COUNTRY INN & SUITES - Tyson and Billy Architects, P.C. · bm-# concrete beam mark * joist bottom...
Transcript of COUNTRY INN & SUITES - Tyson and Billy Architects, P.C. · bm-# concrete beam mark * joist bottom...
217 Ward CircleBrentwood, Tennessee 37027
Phone: 615.661.7979 Fax: 615.661.0644www.trcww.com
ENG. JOB NO. 15BRW073
Tyson a
nd B
illy A
rchitects
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd, IL
61107
(815)
229-8
222
FA
X (
815)
229-8
218
ww
w.tysonandbilly
.com
Sheet No:
of 1 sheets
Drn
.A
ppd.
Pro
ject N
um
ber
Date
Rev. Date
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
15-1
08
50
--
12
/4/2
015 3
:51
:01 P
MC
:\U
ser s
\jwells
\Docum
ents
\15B
RW
07
3-
Centr
al R
16_
JW
ells
.rvt
COUNTRY INNS & SUITES BY CARLSON
CANTON, TX
S0.0
STRUCTURAL COVER SHEET
CANTON HOTEL JOINT VENTURE
12-0
4-2
015
STRUCTURAL DRAWING LIST
SHEET NUMBER SHEET NAME
FOUNDATION PACKAGE
12-04-2015
S0.0 STRUCTURAL COVER SHEET ●
S0.1 STRUCTURAL GENERAL NOTES ●
S0.2 QUALITY ASSURANCE PLAN ●
S0.3 WIND PRESSURE DIAGRAMS & TABLES
S0.4 TYPICAL FOUNDATION DETAILS ●
S0.5 TYPICAL WOOD DETAILS
S1.0 FOUNDATION & FIRST FLOOR PLAN_AREA A ●
S1.1 FOUNDATION AND FIRST FLOOR PLAN _ AREA B ●
S2.0 LEVEL 2 FLOOR FRAMING PLAN - AREA A
S2.1 ROOF FRAMING PLAN - AREA B
S3.0 LEVEL 3 FLOOR FRAMING PLAN
S4.0 ROOF FRAMING PLAN
S5.0 FOUNDATION SECTIONS ●
S6.0 FLOOR FRAMING SECTIONS
S7.0 ROOF FRAMING SECTIONS
S8.0 SCHEDULES AND DETAILS
COUNTRY INN & SUITESCANTON, TX
HATCH LEGEND
SYMBOL LEGEND SECTIONPLAN
ABBREVIATIONS
- APPROXIMATELY
- ALTERNATE
- ANCHOR RODAR
APPROX
ALT
- BUILDING
- ARCHITECTURAL
- CONTRACTOR
- CONTINUOUS
- CONFIGURATION
- CONCRETE
- CENTERLINE
- CAST IN PLACE
CJ
CL
CIP
CMU
COL
CONC
CONFIG
CONT
CONTR
CLR
CTR - CENTER
- COLUMN
- CLEAR
BM
B/
ARCHL
BLDG
BOTT
BRG
C/C
- BOTTOM
- BEAM
- BEARING
- BOTTOM OF
DET - DETAIL
- ELEVATION/ELEVATOR
- ELEVATION
- EXPANSION JOINT
- EACH FACE
- DIMENSION
- DIAMETER
- EXPANSION
- EACH WAYEW
FIN
EXIST
EXP
FLR - FLOOR
- FINISH
- EXISTING
DIA
DN
DIM
EA
EJ
EL
EF
DWG
ELEV
DR
EQ
- EACH
- EQUAL
- DRAWING
- DOOR/DRAIN
- DOWN
EE - EACH END
- FAR SIDE
- HOLLOW CORE
- GALVANIZED
HC
FS
GA
FT
FOM
FTG
GALV
- GAGE
- FOOTING
- FOOT
HDG
- FOUNDATIONFND
DBL - DOUBLE
- FACE OF MASONRY
- CONTRACTION JOINT
- CENTER TO CENTER
- CONCRETE MASONRY UNIT
- HOT DIPPED GALVANIZED
- ARCHITECTARCH
- HIP GIRDERHG
- GIRDER TRUSSGT
EOS - EDGE OF SLAB
BC - BOTTOM CHORD
EXT - EXTERIOR
- HOLLOW CORE PLANKHCP
- ENGINEERENGR
- HOOKHK
- GENERAL CONTRACTORGC
EOR - ENGINEER OF RECORD
L - ANGLE
LG
LW
- LONG
- METAL
- PLATE
NTS
PLF
PSF
OC
OPNG
PART
PL
MTL
MIN
MISC
NIC
NS
MFR
MATL
MAX
MECHL
MAS
MO
PCJ
- MATERIAL
- MINIMUM
- MECHANICAL
- MAXIMUM
- MASONRY
- NEAR SIDE
- ON CENTER
- OPENING
- PARTITION
- MANUFACTURER
- MASONRY OPENING
- MISCELLANEOUS
- NOT TO SCALE
- NOT IN CONTRACT
- POUNDS PER LINEAR FOOT
- POUNDS PER SQUARE FOOT
- PRECAST CONCRETE JOIST
- LONG WAY
REM
- SLOPE
- ROOM
- SIMILAR
- SPIRAL
- STEEL
SW
STL
STRUCTL
SECT
SIM
STD
SQ
SP
SL
REQD
REV
SCHED
RM
RO
- RISER/RADIUS
REINF
R
PT
- REMAINDER
- ROUGH OPENING
- REQUIRED
- STANDARD
- SECTION
- SQUARE
- SCHEDULE
- STRUCTURAL
- REVISED/REVISION
- SHEARWALL/SHORT WAY
- REINFORCING
- POST TENSIONED/PRESSURE TREATED
- WITH
WWR
UNO
VERT
WP
W/
- TREAD/TRUSS
T/
TEMP
TYP
TR
T/O
TC
- UNLESS NOTED OTHERWISE
- VERTICAL
- WORK POINT
- WELDED WIRE REINFORCEMENT
- TIE COLUMN/TOP CHORD
- TOP OF
- THRU OUT
- TYPICAL
- TEMPERATURE
- TIE BEAMTB
- POUNDS PER SQUARE INCHPSI
- INTERIOR
- INFORMATION
- ISOLATION JOINT
- HIGH POINT
- HORIZONTAL
HP
IJ
HORIZ
INT
JT
KJ
INFO
- JOINT
- CONSTRUCTION JOINT
LP - LOW POINT
W/O - WITHOUT
TJ - TIE JOIST
- SLAB-ON-GRADESOG
JR - JAMB REINFORCING
WD - WOOD
OH - OPPOSITE HAND
PARTL - PARTIAL
PAF - POWDER ACTUATED FASTENERS
- IRREGULARIRR
RQMTS - REQUIREMENTS
- REGULARREG
LLV - LONG LEG VERTICAL
LLH - LONG LEG HORIZONTAL
- HIGH STRENGTHHS
SS - STAINLESS STEEL
KLF - KIPS PER LINEAR FOOT
KIP(s) - 1000 POUNDS
K - KIP(s)
- INSULATIONINS
(FOR STRUCTURAL DRAWINGS ONLY)
PED - PEDESTAL
- SPECIFICATIONSSPECS
REVISIONS
FOOTING MARK
COLUMN MARK
GRADE BEAM MARKGB-#
PILE CAP MARKPC#
MOMENT CONNECTION(SEE SECTION)
2-#6 VERTICAL REINFORCING
MOMENT SPLICE
CONCRETE BEAM MARKBM-#
*
JOIST BOTTOM CHORD EXTENSION
SLOPE
S SLIP CONNECTION
ENGINEERED FILL ORUNDISTURBED SOIL
CONCRETE
RECESS
AGGREGATE FILL
STEEL
EXISTING
BLOCK
BRICK
ROCK
-
#
ENGINEERED FILL ORUNDISTURBED SOIL
CONCRETE
RECESS
AGGREGATE FILL
STEEL
EXISTING
BLOCK
BRICK
ROCK
EOBP - EDGE OF BENT PLATE
1
SLOPE
GENERAL DESIGN AND CODE INFORMATION:
A. THE CONSTRUCTION OF THIS STRUCTURE SHALL CONFORM WITH THE BUILDING CODE DEFINED AS THE 2006 INTERNATIONAL BUILDING CODE.
