COUNTY OF LOS ANGELESfile.lacounty.gov/SDSInter/bos/bc/045483_PDT728.pdf · COUNTY OF LOS ANGELES...

59
COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS “To Enrich Lives Through Effective and Caring Service” 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 www.ladpw.org DONALD L. WOLFE, Director ADDRESS ALL CORRESPONDENCE TO: P.O. BOX 1460 ALHAMBRA, CALIFORNIA 91802-1460 IN REPLY PLEASE REFER TO FILE: MP-5 154.041 June 1, 2006 The Honorable Board of Supervisors County of Los Angeles 383 Kenneth Hahn Hall of Administration 500 West Temple Street Los Angeles, CA 90012 Dear Supervisors: PRIVATE DRAIN NO. T 728 GRANT OF EASEMENT CITY OF WESTLAKE VILLAGE SUPERVISORIAL DISTRICT 3 3 VOTES IT IS RECOMMENDED THAT YOUR BOARD ACTING AS THE GOVERNING BODY OF THE LOS ANGELES COUNTY FLOOD CONTROL DISTRICT: 1. Acting as a responsible agency pursuant to the California Environmental Quality Act (CEQA), consider the enclosed Negative Declaration/Finding of No Significant Impact, including comments received during the public review process, which was prepared by the California Department of Transportation (Caltrans). This report was approved by Caltrans and the Federal Highway Administration for the Lindero Canyon Road and U.S. 101 Street and Ramp Improvement project on August 23 and September 13, 2001, respectively; find that the granting of the recommended easement is within the scope of the proposed project; find that the proposed project will not have a significant effect on the environment; find that the Negative Declaration/Finding of No Significant Impact document reflects the independent judgment of the County; and approve the Negative Declaration/Finding of No Significant Impact document.

Transcript of COUNTY OF LOS ANGELESfile.lacounty.gov/SDSInter/bos/bc/045483_PDT728.pdf · COUNTY OF LOS ANGELES...

COUNTY OF LOS ANGELES

DEPARTMENT OF PUBLIC WORKS “To Enrich Lives Through Effective and Caring Service”

900 SOUTH FREMONT AVENUE

ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100

www.ladpw.org

DONALD L. WOLFE, Director

ADDRESS ALL CORRESPONDENCE TO:P.O. BOX 1460

ALHAMBRA, CALIFORNIA 91802-1460

IN REPLY PLEASE

REFER TO FILE: MP-5 154.041

June 1, 2006 The Honorable Board of Supervisors County of Los Angeles 383 Kenneth Hahn Hall of Administration 500 West Temple Street Los Angeles, CA 90012 Dear Supervisors: PRIVATE DRAIN NO. T 728 GRANT OF EASEMENT CITY OF WESTLAKE VILLAGE SUPERVISORIAL DISTRICT 3 3 VOTES IT IS RECOMMENDED THAT YOUR BOARD ACTING AS THE GOVERNING BODY OF THE LOS ANGELES COUNTY FLOOD CONTROL DISTRICT:

1. Acting as a responsible agency pursuant to the California Environmental Quality Act (CEQA), consider the enclosed Negative Declaration/Finding of No Significant Impact, including comments received during the public review process, which was prepared by the California Department of Transportation (Caltrans). This report was approved by Caltrans and the Federal Highway Administration for the Lindero Canyon Road and U.S. 101 Street and Ramp Improvement project on August 23 and September 13, 2001, respectively; find that the granting of the recommended easement is within the scope of the proposed project; find that the proposed project will not have a significant effect on the environment; find that the Negative Declaration/Finding of No Significant Impact document reflects the independent judgment of the County; and approve the Negative Declaration/Finding of No Significant Impact document.

The Honorable Board of Supervisors June 1, 2006 Page 2

2. Acting as a responsible agency pursuant to CEQA, consider and adopt the Mitigation Monitoring Program (included in the Negative Declaration), which was prepared and adopted by Caltrans as a condition of the project to mitigate or avoid significant effects on the environment.

3. Find that the proposed grant of an easement for public road and highway

purposes in, over, and across Private Drain No. T 728 from the Los Angeles County Flood Control District to the City of Westlake Village and the City's subsequent use of said easement will not interfere with the use of Private Drain No. T 728 for any District purpose.

4. Approve the grant of an easement for public road and highway purposes

from the District to the City of Westlake Village within Private Drain No. T 728 (2,455± square feet) for $13,500. The subject parcel is located at the northeast corner of the intersection of Lindero Canyon and Agoura Roads in the City of Westlake Village.

5. Instruct the Chair to sign the enclosed Road Deed and authorize delivery

to the Grantee.

PURPOSE/JUSTIFICATION OF RECOMMENDED ACTION This action will allow the District to grant an easement within Private Drain No. T 728 to the City of Westlake Village. The City requested the easement for the road widening of Lindero Canyon and Agoura Roads in connection with Caltrans' Lindero Canyon Road and U.S. Highway 101 Street and Ramp Improvement project. The granting of this easement is not considered adverse to the District's purposes. Implementation of Strategic Plan Goals This action meets the County Strategic Plan Goal of Fiscal Responsibility. The revenue from this transaction will be used for flood control purposes. FISCAL IMPACT/FINANCING The $13,500 proposed selling price represents the market value of the easement. This amount has been paid and deposited into the Flood Control District Fund.

The Honorable Board of Supervisors June 1, 2006 Page 3 FACTS AND PROVISIONS/LEGAL REQUIREMENTS The granting of this easement will not hinder the use of the channel for possible transportation, utility, or recreational corridors. The enclosed Road Deed has been approved by County Counsel and will be recorded. ENVIRONMENTAL DOCUMENTATION On May 3, 2001, Caltrans, as the lead agency, circulated a Negative Declaration/Finding of No Significant Impact for the Lindero Canyon Road and U.S. 101 Street and Ramp Improvement project in accordance with CEQA requirements. The mitigation measures included in the CEQA document for the project specifically address air quality, archeologic-historic, flood plain/flooding, geologic/seismic, noise, public services, soil erosion/compaction/grading, traffic/circulation, vegetation, and water quality issues. The Negative Declaration/Finding of No Significant Impact concluded that the project, with the proposed mitigation measures, will not have a significant effect on the environment. The public comment period did not raise significant environmental issues with the project; therefore, Caltrans finalized and adopted the Negative Declaration/Finding of No Significant Impact on August 23, 2001. Under CEQA, the District is a responsible agency whose discretionary approval of the project is required in order to carry out the project. As a responsible agency, your Board must consider and adopt the Negative Declaration/Finding of No Significant Impact and the Mitigation Monitoring Plan prepared by Caltrans before the recommended easement is granted. IMPACT ON CURRENT SERVICES (OR PROJECTS) None. CONCLUSION Enclosed are an original and duplicate of the Road Deed. Please have the original and duplicate signed by the Chair and acknowledged by the Executive Officer of the Board. Please return the executed original to Public Works and retain the duplicate for your files.

The Honorable Board of Supervisors June 1, 2006 Page 4 One adopted copy of this letter is requested. Respectfully submitted, DONALD L. WOLFE Director of Public Works DKW:mr P6:\blPDT728.doc Enc. cc: Auditor-Controller (Accounting Division - Asset Management) Chief Administrative Office County Counsel

ORIGINAL

RECORDING REQUESTED BYAND MAIL TO:

City of Westlake ViI/age31200 Oak Crest DriveWestlake ViI/age, CA 91361

Space Above This Line Reserved for Recorder's Use

THIS DOCUMENT IS EXEMPT FROM DOCUMENTARY TRANSFER TAX PURSUANTTO SECTION 11922 OF THE REVENUE & TAXTION CODE. Assessor's Identification Number:

2057 -001-900 (Portion)THIS DOCUMENT IS EXEMPT FROM RECORDING FEES PURSUANT TO SECTION27383 OF THE GOVERNMENT CODE.

ROAD DEEDFor a valuable consideration, receipt of which is hereby acknowledged, the

LOS ANGELES COUNTY FLOOD CONTROL DISTRICT, a body corporate and politic, doeshereby grant to the CITY OF WESTLAKE VILLAGE, a municipal corporation, an easement forpublic road and highway purposes in, on, over, and across aI/ that real property in the City ofWestlake ViI/age, County of Los Angeles, State of California, described in Exhibit A attachedhereto and by this reference made a part hereof.

Dated

LOS ANGELES COUNTY FLOOD CONTROL DISTRICT,a body corporate and politic

(LACFCD-SEAL)By

Chair, Board of Supervisors of theLos Angeles County Flood Control District

ATTEST:

By

File with: TRANSFER DRAINSPRIVATE DRAIN NO. 728

Affects: Agoura Road, Parcel 6-3RE

(File with: Lindero Canyon Road (1))I.M. 159-037S.D. 3 M0523002

Sachi Hamai, Executive Officerof the Board of Supervisorsof the County of Los Angeles

Deputy

NOTE: Acknowledgment form on reverse side.

OG:bwP:\MPM\WORDPRO\TITlE\CONF\OG-RD PO 728.DOC

STATE OF CALIFORNIA )) ss.

COUNTY OF LOS ANGELES )

On January 6, 1987, the Board of Supervisors for the County of Los Angeles andex offcio the governing body of aI/ other special assessment and taxing districts, agencies,and authorities for which said Board so acts adopted a resolution pursuant to Section 25103of the Government Code that authorized the use of facsimile signatures of the Chair of theBoard on aI/ papers, documents, or instruments requiring the Chair's signature.

The undersigned hereby certifies that on this day of ,20_,the facsimile signature ofChair of the Board of Supervisors of the LOS ANGELES COUNTY FLOOD CONTROLDISTRICT was affxed hereto as the offcial execution of this document. The undersignedfurther certifies that on this date, a copy of the document was delivered to the Chair of theBoard of Supervisors of the LOS ANGELES COUNTY FLOOD CONTROL DISTRICT.

In witness whereof, I have also hereunto set my hand and affixed my official seal theday and year above written.

Sachi Hamai, Executive Officerof the Board of Supervisorsof the County of Los Angeles

By

(LACFCD-SEAL)

APPROVED AS TO FORM:

Deputy

RAYMOND G. FORTNER, JR.,

::7MÖ'~--Depu

CERTIFICATE OF ACCEPTANCE

,20DEPARTMENT OF PUBLIC WORKSMapping & Property Management Division

This is to certify that the interest in real property conveyed bythe deed or grant herein, dated , from the LosAngeles County Flood Control District, a body corporate andpolitic, to the City of Westlake Village, a municipal corporation,is hereby accepted pursuant to authority conferred byResolution No. adopted on ,and the grantee consents to the recordation thereof by its dulyauthorized officer.

APPROVED as to title and execution,

Supervising Title Examiner

ByDated

P:Conf:ACKS:floodfax2 w accpt wlk vilge.doc By

EXHIBIT A

File with: TRANSFER DRAINSPRIVATE DRAIN NO. 728

Affects: Agoura Road Parcel No. 6-3RE(File with: Lindero Canyon Road (1))A.P.N. 2057-001-900 (Portion)T.G. 557 (E6)

i. M. 159-037S.D. 3M0523002

LEGAL DESCRIPTION(Grant of easement for public road and highway purposes)

That portion of Lot 2, Tract No. 27425, as shown on map filed in Book 763,pages 45, 46 and 47, of Maps, in the office of the Recorder of the County of LosAngeles, within the fol/owing described boundaries:

Beginning at the most southerly corner of said Lot 2; thence northwesterly alongthe general/y southwesterly boundary of said lot and continuing in a general/y

northwesterly direction along its various courses and curves to the westerly terminus ofthat certain course having a bearing and distance of N 68°28'06" W 45.74 feet in saidgeneral/y southwesterly boundary; thence South 68°28'06" East along said certaincourse, a distance of 25.09 feet; thence leaving said general/y southwesterly boundary,South 34°08'59" West 29.01 feet; thence South 1JD34'20" West 20.20 feet; thenceSouth 53°07'44" East 90.22 feet to the general/y southeasterly boundary of said Lot 2;thence South 13°03'56" West along said general/y southeasterly boundary, a distanceof 12.76 feet to the point of beginning.

Containing: 2,455:t sJ.

To be known as AGOURA ROAD.. .'

LP\DMS fies\mpm0523002.rwe.fleg.doc3/28/2006

Lindero Canyon Road and U.S. Highway 101

Street and Ramp Improvements

Negative Declaration/Finding of No Significant Impact

tJ fHWA ..I1

..11 California Depa.rt~ent of Transportation

. Los Angeles, Distrrct 7

I1 Office of Environmental Planning

.)

¡

¡.,

Street and Ramp Improvements at lindero Canyon Road andU.S. Highway 101, Westlake Vilage, California

(07/LA101 KP59.55/61.15)

INITIAL STUDYIENVIRONMENTAL ASSESSMENT

State of CaliforniaDepartment of Transportation

andU.S. Department of TransportationFederal Highway Administration

Pursuant to: 42 U.S.C. 4332(2)(C)

~Acting Division ChiefCalifornia Department of Transportation

c?~?~ ..Michael G. RitchieDivisiòn AdministratorFederal Highway Administration

Øl6' 0 LdO/Date

~-ILj-OfDate

The following persons may be contacted for additional information concerning this document:

Cesar PerezSenior Transportation EngineerFederal Highway Administration980 Ninth Street, Suite 400Sacramento, CA 95814(916) 498-5860

Ron KosinskiActing Division ChiefCaltrans District 7120 W. Spring StreetLos Angeles. CA 90012(213) 897-0703

John Knipe

City EngineerCity of Westlake Vilage31824 W. Villa Ce RoaWestlake Village, CA 91361(818) 706-.1613

STATE OF CALIFORNIADEPARTMENT OF TRANSPORTATION

SCH No. 2001051009(07/LA101KP59.55/61.15)CU-EA 07186-120161

NEGATIVE DECLARATION

Pursuant to: Division 13, Public Resources Code

Description

,;

The project consists of widening Lindero Canyon Road from Agoura Road to Via Colinas in theCity of Westlake Vilage including median reconstruction and re-striping of Undero CanyonRoad, construction of a bike path and widening the southbound Lindero Canyon Road on-rampto northbound US 101 (Ramp G-6) within the Caltrans right-of-way. The reconstruction andwidening of portions of Lindero Canyon Road and Ramp G-6 was generated by the projectedYear 2020 traffc conditions. Land uses in the immediate vicinity of the project site consist ofOffce Commercial, Specific Plan (Commercial) and Commercial Recreation.

Summary of Review Process'

A Public Notice was published on May 3, 2001 in the Los Angeles Times inviting publiccomments on the Draft Initial Study/Environmental Assessment which was prepared for theproposed project. The public review penod closed on June 18, 2001. The Draft InitialStudylEnvironmental Assessment was also circulated to the State Clearinghouse on May 3,2001 for distrbution to affected agencies for their review and comment.

