Country Presentations Kenya MDG Based Planning Workshop Dar es Salaam.
-
Upload
steven-joseph -
Category
Documents
-
view
213 -
download
0
Transcript of Country Presentations Kenya MDG Based Planning Workshop Dar es Salaam.
![Page 1: Country Presentations Kenya MDG Based Planning Workshop Dar es Salaam.](https://reader035.fdocuments.in/reader035/viewer/2022080905/56649e685503460f94b64431/html5/thumbnails/1.jpg)
Country PresentationsKenya
MDG Based Planning Workshop
Dar es Salaam
![Page 2: Country Presentations Kenya MDG Based Planning Workshop Dar es Salaam.](https://reader035.fdocuments.in/reader035/viewer/2022080905/56649e685503460f94b64431/html5/thumbnails/2.jpg)
Milestones and Timelines in the National Planning Process
• Kenya’s national long term planning has been anchored on the sessional papers (10-15 yrs);
• 5-7 year development plans form the medium term strategies;
• The Economic Recovery Strategy (ERS) (2003-2007) is the current medium term strategy;
• Investment Programme of the ERS (IP-ERS) that gives the coordination mechanism and cost of interventions prepared;
• M and E system to track and report on progress established.
![Page 3: Country Presentations Kenya MDG Based Planning Workshop Dar es Salaam.](https://reader035.fdocuments.in/reader035/viewer/2022080905/56649e685503460f94b64431/html5/thumbnails/3.jpg)
Milestones and Timelines in the National Planning … Cont.
• ERS has strong political support and went through elaborate consultative process;
• ERS has clear targets – macro and sectoral level;
• In some cases ERS is more ambitious than MDGs e.g. Health and education.
• We have 5 yr district plans, whose review is expected in 2007;
• We also have annual district and constituency based initiatives that are open in approach but focus on MDGs- CDF, LATF, Bursary funds, etc.
![Page 4: Country Presentations Kenya MDG Based Planning Workshop Dar es Salaam.](https://reader035.fdocuments.in/reader035/viewer/2022080905/56649e685503460f94b64431/html5/thumbnails/4.jpg)
Next Steps in the Process
• MDG Needs Assessment already carried out;• Development of a long term strategy on MDGs
that will be in line with the new long term vision (Vision 2030) being is being developed;
• ERS comes to an end in 2007. A mid-term review has already been carried out.
• There will be need to ensure that that the next strategy is fully aligned to MDGs;
![Page 5: Country Presentations Kenya MDG Based Planning Workshop Dar es Salaam.](https://reader035.fdocuments.in/reader035/viewer/2022080905/56649e685503460f94b64431/html5/thumbnails/5.jpg)
Challenges
• Lack of/inconsistency of data;• Possible unrealistic final cost estimates due to failure to
cross-reference between sectors;• Most MDG enablers (infrastructure, trade, etc.) “costed”
using different methodologies – issues of consistency;• Mobilization of all stakeholders, especially some of the
donors and stakeholders at the sub-national level• Taking the process to the sub-national, especially
community level; • Capacity development at all levels and in all sectors• Securing adequate resources MDGs – improving aid
uptake, filling resource gaps, etc
![Page 6: Country Presentations Kenya MDG Based Planning Workshop Dar es Salaam.](https://reader035.fdocuments.in/reader035/viewer/2022080905/56649e685503460f94b64431/html5/thumbnails/6.jpg)
Support Required on:
• Development of MDG based long term plan
• Development of sectoral Quick Win strategies.