B. CONCRETE: BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318, LATEST EDITION).
C. PRECAST CONCRETE: PCI MANUAL 116 FOR QUALITY CONTROL FOR PLANTS AND PRODUCTION OF STRUCTURAL PRECAST CONCRETE PRODUCTS (LATESTEDITION).
D. STRUCTURAL STEEL:
1. SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, ALLOWABLE STRESS DESIGN, AND PLASTIC DESIGN, AMERICAN INSTITUTE OF STEEL CONSTRUCTION(LATEST EDITION).
2. LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS (LATEST EDITION).
E. OPEN WEB STEEL JOISTS: STANDARD SPECIFICATIONS, LOAD TABLES, AND WEIGHT TABLES FOR STEEL JOISTS AND JOIST GIRDERS, SJI (LATEST EDITION).
F. STEEL DECK: STEEL DECK INSTITUTE DESIGN MANUAL FOR COMPOSITE DECKS, FORM DECKS, ROOF DECKS, AND CELLULAR METAL FLOOR DECK WITHELECTRICAL DISTRIBUTION (LATEST EDITION).
G. MASONRY: BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES (ACI 530, LATEST EDITION) AND SPECIFICATION FOR MASONRY STRUCTURES (ACI530.1, LATEST EDITION).
H. TIMBER: NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION, NATIONAL FOREST PRODUCTS ASSOCIATION (LATEST EDITION).
I. STRUCTURAL METAL STUDS: SPECIFICATION FOR DESIGN OF COLD-FORMED STEEL STRUCTURAL MEMBERS, AMERICAN IRON AND STEEL INSTITUTE (LATESTEDITION).
J. CONTRACTOR SHALL MAKE ALLOWANCE FOR SUPPLYING AND INSTALLING TWO TONS OF REINFORCING STEEL OF VARIOUS SIZES TO BE USED IN PLACE AT THEDISCRETION OF THE STRUCTURAL ENGINEER.
DESIGN LOADS:
A. THE ROOF IS DESIGNED FOR A LIVE LOAD OF 20 PSF OR THE ROOF IS DESIGNED FOR SNOW LOADS IN ACCORDANCE WITH THE ABOVE NOTEDCODE WITH DISTRIBUTION COEFFICIENTS APPLIED TO THE BASE LOAD AS REQUIRED. WHERE SNOW LOADS DO NOT GOVERN, MEMBERS AREDESIGNED FOR A LIVE LOAD OF 20 PSF. THE FOLLOWING COEFFICIENTS WERE USED:
1. FLAT SNOW LOAD (PF)........................................5 PSF2. SNOW EXPOSURE FACTOR (CE).......................1.03. SNOW LOAD IMPORTANCE FACTOR (I).............1.04. THERMAL FACTOR (CT).......................................1.0
B. FLOORS ABOVE GRADE HAVE BEEN DESIGNED FOR THE FOLLOWING LIVE LOADS. ALL LIVE LOADS ARE REDUCED FROM THE BASE LIVE LOADSSHOWN AS ALLOWED IN THE ABOVE REFERENCED BUILDING CODE.
CORRIDORS ABOVE FIRST FLOOR ……….………….….…….….……….40 PSFPRIVATE ROOMS..............................................................................…....40 PSFPUBLIC ROOMS…………………………………………………………………100 PSFSTAIRS, EXITWAYS……...........................................................................100 PSFLIGHT STORAGE AREA……………………………………………..…………100 PSF
C. DESIGN LOADS FOR THE ROOF SYSTEMS ARE INDICATED ON THE STRUCTURAL DRAWINGS.
D. THE STRUCTURE WAS DESIGNED FOR THE FOLLOWING WIND LOADS:1. BASIC WIND SPEED………………………..90 MPH2. WIND IMPORTANCE FACTOR (I).............1.03. WIND EXPOSURE.....................................C
E. THE STRUCTURE WAS DESIGNED FOR THE FOLLOWING SEISMIC LOADS:1. OCCUPANCY CATEGORY......................................II
………..SEISMIC IMPORTANCE FACTOR…………….…...1.02. MAPPED SPECTRAL RESPONSE ACCELERATIONS
SS...........................................................................0.123S1...........................................................................0.054
3. SITE CLASS.........................................................D4. SDS.......................................................................0.131
………...SD1.......................................................................0.0865. SEISMIC DESIGN CATEGORY...........................B6. BASIC SEISMIC FORCE RESISTING SYSTEM – LIGHT-FRAMED WALLS SHEATHED WITH WOOD STRUCTURAL PANELS RATED FOR SHEAR
RESISTANCE 7. BASE SHEAR......................................................0.020 x W KIPS
8. SEISMIC RESPONSE COEFFICIENT (Cs)….....0.029. RESPONSE MODIFICATION FACTOR (R)…....6.510. ANALYSIS PROCEDURE...................................EQUIVALENT LATERAL FORCE
F. FLOORS SUPPORTED CONTINUOUSLY ON GRADE ARE NOT DESIGNED FOR ANY SPECIAL POINT LOADS. THE DESIGN LIVE LOAD FOR THE SLAB ONGRADE IS 100 PSF
G. THE DESIGN ADEQUACY AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC. ARE THE RESPONSIBILITY OF THECONTRACTOR. THE TEMPORARY BRACING SUPPORTS FOR THE STRUCTURE SHALL REMAIN IN PLACE UNTIL PERMANENT BRACING IS IN PLACE. THESTRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER THE BUILDING IS COMPLETE. IT IS THE CONTRACTORS RESPONSIBILITY TODETERMINE ERECTION PROCEDURES AND SEQUENCE TO INSURE SAFETY OF THE BUILDING AND ITS COMPONENTS DURING ERECTION.
H. THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND COORDINATE WITH ARCHITECTURAL DRAWINGS. IMMEDIATELY NOTIFY ARCHITECT OF ANYDISCREPANCIES.
I. SHOP DRAWINGS SHALL NOT BE REVIEWED FOR APPROVAL UNLESS CHECKED BY THE FABRICATOR AND APPROVED BY THE CONTRACTOR.SUBMIT A MAXIMUM OF FOUR SETS OF DRAWINGS FOR REVIEW. ONE SET WILL BE KEPT BY OUR OFFICE.