Summary of Comments Received on Draft Initial Studv/Environmental Assessment

-)

No comments were received on the Draft Initial Study/Environmental Assessment from thepublic. No comments were received from agencies receiving copies of the Draft Initial'StudylEnvironmental Assessment through the State Cleannghouse, with the exception of theCalifornia Department of Fish and "Game (CDFG). The CDFG expressed concerns regardingproject-related water quality impact to streams and watercourses in the project vicinity. TheCDFG also recommended that a pre-construction survey be conducted for bats, swallows, andnesting birds in the project area and that a buffer be maintained. between nesting areas andconstruction activities. Both concerns expressed by the CDFG have been addressed by new orrevised project mitigation measures.

Summary of Mitiqation Measures

1. If .groundwater is encountered during construction and dewatering is necessary, the effuent

generated shall be containerized and disposed of off-site or be treated and discharged on-site after regulatory approval of appropnate permits.

2. If excavation of the sewer line is conducted and soil affected by chlorinated vac is

encountered, the affected soil shall be containerized arid disposed of off-site or be treatedand discharged on-site after regulatory approval of appropriate permits.

-J. Soils alor.g on-ramp G-6 shall be tested for aerially deposited lead in accordance with latestpolicies during the design stage of Phases 1 and 2. If such soils are found, they shall beproperly disposed of in accordance with the special management requirements of a varianceissued to CAL TRANS by the DSTC.

. :~j

4. To reduce noise levels below the established noise standards of the City of WestlakeVillage, the project shall comply with the special provisions of the City's noise ordinanceaddressing construction noise, including provisions Jorlimiting hours of construction in orderto reduce adverse effects on sensitive receptors.

5. Native plant species shall be used to revegetate embankments and roadway edges.Planting and hydroseeding shall be utilized for erosion control purposes.

6. If project activities are to occur during the nesting season of birds (March 1 to September 1),a pre-construction survey for breeding bats and swallows and other nesting birds shall beconducted per California Department of Fish and Game guidelines. A buffer of at least 150feet for construction activities shall be maintained for any active bird bests (500 feet forraptor nests). .

¡

\J

7. The applicant shall consult with local police, fjre and other emergency service providers todevelop temporary alternatives to the use of Lindero Canyon Road as an emergencyresponse or evacuation route during project construction.

8. If buried historic or prehistoric resources are found during the excavation activities,excavation activities shall be halted and an archaeological monitor shall be retained toformally evaluate such resources for their significance and/or importance pursuant to CEQA.

Determination

An Initial Study/Environmental Assessment has been prepared by the California Department ofTransportation (Caltrans). On the basis of this study it is determined that the proposed actionwill not have a significant effect upo'n the environment for the following reasons:

1. There wil be no effect on: unique or natural features, plant or animal life, habitats,archaeological, historic, agricultural, scenic or timber resources, residences, businesses,schools or neighborhoods, flood plains, wetlands or water bodies.

2. There wil be no significant effect on: air or water quality, improvements or increases inenergy consumption.

3. in the project which will reduce potentially

--j

Aziz ElattarActing Deputy District DirectorDivision of Environmental PlanningCalifornia Department of Transportation

~ %- 2 3 _ ? OÐ IDate

~,

FEDERAL HIGHWAY ADMINISTRATIONFINDING OF NO SIGNIFICANT IMPACT

\

FORSTREET AND RAMP IMPROVEMENTS AT LlNDEROCANYON ROAD AND

U.S. HIGHWAY 101, WESTLAKE VILLAGE~ CALIFORNIA

. ~ 'f

The project consists of widening Lindero Canyon Road from Agoura Road to Via Colinas inthe City of Westlake Vilage including median reconstrction and re-sttping 01 Lindero

Canyon Road, construction of a bike path, and widening the southbound Undero CanyonRoad onrramp to northbound US 101 (Ramp G-6) within the Caltrans right-of-way. Thereconstrction and widening of portions ofUndero Canyon Road and Ramp G~6 was .generated by the projected Year 2020 tiaffc cûnditÎons.

The FHWA has determined that this project wil not have any significant impact on the humanenvironment. This finding of no signifcant impact is based on the attched environmentalassessment, which has been independently evaluated by the FHWA and determined toadequately and accrately discuss the environmental issues and impact of the proposed

. project. It provides suffcient evidence and analysis for detemmining that an environmentalimpact statement is not required. The FHWA takes fun responsibilit forthe accuracy. scope,and content of the enclosed EnvironmentalAssessment.

~Lt~César E. PérezSr. "rransporttion Engineer

ih'3/ó iDáte (

.

TABLE OF CONTENTS

A. PURPOSE OF AND NEED FOR PROJECT 1

B. PROJECT DESCRIPTION 4

C. AFFECTED ENVIRONMENT 17

D. ENVIRONMENTAL EVALUATION 21

E. DISCUSSION OF ENVIRONMENTAL EVALUATION 23

F. CONSUL T A TION AND COORDINATION 32

G. REFERENCES 32

H. LIST OF PREPARERS 36

i. TITLE VI POLICY STATEMENT 38

J. MITIGATION MONITORING PLAN 39

K. DISTRIBUTION/MAILING LIST 43

L. COMMENTS RECEIVED AND RESPONSES TO COMMENTS 44

APPENDIX A - PACIFIC SOUTHWEST BIOLOGICAL SERVICES LETTER

APPENDIX B - STATE CLEARINGHOUSE LETTER

Cíty of Westlake Vílage1..;,.;"" Cl..rl.,/C,.,.:--_____...._, JI________~.. Lindero Canyon Road at US 101. .

TABLES

Table No. Description

1

2

3

Level of Service Analyses 2

3

4

Level of Service Definitions for Signalized Intersections

T ASAS Accident Rates

FIGURES

ï Figure No. Description.,

1 Location Map 6

2a Phase 1 Layout 7

2b Phase 1 Layout 8

2c Phase 1 Layout 9

2d Phase 1 Cross Section 10

2e Phase 1 Cross Section 11

2f Phase 1 Cross Section 12

2g Phase 2 Layout 13

2h Phase 2 Layout 14

2i Phase 2 Cross Section 15

3 Public Notice 34

City of Westlake Vilage Lindero Canyon Road at US 101

INITIAL STUDY/ENVIRONMENTAL ASSESSMENT

A. PURPOSE OF AND NEED FOR PROJECT

The City of Westlake Vilage (City) proposes to widen Lindero Canyon Road and Ramp G-6 at U.S. Highway 101 (US 101) K.P.59.55/61.15. The proposal to reconstruct and widenportions of Lindero Canyon Road and ramp G-6 was generated by the projected Year 2020traffc deficiencies as summarized in the combined Project Study ReportProject Report,Section 6, Traffc and Accident Data and WPA Traffc Engineering, Inc, US 101- LinderoCanyon Road PSR Traffc Analysis, April, 1997.

.-i

The project is needed in order to accommodate future anticipated growth and to reducecongestion and related accidents. As can be seen in Table 1, below, four (4) keyintersections wil have deficient operations by the year 2020 without the proposedimprovements. The proposed improvements wil assist the City in achieving objectivesincluded in the City's General Plan Circulation Element. The Circulation Element

establishes LOS C as the minimum acceptable level of service at all intersections withinthe City, except that LOS D is acceptable at intersections along Lindero Canyon Roadbetween Agoura Road and Via Colinas. These minimum acceptable levels of service wilbe achieved (with the exception of the intersection of Lindero Canyon Road and ViaColinas) with implementation of the project.

Lindero Canyon Road is a major arterial highway in the City of Westlake Vilage. It iscurrently striped for two lanes in each direction. The City is currently widening LinderoCanyon Road east of Via Colinas to accommodate three lanes in each direction. Thewidening of Lindero Canyon Road is consistent with the City's General Plan.

The Lindero Canyon Road Interchange with U.S. 101 was constructed in 1974. US 101 isan interregional freeway. The existing roadway consists of eight mixed flow lanes andauxiliary lanes. The 2010 Route Concept Report indicates that US 101 should consist of

.i eight mixed flow and two HOV lanes. The HOV lanes would be accommodated in themedian of this segment of the freeway so that no outside widening would be necessary.This proposal would not interfere with existing usage of US 101 and would be consistentwith and would not affect its future operations. The Lindero Canyon Bridge wil not requirefurther modification in the future when additional (HOV) lanes are added in the future.

Background

The Lindero Canyon Road overcrossing of US 101 (built in 1974) is located in the southernportion of the City of Westlake Vilage. Westlake Village is located in the Conejo Valley, arapidly growing urban area, approximately 20 miles northwest of the City of Los Angeles atthewestern edge of Los Angeles County. US 101 runs in a generally north-south direction(but east-west through Westlake Vilage) and provides access to the Los Angeles region tothe southeast. Lindero Canyon Road carries traffc both within the Westlake Vilage areaand to and from US 101. The widening of Lindero Canyon Road and on-ramp G-6 would

City of Westlake Village Undero Canyon Road at US 101

.'-,

.,

involve excavation for grading and construction of a retaining wal/ along the south side ofthe adjoining Dole Foods Corporation (Dole) property at 5411 Lindero Canyon Road. TheCity of Westlake Village has a cooperative development agreement with Dole and the Stateof California Department of Transportation (CAL TRANS) for improvements along the Dolepropert and the northbound on-ramp to US 101. The City wil acquire a strip along theeastern and southern sides of the Dole property. The strip includes a maximum 8.5 meter(28 foot) width for additional Lindero Canyon Road right-of-way (ROW), and a temporaryconstruction easement of 7.0 meter (22.5 foot) width. Following construction ofimprovements, CAL TRANS will receive and take control of the ROW associated with thelimits of the state highway. The 2010 Route Concept Report states that US 101 at LinderoCanyon Road should consist of eight mixed flow lanes and two HOV lanes. The existingfreeway has eight mixed flow lanes and auxiliary lanes in each direction.

Deficiencies¡.!

A Traffc Analysis Report has been completed for Lindero Canyon Road for existingconditions and the year 2020 with and without traffc improvements.1 A total of fourintersections included in the report were:

. !

!

)

Lindero Canyon Road and Agoura RoadLindero Canyon Road and US 101 Southbound Off-rampLindero Canyon Road and US 101 Northbound Off-rampLindero Canyon Road and Via Colin as

,-or

The results of the existing and Year 2020 traffc condition analysis for these intersectionsare presented in Table 1. The analysis shows deficiencies in the Year 2020, if roadimprovements are not made, at Lindero Canyon Road and Via Colinas in both the a.m. aridp.m. peak hours; at Lindero Canyon Road and Northbound on-ramp in the a.m. peak hour;and, at Lindero Canyon Road and Agoura Road in the p.m. peak hour. An explanation oflevels of service is provided in Table 2.

Table 1

L i fS A

i.1

eve 0 ervice naiysesIntersection Capacitv Utilzation/Level of Service

Year 2020 Year 2020Location Existing Conditions Conditions without Conditions with

Improvements ImprovementsAM PM AM PM AM PM

Lindero Canyon Road and0.76/C O.74/C 1.05/F 1.40/F 0.92/E 0.93/EVia Colinas

Lindero Canyon Road and0.51/A 0.57A 0.82/0 O.77/C 0.79/C O.77/CSouthbound Off-ramp

Lindero Canyon Road and0.53/A 0.60/A 1.01/F 0.84/0 0.80/C 0.72/CNorthbound Off-ramp

Lindero Canyon Road and0.66/B O.76/C 0.83/0 O.96/E O.66/B O.65/BAQoura Road

.. -J

1 WPA Traffc Engineering, Inc, US 101- Undero Canyon Road PSR Traffc Analysis, April, 1997.

City of WesUake Vilage Lindero Canyon Road at US 101

i.-j

Table 2Level of Service Definitions for Signalized Intersections

rii;¡. LOS V/C DEFINITION

A 0.00-0.60 Excellent No vehicle waits longer than one red light andno approach phase is fully used.

8 ::0.60-0.70 Very Good An occasional approach phase if fully utmzed;many drivers begin to feel some what restrictedwithin groups of vehicles.

C ;:0.70-0.80 Good Occasionally drivers may have to wait throughmore than one red light; backups may developbehind turning vehicles.

D ::0.80-0.90 Fair Delays may be substantial during portions of therush hours, but enough lower volume periodsoccur to permit clearing of developing lines,preventing excessive backups.

E ::0.90-1.00 Poor Represents the most vehicle intersectionapproaches can accommodate; may be longlines of waiting vehicles through several signalcycles.

F ::1.00 Failure Backups from nearby locations or on cross-stre-els may i e~ll icl VI pi everrl movenneiil urtremendous delays with continuously increasingqueue lengths.

i.

i

j

. ,i

t'/

~ "

!y

Accident Data

:':ii-.

Table 3 is a summary of the Caltrans Traffc Accident Surveilance and Analysis System(TASAS) Table B printout for this project's locations at Lindero Canyon Road and SR101for five years. The T AS AS is for the period January 1, 1993 to December 31, 1997. Acomplete copy of the T ASAS, Table B printout for the Lindero Canyon Road Interchange isincluded in the PSR/PR.

....,

City of WesUake Viiage I inrlQm r."nvnn Rn"rl "t 11.0: 1 n1

":1'.,

- ~-;!

l

,j

..

""J

.!

Table 3

T ASAS Accident Rates.

Actual Rates* Average Rates*

Location. Total No.F F + 1 Total F F + 1 Totalof Accidents

5B on from NB Lindero1 0.000 0.00 0.12 0.004 0.23 0.60Canyon Rd

NB off to Lindero Canyon13 0.000. 0.13 0.55 0.005 0.59 1.50Rd

NB on from NB Lindero0 0.000 0.00 0.00 0.002 0.27 0.70Canyon Rd

5B on from 5B Lindero3 0.000 0.09 0.26 0.002 0.27 0.70Canyon Rd

NB on from 5B Lindero4 0.000 0.09 0.36 0.004 0.23 0.60Canyon Rd

5B Off to Lindero Canyon12 0.000 0.22 0.66 0.005 0.59 1.50Rd

*Accidents per Milion Vehicfe Miles

A review of Table 3 indicates that the actual total accident rates are less than the averagerates expected for the locations indicated along Undero Canyon Road. It is expected thatwidening Lindero Canyon Road at these locations wil not increase the actual accidentrates and would instead lower future accident rates by reducing future traffc congestion.

B. PROJECT DESCRIPTION

ALTERNATIVES ANALYSIS

This section describes the alternatives considered for the project: No-build (Alternative A),'. La Tienda Road extension alternative (Alternative "8), and the Preferred Alternative

. (Alternative C).

