amount

of heat trapped by a similar mass of carbon dioxide. A GWP is calculated over a specific

time interval, commonly 20, 100 or 500 years. GWP is expressed as a factor of Carbon

Dioxide ( GWP is standardized to 1).

Source: https://en.wikipedia.org/wiki/Global_warming_potential

BEAM Plus NB Ma 8

NB Ma 8 Ozone Depleting Substances – 2 credits

Page 51: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

1 credit for use of raw material (Constituents) and materials manufactured & locally within

800km from the site, which contribute to at least 10% of all building materials used in the

project.

2 credits for use of raw material (Constituents) and materials manufactured locally within

800km from the site, which contribute to at least 20% of all building materials used in the

project.

NB Ma 9 Regionally Manufactured Materials – 2 credits

Objective:

Encourage the use of materials manufactured locally so as to reduce the environmental

impacts arising from transportation.

Remarks:

Plumbing products, reused and salvage materials such as furniture may be included in the calculation,

but mechanical and electrical system components shall not be included.

BEAM Circular No. 2013.113

Exclusions:

None.

BEAM Plus NB Ma 9

Page 52: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

52

BEAM Plus NB Ma 9

Image source: http://map.google.com

(Last Viewed 2010)

Page 53: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

1 credit for demonstrating that at least 30% of demolition waste is recycled.

2 credits for demonstrating that at least 60%.

NB Ma 10 Demolition Waste Reduction – 2 credits Exclusion: Project where demolition is not required or is not under the Client’s

control.

Remarks:

Disposal of inert waste to public fill will NOT be considered. However, if there are

evidence that those waste to public fill was recycled, it can also be counted.

If the demolition works were not conducted by the project proponent AND it was

completed before 01 April 2010, the BEAM assessor can consider to exclude all the

demolition related credit in the BEAM Plus assessment. However, relevant document

shall be submitted to provide the completion date of the demolition.

For MA P3 - Supporting document for waste management in demolition stage should

be provided as evident

Objective: Encourage best practices in the management of waste, including sorting,

recycling and disposal of demolition waste.

BEAM Plus NB Ma 10

Page 54: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Requirement:

1. credit for demonstrating that at least 30% of construction waste is recycled.

2. credits for demonstrating that at least 60%.

NB Ma 11 Construction Waste Reduction – 2 credits

Remark:

The excavated waste will NOT be considered as construction waste.

The disposal of inert waste to public fill will NOT be considered also.

However, if there are evidence that wastes to public fill was recycled, it can also be counted.

Objective:

Encourage best practices in the management of waste, including sorting, recycling and

disposal of construction waste.

Exclusions:

None.

BEAM Plus NB Ma 11

Page 55: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Definition from Environmental

Protection Department

"Construction waste" means any

substance, matter or thing which is

generated as a result of construction

work and abandoned whether or not it

has been processed or stockpiled before

being abandoned, but does not include

any sludge , screenings or matter

removed in or generated from any

desludging, desilting or dredging

works.

Source: http://www.epd.gov.hk/epd/misc/cdm/introduction.htm, Environmental Protection Department

Images source: (top) https://www.recyclenow.com/sites/files/recyclenow/styles/custom_main/public/images/main/rubble.jpg?itok=lxKTPNMU

(bottom) http://www.epd.gov.hk/epd/sites/default/files/epd/english/environmentinhk/waste/images/wastemain_growing.jpg

NB Ma 11 Construction Waste Reduction – 2 credits

BEAM Plus NB Ma 11

Page 56: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma 11

NB Ma 11 Construction Waste Reduction – 2 credits

Page 57: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

BEAM Plus NB Ma 11

NB Ma 11 Construction Waste Reduction – 2 credits

Page 58: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building

Key Words

Supplementary Information

Materials Aspects (MA) 用材 (MA)1 Construction Waste 建築廢物

2 Waste Minimization 減廢 / 廢物減量

3 Waste Recycling 廢物回收 / 廢物循環再造

4 Ozone Depletion 臭氧層耗蝕 / 臭氧層損耗

5 Waste Management Plan 廢物管理計劃

6 Prefabrication 預製

7 Modular Design 模組化設計

8 Sustainable Timber 可持續木材

9 CFC 氟氯化碳

10 Structural Adaptability 結構可適應性

11 Global Warming Potential (GWP) 全球升溫潛能值

12 Ozone Depletion Potential (ODP) 臭氧破壞潛能值

Page 59: Course Title - BEAMStructural beams system Concrete slab Concrete flooring Facade elements: External wall Bay-window unit Cladding unit Utility platform Architectural/Internal building