J. SHOP DRAWINGS SHALL NOT CONTAIN DETAILS COPIED OR REPRODUCED FROM THE CONTRACT DOCUMENTS. REPRODUCTION OF THE CONTRACTDOCUMENTS SHALL RESULT IN A REJECTION OF THE SHOP DRAWINGS.
K. TRC IS NOT RESPONSIBLE FOR THE DESIGN AND DETAILING OF LOUVERS, SUNSHADES, GATES, RAILS AND OTHER NOT-STRUCTURAL ELEMENTSUNLESS SPECIFICALLY SHOWN IN THE STRUCTURAL CONTRACT DOCUMENTS.
SPECIAL INSPECTION:
A. SPECIAL INSPECTIONS ARE REQUIRED PER THE ABOVE REFERENCED CODE FOR THE FOLLOWING PORTIONS OF CONSTRUCTION.1. CONCRETE2. BOLTS INSTALLED IN CONCRETE3. REINFORCING STEEL4. STRUCTURAL WELDING AND BOLTING5. STRUCTURAL MASONRY
FOUNDATION DESIGN INFORMATION:
A. THE FOUNDATION DESIGN IS BASED ON THE RECOMMENDATIONS CONTAINED IN THE SOILS REPORT ENTITLED"GEOTECHNICAL ENGINEERING REPORT – COUNTRY INN AND SUITES HOTEL CANTON, TEXAS"DATED SEPTEMBER 29, 2015 BY AUCKLAND CONSULTING, LLC.
B. IT IS IMPERATIVE THAT THE CONTRACTOR OBTAIN, READ, AND UNDERSTAND THE REPORT. ALL RECOMMENDATIONS WITHIN THE REPORT SHOULDBE FOLLOWED.
C. ASSUMED SAFE SUBGRADE BEARING CAPACITIES LISTED BELOW SHALL BE CONFIRMED IN THE FIELD BY A REGISTERED GEOTECHNICAL ENGINEER:
ISOLATED SPREAD FOOTINGS.....................1500 PSFCONTINUOUS FOOTINGS..............................1500 PSF
D. ASSUMED SUBGRADE MODULUS FOR SLAB ON GRADE DESIGN IS 100 PCI. PROPER PREPARATION OF THE SUBGRADE AND SUBSEQUENT MONITORING BYA REGISTERED GEOTECHNICAL ENGINEER IS CRITICAL FOR THE PERFORMANCE OF THE SLAB ON GRADE.
E. WALLS RETAINING EARTH ARE DESIGNED FOR LATERAL EARTH PRESSURE OF 100 PCF. BACKFILL ALL WALLS WITH FREE DRAINING CRUSHED STONE.PROVIDE A DRAIN SYSTEM THAT IS PART OF THE STRUCTURE.
F. FOUNDATION WALLS WITHOUT CANTILEVERED FOOTINGS SHALL NOT BE BACKFILLED UNTIL SHORED OR PERMANENTLY SUPPORTED AT THE TOPOF THE WALL.
G. FOOTINGS ARE TO BEAR ON FIRM UNDISTURBED EARTH, APPROVED CONTROLLED FILL, WEATHERED ROCK, OR SOUND ROCK.
H. WHERE UNACCEPTABLE MATERIAL OCCURS, EXCAVATE AND REPLACE WITH ENGINEERED FILL OR MATERIAL NOTED IN GEOTECHNICAL REPORT.
I. THE REGISTERED GEOTECHNICAL ENGINEER IN THE FIELD SHALL VERIFY THAT ALL SITE PREPARATION FILL OPERATIONS AND BEARING CONDITIONCOMPLY WITH THE SOILS REPORT.
REINFORCED CONCRETE AND CONCRETE REINFORCEMENT:
A. MINIMUM COMPRESSIVE STRENGTH OF CONCRETE AT 28 DAYS (F'C) SHALL BE AS FOLLOWS:FOOTINGS..............................................................3000 PSIINTERIOR SLAB ON GRADE.................................3000 PSIALL OTHER CONCRETE........................................4000 PSI
B. CONCRETE EXPOSED TO FREEZING AND THAWING SHALL HAVE A MAXIMUM WATER/CEMENT RATIO OF 0.45. ALL CONCRETE SUBJECTED TODEICERS AND/OR REQUIRED TO BE WATERTIGHT SHALL HAVE A MAXIMUM WATER/CEMENT RATIO OF 0.45. PROVIDE ENTRAINED AIR AS PER ACI 318.
C. ALL PIPE PENETRATIONS THROUGH SLABS SHALL BE SLEEVED, UNLESS OTHERWISE NOTED.
D. ALL CONCRETE SHALL BE VIBRATED BY MECHANICAL VIBRATORS.
E. NO REPAIR OR RUBBING OF THE CONCRETE SURFACES SHALL BE MADE PRIOR TO INSPECTION BY AND WITH THE APPROVAL OF THE ARCHITECT.
F. REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO ASTM A615, GRADE 60.
G. ALL LAP SPLICES FOR REINFORCING BARS SHALL BE "CLASS B", UNLESS NOTED OTHERWISE. LAP WWFA MINIMUM OF 6".
H. CONCRETE PLACEMENT SHALL NOT TAKE PLACE UNTIL INSPECTION BY AUTHORIZED AGENT OF THE ARCHITECT.
I. CLEAR COVER DISTANCE FOR REINFORCING STEEL SHALL BE PROVIDED AS FOLLOWS (UNLESS NOTED OTHERWISE).
FOOTINGS............................................................3" BOTTOM AND SIDESDRILLED PIERS....................................................3" CLEAR OF TIESBELLED PIERS.....................................................3" CLEAR OF TIESPILE CAPS............................................................3" BOTTOM AND SIDES, 2" TOPGRADE BEAMS.....................................................3" BOTTOM AND SIDES, 2" TOPWALLS...................................................................11/2"PEDESTAL............................................................11/2" CLEAR OF TIESCOLUMNS.............................................................11/2" CLEAR OF TIESBEAMS..................................................................11/2" CLEAR OF TIESGIRDERS IN JOIST FLOOR SYSTEM…………....21/4" CLEAR OF TIESGIRDERS...............................................................11/2" CLEAR OF TIESWIDE MODULE JOISTS.......................................11/2" TOP, BOTTOM AND SIDESSLABS................................................................... 3/4"
MAXIMUM DEVIATION IN BAR PLACEMENT SHALL BE PLUS OR MINUS 1/4" FOR SECTION 10" OR LESS AND 1/2" FOR SECTION OVER 10" THICK. SEE ACI 318SECTION 2.7.1 FOR CONDITIONS NOT LISTED.
STRUCTURAL STEEL, AND STEEL STAIRS:
A. STRUCTURAL STEEL
1. ALL STRUCTURAL STEEL WORK SHALL CONFORM TO THE AISC "SPECIFICATIONS FOR THE DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS", LATEST EDITION.
2. ALL STRUCTURAL STEEL WIDE FLANGE MEMBERS SHALL BE ASTM A572 OR ASTM A992, GRADE 50. OTHER MISCELLANEOUS SHAPES SHALL BE ASTM-36, UNLESS NOTED OTHERWISE.
3. STRUCTURAL TUBING SHALL CONFORM TO ASTM A-500, GRADE B, UNLESS NOTED OTHERWISE. CIRCULAR STRUCTURAL PIPING SHALL BE ASTM A53, GRADE B.