No Build Alternative - Alternative A

Alternative A, the No Build or "No Project" alternative, would result in no wideningimprovements to Undero Canyon Road or associated ramps at the US 101/UnderoCanyon Road Interchange. While this alternative would result in no construction-relatedimpacts, this alternative would not be consistent with local planning. This alternative doesnot address future traffc deficiencies resulting from continued growth and increasing traffclevels. As indicated in Table 1, three of the four intersections studied are projected tooperate at Levels of Service (LOS) E and F for the year 2020 "no build" alternative.

La Tienda Road Extension - Alternative B

This alternative consisted of the extension of La Tienda Road from Via Rocas to UnderoCanyon Road, intersecting Lindero across from the U.S. 101 Northbound Off-ramp. The

City of Westlake Village Lindero Canyon Road at US 101r_~":_J ("... _~_ _ no .__

niI\

-L

northbound direct on-ramp would be widened to two lanes and depressed under the LaTienda Road extension. Preliminary geometnc design identifed significant design issues,most notably prohibitively high retaining wall and structure costs. Reasons for these highcosts included the high retaining walls required to provide vertical clearance on the on-ramp and the long structure necessitated by sight distance requirements along the on-rampcurVe. In addition to its economic infeasibilty, this alternative would also require moreright-of-way than the preferred alternative, would present drainage diffculties due to thedepth of the depressed on-ramp (potential need for pumping stormwater, with associatedconcerns regarding maintenance and safety in the event of pump failure), and would resultin a less-aesthetically pleasing project (very high retaining wal/s and overhead structures).

~ ;

l

Preferred Alternative - Alternative C

'.

The City of Westlake Vilage (City) proposes to widen Lindero Canyon Road and Ramp G-6 at U.S. Highway 101(US 101) (K.P.59.55/61.15) (See Figure 1, Location Map). Theproposal to reconstruct and widen portions of Lindero Canyon Road and ramp G-6 wasgenerated by the projected Year 2020 traffc deficiencies as summarized in the combinedProject Study ReporUProject Report, Section 6, Traffc and Accident Data and WPA TraffcEngineering, Inc, US 101- Undero Canyon Road PSR Traffc Analysis, April, 1997. Thepreferred alternative comprises a significant portion of the project identified as ProjèctLA960142 in the Federal Transportation Improvement Program. In addition, the project isthe central element of the Congestion Management Program Deficiency Plan for the City ofWestlake Vilage, as approved by the Los Angeles County Metropolitan TransportationAuthority. The project has also been designated as a High Priority project (Project No.0065) under the Transportation Equity Act of the 21st Century (TEA-21), with Federal

funding in the amount of $236,000. The balance of the project funding wil be provided bylocal funds.

-,.~

i

)

.'

It is proposed to widen Lindero Canyon Road between Via Colinas to the north of US 101and Agoura Road to the south from two lanes to three lanes in each direction. The bridgeovercrossing would not require widening. Proposed improvements include the widening ofthe west side of Lindero Canyon Road and the northbound on-ramp (G-6) to US 101. Theconstruction project wil extend from Via Colinas to Agoura Road, a distance of 750 meters(2,450 feet). The City proposes to construct this alternative in two phases for fundingreasons. . Phase 1 would involve reconstruction and widening of Lindero Canyon Road toaccommodate three lanes in each direction and a bikepath. Phase 2 would involve thewidening of Ramp G-6 to two lanes (Please refer to Figures 2a through 2f, Phase 1Layouts and Cross Sections, and Figures 29 through 2i, Phase 2 Layouts and CrossSections).

Based on the descriptions of the relevant resources in Section C (Affected Environment),and the predicted effects of the preferred alternative in Section D (Environmental

Evaluation), the preferred alternative (Alternative C) represents the best choice to reduceexisting and projected future congestion levels. It is also the best choice to reducecongestion-related accidents in the project area by enhancing capacity and mobility alongLindero Canyon Road.

City of Westfake Vi/age Lindero Canyon Road at US 101

jl

j

~

-1¡

. NOT TO SC¡

1

J

City of Westlake Vilage

Figure 1

Location MapCity of Westlake VilageInitial Study/Environmental Assessment

6Lindero Canyon Road at US 101

Improvements

"'..

._-~

. -".

'':'

~":,.

.ø.;L

.:.,

'. 'I ~'-.-

.... -

'''~_J

'...

.:-...

_--.

--..

.."...

"....

.

NOTES: 1. VEFHlCAL ALIGNMENT FOR

LlN

D'E

RO

CA

NY

ON

RO

AD

,AL TERN

A T

IVE

B, P

HA

SE

1 W

ILL

NO

TB

E R

EV

ISE

D. R

EF

ER

EN

CE

IS M

AD

ETO CONTRACT NO. 07-100554

SHiE

ET

22 O

F 29

2.2. CURB RAMPS WILL BE CONSTRUCTED

TO ADA STANDARDS.

"-'-"

'''''-'

'-'''''

-'~. .

SC

1: 5

0

/(/

/1/

~ 4- oS c-c- ~ W

WY

)"; ~ () '4 ~

~;,,.

, .

Ph,a

s,e

1 L

ayou

tF

ig:fJ

re 2

aC

ity o

f Wes

tlake

Vill

age

Initi

al S

tudy

/Env

ironm

enta

l Ass

essm

ent

, ' '.

~; ~

fft.~

'i::~

;: .

;f'7

.'¡'

:\:::¡

.r;

Lind

erG

) C

anyo

n R

oad

at U

S 1

01

Impr

ovem

ents

¡ i ."

...".

.-...

,:.:..

....

"~ "

,,---

---

.,.._

---,

.. in

NOTES: 1. VERllCAL ALIGNMENT FOR

LlNOERO CANYON ROAD,

AL TERN

A ll

VE

8, P

HA

SE

1 W

ILL

NO

TB

E R

EV

ISE

D. R

EF

ER

EN

CE

IS M

AD

ETO CONTRACT NO. 07-100554

SHEET' 22 OF 292.

2. CUR,S RAMPS WILL BE CONSTRUCTED '

TO ADA STANDARDS.

s

LL

LL

CI

,. , -J

Pha

se 1

Lay

out

Figu

re 2

bC

ity o

f Wes

tlake

Viia

geIn

itial

Stu

dy/E

nviro

nmen

tal A

sses

smen

t

,;,...

,,,',,

,.

:i:"'

I:'~

J1ß

i.--~

:

Lin

dero

Can

yon

Roa

d at

US

101

Impr

ovem

ents

_...,

.__.

...

~ '" iiN

icrP

ES

: 1. V

ER

TIC

AL

ALI

GN

ME

NT

FO

RL

lM¡~

ER

O C

AN

YO

N R

OA

D.

AL TERN

A T

lVE

B, P

HA

SE

1 W

ILL

NO

TBË REVISED. REFERENCE IS MADE

TO CONTRACT NO. 07-100554

~/i,

IEE

T 2

2 O

F 2

92.

2. C

UR

'S R

AM

PS W

ILL

BE

CO

NST

RU

CW

JÐTO ADA STANDARDS.

+ 1£ f" '\ t- ~ .. ~

I I

#// ,

. ....

I I I I

'"

Pln

.se

1 La

iyfJ

ilJit

¡:ig

!ure

2c

City

of W

estla

ke V

ilage

Initi

al S

tudy

/Env

ironm

enta

l Ass

eS6m

ent

¡':¡';

:~;:k

\f¡

....¡l.1 ¡

..!,!

!,,~

J¡,

",' .

...""

.""'.

,"'..

"._,

......

....~

_.._

.._...

.._-"

,.....

.".."

.

Lind

el'o

Can

yon

Roa

ø a

t U!$

101

Impr

ovem

ents

. .''"

''~.''

. '

~I

!- EXIST RlW

i

28,0

4

J.6

TH

RU

LtN

DfR

O C

..NY

ON

RO

..DE

XlS

l1N

GST

A 2

J+00

CU

RB

i:~"""" ,'" =3-1J7,2mmAC

24J,8 mm AB -- - '. -~ '2

- r'" 0 mm AS

L__

-E

)(S

T R

/W

4.2

RIG

HT

TU

RN

LA

NE

28.0

4

J.6

TH

RU

V It LINOERO ~YDN ROAO i- EXIST R/W

15,2

4 i

6.0 I f J.6 J.6 J.6 2.4 i

OUAL i DI THRU THRU THRU S!

LEFT I II 12 i

TURNS - ' i

0,9 ' In-------~-

_1- - - - - - - - = = = ~J1 i.¡: = == = = = - - _1- _.J,1=:3: i-

- - -::::: -- - - -.. "" ~ - -- - - _::: - -- ..ri- -ü"" EXIST

:::__________.. ~ã:-2-------::: ~,6 mm RETAINING WALL

CU

RB

I -

'-A-2

I L

lNO

ER

O C

AN

YO

N R

OA

O C

UR

BPR

OPO

SED

ST A

23+

00

SE

CT

ION

ANO SC ,

3.3

TH

RU

J,6

TH

RU

i ~ 4-150 mm AC

150 mm AS '~,~ 1-J70 mm AS

SECTION 8

NO

SC

E

i

!-E

XIS

T R

/Wi

J6 ANO VARIES

EXIST R/~

6,0 ANO

3.6

2,4

,V

AR

IES

RA

MP

SID

E-

iG

-6W

All

iG

OR

EI

AR

EA

,

NOTES: 1, All CROSSF"AllS

i I

:z::

UN

LES

S O

TH

ER

WIS

ESH

OW

N,

2. ALL DIMENSIONS ARE

,-lI

ND

ER

O C

AN

YO

N R

OA

r)C

UR

BSH

OW

N I

N U

ET

ER

SE

XlS

l1N

G

UNLESS OTHERWISE

sTA

25+

09.8

7

SHO

WN

,E

XIS

T R

/W

"120

.06

36 AND VARIES

i-E

XIS

T R

/Wi

""12,80 ANO VARIES

i, ~

I~w

12.6

i~

iw

4.8

3.6

J.6

J.6

J,6

6.5 ANO

,6

I

idæ

0i

¡¡

TH

RU

TH

RU

TH

RU

TH

RU

RA

MP

VA

RIE

SR

AM

PI

3.0

1.2

G-5

GO

RE

G-6

,A

RE

Ai

i

LlNDERØ P-Yrr RØ..Ð

PR

$ I)

STA

11"

09,8

7A

-2C

UR

iI

Phi

Bse

1 C

ross

Sec

tion

Figu

re 2

dC

ity o

f Wes

tlake

Vila

geIn

ital S

tudy

/Env

ironm

enta

l Ass

essm

ent

X;.:

.:~~:

.'~.:;

~;~

:::~~

.

'.'~&

;i\

j..!~

JLi

rrde

'fro

Can

yørr

Roa

d at

US

101

Impr

ovem

ents

"'H

".H

'__~

'.""

....:~

..,...

..._

_._.

....~

......

..'H

....-

...;-

_.

lINDERD CANYON ROAD

EX

IST

ING

STA 27+00

12.8

0It

UN

DE

RO

CA

NY

ON

RO

AD

16.4

6

i:.~".~= ," =J-137.2 mm AC

243.8 mm AB ---- -j.32D mm AS

l__

-Q

:"" o .. :J o :: V

I

3,6,

TH

RU

3,6

TH

RU

i

Q: i

-1.1D " ¡ I MEDIAN

~ ~"

~0,6 i J ~iiU THRU

, iI I

SECTION A

NO

SC

AE

2,3

1.2

3.6

TH

RU

'" ""3.

6 ~9

RAMP õ

G-S

¡¡

O.J

OS

~ ::150 mm AC

150 mm ABi '" .~ )-370 mm AS

1.2

2,3)

SID

EW

AL

K

SECTION B

NO

SC

AL

LOS ANGELES COUN TV

OEPARThENT OF

PUBLIC WORKS

VA

RiE

S 8.

84 5

.40

12,8

735

:1 3

.6 V

AR

IES

1,.8

1.5

3,6

3.6

3.0

J.O

3.6

3',6

3,6

2.4

4VARIES r RAMP IDE THRU THRU I THRU THRU THRU ,

: _______~G-,------======= W: _~-==-===t~ìii. ===J=====___~____ ,rl~ EXIST R/W

1-==_______ ======-======:¡ ï ..1-- - ------- '- -----___ --- --__==:¡.. r~

É::=

==

==

==

= =

==

==

==

----

-- ¡

'-1L

- =

=--

---

LB

--2

--__

__=

==

: ---

-__-

¡..\.

. 100

6 m

mA 2J - - -__ -- .

i CURB I CURB I ---

A-2

LIN

DE

"RO

CA

NY

ON

RO

AD

CU

RB

EX

IST

ING

ST

A 2

6+50

r- It LINDERO CANYON ROAD

i

~"~'" - =:r106.7 mm AC

198.1 mm CTB -- -' _- L 76,2 mm AB

121.9 mm AS-t___ __"1

SE

CT

ION

çN

O S

CA

L

lINDERO CANYON ROAD

PRO

POSE

OS

TA

27+

00EXIST R /W I "-

14.4

NO

TE

S: 1

. All

CR

OSS

FAllS

2% UNLESS OTHERWISE

SHO

WN

.2. ALL DIMENSIONS ARE

SHO

WN

IN

ME

TE

RS

UNLESS OTHERwwse;

SHO

WN

.

VA

RIE

So

V It LINDERO CANYON ROAD

5,40 U60

3.6 3.6 3,6 3.6 3,6 3.6 3.6 1,5

THRU lHRU 1.2 I THRU THRU THRU : EXIST R/W

0,6

i I--

¡-=

==

=--

..ìíl.

.F=

==

==

==

=-t

-- ~

========?~~~======== ======== 100 mm

I CURB' 'I

' LmI! CAN¥ON ROAI! , " I A - 2

j!iROP'ØSEO. CURB

51..

28+

SQ

35:1

VA

RIE

S

VA

RIE

S

OV

Ig¡

vv",

¡!Q

::S~'

"a.

Um

Q.

.,','.

\'b,"

I,,','

:,~j '

í"~

" .

':::;;

~';.:

'~:)

!IK

!i

Pha

se 1

Cro

ss S

ectio

,nm,itt'u'..4 2' 'm

r¡ 'i

l ,,'

!, V

' V

City

of W

estla

ke V

illag

eIn

itial

Stu

dy/E

nviro

nmen

tal A

sses

smen

t"'

\jîa¡

'111

!:;1

:!.:.

..,...

-,..'

.'

.,.",

,,1,,.

.:1,,"

;.:

Lin

dero

Can

yon

Roa

d at

US

101

Impr

ovem

ents

-;".

....."

..,.-

'".e

".N

_. '.

.,,'

:..:,

~,'"

.....'

_...-

.\.",

NOTES: 1. ALL CROSSF ALLS

2% UNLESS OTHERWISE

SHÒ

WN

.2. ALL DIMENSIONS ARE

SHO

WN

IN

ME

TE

RS

UNLESS OTHERWISE

SHO

WN

.

i:~. .=3-137.2 !Tm AC

243.8 mm A8 -- - --

L== _r320mm AS

Exiin R./W

LOS ANGELES COUNTY

DEPARTIENT OF

PUBLIC WORKS

EXIST Rl' I ~ i I i I

LOS ANGELES COUNTY

DEPARTIENT, OF

PUBLIC WORKS

150

mm

AB

i ~td50 mm AC

370 mm AS

sEcnON A

NO

SC

AL

SE

CT

ION

EI

NO SCALE

.~ :.

'....

..::,,

:.='::

.....:

...

"" I-~ ! r It' lINOERO CANYON ROAD Ë! ~ EXIST R/W

i !!:¡ 5.2 12.80 iii i

~ 5." ~~ '.3 TH3'R6U 3.0 3,0 ~:U ~':U ~:U v~

¡ VARIES

I 1.

8 T

HR

U :

l----~~""~Q~-J~1 t -----.Ji~!.¡:-- J__ 1 i).-d

I "'~-V~' ì ..~= =::===::~:====::= ==========::..1-

v)- 1)-1- - i L - ---_______ -'

1 mm L_ ------' ------__ ____ --..~00.6 mm

8-2 ---___

A-2

i C

UR

B I

'A-2

~ ~~~~~ ~

EX

IST

ING

ST

A 3

0+00

5.9:

tE

XIS

T R

IWI-

~ ¡

,!!~

IIt lINDERO CANYON ROAD i::: ,

5.2

12.8

0 ii

i3.6 3.0 3,0 3.6 3.6 3.6 v~

THRU I THRU THRU RIGHT ,

ON

LY

Q6 'I

' r

-- i -----.Jì~!.F---l-_--_ ¡ ,).-:1

mm

T--

: ==

==

==

t,"rc

==

==

==

==

==

==

==

==

==

~"--

""..r

r~0.

6 m

m--

. L ~

8-2

----

--1

\"JI

-2~ I ~ I ~

lIND

ER

O C

AN

YO

N R

OA

DPR

OPO

SED

ST

A 3

0+00

HV

AR

IES

~1-

-'!!

~ x..

""0 ii

1.8

3.7

2.0:

1

Pha

se 1

Cro

ss S

ectio

n¡:

;giu

re 2

f

,~ tt

~

'"'1

2'1

t'"."

..,:~

City

of W

estla

ke V

ilage

Initi

al S

tudy

lEnv

ironm

enta

l Ass

essm

ent

LinC

!$r'I

CS

fI¥G

Jn R

èaii

at U

S 1

'91

Impr

CI1

item

ef'ts

......

...,..

~,.

~'._

_...,

.,.u.

._ '

...".

,n__

____

___h

.

NOTES: 1. VERTICAL ALIGNMENT FOR

RAMP G-6, AL TERNA nVE 8,

PHASE 2 WILL NOt BE REVISED.

REFERENCE IS MADE TO CONTRACT

NO

. 07

-100

554,

SH

EE

T 2

.3 O

F 2

92.

2. CURB RAMPS WILL BE CONSTRUCTED

TO ADA STANDARDS..

SC

1: S

O

/1/

/0/

..~+

~CLASS I BI~ PAlH

1,2 SIDEWALK

"'!

~~o úI -+ N

Ni. \

i, ..

~H .. ..

:: vv

U i- .. ~

~ssC

1ON

EA

T

Pha

se 2

Lay

out

Figu

re 2

gC

ity o

f Wes

tlake

Vila

geInital Study

/Env

ironm

enta

l Ass

essm

ent

. ,,;,

,~~

~;.:

;:~:

iE!

Lind

ero

Can

yon

Roa

d at

US

101

,

Impr

ovem

ents

-"".

_.",

.."...

...'

tj ,

". Ir -¡ /g ff '

~ E ~

- .."

. "-'.

."".

'~'.'

-'g'-'

~~-"

-'-""

--"'

-'..'-

'-"._

-"..

....,.

.,-."

.-,..

.

. """

'" ,.

"C, .

.,,_.

,. '.:

..".,¡

."".

.~",

.." _

;" "

......

:,:."

...'.'

.~""

':'.,.

_"..,

~"",

'~".

NO

TE

S: 1

. VE

RT

lC,A

L A

UG

NM

EN

T F

OR

RA

MP

G-6

, AL

RN

A T

lVË

. B

,PHASE 2 WILL NOT BE REVISED.

RE

FER

EN

CE

IS

MA

DE

TO

CO

NT

RA

CT

NO. 07-100554, SHEET 2.3 OF 292.

2. CURB RAMPS WILL BE CONSTRUCTED'

TO ADA STANDARDS.

SC 1

: ii

~ 1

City

of W

estla

ke V

ilage

Initi

al S

tudy

/Env

ironm

enta

l Ass

essm

ent

." .

'h,'

.... .

:::::;

:::;::

:

t"""

~d':i

14

:'j,

I....

~..

¡ P

hase

2 L

ayou

tFi

gure

2h

LiP

l'ØeF

Ii C

a'f!f

Iif1

PP

øad

at u

s 1Ø

1

Impr

OV

Bm

Bnt

s

EXIST R/W '\ I. V It LlNIiERO CAN'YCJ RÐAÐ

'' 28,04 15.24

I ~ 4.2 3.6 3.3 3.6 6,0 I 3,6 3,6 3.6

ig RIGHT THRU THRU THRU DUAL i THRU THRU THRU

i a.:r

a. T

UR

N L

EfT

112

ii ~\:~ ii LANE TURNS . ,

I 0.6 a.~~a. \'2 0.9 i ,- I l liT------~---'

01 i - - ~--------==---..~ II ¡:-___-~------ I ::ii

\..i~/::-i--ì~F========== :::::::--=====i,,;"====- ::::::: rT-Ü

-.,~

~ i l

oa, m

m '7

..---

--:::

::::::

: ___

____

____

___

~e=

2---

---

-_..

"\ ~

.~ .. 2J L_____ CURB I \.

CURB I IINDFRO CANYON ROAD A-2

EXISTING CURB

ST" 23+0D

---_

."..~

.,...,

.,-_.

.._..

.

EXIST R/W I V It LlNDERO CANYON RO"O

28.04 15.24

I ~¡! 4,2 3.6 3.3 3.6 6.0 3.6 3.6 3,6

, l:~ i ~~i THRU THRU THRU ~~:t i I~RU THRU THRU

"'~-"77~~"-~cc== =:::~::: :::::::::::~ ~~~~~=l::::::

--'~

~ 1

100.

mm

'7""

---

____

____

____

__ ~

B-2

_ _

____

_.~ ..-2J L______ CURB I

CURB I LlNDERO C"'NYON ROAD

PRO

POSE

DST" 23+00

R""'P G-6 i

~R

A"'P

G-6

~

. --,

-"",

-,,,~

,,--,

._,

I-E

XIS

T R

/W

2.4

i- EXIST. R/W

PR

OP

R/W

i-,

3.5

....X

IV..RIES ¡.

I

15:1

;.' I

EX

IST

R/W

V i I

i-19 1.2 3.6 :

----

t..

_"F~

=¡~

;';;'~

= =

==

: ~ -

-- E =====-----'-

-----===:: ''"..c DIKE

I BA TYE "

EX

IST

ING

STA

6.4

+00

17:1

EX

IST

R/W

----

----

R""

'P G

-6 !i

VR

A"'P

G-6

!i

I- EXIST R/W

i ,

v15

:1

3.6 7.0

CHP ENFORCEMENT

AR

EA

EX

IST

R/W

l- , i I -- V..I

ES

4.0 MAX

City

of W

estla

ke V

ilage

Initi

al S

tudy

/Env

ironm

enta

l Ass

essm

ent

,'~":

~.:\

.

Jí1

'J,\.

,~...

_~.~

_,. ~

._._

__,,~

_J

NOTES: 1. All cROSSFAllS

2% UNLESS OTHERWISE

SHO

WN

.2. All DIMENSIONS ARE

SHO

WN

IN

ME

TE

RS

UNLESS OTHERWISE

SHO

WN

.

SLO

PEE

ASE

ME

NT

C~=:r137.2 mm "C

243,8 mm AB -T.-- =j-320 mm "S

L__

.SE

CT

ION

.AN

O S

C

~ 3=150 mm "C

200 mm "B-t:~ 350 mm "5

SECTION B

NO

SC

i:~=:r106.7 mm "C

198.

1 m

m C

TB

-F_

-L76

.2 m

m "

B121.9 mm "5-£"___ __J

SECTION C

NO

5C

-

Pha

se 2

Cro

ss S

ectio

nF

igur

e 2i

Lin

dem

Can

yon

Roa

d at

US

101

Impr

ovem

ents

.:ì

¡

Phase 1 - Lindero Canyon Road Widening

Curb returns and island curbs and gutters at the ramp termini for Ramps G-1, 2,3,4 and 5would undergo minor reconstruction, Lindero Canyon Road between Via Colin as andAgoura Road would be widened from two lanes to three lanes in each direction, Toaccomolish this. oortions of roadwav curb and outter and raised median would bei i l. - - - - - - - -- - - --.I - --- - ---. vreconstructed but the bridge overcrossing of U.S. 101 would not require widening. TheCity has acquired the necessary right of way for this work.

The schedule for Phase 1 is being dictated by development projects in the City of WestlakeVilage which are scheduled to be completed by 2004. It is the City's desire to have theroadway improvements in place prior to completion of the developments.

Phase 2 - Ramp G-6 Widening

Ramp G-6 would be widened to two lanes and include a California Highway Patrol (CHP)enforcement pocket. Provisions would also be made for future ramp metering equipmentshould the need arise beyond the year 2004. The City proposes to begin the widening atVia Colinas. The ramp widening project would provide for two free right turn lanes forsouthbound Via Colin as traffc at Lindero Canyon Road.

The schedule for Phase 2 is being dictated by development projects in the City of WestlakeVilage which are scheduled to be completed by 2004. It is the City's desire to have theroadway improvements in place prior to' completion of the developments.

Traffc Signals

Existing traffc signals at the Lindero Canyon Road intersections with Via Colinas, AgouraRoad and the freeway ramps would require construction modification.

. iNon-Standard Design Features

There is one non-standard advisory feature associated with this proposal. This proposalprovides for a varying median width with a minimum width of 1.1 meters (3.6 feet). Topic308 - Cross Sections for Roads Under Other Jurisdictions; 308. 1 City Streets and CountyRoads, Caltrans Highway Design Manual, requires that conventional highway designstandards be incorporated in a project. The conventional highway design standards formedian widths are identified in Topic 305 - Median Standards; 305.1 Width: (2)

Conventional Highways, Caltrans Highway Design Manual, which states that the minimummedian width for city street conditions should be 3.6 meters (11.8 feet). The projectprovides for a 1.1 meters (3.6 feet) minimum median width for Lindero Canyon Road whichis a non-standard design feature. A Fact Sheet, completed to justify the exception for anonstandard median width, has been approved by Caltrans.

City of Westlake VilageInitial StudyÆnvironmental Assessment 16

Lindero Canyon Road at US 101Improvements

i~ I

¡

Permits Required

A Control Checklist of Water Pollution has been completed for this project. Theconstruction contractor wil obtain the NPDES Permit required for this project prior to thestart of construction.

~ i

i

The City of Westlake Vilage will apply for an Encroachment Permit from Caltrans for thisproject, and a permit from Los Angeles County Department of Public Works forimprovements to Agoura Road over the flood control channeL.

C. AFFECTED ENVIRONMENT

Location

The Lindero Canyon Road overcrossing of US 101 (built in 1974) is located in the southernportion of the City of Westlake Vilage. Westlake Vilage is located in the ConejoValley, arapidly growing urban area, approximately 20 miles northwest of the City of Los Angeles atthe western edge of Los Angeles County.

Topography

The topography of the project area is nearly flat about 950 feet above sea leveL. Drainageis from north to south via groundwater flow. The east side of Lindero Canyon Road has noimprovements other than signs and traffc signals. Vegetation includes annual grasses andweeds, oak trees and oleanders. Improvements along the west side of Lindero CanyonRoad, adjacent to the Dole property, include a sidewalk, a section of retaining wall, signsand traffc signals. A short slope above the retaining wall extends to a chain link fence

surrounding the relatively level area of the Dole property which is currently undergoinggrading for construction of the Dole World Headquarters. The slope is vegetated withseveral types of trees and sparse annual grasses and weeds. The level area of the Doleproperty is at approximately the same grade as the top of on-ramp G-6. The retaining wallextends south along Lindero Canyon Road to approximately 600 feet south of

Via Colin asbeyond which there is no retaining wal/, and the south side of the Dole propert slopesmoderately steeply from the fence line to on-ramp G-6. This slope is well vegetated withannual grasses and weeds as well as various shrubs and trees, including oleanders, palmsand pines most of which are located along the fence line.

Land Use

The existing General Plan designation for the property on the northwest quadrant of theLinderQ Canyon Road/U.S. 101 interchange is Offce Commercial; in the northeastquadrant, Specific Plan (Commercial); in the southwest quadrant, CommercialRecreational; and in the southeast quadrant Offce CommerciaL. Land uses within thevicinity ofthe project include the Dole corporate headquarters (northwest quadrant); vacantland and a cemetery (northeast quadrant); a golf course and clubhouse (southwestquadraht); and offce/industrial buildings (southeast quadrant).

City of Westlake ViiageInitial StudyÆiivironmental Assessment 17

Lindero Canyon Road at US 101Improvements

.\1. i-J

r

-. I

Land uses within the City of Westlake Vilage are controlled by the City of Westlake VilageGeneral Plan. A comparison of the project with existing General Plan goals and policiesindicates that the project is consistent with the City of Westlake Vilage's General Plan andthe designation of Lindero Canyon Road as a major arterial highway. The proposedimprovements to the interchange wil also help achieve objectives included in the City'sGenera! Plan Circulation Element. The Circulation E!ement establishes LOS C as theminimum acceptable level of service at all intersections within the City, except that LOS Dis acceptable at intersections along Lindero Canyon Road between Agoura Road and ViaColinas .. ¡

!!

Biological Resources

'I

The areas adjacent to Lindero Canyon Road, south of Via Colinas, consist largely of bareearth and patches of weeds and grass. Some native vegetation exists along this portion ofLindero Canyon Road but there is no significant amount of native plant species on eitherside of the road. The east side of Lindero Canyon Road has no improvements other thansigns and traffc signals. Vegetation includes annual grasses and weeds, oak trees andoleanders. Improvements along the west side of Lindero Canyon Road, adjacent to theDole property, include a sidewalk, a section of retaining wall, signs and traffc signals. Ashort slope above the retaining wall is vegetated with several types of trees and sparseannual grasses and weeds. The south side of the Dole property slopes moderately steeplyfrom the fence line to the Lindero Canyon Road on-ramp to northbound US 101. Thisslope is well vegetated with annual grasses and weeds as well as various shrubs andtrees, including oleanders, palms and pines, most of which are located along the fenceline. Some native vegetation exists along roadway embankments and within the interior ofthe interchange loop ramps where Lindero Canyon Road crosses over U.S. 101. Areasadjacent to and within the loop ramps are also heavily landscaped with non-native plantspecies which are part of the freeway planting which occurred when the interchange wasfirst constructed.

iiI

!