4. STEEL FRAMING CONNECTIONS SHALL BE BOLTED OR WELDED. BOLTS SHALL BE 3/4" DIAMETER MINIMUM AND SHALL BE ASTM A-325 BEARING TYPE CONNECTION, UNLESS NOTED OTHERWISE. BOLTS IN MOMENT CONNECTIONS, X-BRACES, SKYLIGHT FRAMES, OR OTHER LOCATIONS NOTED SHALL BE INSTALLED WITH APPROVED DIRECT TENSION INDICATORS, OR BE APPROVED INDICATOR BOLTS. BOLTS IN TYPICAL SHEAR CONNECTIONS SHALL BE SNUG TIGHT ONLY.
5. ANCHOR BOLTS SHALL BE ASTM A-307 OR F1554, Fy = 36 KSI.
6. FRAMED BEAM CONNECTIONS SHALL DEVELOP THE REACTION SHOWN FOR THE ENDS OF BEAMS ON STRUCTURAL PLANS. IN NO CASE SHALLTHE LENGTH OF THE FRAMED CONNECTION BE LESS THAN 1.2 (OR 1.4 FOR COMPOSITE BEAMS) THE ALLOWABLE UNIFORM LOAD FOR LATERALLY SUPPORTED BEAMS AS SHOWN IN PART 2 OF THE AISC MANUAL.
7. WELDS SHOWN ON THE STRUCTURAL DRAWINGS ARE THE MINIMUM REQUIRED BY DESIGN. THE FABRICATORS DRAWINGS SHALL SHOW WELDS AND THEY SHALL CONFORM TO A.W.S. SPECIFICATIONS. ALL WELDING SHALL BE DONE WITH E-70 SERIES ELECTRODES. MINIMUM WELD SIZE SHALL BE 3/16".
8. PAINT ALL STRUCTURAL STEEL WITH A HIGH GRADE RUST-INHIBITING PRIMER. USE RED OXIDE PRIMER UNLESS OTHERWISE NOTED. THE COMPATIBILITY OF PRIMER AND ANY TOP COAT SHALL BE VERIFIED BEFORE ANY PAINTING IS STARTED. TOUCH-UP ALL EXPOSED STEEL AFTER FIELD INSTALLATION. ALL STRUCTURAL STEEL WHICH IS EXPOSED TO THE ELEMENTS SHALL RECEIVE TWO COATS OF EXTERIOR ENAMEL WHICH IS COMPATIBLE TO THE PRIMERED SURFACE. DO NOT PAINT STEEL TO RECEIVE SPRAYED-ON FIREPROOFING.
9. ALL STEEL EXPOSED TO WEATHER IN THE COMPLETE STRUCTURE SHALL BE COATED WITH A ZINC RICH PRIMER.
10. DETAILS AND CONNECTIONS COMPLETELY DETAILED IN THE CONTRACT DOCUMENTS SHALL NOT BE ALTERED WITHOUT WRITTEN APPROVAL BY THE ENGINEER OF RECORD.
11. STEEL CONNECTIONS NOT SPECIFICALLY DETAILED IN THE STRUCTURAL DRAWINGS SHALL BE DESIGNED BY THE CONTRACTOR. THIS DESIGNSERVICE SHALL BE INCLUDED IN THE CONTRACTOR’S SCOPE OF SERVICES. SHOP DRAWINGS OF SUCH CONNECTIONS SHALL BE SEALED BYAN ENGINEER LICENSED IN THE PROJECT STATE.
B. STEEL STAIRS
1. RAILINGS, POSTS, AND CONNECTIONS SHALL BE CAPABLE OF RESISTING A HORIZONTAL LOADING OF 50 PLF OR 200 LBS. APPLIED AT TOP RAILWITHOUT EXCEEDING ALLOWABLE STRESSES INCREASED BY ONE-THIRD. MAXIMUM SPACING OF 1~8"∅ STD. STEEL PIPE POSTS SHALL BE4'-0". DESIGN OF RAILS, POSTS, AND CONNECTIONS SHALL BE THE RESPONSIBILITY OF THE STAIR MANUFACTURER. SUBMIT SIGNED AND STAMPED CALCULATIONS WITH SHOP DRAWINGS.
2. STEEL STAIR WITH CONCRETE FILLED STEEL PAN OR PRECAST CONCRETE TREADS: SEE ARCHITECTURAL DRAWINGS FOR STAIR DIMENSIONSAND LOCATIONS. STAIR MANUFACTURER SHALL SUBMIT SIGNED AND STAMPED STRUCTURAL CALCULATIONS FOR STAIR MEMBERS AND CONNECTIONS WITH STAIR SHOP DRAWINGS FOR REVIEW. STAIR SHOP DRAWINGS SHALL INDICATE ALL CONNECTIONS TO BUILDING STRUCTURE, INCLUDING CONNECTORS EMBEDDED IN CONCRETE.
EXTERIOR LIGHT-GAUGE METAL FRAMING:
A. STRUCTURAL PROPERTIES OF STUDS SHALL BE COMPUTED IN ACCORDANCE WITH AISI "SPECIFICATION FOR DESIGN OF COLD-FORMEDSTEEL STRUCTURAL MEMBERS".
1. MAXIMUM ALLOWABLE HEIGHTS BASED ON CONTINUOUS SUPPORT OF EACH FLANGE OVER THE FULL LENGTH OF THE STUD.2. YIELD STRESS OF STEEL 33KSI.3. (*) - SPACE STUDS AT 12" MAX. WITHIN 15'-0" OF BUILDING CORNERS.
B. VERTICAL STUDS SUPPORTING FRAMING MEMBERS SHALL BE 100% END BEARING.
C. PROVIDE COLD-ROLLED BRACING FOR ALL VERTICAL LOAD BEARING STUDS AT 48" ON CENTER MAXIMUM. PROVIDE SIMPSON STRONG-TIE TYPE TB BRIDGING AT 8'-0" ON CENTER MAXIMUM FOR ALL JOIST FLOOR FRAMING.
D. VERTICAL STUDS INTERRUPTED BY WALL OPENINGS SHALL BE LOCATED EQUALLY ON EACH SIDE OF THE OPENING. WELD STUDFLANGES TOGETHER WITH FILLET WELDS AT 6".
E. PROVIDE SHOP DRAWINGS SHOWING PLANS, ELEVATIONS, AND CONNECTION DETAILS FOR ALL LIGHT-GAUGE FRAMING.
WOOD FRAMING:
A. GENERAL:
1. ALL WOOD SILLS ARE TO BE 2X PRESSURE-TREATED SOUTHERN YELLOW PINE (SYP.), WITH BOLTS PLACED NOT MORE THAN 9" FROM ENDS OF SILL PIECES AND NOT OVER 4'-0" ON CENTER BETWEEN BOLTS. VEE NOTCHES IN SILL ARE CONSIDERED ENDS.
2. EXCEPT WHERE OTHERWISE NOTED, ALL STUDS SHALL BE 2x6 AT 16" ON CENTER.
3. PROVIDE CONTINUOUS 2X STUD WIDTH BLOCKING BETWEEN STUDS AT MID-HEIGHT OF STUDS SO SPACED THAT UNBRACED LENGTH OF STUDS DOES NOT EXCEED 10'-0".