'I

Pacifc Southwest Biological Services conducted a search of the California Department ofFish and Game's Natural Diversity Data Base (NDDB) in May, 1997 to determine if anyrare, threatened, or endangered plant or animal species are known to exist in theimmediate vicinity of the project site. The database indicated that the following resourcesare within the region: Santa Susanna Tarplant (Hemizonia minthomiij, Lyon's Pentachaeta(Pentachaeta Iyoniij, Bank Swallow (Riparia riparia) and the Western Pond Turtle (Clemysmarmorata pallda). The following sensitive habitats also occur in the region: SouthernCoast Live Oak Riparian Forest, Southern Sycamore Alder Riparian Woodland and ValleyOak Woodland.

Cultural Resources

A standard archaeological records check and literature review was completed for theproject by EIP Associates in May 1997. The records check and literature review showedthat fourteen cultural resource studies have been conducted in Los Angeles County andten within Ventura County within one mile of the project site. Of these, ten containidentified cultural resources but none of the ten are within the current Area of PotentialEffects (APE). The majority of the APE has been addressed by cultural resourceCity of Westlake ViiageInital StudyÆnvironmental Assessmßnt 18

Lindero Canyon Road at US 101ImDrovements

-j

-¡j

..j

;ii

-j

investigations between 1969 and 1996. The areas not surveyed or addressed are locatednorthwest of the Lindero Canyon Road overcrossing between US 101 and Via Colin as andbetween Lindero Canyon Road and Via Rocas.

i Hazardous Waste

An Initial Site Assessment (ISA) Report has been completed for this proposed project. Ofthe hazardous waste sites or otherwise environmentally impacted sites present in thevicinity of the study area, only the Dole property appears to have adverse environmentalimpacts with potential to affect the project area. A plume of groundwater contaminationconsisting of dissolved chlorinated volatie organic compounds (VOCs) in concentrationsexceeding the Maximum Contaminant Limit extends south from the Dole propertapproximately centered on the Lindero Canyon Road on-ramp to northbound US 101.

Waterways and Hydrologic Systems

The nearest natural, unchannelized watercourse to the project site is Lindero Creek, whichis located over a half-mile northeast of the project site. Lindero Creek acts as a naturalflood channel for the area and its 1 OO-year and 500-year floodplains are contained withinthe unimproved channeL. There are no sole source acquifers in the area

Drainage in the project area is currently conveyed to an open trapezoidal channel ownedand operated by the Los Angeles County Flood Control District (PO 728). This channel isaligned parallel to Lindero Canyon Road and extends from the U.S. 101 Freeway toWestlake Lake south of Foxfeld Drive.

Water Quality

Water quality is currently regulated by a General Construction Activity Storm Water permit,issued by the Regional Water Quality Control Board (RWQCB) pursuant to the Clean

'.. Water Act. Provisions of the National Pollutant Discharge Elimination System (NPDES)

establish procedures to protect against water quality impacts resulting from projectconstruction. Provisions underthe General Construction Storm Water Permit require that aStorm Water Pol/ution Prevention Plan (SWPPP) be implemènted to control construction 'site runoff that could potentially degrade water quality.

Air Quality

The Clean Air Act Amendments (CAAs) of 1990 require that transportation plans,programs, and projects which are funded by or approved under Title 23 U.S.C. or theFederal Transit Act (FT A) conform with state or federal air quality plans. The project isidentified in the 1998/99 through 2004/2005 Regional Transportation ImprovementProgram (RTIP), which is in conformance with all applicable State Implementation Plans(SIPs), and with the 1998 Regional Mobilty Element prepared by the Southern CaliforniaAssociation of Governments (SCAG). Assumptions used in the FY 1998/99 through 2004-2005 RTIP regarding population, employment, travel and congestion were the most recentdeveloped by SCAG for the 1998 RTP, and included the most recently approved planningassumptions by SCAG's Regional CounciL. SCAG conducted a regional emissions analysisCity of Westlake VilageInitial StudyÆnvironmental Assessment 19

Undero Canyon Road at US 101Imorovements

j

-.-ì

1

. i!

!

-,

of the FY 1998/99 - 2004/2005 RTIP and used the most recent California Air ResourcesBoard (CARB) emission factors.

Pedestrian and Bicvcle Facilties

I\~ u,ifh ..11 ,.fh,.". ...+....i..1 ..f......f~ i.. fh.. 0if" ,.of \/\I....+1.."e \/ill,.,.o. I in~o..... 0a.."I".. DI"",~"" yy IU I aii VUlvl ai Lviia. ¡:LI vvL¡: ILL Lilt: '-ILl Vi Y yt:¡:Llaß Y iiia~v, i-iiiuv' v '- i 'J VII I'VCCU

currently provides for bicycle traffc with designated facilities. There is currently a Class"bicycle traffc lane located between Via Colinas and Agoura Road. There are no pedestrianfacilties (sidewalks) in the project area.

D. ENVIRONMENTAL EVALUATION

The Environmental Significance Checklist was used to identify physical, biological, socialand economic factors which might be impacted by the proposed project. In many cases,the background studies performed in connection with this project clearly indicate the projectwil not affect a particular item. A "NO" answer in the first column documents thisdetermination. When there is a need for clarifying discussion, an asterisk is shown next tothe answer. The discussion is in the section following the checklist.

YES orIf YES, is it

PHYSICAL. Wil the Proposal (either directly or indirectly): NO significant? YES

or NO

1. Appreciably chanççe the topography or ççround surface relief features? Yes No*2. Destroy, cover, or modif any unique oeologic or physical features? No3. Result in the loss of availabilty of a known mineral resource or locally important

mineral resource recovery site that would be of value to the region and the Noresidents of the state?

4. Result in unstable earth surfaces or increase the exposure of people orNo*propert to oeoloççic or sèismic hazards?

5, Result in or be affected by soil erosion or situation (whether by water or wind)? Yes No*6. Result in the increased use of fuel or energy in large amounts or in a wasteful

Nomanner?7. Result in an increase in the rate of use of any natural resource? No*8. Result in the substantial depletion of any nonrenewable resource? No9. Violate any published Federal, State, or local standards pertaining to

No*hazardous waste, solid waste, or Jitter control?10. Modify the channel of a river or stream or the bed of the ocean or any bay,

No*inlet, or lake?11. Encroach upon a floodplain or result in or be affected by floodwaters or tidal

No*waves?12. Adversely affect the quantity or quality of surface water, groundwater, or public

No*water supply?

13. Result in the use of water in larççe amounts or in a wasteful manner? No14. Affect wetlands or riparian vegetation? No15. Violate or be inconsistent with Federal, State, or local water quality standards? No16. Result in changes in air movement, moisture, or temperature orany climatic

Noconditions?17. Result in an increase in air pollutant emissions, adverse effects on or

Yes No*deterioration of ambient air qualitv?

City of Westlake VifageInital StudyÆnvironmental Assessment 20

Lindero Canyon Road at US 101Imnrovp.mp.nt.~

;

i.1.;

I

.1

-.J

YES or If YES, is itPHYSICAL. Wil the Proposal (either directly or indirectly):

NOsignificant? YES

or NO

18. Results in the creation of objectionable odors? No19. Violate or be inconsistent with Federal, State, or local air standards or control

No*plans??O. Result in an increase in noise levels or vibration fer adicining areas? Vo", No*, ....21. Result in any Federal, State, or local noise criteria beinQ equal or exceeded? Yes No*22. Produce new IiQht, Qlare, or shadows? No

YES or If YES, is itBIOLOGICAL. Wil the proposal (either directly or indirectly):

NOsignificant? YES

or NO

23. Change in the diversity of species or number of any species of (including trees,No*shrubs, Qrass, microflora, and aquatic plants)?

24. Reduction of the numbers of or encroachment upon the critical habitat or anyNo*uniaue, threatened, or endanQered species of plants?

25. Introduction of new species of plants into an area, or result in a barrier to theYes No*normal replenishment of existinçç species?

26. Reduction in acreage of any agricultural crop or commercial timber stands, orNoaffects prime, unique, or other farmland of State or local importance?

27. Removal or deterioration of existinQ fish or wildlife habitat? Yes No*28. Change in the diversity of species, or numbers of any species of animals (birds,

land animals including repties, fish and shellfish, benthic organisms, insects, or Yes No*microfauna)?

29. Reduction of the numbers of or encroachment upon the critical habitat of anyNo*unique, threatened, or endanQered species of animals?

30. Conflct with any applicable habitat conservation plan, natural comml.mityNoconservation plan or other approved local, reoional or state habitat plan?

31. Introduction of new species of animals into an area, or result in a barrier to theNomioration of movement of animals?

YES orIf YES, is it

SOCIAL AND ECONOMIC. Wil the proposal (directly or indirectly):NO

significant? YESor NO

32. Cause disruption of orderly planned development? No*33. Be inconsistent with any elements of adopted community plans, policies, or

No*Qoals?34. Be inconsistent with a Coastal Zone ManaQement Plan? No35. Affect the location, distribution density, or grm"/th rate of the human population

No*of an area?36. Affect life-styles, or neiQhborhood character or stabilty? No37. Affect minority, elderly, handicapped, transit-dependent, or other specific

Nointerest Qroups?38. Divide or disrupt an established community? No* .39. Affect existing housing, require the acquisition of residential improvements, or

Nothe displacement of people or create a demand for additional housinçç?40. Affect employment, industry, or commerce, or require the displacement of

No*businesses or farms?41. Affect propert values or the local tax base? No*42. Affect any community facilties (including medical, educational, scientific,

Norecreational or religious institutions, ceremonial sites, or sacred shrines)?43, Affect public utilties, or police, fire emergency, or other public services? No*44. Have substantial impact on existing transportation systems, or alter present

No*patterns of circulation or movement of people and/or ç¡oods?45. Generate additional traffc? Yes No*46. Affect or be affected by existing parking facilties or result in demand of new

NoparkinQ?

Crt of WesUake Vilage

Initial StudyÆnvironmental Assessment 21Undero Canyon Road at US 101

ImnmVRmRnf.C:

I

.J

ii

J

.;

. .

-¡I

!i

47. Expose people or structures to a significant risk of loss, injury, or deathinvolving wildland fires, including where wildlands are adjacent to urbanized Noareas of where residences are intermixed with wildlands?

48. Involve a substantial risk of an explosion or the release. of hazardoussubstances in the event of an accident or otherwise adversely affect overall Yes No*public safety?

49. Result in alterations to vv/aterborne, rail, or air traffc? f\Jo50. Support lame commércial or residential development? No51. Affect a siççnificant archaeological or historic site, structure object, or buildinç¡? No*52. Affect wild or scenic rivers or natural landmarks? No53. Affect any scenic resources or result in the obstruction of any scenic vista or

view open to the public, or creation of an aesthetically offensive site open to Nopublic view?

54. Result in substantial impacts associate with construction activities (e.g., noise,Yes No*dust, temporary drainaç¡e, traffc detours, and temporary access, etc.)?

55. Result in the use of any publicly owned land from a park, recreation area, orNowildlife and waterfowl refuge?

YES or If YES, is itMANDATORY FINDINGS OF SIGNIFICANCE

NOsignificant? YES

or NO

56. Does the project have the potential to substantially degrade the quality of theenvironment, substantially reduce the habitat of a fish or wildlife species, causefish or wildlife population to drop below self-sustaining levels, threaten to

Noeliminate a plant or animal community, reduce the number of, restrict the rangeof a rare or endangered plant or animal, or eliminate important examples of themajor periods of California history or prehistory?

57. Does the project have the potential to achieve short-term, to the disadvantageof long-term, environmental goals? (A short-term impact on the environment is

Noone which occurs in a relatively brief, definitive period of time while long-termimpacts wil endure well into the future.)

58. Does the project have environmental effects which are individually limited, butcumulatively considerable? Cumulatively considerable means that theincremental effects of an individual project are considerable when viewed in

Noconnection with the effects of past projects, the effects of other current projects,and the effects probable future projects. It includes the effects of other projectswhich interact with this project and, tOQether, are considerable.

59. Does the project have environmental effects that wil cause substantial adverseNoeffects on human beinas, either directly or indirectlv?

'" An asterisk indicates that impacts can be mitigated to non-signifcance.

City of Westlake VílageInital Study/Environmental Assessment 22

Lindero Canyon Road at US 101ImnmVAmønli:

.',1

jjri

,

. ;

.¡5.

E. DISCUSSION OF ENVIRONMENTAL EVALUATION

1. Some minor modification of the existing topography will be required to implementthe proposed project. Landform modifications would consist of the minor grading ofcut and fill slopes (1:2 or flatter) to accommodate intersection improvements,including a wider bike lane. Interchange improvements at the U.S. 101overcrossing would consist of minor cut and fill to increase the width of existing on-

. and off-ramps. Because the land in these areas is vacant, is owned by the City,and was originally designed to accommodate future widening, very little landformmodification would be required to accommodate the proposed improvements.

Excavation for grading and construction of retaining walls along the east and southsides of the adjoining Dole Foods Corporation (Dole) property at 5411 LinderoCanyon Road would be required to accommodate the widening of Lindero CanyonRoad and on-ramp G-6.

4. As is typical of all of southern California, the project site is subject to ground shakinggenerated by periodic seismic activity. Fracturing and displacement of the groundsurface can occur during an earthquake along a causative fault and also as a resultof sympathetic movement on zones of weakness such as older trace faults.However, no such faults have been identified in the project area so no significantimpact is anticipated.

The potential for seismic ground-shaking in the project area is expected to besignificant but the intensity of the shaking is expected to be moderate.2 Seismichazards and the design implications for the project wil/ be addressed in the

'foundation report which wil be prepared for the project. All structures wil bedesigned in accordance with Caltrans current standard seismic load conditions andthe most recent Uniform Building Code, as amended by City Ordinance.Compliance with these standards wil be enforced through plan review and

inspections during construction. Compliance ofthe project with Code requirementswil reduce impacts from ground shaking to a less than significant leveL.

During project construction, ground disturbance wil temporarily increase thepotential for soil erosion. Soil erosion also could be caused by either water or wind.In addition, the project site is within a zone of soils with high shrink-swell potential.3Existing State and City requirements and standard engineering practices wouldreduce impacts to a less than significant leveL. Construction plans wil need tospecify measures for controllng erosion at the project site.

2 City of Westlake Vilage, General Plan, July 1993.

3 Ibid.

City of Westlake VilageInital StudyÆnvironmental Assessment

Lindero Canyon Road at US 101ImDrovements23

O!

.j

7. The project would use a variety of widely available non-renewable materials forconstruction of the widened road and bíidge including aggregate, asphalt, iron andrelated minerals used in steel, mineral oil and fuel to power construction vehiclesand equipment. Project construction and operation would not involve the wastefuluse of non-renewable resources. No impact would occur.

9. Project construction activities, including disposal of construction waste, wil need toconform to all applicable regulations regarding hazardous waste, solid waste, andlitter control. An Initial Site Assessment (ISA) Report has been completed for thisproposed project. Of the hazardous waste sites or otherwise environmentallyimpacted sites present in the vicinity of the study area, only the Dole propertyappears to have adverse environmental impacts with potential to affect the projectarea. A plume of groundwater contamination consisting of dissolved chlorinatedvolatile organic compounds (VOCs) in concentrations exceeding the MaximumContaminant Limit extends off the Dole propert approximately centered on on-rampG-6. Considering that groundwater is not anticipated to be encountered duringproject construction, the vac plume is not considered to be of concern. Ifgroundwater is encountered during construction and dewatering is necessary, theeffuent generated would require containerization and off-site disposal or treatmentand discharge on-site upon regulatory approval of appropriate permits. Potentialsoil impacts along the portion of the project area at the Dole property are probablyrestricted to very localized occurrences along the sanitary sewer line. If excavationof the sewer line is conducted, there is a low to medium potential of encounteringsoil affected by chlorinated VOC, which would require special management. Alongon-ramp G-6, there is a medium to high potential of encountering soils impacted byaerially deposited lead. Such soils require special management under a varianceissued to CAL TRANS by the DSTC. It is recommended to perform testing for leadin accordance with latest policies during the design phase. If surface leadcontamination is found it is believed that it can be properly disposed of within the fillareas of the project. The project is not expected to result in the generation of anyhazardous waste or other waste products requiring special handling and disposaL.However, if the hazardous materials discussed above are encountered, thefollowing mitigation measures would reduce environmental impacts to a less thansignificant level:

If groundwater is encountered during construction and dewatering isnecessary, the effluent generated shall be containerized and disposed of off-site or be treated and discharged on-site after regulatory approval ofappropriate permits.

If excavation of the sewer line is conducted and soil affected by chlorinatedVaG is encountered, the affected soil shall be containerized and disposed ofoff-site or be treated' and discharged on-site after regulatory approval ofappropriate permits.

City of Westlake VilageInitial Study/Environmental Assessment 24

Lindero Canyon Road at US 101Imnmvp.mp.nt,~

:-j

Soils along on-ramp G-6 shall be tested for aerially deposited lead inaccordance with latest policies during the design stage of Phases 1 and 2. Ifsuch soils are found, they shall be properly disposed of in accordance withthe special management requirements of a variance issued to CAL TRANSby the DSTC.

11.

The nearest natural watercourse to the project site is Lindero Creek, which islocated over a half-mile east of the project site. The proposed improvements wilnot have any effect on Lindero Creek. There is, however, an open trapezoidalchannel owned and operated by the Los Angeles County Flood Control District(PD728) in the project vicinity. This channel is aligned parallel to Lindero Canyon Roadand extends from the U.S. 1 D1 Freeway to Westlake Lake south of Foxfeld Drive.Drainage in the project area is currently conveyed to this channeL. Although theAgoura Road Bridge over the channel wil be widened to provide for an additionalturn lane, the proposed project wil not alter existing drainage facilities or historicdrainage patterns. Work on the bridge, however, may potential/y impact waterquality in the drainage channeL. See response to No. 12, below.

Lindero Creek, over a half-mile east of the project site, acts as a natural floodchannel for the area and its 1 DO-year and 500-year floodplains are contained withinthe unimproved channeL. The proposed ramp and roadway widening improvementswil not encroach upon this flood channel area.4 A Floodplain Evaluation Report

would, therefore, not be required for this project.

:1

---:;

i

12. The widening of Lindero Canyon Road and on-ramp G-6 would disturb more thanfive acres and would increase the amount of impervious surface in the project areathus slightly decreasing the absorption rate and slightly increasing the amount ofsurface runoff. The runoff however would fol/ow existing drainage patterns and thechanges in absorption rate and surface runoff are considered to be less thansignificant impacts.

During construction, there is the potential for discharge into the drainage system,and thence to Lindero Creek, of construction related materials. Also, duringoperation of the widened Lindero Canyon Road and on-ramp G-6, there is thepotential for an increased discharge of automotive related materials into the creek.A General Construction Activity Storm Water permit, issued by the Regional WaterQuality Control Board (RWQCB) pursuant to the Clean Water Act, wil be required toimplement the provisions of the National Pollutant Discharge Elimination System(NPDES). Provisions under the General Construction Storm Water Permit requirethat a Storm Water Pollution Prevention Plan (SWPPP) be implemented to controlconstruction site runoff. Required compliance with these provisions wil ensure thatconstruction impacts on water quality would be at a less than significant leveL.

The project would not cause changes in the quantity of ground waters, eitherthrough direct additions or withdrawals, or through interception of an aquifer by cuts

4 Ibid

City of Westlake VilageInital StudylEnvironmental Assessment 25

Lindero Canyon Road at US 101ImDrDVements

or excavations or through substantial loss of groundwater recharge capabiliy.

17. Air pollutants would be generated during project construction, primarily fromconstruction vehicle emissions and fugitive dust caused by earth disturbance.Construction emissions are expected to be typical of a project of this type and nounusually high levels of pollutants are expected to be generated by constructionactivities. The project area and amount of earth moved would be less

than theSouth Coast Air Quality Management District (SCAQMD) screening threshold ofsignificance so impacts would be less than significant and no mitigation would berequired. Following project completion, air quality is expected to improve due toimproved tràffc flow over the widened roadway.

19. See No. 17 above. Although temporary in nature, the generation of particulatematter in excess of State and local standards is a common concern withconstruction projects. However, due to the limited amount of grading required forthe proposed project, it is not anticipated that emission standards for particulateswil be exceeded.

20. Construction activities would cause temporary, localized increases in noise and

vibration levels. The noise and vibration associated with construction activity areunavoidable and it is possible that noise generated by project construction wouldequal or exceed established noise standards. However, the exceedance of noisestandards is not considered significant because no noise-sensitive uses such asresidential neighborhoods, schools, day-care facilties, hospitals or nursing homesare located in the project area. If the project exceeds noise standards, the followingmitigation measure shall be implemented:

To reduce noise levels below the established noise standards of the City of

Westlake Village, the project shall comply with the special provisions of theCity's noise ordinance addressing construction noise, including provisions forlimitng hours of construction in order to reduce adverse effects on sensitvereceptors.

21. It is possible that noise generated by project construction would equal or exceed

established noise standards. The City of Westlake Vilage's noise regulationscontain special provisions addressing construction noise, including provisions forlimiting hours of construction in order to reduce adverse effects on sensitive.receptors. See No. 19 above.

23. The areas adjacent to Lindero Canyon Road, south of Via Colinas, consist largely ofbare earth and patches of weeds and grass. Some native vegetation exists alongthis portion of Lindero Canyon Road but there is no significant amount of nativeplant species on either side of the road. The east side of Lindero Canyon Road hasno improvements other than signs and traffic signals. Vegetation includes annualgrasses and weeds, oak trees and oleanders. Improvements along the west side ofLindero Canyon Road, adjacent to the Dole property, include a sidewalk, a sectionof retaining wall, signs and traffc signals. A short slope above the retaining wal/ isvegetated with several types of trees and sparse annual grasses and weeds. The

City of Westlake Viiage .Initial Study/Environmental Assessment

Lindero Canyon Road at US 101?R 1","__1,,.......10'"

south side of the Dole property slopes moderately steeply from the fence line to on-ramp G-6. This slope is well vegetated with annual grasses and weeds as well asvarious shrubs and trees, including oleanders, palms and pines,most of which arelocated along the fence line. Some native vegetation exists along roadway

embankments and within the interior of the interchange loop ramps where Lindero. Canyon Road crosses over Ü.S. î ûî. Areasaåjacent to and within the ioop rampsare also heavily landscaped with non-native plant species which are part of thefreeway planting which occurred when the interchange was first constructed. Nosignificant amount of native or non-native plant species would be lost due toconstruction of the proposed roadway improvements.

Pacific Southwest Biological Services conducted a search of the CaliforniaDepartment of Fish and Game's Natural Diversity Data Base (NDDB) in May, 1997to determine if any rare, threatened, or endangered plant or animal species areknown to exist in the immediate vicinity of the project site. The database indicatedthat the following resources are within the region:

Santa Susanna Tarplant (Hemizonia minthornii)Lyon's Pentachaeta(Pentachaeta Iyonii)Bank Swallow (Riparia riparia)Western Pond Turtle (Clemys marmorata pallda)

The fol/owing sensitive habitats also occur in the region:

Southern Coast Live Oak Riparian ForestSouthern Sycamore Alder Riparian WoodlandValley Oak Woodland

.'

Because of the characteristics of the project site, the habitat requirements ofspecies, and the hydrological conditions of the site, PSBS concluded that there isno possibilty of any of these resources occurring at the project site. No significantamount of native plant species would be lost due to constmction of the proposedramp and roadway improvements.

24. See Response 23 above.

25. The existing landscaping on the roadway slope of Lindero Canyon Road in the

. - southeast quadrant of the interchange would be removed. The top of the slopewould be widened to provide space for the bikepath proposed for Phase 1. It isproposed to construct a new irrigation system and to replace the landscaping. Thefollowing mitigation measure shall be implemented:

Native plant species shall be used to revegetate embankments and roadwayedges. Planting and hydroseeding is rccommcnded shall be to be utilized forerosion control purposes.

City of Westlake Vilagelroil;..' C"h.,..,J'....:.._____.._. JI_____ Lindero Canyon Road at US 101

27. Some isolated patches of vegetation (primarily along roadway embankments) wouldbe destroyed by the proposed project. It is possible that these areas provide limitedhabitat for some species. However, because of the small, isolated, and degradedcondition of these areas, any loss of habitat wil be insignificant.

2ô. Aithough considered minimai, the vegetation aiong the rõadway edge may have

some limited habitat value (see No. 27 above). However, the project would affectsuch a small and isolated area of degraded habitat that any loss would beinsignificant. As a result, the limited loss of species that might occur would not havea significant effect on the diversity of animal species in the area.

29. There are two bridges within the project area. the Lindero Canyon Bridge and the

AQoura Road Bridge. which could potentially provide habitat for bats and/or cliffswallows. In addition. there are vegetated areas within the project footprint thatcould additionally provide nestin~ habitat for other native birds. Consequently. a pre-construction survey should be conducted for breeding bats and swallows ana asimilar survey should be conducted for nesting birds. Implementation of thefol/owing mitigation measure would result in a less than significant impact:

If project activities are to occur during the nesting season of birds (March 1 toSeptember 1), a pre-construction survey for breeding bats and swallows andother nesting birds shall be conducted per California Department of Fish andGame guidelines. A buffer of at leàst 150 feet for construction activities shallbe maintained for any active bird bests (500 feet for raptor nests).

32. Acquisition of right-of-way would not be required for the Phase 1 work. The project

would, however, require the acquisition of a portion of the Dole property alongLindero Canyon Road and on-ramp G-6 for the Phase 2 work. The City of WestlakeVilage has a cooperative development agreement with Dole and the State ofCalifornia Department of Transportation (CAL TRANS) for improvements along theDole propert and the northbound on-ramp to US 101. The City wil acquire a stripalong the eastern and southern sides of the Dole propert. The strip includes amaximum 8.5 meter (28 foot) width for additional Lindero Canyon Road right-of-way(ROW) and a temporary construction easement of 7.0 meter (22.5 foot) width.Following construction of improvements, CAL TRANS wil receive and take control ofthe ROW associated with the limits of the state highway. This acquisition would beconsistent with the General Plan designation of Lindero Canyon Road and wouldhave no impact on the designated uses. The property required for right-of-way iscurrently vacant and its land use designation is commerciaL. A Right-of-Way DataSheet has been prepared for this project.

33. The project is consistent with the City of Westlake Vilage's General Plan and thedesignation of Lindero Canyon Road as a major arterial highway.

35. The project does not involve the construction or demolition of housing and would,therefore, not affect regional or local population projections. The project wouldenhance access between areas along Lindero Canyon Road to US 101 and thenceto other parts of California. However, the enhanced access would be insufficient to

City of Westlake Vilage Undero Canyon Road at US 1011",;li..1 C'1.."J.,IC..,'o"',.........l-..I JI..........._....10 1___..____.&_

induce substantial growth in the project area and would have a less than significantimpact.

38. The project concerns the widening of an existing street and freeway access rampsin an area zoned for industrial and commercial uses. There would, therefore, be noåisruption or åivision or the physicai arrangement of an existing communiry

40. The proposed project would generate temporary construction employment and is

expected to have a positive effect on local industry and commerce by eliminating aprojected roadway deficiency which hampers circulation in the area.

41. The project is not expected to have a direct effect on propert values or the local taxbase; however, the elimination of circulation deficiencies would remove oneconstraint to growth in the area, thereby enhancing the potential for future growth inpropert values and the local tax base.

43. A review of utilty atlases indicates that this project would have no impact on utilities.The City of Westlake Vilage wil prepare the Certification of Utiliy Facilities. Duringconstruction, temporary road closures may cause emergency response fire andpolice protection vehicles to take alternative routes thus increasing response timesand interfere with emergency response and/or emergency evacuation plans.Implementation of the following mitigation measure would result in a less thansignificant impact:

The applicant shall consult with local police, fire and other emergencyservice providers to develop temporaryaltematives to the use of LinderoCanyon Road as an emergency response or evacuation route during projectconstruction.

Once completed, the project, by widening Lindero Canyon Road and improvingtraffc. operation, would improve emergency response times and enhance firepiOtection. The project would not result in the need for new or altered fire andpolice protection services.

The project would increase the impermeable surfaces of Lindero Canyon Road andcreate additional run-off to the local storm drainage system. Site run-off would notexceed the capacity of the storm drains serving the site. Therefore, the projectwould have a less than significant impact on storm water infrastructure.

The project would require solid waste disposal service only during construction.The construction contractor would remove all solid waste from the site. Duringproject operation, waste would be removed by the road-sweeping service thatcurrently clears Lindero Canyon Road. There would be no impact on solid wastedisposal services

The project would use a small amount of water during construction which can besupplied by existing water services and which would not have a substantial impacton local or regional water supplies. During operation, the project would not use any

City of Westlake Vilage Lindero Canyon Road at US 101. .

water. Therefore, there would be no impact on local or regional water supplies.