4. LAP WALL PLATES AT CORNERS AND INTERSECTIONS.
5. PROVIDE 2X SOLID BLOCKING BETWEEN JOISTS OR RAFTERS OVER SUPPORTS.
6. WINDOW AND DOOR FRAMES SHALL BE FIRMLY SECURED IN PLACE BY BLOCKING BETWEEN JAMS AND ROUGH OPENINGS AT TOP AND BOTTOM AND AT A MAXIMUM INTERVAL OF 24" BETWEEN BLOCKING BEING NAILED TO ROUGH FRAME WITH 2 NAILS SET 1/8".
7. BOLT HOLES IN WOOD OR STEEL SHALL BE 1/32" LARGER THAN BOLT SIZE EXCEPT THAT IN SINGLE BOLT CONNECTIONS THE BOLT HOLE MAY BE 1/16" LARGER THAN THE BOLT SIZE.
8. ALL NUTS SHALL BE TIGHTENED WHEN PLACED AND RE-TIGHTENED AT COMPLETION OF JOB OR WHEN FINISH IS APPLIED.
9. ALL CABINETS, LOCKERS, ETC., SHALL BE FIRMLY SECURED IN PLACE BY 4-8D MINIMUM BOX NAILS PER STUD THROUGH PLYWOOD BACK EXCEPT IF CABINETS ARE WALL HUNG #12 WOOD SCREWS SHALL BE USED IN PLACE PENETRATING THE STUDS 2" MINIMUM (SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL ANCHORAGE).
B. NAILING NOTES:
1. ALL NAILS FOR STRUCTURAL WORKS SHALL USE COMMON WIRE NAILS UNLESS NOTED OTHERWISE.
2. NAIL HOLES SHALL BE SUB-DRILLED WHERE NECESSARY TO PREVENT SPLITTING WOOD.
3. NAILING SHALL BE IN ACCORDANCE WITH THE BUILDING CODE NOTED ABOVE.
C. MINIMUM LUMBER GRADES:
1. ALL PLYWOOD TO BE STRUC II, CDX (UNLESS NOTED OTHERWISE).
2. ALL STUD WALLS SHALL BE SPRUCE PINE FIR #2.
3. ALL JOISTS, RAFTERS, LEDGERS, BAND JOISTS, RIDGES, VALLEYS, HIPS, BRACES, ETC., TO BY S.Y.P. #2.
4. ALL POSTS, BEAMS, HEADERS, ETC., TO BE S.Y.P. #2.
D. ROOF/FLOOR TRUSS FABRICATION:
1. DESIGN ALL ROOF TRUSSES AND FRAMING MEMBERS FOR LOADS SHOWN ON THE FRAMING PLANS. DESIGN TRUSSES FOR THE LIVE LOADS AND WINDLOADS SPECIFIED IN THE REFERENCED CODE. SUBMIT SHOP DRAWINGS SIGNED AND STAMPED BY A REGISTERED STRUCTURAL ENGINEER IN THESTATE IN WHICH THE PROJECT IS LOCATED. DESIGN ALL CONNECTIONS OF FRAMING MEMBERS TO EACH OTHER AND TO THE REST OF THE STRUCTURE FOR CODE LOADS.
2. ALL TRUSSES AND OTHER ROOF STRUCTURAL COMPONENTS SHALL BE FABRICATED IN A PROPERLY EQUIPPED MANUFACTURING FACILITY OF A PERMANENT NATURE. THEY SHALL BE MANUFACTURED BY EXPERIENCED WORKMEN, USING PRECISION CUTTING AND TRUSS ASSEMBLY METHODS UNDER THE DIRECT SUPERVISION OF A QUALIFIED FOREMAN. ALL TRUSSES SHALL BE FABRICATED UNDER THE STRICT RULES OF THE TRUSS PLATE INSTITUTE (TPI).
3. THE QUALIFIED COMPONENT MANUFACTURER MUST BE A MEMBER OF THE TRUSS PLATE INSTITUTE AND PARTICIPATE IN THE QUALITY CONTROL TEST CRITERIA PROGRAM, OR DEMONSTRATE TO THE ARCHITECT OR HIS ENGINEER THE QUALITY ASSURANCE PROGRAM COMPARABLE TO THE TPI TESTING CRITERIA PROGRAM. THAT QUALITY ASSURANCE PROGRAM MUST INCLUDE, BUT NOT LIMITED TO THEINSPECTION OF ALL PHASES OF PRESSES OR ROLLERS, FABRICATION PROCEDURES AND COMPUTER DESIGN PROGRAMS SPECIFICALLY RELATING TO THE SPECIFIC TRUSS BEING FABRICATED FOR THE PROJECT AS APPROVED IN THE TRUSS DESIGN CALCULATION OR PRINTOUT.
4. ALL TRUSS MEMBERS SHALL BE ACCURATELY CUT TO LENGTH AND ANGLE FROM STRAIGHT LUMBER TO ASSURE TIGHT JOINTS FOR FINISHED TRUSS. PROVIDE CONTINUOUS IN-PLANT INSPECTION OF PRE-FABRICATED TRUSSES.
5. ALL TRUSS MEMBERS AND CONNECTOR PLATES SHALL BE PROPERLY PLACED IN JIGS AND MEMBERS TIGHTLY CLAMPED IN PLACE, REMAINING IN THE POSITION UNTIL A CONNECTOR PLATE HAS BEEN PRESSED OR ROLLED IN THE LUMBER SIMULTANEOUSLY ON BOTH SIDES OF THE JOINTS.
6. DEAD LOAD CHAMBER SHALL BE BUILT INTO THE TRUSSES, AS NOTED ON THE ENGINEERING TRUSS DESIGNS, BY PROPERLY POSITIONING THE MEMBERS IN THE FABRICATING JIG.
7. ALL LUMBER USED IN TRUSSES SHALL HAVE A MOISTURE CONTENT OF NOT LESS THAN 11.1 AND NOT MORE THAN 19.1 AT THE TIME OF FABRICATION.
E. ROOF/FLOOR TRUSS HANDLING AND ERECTION:
1. FABRICATED TRUSSES AND SUBASSEMBLIES SHALL BE HANDLED WITH CARE SO THAT THEY ARE NOT SUBJECT TO DAMAGE. IF THE TRUSSES ARE TO BE STOCKPILED OR STORED PRIOR TO ERECTION, THEY SHALL BE SET IN THE HORIZONTAL POSITION, RESTING UPON TEMPORARY BEARING SUPPORTS AND BRACED SO THAT THEY WILL BE SUBJECTED TO NO UNUSUAL BENDING OR BREAKING.
2. DURING ERECTION, CARE SHALL BE EXERCISED TO KEEP HORIZONTAL BENDING OF THE TRUSSES TO MINIMUM. CARE MUST BE TAKEN TO INSTALL TRUSSES RIGHT SIDE UP AND TO HAVE TRUSSES POSITIONED AT THEIR RESPECTIVE BEARING POINTS AS INDICATED ON THE TRUSS DRAWINGS.
3. THE PERMANENT STRUCTURAL CROSS-BRACING, TO ENSURE THE OVERALL RIGIDITY OF THE TRUSS SYSTEM, SHALL BE IN ACCORDANCE WITH THE ARCHITECTURAL PLANS OF THE BUILDING STRUCTURE.
4. PROPER ERECTION BRACING SHALL BE INSTALLED TO HOLD THE TRUSSES TRUE AND PLUMB AND IN A SAFE CONDITION UNTIL PERMANENT TRUSS BRACING AND BRIDGING CAN BE SOLIDLY NAILED IN PLACE TO FORM A STRUCTURALLY SOUND FRAMING SYSTEM. ALL ERECTION AND PERMANENT BRACING SHALL BE INSTALLED AND ALL COMPONENTS PERMANENTLY FASTENED BEFORE THE APPLICATION OF ANY LOADS TO THE TRUSSES.
5. ALL PRE-FABRICATED WOOD TRUSSES ARE TO BE INSTALLED IN ACCORDANCE WITH BRACING WOOD TRUSSES COMMENTARY (BWT-76) OR HFT-80, AS PUBLISHED BY THE TRUSS PLATE INSTITUTE.
6. FIELD ERECTION OF THE TRUSSES, INCLUDING ITEMS SUCH AS PROPER HANDLING, SAFETY PRECAUTIONS, TEMPORARY BRACING TO PREVENT TOPPLING OR DOMINOING OF THE TRUSSES DURING ERECTION, AND ANY OTHER SAFEGUARDS OR PROCEDURES CONSISTENT WITH GOOD WORKMANSHIP AND GOOD BUILDING ERECTION PRACTICES, SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND/OR THE FRAMING SUBCONTRACTOR.
7. FRAMING ANCHORS AND/OR TRUSS HANGERS SHALL BE SPREAD OUT OVER THE TRUSS AS NOT TO CAUSE MEMBERS STRESS BEYOND THE LIMITS OF THE UNIT DESIGN IN THE MEMBERS.
8. TEMPORARY CONSTRUCTION LOADS SHOULD BE SPREAD OUT OVER THE TRUSS MEMBERS SO AS NOT TO CAUSE MEMBER STRESSES BEYOND THE LIMITS OF UNIT DESIGN.
217 Ward CircleBrentwood, Tennessee 37027
Phone: 615.661.7979 Fax: 615.661.0644www.trcww.com
ENG. JOB NO. 15BRW073
Tyson a
nd B
illy A
rchitects
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd, IL
61107
(815)
229-8
222
FA
X (
815)
229-8
218
ww
w.tysonandbilly
.com
Sheet No:
of 1 sheets
Drn
.A
ppd.
Pro
ject N
um
ber
Date
Rev. Date
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
15-1
08
50
--
12
/4/2
015 3
:51
:02 P
MC
:\U
ser s
\jwells
\Docum
ents
\15B
RW
07
3-
Centr
al R
16_
JW
ells
.rvt
COUNTRY INNS & SUITES BY CARLSON
CANTON, TX
S0.1
STRUCTURAL GENERAL NOTES
CANTON HOTEL JOINT VENTURE
12-0
4-2
015
GENERAL:
THIS STRUCTURAL QUALITY ASSURANCE PLAN IDENTIFIES THE RESPONSIBILITIES OF THE
CONTRACTOR AND THE SPECIAL INSPECTOR IN PERFORMING THE TESTING AND
INSPECTION OF THE WORK REQUIRED BY CHAPTER 17 OF THE BUILDING CODE THAT IS
WITHIN THE SCOPE OF THE STRUCTURAL ENGINEERING SERVICES FOR THIS PROJECT.
REFER TO OTHER PORTIONS OF THE CONSTRUCTION DOCUMENTS FOR TESTING AND
INSPECTIONS REQUIRED OF ARCHITECTURAL, MECHANICAL, ELECTRICAL, OR OTHER
BUILDING COMPONENTS.CONTRACTOR RESPONSIBILITIES:
THE CONTRACTOR SHALL SUBMIT TO THE BUILDING OFFICIAL AND THE ARCHITECT A
WRITTEN STATEMENT OF RESPONSIBILITIES THAT CONTAIN THE FOLLOWING:
1. ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED
WITHIN THIS STRUCTURAL QUALITY ASSURANCE PLAN.
2. ACKNOWLEDGEMENT THAT CONTROL SHALL BE EXERCISED TO OBTAIN CONFORMANCE
WITH THE CONSTRUCTION DOCUMENTS APPROVED BY THE BUILDING OFFICIAL.
3. PROCEDURES FOR EXERCISING CONTROL WITHIN THE CONTRACTOR'S ORGANIZATION,
THE METHOD AND FREQUENCY OF REPORTING, AND THE DISTRIBUTION OF REPORTS.
4. IDENTIFICATION AND QUALIFICATIONS OF THE PERSON(S) EXERCISING SUCH CONTROL
AND THEIR POSITION(S) IN THE ORGANIZATION
THE STRUCTURAL TESTING/INSPECTION AGENCY THAT IS TO ACT AS THE SPECIAL
INSPECTOR WILL BE HIRED BY THE OWNER. CONTRACTOR SHALL PAY FOR ANY
ADDITIONAL STRUCTURAL TESTING/INSPECTION REQUIRED FOR WORK OR MATERIALS NOT
COMPLYING WITH THE CONSTRUCTION DOCUMENTS DUE TO NEGLIGENCE OR
NONCONFORMANCE AND SHALL PAY FOR ANY ADDITIONAL STRUCTURAL
TESTING/INSPECTION REQUIRED FOR HIS CONVENIENCE.
CONTRACTOR IS RESPONSIBLE TO ENSURE THAT THE SPECIAL INSPECTOR IS PRESENT
FOR ALL WORK REQUIRING SPECIAL INSPECTION. ANY WORK THAT REQUIRES SPECIAL
INSPECTION AND IS PERFORMED WITHOUT THE SPECIAL INSPECTOR PRESENT IS SUBJECT
TO BEING DEMOLISHED AND RECONSTRUCTED.
CONTRACTOR HAS THE FOLLOWING RESPONSIBILITIES TO THE SPECIAL INSPECTOR:
1. PROVIDE COPY OF CONSTRUCTION DOCUMENTS TO THE SPECIAL INSPECTOR.
2. NOTIFY THE SPECIAL INSPECTOR SUFFICIENTLY IN ADVANCE OF OPERATIONS TO
ALLOW ASSIGNMENT OF PERSONNEL AND SCHEDULING OF TESTS.
3. COOPERATE WITH SPECIAL INSPECTOR AND PROVIDE ACCESS TO WORK.
4. PROVIDE SAMPLES OF MATERIALS TO BE TESTED IN REQUIRED QUANTITIES.
5. PROVIDE STORAGE SPACE FOR THE SPECIAL INSPECTOR'S EXCLUSIVE USE, SUCH AS
FOR STORING AND CURING CONCRETE TESTING SAMPLES.
6. PROVIDE LABOR TO ASSIST THE SPECIAL INSPECTOR IN PERFORMING
TESTS/INSPECTIONS.
SPECIAL INSPECTOR RESPONSIBILITIES:
SPECIAL INSPECTOR SHALL MAINTAIN RECORDS OF INSPECTIONS IN ACCORDANCE WITH
CHAPTER 17 OF THE BUILDING CODE AND SHALL DISTRIBUTE THESE RECORDS TO THE
BUILDING OFFICIAL, ARCHITECT, AND STRUCTURAL ENGINEER ON A WEEKLY BASIS. AT THE
CONCLUSION OF THE PROJECT THE SPECIAL INSPECTOR SHALL SUBMIT A WRITTEN
STATEMENT THAT THE SPECIAL INSPECTIONS DURING CONSTRUCTION HAVE COMPLIED WITH
THIS STRUCTURAL QUALITY ASSURANCE PLAN AND THAT ANY DISCREPANCIES NOTED DURING
CONSTRUCTION HAVE BEEN CORRECTED.