,. ,

44. The proposed project wil not significantly impact existing transportation systems oralter present patterns of circulation. Instead, the proposed improvements wilimprove traffc circulation along Lindero Canyon Road and improve traffc safety atthe ûn-ramp access for ÜS Î û1. During construction, detours may be necessarythereby having a temporary impact on interchange circulation. Provision of signsnotifying the public of pending construction and ramp closures would be adequatenotification for this project. Traffc that would normally use the interchange atLindero Canyon Road may instead utilze the next interchanges to the north andsouth. These conditions, however, would be temporary and would be alleviatedupon completion ofthe project. Overall, the project would improve traffc circulationin the project area and be beneficial for the community.

-I

i

., ,j

,

!

)

The proposed project wil improve pedestrian circulation and safety by providingconnecting sidewalk improvements where none currently exist. Although pedestrianvolumes have been and are expected to remain relatively low, the proposedsidewalk faciliies wil improve safety and should adequately serve future needs.

45. During project construction, vehicle trips would be temporarily increased byconstruction-related trips and traffc congestion would be temporarily increased byintermittent lane closures due to construction during active construction times. Thiswould be a less than significant impact.

The project is designed to accommodate traffc generated by planned growth.Project operation would not generate vehicle trips or promote traffc congestion.

, 48. The project is not anticipated to involve the risk of an accidental explosion but the

! accidental release of hazardous substances is possible during project construction.Compliance with federal, state and local regulations concerning hazardous solid andliquid waste would ensure that the impact would be less than significant.

51. A standard archaeological records check and literature review was completed for

the project by EIP Associates in May, 1997. The records check and literaturereview showed that fourteen cultural resource studies have been conducted in LosAngeles County and ten within Ventura County within one mile ofthe project site. Ofthese, ten contain identified cultural resources but none of the ten are within thecurrent Area of Potential Effects (APE). The majority of the APE has beenaddressed by cultural resource investigations between 1969 and 1996. The areasnot surveyed or addressed are located northwest of the Lindero Canyon Roadovercrossing between US 101 and Via Colinas and between Lindero Canyon Roadand Via Rocas. The lack of identified cultural remains for the rest of the APE andthe majority of the study area indicate that the project site is of low sensitivity forhistoric cultural resources and of low to moderate sensitivity for prehistoric culturalresources. As recommended by EIP Associates, the area northwest of the LinderoCanyon Road overcrossing (and within the APE) was subjected to anarchaeological reconnaissance survey and other areas of immediate impact

received a cursory survey for current conditions. The recently completed

City of W.estlake Viiage Lindero Canyon Road at US 101In;lj~' Cl..,..~/C"".li...._....¡,_1 A....______J. . .

archaeological records check need not be repeated and a Negative HPSRdocument, adequate for compliance, is included in the PSR/PR as Attachment A.

The following mitigation measure shall be implemented:

If buried historic or prehisroric resources are round during ine excavarionactivities, Excavation activites shall be halted and an archaeological monitorshall be retained to formally evaluate such resources for their signifcanceand/or imporlance pursuant to CEQA.

..

54. Construction activities wil generate temporary air pollutant emissions, dust, noise,and vibration. Project construction may also temporarily hamper access andnecessitate traffc detours. Access and traffc detour alternatives wil need to beincorporated into project construction plans. See nos. 16, 19, 20, and 42 above.

The references consulted and specialized studies conducted in conjunction with thepreparation of this Environmental Evaluation are included in Section G - References.Copies of these documents are available for public review at the Westlake Vilage City Hall,4373 Park Terrace Drive, Westlake Village, California during normal business hours.

City of Westlake Viiage Undero Canyon Road at US 101

F. CONSULTATION AND COORDINATION

Public Involvement and Comment Period

A Notice of Availabilty of Environmental Document For Public Review was published in theLos Anqeles Times on May 3,2001 inviting the public to comment on the proposed projectand environmentai evaluation and offerinq the opportunity for a pubUc hearing to beconducted if desired by the public (Figure 3). The public comment period was from May 3.2001 through June 18. 2001. No requests were received from the public asking for ahearing. The State Clearinghouse letter acknowledging Caltran's compliance with theState Clearinghouse review requirements for draft environmental documents, pursuant tothe California Environmental Quality Act, can be found in Appendix B.

Consultation

The following individuals were consulted in the preparation of this document:

1. Min Wun, Senior Transportation Coordinator, $tate of California, Department of

Transportation2. Cathy Wright, Senior Environmental Planner, State of California, Department of

Transportation3. Barbara Pilolla, Environmental Planner, State of California, Department of

Transportation4. Abbe Hoenscheid, Environmental Planner, State of California, Department of

Transportation5. Karl Price, Associate Environmental Planner, State of California, Department of

Transportation6. R. Mitchell Beauchamp, M. Sc., Pacific Southwest Biological Services

7. Jeanette A. McKenna, Principal Investigator, McKenna et al.8. Wes Pringle, WPA Traffc Engineering, Inc.

Additional agencies, organizations, and individuals contacted include the following:

1. Ron Kosinski, Chief, Environmental Planning Branch, Caltrans, District 72. Diane Kane, Caltrans District 7 Heritage Preservation Coordinator3. Cesar Perez, FHWA Area Engineer4. Gail McNulty, Native American Heritage Commission5. Anthony Morales, GabrielinolTongva Tribal Council6. Beverly Salazar Folkes, Chumash/Fernandeño Representative7. John Knipe, City of Westlake Vilage City Engineer

G. REFERENCES

State of California, Department of Transportation, Combined Project Study ReportProjectReport (PSR/PR) on Route 10fat Lindero Canyon Road ( 07-LA-101 KP 59.55/61/1507234-120160K),1998.

City of Westlake VillageInili,,1 C''',,''.~~_..:______.._, A__ Lindero Canyon Road at US 101

City of Westlake. Village, General Plan, July 1993.

Pacific Southwest Biological Service.s, Inc., Letter to Wi/dan Associates (PSBS #T266),May 13,1997.

WPA Traffc Engineering, Inc., U.S. 101- Lindero Canyon Road PSR TraffcAnalysis, April1997.

ElF' Associates, Results of a Standard Archaeological Records Check for the ProposedLindero Canyon Road Overcrossing Improvements Project in the City of Westlake Vilage,Los Angeles County, California, May 19,1997.

. .°1

Roy F. Weston, Inc., Initial Site Assessment Proposed Street and Ramp ImprovementsLindero Canyon Road at U.S. Highway 101, Westlake Village, California, July 1998.

South Coast Air Quality Management District, Environmental Handbook, November 1993.

California De.partment of Transportation, Historic Property Survey Report - NegativeFindings, Negative Archeological Survey Report, June 15, 1999.

City of Westlake Vílage Lindero Canyon Road at US 101

PUBLIC NP11CENotice of Availability of Env.."nmental DocumentFor Public Review for the street and rampimprovements project at Lindero Canyon Rd. andU.S. 101 in the City of Westlake Vilage.

.litr FIGURE 3

¡

..-~~~ G~~'i~-.~~~o.._-..~

c.o~~c'"_'Co o.-=..~

City of' WesUake Village

..;

What'sBeing

Planned?

WhyThisAd?

What'sAvailable?

WhereDo

YouComeIn?

The City of Westlake Vilage proposes to widen Lindero

Canyon Road between Via Colinas and Agoura Rd. fromtwo lanes to thee in each direction. The nortbound on-ramp to u.s. 101 would also be widened.

Caltrans has stdied the effects that this project may haveon the environment. Our studies show it wil notsignificantly afect the quality of the environment. Theresults of the study are contained in an environmental

document known as an Initial StudyÆnvironmentalAssessment (ISÆA) which should lead to a NegativeDec1aration/inding of No Significant Impact(N/FONSI). Ths notice is to tell you of its preparationand of its availability for you to read, and to offer theo orti for a ublic hearn .

The environmental document is available for review andcopying at the CALTRS Distct 7 Office (120 S.Spnng Street, Los Angeles), on weekdays from 8:00 a.m.to 5:00 p.m and at the Westlake Vilage City Hall, 4373

Park Terrace Drve, Westlake Village, CA durng nonna1business hours. The environmental document is also

available at the Westlake Vilage Public Librar, 4371Park Terrace Drve, Westlake Vila e, CA.

Do you have any comments about processing the projectwith an ND/FONSI and the ISÆA? Do you disagree withthe findings of our study as set fort in the Proposed

ND/FONSï? Would you care to make any other conuentson the project? Would you like a public hearng? Pleasesubmit your comments andlor request for a public hearigin wrtig no later than June 18, 200 1 to:

Ronald J. Kosinski, Deputy Distrct DirectorDivision of Environmental Planning

CAL TRS120 S. Spnng StreetLos Angeles, CA 90012

If there are no major comments or requests for a publichearing, CAL TRNS wil request approval from theFederal Highway Administration and proceed with thero'ects desi

For more information about this study or anyContact transportation matter, call Ronald J. Kosinski at (213) 897-

0703. Individuals who require documents in alternativeformats are requesíed to contact the District 7 PublicAffairs Offce at (213) 897-3800. TDD users may contactthe California Relay Service TDD line at 1-800-735-2929or Voice Line at 1-800-735-2922.

Thank ou or .our interest!

H. LIST OF PREPARERS

.fState of California, Department of Transportation

¡

I.,,

Min Wun, P.E., Senior Transportation EngineerOffce of Project Studies120 S. Spíing Stíeet

Los Angeles, CA 90012213-897-7413.. i

¡

;

Cathy Wright, Senior Environmental PlannerBarbara Pilolla, Environmental PlannerAbbe Hoenscheid, Environmental PlannerKarl Price, Associate Environmental PlannerOffce of Environmental Planning

120 S. Spring StreetLos Angeles, CA 90012213-897-0687

City of Westlake Vilage-¡

l John Knipe P.E.City EngineerCity of Westlake Village4373 Park Terrace DriveWestlake Vilage, CA 91361

Mark Wessel, P.E.

Deputy City Traffc EngineerCity of Westlake Vilage4373 Park Terrace DriveWestlake Vilage, CA 91361

Wildan Associates - Prime Consultant

Teresa Kelley, Supervising EngineerDean Sherer, AICP, Principal PlannerRoger Kent, Consulting Senior Planner12900 Crossroads Parkway South, Suite 200Industry, CA 91746-3499562-908-6259

City of Westlake Vilage Undero Canyon Road at US 101

i.',

~ I

~I

L-Y

)

Pacific Southwest Biological Services - Biological Resources Subconsultant

R. Mitchel Beauchamp, M. Sc., PresidentP.O. Box 985Nationar City, CA 91951-0985619-477-5333

WPA Traffc Engineering. Inc. - Traffc Subconsultant

Wes Pringle, Principal, Weston Pringle Associates23421 south Pointe Drive, Suite 190Laguna Hils, CA 92653

McKenna et. ar. . Cultural Resources Subconsultant

Jeanette A. McKenna, M.A., Principal Investigator6008 Friends AvenueWhittier, California 90601-3724562-696-3852

City of Westlake Viiage Undero Canyon Road at US 101'nili,., C""..."",./L_..:______.i_1 A _______~.L

i. TITLE Vi ~oLlCY STATEMENT

'-i!ï;

TITLE ViPOLICY STATEMENT

¡

..J The California State Department of Transportation under Title Vi of the Civil Rights Act of

1964 and related statutes, ensures that no person in the State of California shall, on thegrounds of race, color, sex and national origin be excluded from participation in, be deniedthe benefis of, or be otherwise subjected to discrimination under any program or activity itadministers.

i.i

i, JEFF MORALESí Director

J

.1

'i." j

. ..

City of Westlake Vilage'_:4.:_1 r-I......_L-__ _~___ Lindero Canyon Road at US 101

,

. ~

.----",

j

Li

J. Mitigation Monitoring Plan

¡

)

A Mitigation Monitoring Plan has been prepared to describe the responsibilties andprocedures for monitoring the implementation of mitigation measures. The table on thefollowing page indicates: 1) the required mitigation measure, 2) when the implementation ofeach mitigation measure is to be monitored, 3) performance objectives (actions required tobe compieted), and 4) verification of compliance.

Cit of Westlake Viiage Lindero Canyon Road at US 101

,-,,.

......

......

. .._

_..,

"-.,-

_'._

.._--

.._".

..:...

'-~~.

Str

eet &

Ram

p Im

prov

emen

ts a

t Lin

dero

Can

yon

Roa

d an

d U

.S. H

ighw

ay 1

01M

itiga

tion

Mon

itori

ng P

lan

Env

iron

men

tal

Miti

gatio

n M

easu

reT

imin

g of

Miti

gatio

nPe

norm

ance

Ver

ific

atio

n of

Miti

gatio

n C

:om

plet

edC

once

rnM

easu

reO

bjec

tives

Com

plia

nce

Haz

ardo

us M

ater

ials

If gr

ound

wat

er is

enc

ount

ered

dur

ing

Con

stru

ctio

nM

onito

r fo

rD

ate

Com

plet

ed:

cons

truc

tion

and

dew

ater

ing

isco

mpl

ianc

e du

ring

Section E

nece

ssar

y, th

e ef

fuen

t gen

erat

edco

nstr

uctio

nPage 26

shal

l be

cont

aine

rize

d an

d di

spos

edphase. A record

of o

ff-si

te o

r be

trea

ted

and

of c

ompl

ianc

edi

scha

rged

on-

site

afte

r re

gula

tory

shal

l be

logg

edap

prov

al o

f app

ropr

iate

per

mits

.da

ily a

ndsu

bmiU

ed to

the

Publ

ic W

orks

Env

iron

men

tal

Dat

eIn

spec

tor

on a

Ove

rsig

htw

eekl

y ba

sis.

Haz

ardo

us M

ater

ials

If ex

cava

tion

of th

e se

wer

line

isC

onst

ruct

ion

Mon

itor

for

Dat

e C

ompl

eted

:co

nduc

ted

and

soil

affe

cted

by

com

plia

nce

durin

gSection E

chlo

rinat

ed V

OC

is e

ncou

nter

ed, t

heco

nstr

uctio

nPage 26

affe

cted

soi

l sha

ll be

con

tain

eriz

edphase. A record

and

disp

osed

of o

ff-si

te o

r be

trea

ted

of c

ompl

ianc

ean

d di

scha

rged

on-

site

afte

rsh

all b

e lo

gged

regu

lato

ry a

ppro

val o

f ap

prop

riat

eda

ily a

ndE

nvir

onm

enta

lD

ate

perm

its.

subm

itted

to th

eO

vers

ight

Pub

lic W

orks

Inspector 011 a

wee

kly

basi

s...

:ity

of W

estla

ke V

ilage

¡ilal

Stu

dylE

nviro

nmen

tal A

sses

smen

t40

Lin

dero

Can

yon

Roa

d at

US

101

ImD

mve

men

l!'

--._

-"",

,.--_

.....

..,-'.

.....,

--.-

."_.

,,.~~

._-

.,..

..w

__.~

..~.

--. -

,,-~"

_.."