VERIFY ITEMS PER IBC SECTION 1704.7 REFERENCED STANDARDS, AND AS OUTLINED BELOW:
ITEM FREQUENCY SCOPE
1. REINFORCINGSTEEL
PERIODICALLY INSPECTION OF REINFORCING STEEL AND PLACEMENT.
INSPECTION OF REINFORCING STEEL WELDING IN ACCORDANCEWITH IBC 1704.3. SER APPROVAL SHALL BE OBTAINED PRIORTOWELDING OF REINFORCING STEEL, UNLESS DETAILED ONDRAWINGS.
VERIFY MILL CERTIFICATES FOR REINFORCINGSTEELHAVE BEEN SUBMITTED FOR RECORD TO EOR.
INSPECTION OF CAST IN PLACE BOLTS AND EMBEDS PRIORTOPLACING CONCRETE.CONTINUOUS INSPECTION OF BOLTS INSTALLED IN CONCRETE PRIORTO AND DURING PLACEMENT IS NOT REQUIRED, BECAUSE ALLOWABLELOADS HAVE NOT BEEN INCREASED IN ACCORDANCE WITH IBC 1912.5.
VERIFY USE OF REQUIRED MIX DESIGNS FOR EACH TYPEOFCONCRETE.
VERIFY REINFORCEMENT SIZE, QUANTITY, GRADE,SPACING, SPLICING AND MINIMUM COVERREQUIREMENTS OF THE CONTRACT DOCUMENTSAREMET.
2. BOLTS ANDEMBEDDED ITEMS
3. MIX DESIGNS PERIODICALLY
FRESH CONCRETE SAMPLING AND PERFORMING SLUMP, AIRCONTENT AND DETERMINING THE TEMPERATURE OF FRESHCONCRETE AT THE TIME OF MAKING SPECIMENS FORSTRENGTHTESTS.
4. CONCRETE SAMPLING, TESTING AND PLACEMENT
CONTINUOUSLY
INSPECTION OF CONCRETE PLACEMENT FOR PROPER APPLICATION ANDTECHNIQUES.
INSPECTION FOR MAINTENANCE OF SPECIFIED CURING TEMPERATUREAND TECHNIQUES.
5. CURING PERIODICALLY
SIZES OF CONCRETE STRUCTURAL ELEMENTS ARE SIZED IN ACCORDANCEWITH THE CONTRACT DOCUMENTS.
6. MEMBERS PERIODICALLY
ITEM FREQUENCY SCOPE
VERIFY ANCHOR DIAMETER AND EMBEDMENT.
VERIFY THAT INSTALLATION IS IN ACCORDANCE WITH MANUFACTURER'SINSTRUCTIONS.
2. INSTALLATION PERIODICALLY
1. FASTENERS PERIODICALLY
PERIODICALLY
PERIODICALLY
PERIODICALLY
CONTINUOUSLY
CONTINUOUSLY
CONTINUOUSLY
STRUCTURAL QUALITY ASSURANCE PLAN
SPECIAL INSPECTIONS FOR MECHANICAL FASTENERS:
SPECIAL INSPECTIONS FOR CAST IN PLACE CONCRETE:
VERIFY ITEMS PER IBC SECTION 1704.7 AND AS OUTLINED BELOW:
ITEM FREQUENCY SCOPE
1. SITE PREPARATION PERIODICALLY VERIFY SITE PREPARATION COMPLIES WITH APPROVED SOILS REPORTAND CONTRACT DOCUMENTS.
2. STRUCTURAL FILL VERIFY PLACEMENT COMPACTION OF FILL MATERIALS COMPLIESWITHAPPROVED SOILS REPORT AND CONTRACT DOCUMENTS.VERIFY DRY-DENSITY OF COMPACTED FILL COMPLIES WITH APPROVEDSOILS REPORT AND CONTRACT DOCUMENTS.
3. BEARING CAPACITY VERIFY SOILS ENGINEER HAS APPROVED DESIGN-BEARING CAPACITY
CONTINUOUSLY
CONTINUOUSLY
PERIODICALLY
SPECIAL INSPECTIONS FOR SOILS:
SPECIAL INSPECTIONS FOR WOOD:
VERIFY ITEMS PER IBC SECTION 1704.6 AND AS OUTLINED BELOW:
ITEM FREQUENCY SCOPE
1. PRODUCTS VERIFY WOOD PRODUCTS BY OFFICIAL GRADE MARK
2. TRUSSCONNECTIONS
VERIFY TRUSS AND TRUSS CONNECTIONS ARE NOT DAMAGED
4. TRUSS ANCHORAGE VERIFY TRUSS ANCHORAGE DETAILS AT ALL SUPPORT POINTS
CONTINUOUSLY
CONTINUOUSLY
3. TRUSS BEARINGLENGTHS
VERIFY LENGTHS AT ALL SUPPORTSCONTINUOUSLY
5. TRUSSARRANGEMENT
VERIFY TRUSS ARRANGEMENT AND INSTALLATION IS INACCORDANCE WITH TRUSS SHOP DRAWINGS AND CONTRACT DOCUMENTS.
CONTINUOUSLY
CONTINUOUSLY
217 Ward CircleBrentwood, Tennessee 37027
Phone: 615.661.7979 Fax: 615.661.0644www.trcww.com
ENG. JOB NO. 15BRW073
Tyson a
nd B
illy A
rchitects
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd, IL
61107
(815)
229-8
222
FA
X (
815)
229-8
218
ww
w.tysonandbilly
.com
Sheet No:
of 1 sheets
Drn
.A
ppd.
Pro
ject N
um
ber
Date
Rev. Date
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
15-1
08
50
--
12
/4/2
015 3
:51
:03 P
MC
:\U
ser s
\jwells
\Docum
ents
\15B
RW
07
3-
Centr
al R
16_
JW
ells
.rvt
COUNTRY INNS & SUITES BY CARLSON
CANTON, TX
S0.2
QUALITY ASSURANCE PLAN
CANTON HOTEL JOINT VENTURE
12-0
4-2
015
3 3
3
3 333
2 222
3 333
1
1
1 1
2
2
2
3 3
3
2
2
2 2
2
2
2 2
2
2
2
2
22
2
3
3
3
3
3
3
3
3
3
3
3
2 2
2 2
3
223 3
23
2
3
2
3 2
2
3 2
2 2
3 2 323
2
TYP
'a'
TY
P
'a'
1
1
1 1
3 2 3
22 1
217 Ward CircleBrentwood, Tennessee 37027
Phone: 615.661.7979 Fax: 615.661.0644www.trcww.com
ENG. JOB NO. 15BRW073
Tyson a
nd B
illy A
rchitects
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd, IL
61107
(815)
229-8
222
FA
X (
815)
229-8
218
ww
w.tysonandbilly
.com
Sheet No:
of 1 sheets
Drn
.A
ppd.