/

Env

iron

men

tal

Miti

gatio

n M

easu

reT

imin

g of

Miti

gatio

nPe

norm

ance

Ver

ific

atio

n of

Miti

gatio

n C

ompl

eted

Con

cern

Mea

sure

Obj

ectiv

esC

ompl

ianc

eH

azar

dous

Mat

eria

lsSo

ils a

long

on-

ram

p G

-6 s

hall

beC

onst

ruct

ion

Mon

itor

for

Dat

e C

ompl

eted

:te

sted

for

aeria

lly d

epos

ited

lead

inco

mpl

ianc

e du

ring

Section E

acco

rdan

ce w

ith la

test

pol

icie

sco

nstr

uctio

nPage 26

durin

g th

e de

sign

sta

ge o

f Pha

ses

1phase. A record

and

2. If

suc

h so

ils a

re fo

und,

they

of c

ompl

ianc

esh

all b

e pr

oper

ly d

ispo

sed

of in

shal

l be

logg

edac

cord

ance

with

the

spec

ial

daily

and

Env

imnm

enta

lD

ate

man

agem

ent r

equi

rem

ents

of a

subm

itted

to th

eO

vers

ight

varia

nce

issu

ed to

CA

L T

RA

NS

by

Publ

ic W

orks

the

DS

TC

.In

spec

tor

& D

ST

Con

a w

eekl

y ba

sis.

'Iois

eT

o re

duce

noi

se le

vels

bel

ow th

eC

onst

ruct

ion

Mon

itor

for

Dat

e C

ompl

eted

:es

tabl

ishe

d no

ise

stan

dard

s of

the

com

plia

nce

durin

gS

ectio

n E

City

of W

estla

ke V

ilage

, the

pro

ject

cons

truc

tion

::age

28

shal

l com

ply

with

the

spec

ial

phase. A record

prov

isio

ns o

f the

City

's n

oise

of c

ompl

ianc

eor

dina

nce

addr

essi

ng c

Qns

truc

tion

shal

l be

logg

edno

ise,

incl

udin

g pr

ovis

ions

for

daily

and

Env

imnm

enta

lD

ate

limiti

ng h

ours

of c

onst

ruct

ion

in o

rder

subm

itted

to th

eO

vers

ight

to r

educ

e ad

vers

e ef

fect

s on

Publ

ic W

orks

sens

itive

rec

epto

rs.

Insp

ecto

r on

aw

eeld

y ba

sis.

:;ultu

ral R

esou

rces

If bu

ried

hist

oric

or

preh

isto

ricC

onst

ruct

ion

Mon

itor

for

Dat

e C

ompl

eted

:re

sour

ces

are

foun

d du

ring

the

com

plia

nce

durin

g3e

ctio

n E

exca

vatio

n ac

tiviti

es, e

xcav

atio

nco

nstr

uctio

n:)

age

32ac

tiviti

es s

hall

be h

alte

d an

d an

phas

e by

Pub

licar

chae

olog

ical

mon

itor

shal

l be

Wor

ks I

nspe

ctor

.retained to formally evaluate SLlch

Ret

ain

reso

urce

s fo

r th

eir

sign

ifica

nce

arch

eolo

gica

lE

nvir

rnm

enta

lD

ate

and/

or Im

port

ance

pur

suan

t to

mon

itor

ifO

vers

ight

CE

QA

.resources are

foun

d. -

;ty o

f Wes

tlake

Vila

gem

al S

fudy

lEnv

ironm

enta

l Ass

essm

ent

41L

inde

ro C

anyo

n R

oad

at U

S 10

1Im

prov

emen

ts

..._'

-._~

,,"'_

"__'

",,_

...~.

-

Env

iron

men

tal

Miti

gatio

n M

easu

reT

imin

g of

Miti

gatio

nPe

norm

ance

Ver

ific

atio

n of

Miti

gatio

n C

ompl

eted

Con

cern

Mea

sure

Obi

ectiv

esC

ompl

ianc

eB

iolo

gica

l Res

ourc

esN

ativ

e pl

ant s

peci

es s

hall

be u

sed

toPr

e-C

onst

ruct

ion!

Inco

rpor

ate

into

Dat

e C

ompl

eted

:re

vege

tate

em

bank

men

ts a

ndC

onst

ruct

ion

final

pla

ns a

ndSection E

road

way

edg

es. P

lant

ing

and

spec

ific

atio

ns a

ndPage 27

hydr

osee

ding

is r

ecom

men

ded

shal

lsi

gn o

ff by

be utilzed for erosion control

resi

dent

eng

inee

rpu

rpos

es.

and

mon

itorin

g by

Publ

ic W

orks

Env

iron

men

tal

Dat

eIn

spec

tor

durin

gO

vers

ight

cons

truc

tion.

Bio

logi

cal R

esol

/rce

sIf

proj

ect a

ctiv

ities

are

to o

ccur

dur

ing

Pre-

Con

stru

ctio

n!M

onito

r fo

rD

ate

Com

plet

ed:

the nestinq season of birds (March 1

Con

stru

ctio

nco

mpl

ianc

e du

ring

Section E

to S

eote

mbe

r11.

a p

re-c

onst

ruct

ion

cons

truc

tion

Pag

e 29

surv

eyfo

rbr

eedi

nqba

tsan

dph

ase

by P

ublic

swal

low

s an

d . o

ther

nes

ting

bird

sW

orks

Ins

pect

orsh

all b

e co

nduc

ted

oer

Cal

iforn

iaD

epar

tmen

tof

Fish

and

Gam

eE

nvir

onm

enta

lD

ate

Qui

delin

es.

A b

uffe

r of

at l

east

150

Ove

rsig

htfe

et f

or c

onst

ruct

ion

activ

ities

sha

ll be

mai

ntai

ned

for

any

activ

e bi

rd b

ests

(500

feet

for

ract

or n

ests

).

::mer

genc

y A

cces

sT

he a

pplic

ant s

hall

cons

ult w

ith lo

cal

Pre-

Con

stru

ctio

nIn

corp

orat

e in

toD

ate

Com

plet

ed:

polic

e, fi

re a

nd o

ther

em

erge

ncy

final

pla

ns a

nd3ection E

serv

ice

prov

ider

s to

dev

elop

spec

ific

atio

ns a

nd~

age

30te

mpo

rary

alte

rnat

ives

to th

e us

e of

sign

off

byLi

nder

o C

anyo

n R

oad

as a

nre

side

nt e

ngin

eer

emer

genc

y re

spon

se o

r ev

acua

tion

and

mon

itorin

g by

rout

e du

ring

proj

ect c

onst

ruct

ion.

Pub

lic W

orks

Env

iron

men

tal

Dat

eIn

spec

tor

durin

gO

vers

ight

cons

truc

tion.

ty o

f Wes

tlake

Vila

ge'fi

at S

tudy

lEnv

ironm

enta

t Ass

essm

ent

42L

inde

ro C

anyo

n R

oad

at U

S 10

1Im

nrnv

i:mi:n

l..

.. ,

~- J K. DISTRIBUTION/MAILING LIST

The following individuals and organizations were sent copies of the Draft IS/EA for their review andcomment:

Federal Offcials and Agencies

ij Hon. Barbara Boxer

U.S. Senator2250 E. Imperial Hwy.EI Segundo, CA 90245

DirectorOffce of Environmental AffairsDepartment of Health and Human Services200 Independence Ave. SW, Rm. 537 FWashington, DC 20201

Hon. Dianne FeinsteinU.S. Senator11111 Santa Monica Blvd. # 915Los Angeles, CA 90048

DirectorOffce of Environmental AffairsDept. of Health and human Services200 Independence Ave. SW, Rm. 537FWashington, DC 20201

;... -I

Hon. Brad ShermanCongressman, District 2421031 Ventura Blvd.Woodland Hils, CA 91364 Centers for Disease Control

Environmental Health and Injury ControlSpecial Programs Group, MS F-291600 Clifton RoadAtlanta, GA 30333

Environmental Protection Agency (EP A)

Offce of Federal Activities (A-I04)401 "M" Street, SWWashington, DC20460

EIS Coordinator, Region 9Environmental Protection Agency75 Hawthorne St.San Francisco, CA 94105

Federal Transit AdministrationRegion 9

201 Mission Street, Suite 2210San Francisco, CA 94105

DirectorOffce of Environmental Policy and ComplianceU. S. Department of InteriorMain Interior Building 1\S 23401849 C Street, NWWashington, DC 20240

District EngineerU. S. Army Corps of Engineers300 N. Los Angeles StreetLos Angeles, CA 90012

Director, Offce of Environmental ComplianceU. S. Department of Energy1000 Independence Ave., SW, Rm. 4G-064Washington, DC 20585

Emironmental Clearance OffcerDepartment of Housing and UrbanDeyelopment450 Goiden Gate AvenueP. O. Box 36003San Francisco, CA 94102

State Offcials and Agencies

Hon. Sheil:: KuehlState Senator. District 23

10951 W Pico Blvd. #202Los .-\ngl'i's. c..\ 9006''

Hon. Fr::n PavleyState Asseinblyinember, Dist. .. i6355 Topanga Cyn. Blvd. Ste. 205Woodl:ind Hills. CA 9l367

( ïn' o( We'xihike' I -¡/Jiig,.liiiiiiii Si"d,. /':I1'irO/lI1(,IIII/ .-1-'.,....'-11('11

4 \!.iide'/O ( '0111',,,, Rood ell I 'S 1111

I mprcJ\ '( 'IIJ( on t."

Mr. Doii DrachaiieCalifornia Air Resources BoardP.O. Box 8001

Ei Monte, CA 91734

Executive OffcerState Lands Commission1807 13"1 Street, RoomJ 01

CommanderCalifornia Highway PatrolWest VaHey Offce

5825 De So to Ave.Woodland Hils 91367-5297

SecretaryResources Agency13lh Floor, 1416 Ninth StreetSacramento, CA 95814

DirectorDepartment of Conservation1416 Ninth Street

Sacramento, CA 95814

Native American Heritage Commission915 Capitol Mall, Rm 288Sacramento, CA 95814

Mr. Dennis Dickerson

Executive Director

Water Quality Control BoardLos Angeles Region320 W. 41h St., Ste. 200Los Angeles, CA 90013

Paul EdelmanSanta Monica Mountains Conservancy5750 Ramirez Canyon Rd.Malibu, CA 90265

Charles RaysbrookRegional ManagerCalifornia Department of Fish and Game, Region 54949 View Ridge Ave.

San Diego, CA 92123Sacramento, CA 95814

Mr. Hans KreutzbergOffce of Historic PreservationDepartment of Parks and RecreationP.O. Box 94289Sacramento, CA 95296

:)

DirectorDepartment of Parks and Recreation1416 Ninth Street

Sacramento, CA 95814

Local Officials and Agencies

Hon. Zev YaroslavskySupervisor, Third DistrictCounty of Los Angeles500 W. Temple St., Room 821Los Angeles, CA 90012

Mr. James Lents

Executive Offcer. South Coast Air Quality Management District21865 E. Copley Dr.

Diamond Bar, CA 91765

Ron. Mark RutherfordMayorCity of Westlake Vilage4373 Park Terrace Drive

Westlake ViIage, CA 91361

Ray MaekawaTransportation Projects ManagerLos Angeles Metropolitan Transportation Authority

P.O. Box 194Los Angeles, CA 90053

(ïii. ol- ir,'sll,ik,' lïllogi'liiÙj,i/ ,\(11.1'- fll'l'Ù'O/illh'Il'iil .-f.'ì.'l'.\'SIIl("J( .i.

Liiide!"" ('IWI'OIl R""diul 'S 101blll'n)\'t'II('lJ(S

L. COMMENTS RECEIVED AND RESPONSES TO COMMENTS

The Draft Initial Study/Environmental Assessment was circulated for public and agencyreview from May 3. 2001 through June 18. 2001.

The foilowing letters were received from reviewing agencies:

1. Letter from C.F. Raysbrook. Regional Manaqer. California Department of Fish andGame. South Coast Region. June 19. 2001.

Letter No.1 - California Department of Fish and Game. South Coast Region

Comment #1: The California Department of Fish and Game (CDFG) indicates that the twobridges within the project area. the Lindero Canyon Bridge and the Agoura Road Bridge,could provide habitat for bats and/or cliff swallows and. that vegetated areas within theproject footprint could additionally provide nestinq habitat for other native birds. The CDFGrecommends that a pre-construction survey be conducted for breeding bats and swallowsand that a similar survey be conducted for nestinq birds. A buffer of at least 150 feet fromactive bird nests (500 feet for raptor nests) is recommended to be maintained.

Response: The following mitigation measure will be added to the project to respond tothese concerns:

Bioloqical Resources

If project activities are to occur during the nesting season of birds (March 1 toSeptember 1). a pre-construction survey for breeding bats and swallows and othernesting birds shall be conducted per California Department of Fish and Gamequidelines. A buffer of at least 150 feet for construction activities shall bemaintained for any active bird bests (500 feet for raptor nests).

,._Î

ï.,

J

Comment #2: The CDFG requests clarification of potential impacts to water quality in thedrainage channel adjacent to the construction site, including indirect impacts todownstream wildlife and wildlife habitat.

Response: There is minimal potential for construction activities to affect water quality inthe drainage channeL. Although the Agoura Road Bridge over the channel wil be widened,project conformance with applicable National Pollutant Discharge Elimination (NPDES)requirements and implementation of a Storm Water Pollution Prevention Plan (SWPPP) wiladequately mitigate potential impacts to water quality in the channeL.

Comment #3: The CDFG recommends including other feasible mitigation measures tomitigate pollutant run-off in addition to compliance with a Storm Water Pollution PreventionPlan (SWPPP).

..

--

-.-!ì

Response: As indicated in the Draft Initial Study/Environmental Assessment. the projectwil be required to obtain a General Construction Activity Storm Water permit. issued by theRegional Water Quality Control Board to implement the provisions of the National PollutantDischarqe Elimination System (NPDES) for the project. In addition. the project wil berequired to implement a Storm Water Pollution Prevention Plan (SWPP) to controlconstruction-related runoff. These measures should be adequate in addressinq potentialwater quality impacts:

A mitigation measure exists (Mitiqation Measure No.5) which requires native plant speciesbe used to revegetate embankments and roadway edges and recommends that plantingand hydroseeding be implemented for erosion control purposes. This mitigation measurewil be revised to address CDFG's concerns as follows:

Biological Resources

Native plant species shall be used to revegetate embankments and roadway edges.

Planting and hydroseeding is recommended shall be utilzed. for erosion controlpurposes.

Comment #4: The CDFG expresses concerns that the project may affect a streambed andthat a Streambed Alteration Agreement may be needed for the project.

Response: The project will not cross a streambed and there will be no alteration to anexistinq streambed. Therefore, a Streambed Alteration Agreement wil not be needed.