Pro
ject N
um
ber
Date
Rev. Date
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
15-1
08
50
--
12
/4/2
015 3
:51
:09 P
MC
:\U
ser s
\jwells
\Docum
ents
\15B
RW
07
3-
Centr
al R
16_
JW
ells
.rvt
COUNTRY INNS & SUITES BY CARLSON
CANTON, TX
S0.3
WIND PRESSURE DIAGRAMS & TABLES
CANTON HOTEL JOINT VENTURE
12-0
4-2
015
1" = 10'-0"S0.3
1 ROOF WIND PRESSURE DIAGRAM
S0.3
2 WALL WIND PRESSURE DIAGRAM
2-#4 x 4'-0" LONG 1" CLEARFROM TOP OF SLAB (TYP)
NOTE: DO NOT PLACERE-ENTRANT BARS ATCONTROL JOINT LOCATIONS.
SLAB EDGE
CONC. SLAB ON GRADE
PLAN INTERSECTION PLAN CORNER
SEE FTG SECTION FORREINFORCEMENT(TYPICAL)
WID
TH
FT
G
ELEVATION STEPS
DE
PT
HF
TG
MA
X
2' -
0"
MAX
2' - 0" LAP
MAX
2' - 0" LAP
4' - 0" MINBETWEEN STEPS
CORNERS ENTRY COLUMN
NOTE:IT IS IMPERATIVE THAT THE CONTRACTOR OBTAIN ACI-302AND UNDERSTAND SLAB CONST AND PROPER JOINTING ASDESCRIBED THERE IN SEE NOTE #3 FOR MAXIMUM SPACING. (TYP)
CJ CJ
CJ
CJ
CJ
CJ
CJ
CLEAR B
ASE PLA
TE
AS REQ
D TO
CONTRACTION ORCONSTRUCTION JOINT
COLUMN
ISOLATION JOINTAT COLUMN
~~
~
~
EDGE OF SLAB
CLEAR B
ASE PLA
TE
AS REQ
D TO
ISOLATION JOINT AT COLUMN
CONTRACTION ORCONSTRUCTION JOINTS
INTERIOR COLUMN EXTERIOR COLUMN
ALTERNATE ISOLATION JOINTS AT COLUMNS(AT CONTRACTORS OPTION)
COLUMN
~~
~
~
EDGE OF SLAB
2-#4 AT EACH CORNEROF COLUMN TYP
INTERIOR COLUMN EXTERIOR COLUMN
FELT WRAPPED COLUMNS
MIN
3"
MIN
3"
CONTRACTION ORCONSTRUCTION JOINT -SEEDETAIL 5/S0.3. SAW CUTCONTRACTION JOINTS INTOTOOLED JOINTS BETWEENCOLUMNS (TYP.)
15# FELT COLUMN WRAP
TOOLED JOINT MIN 1'-0"FROM FACE OF COLUMN ATCONTRACTION JOINTS (TYP)
2-#4 AT EACH CORNEROF COLUMN TYP
15# FELT COLUMN WRAP
12
NOTE:THESE DETAILS DO NOT APPLY IF TOP OF PIPE ISMORE THAN 8" BELOW BOTTOM OF GRADE BEAM
#3 BARS @ 12" C/C
KEEP 6" MIN. OFCONCRETE ALLAROUND
(4) #3 BARS TRANSVERSE
PIPE SLEEVE 3" LARGERTHAN PIPE DIAMETER
12
TOP OF SLEEVE DOES NOT INTERRUPT REINFORCING
PROVIDE DEEPENEDGRADE BEAM AT PIPE
TOP OF SLEEVE INTERRUPTS BOTTOM REINFORCING
KEEP 6" MIN. OFCONCRETE ALL AROUND
(4) #3 BARS TRANSVERSE
BARS TO MATCH GRADEBEAM REINFORCING
PIPE SLEEVE 3" LARGERTHAN PIPE DIAMETER
PROVIDE DEEPENEDGRADE BEAM AT PIPE
LOOSE INSULATION
12" LEG (TYP.) CONT. WALL FOOTINGREINFORCING - SEE SCHEDULE
12" LEG (TYP.) CONT. GRADE BEAMREINFORCING - SEESCHEDULE
LOOSE INSULATION
CONSTRUCTION JOINT DETAIL ATSTOP AND START OF EACH POUR
SEE PLAN
NOTE:1) CONTRACTION JOINTS ARE TO BE SOFTOR TOOLED CUT IMMEDIATELY AFTERCONCRETE PLACEMENT
2) IN CORRIDORS, SPACING OF CONTROLJOINT NOT TO EXCEED 10'-0".
VAPORBARRIER
VAPORBARRIER
CONSTRUCTIONKEY SEE SPECS
SEE PLAN
1/8" SAW CUT
PL
AN
SE
ET
HIC
KN
ES
S1
/4 O
F S
LA
B
MAXIMUM SPACING OF CONTROL JOINTS
SLAB THICKNESS (IN)
5"
SPACING (FT)
6"
8"
10'-0"
15'-0"
15'-0"
2' - 0"
2' - 0" 2' - 0"
2' - 0"
SE
E S
CH
ED
UL
EF
OO
TIN
G D
EP
TH
MATCH FTGREINFORCING
MA
X
2' -
0"
THICKENED SLAB
STRIP FTG,STEP AS REQD
PIPE (SEE PLUMBING DRAWINGS)
NOTE: GENERAL CONTRACTOR SHALLCOORDINATE PLUMBING LOCATIONS WITHPLUMBING DRAWINGS.
CONC SLAB,SEE PLAN
WOOD STAIRSTRINGERBY STAIRSUPPLIER
2-#5 CONT
L3x3x1/4 X 6" WITH 2-1/2"Ø LAG SCREWAND 1/2"Ø EXP ANCHOR(4" EMBEDMENT MIN)
8" 8"
SE
E P
LA
N
217 Ward CircleBrentwood, Tennessee 37027
Phone: 615.661.7979 Fax: 615.661.0644www.trcww.com
ENG. JOB NO. 15BRW073
Tyson a
nd B
illy A
rchitects
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd, IL
61107
(815)
229-8
222
FA
X (
815)
229-8
218
ww
w.tysonandbilly
.com
Sheet No:
of 1 sheets
Drn
.A
ppd.
Pro
ject N
um
ber
Date
Rev. Date
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
15-1
08
50
--
12
/4/2
015 3
:51
:10 P
MC
:\U
ser s
\jwells
\Docum
ents
\15B
RW
07
3-
Centr
al R
16_
JW
ells
.rvt
COUNTRY INNS & SUITES BY CARLSON
CANTON, TX
S0.4
TYPICAL FOUNDATION DETAILS
CANTON HOTEL JOINT VENTURE
12-0
4-2
015
3/4" = 1'-0"S0.4
1
EXTRA REINFORCING AT RE-ENTRANT CORNERS OFSLABS ON GRADE
3/4" = 1'-0"S0.4
2 TYPICAL FOOTING SECTION 3/4" = 1'-0"S0.4
3 TYPICAL CONTROL JOINTS
3/4" = 1'-0"S0.4
4
TYPICAL ISOLATION JOINT DETAILS AT STEELCOLUMNS
3/4" = 1'-0"S0.4
10 TYPICAL PIPE SLEEVE SECTIONS 3/4" = 1'-0"S0.4
6 CONTROL JOINT DETAIL AT SLAB ON GRADE 3/4" = 1'-0"S0.4
7 TYPICAL FOOTING STEP SECTION AT PLUMBING 3/4" = 1'-0"S0.4
8 STAIR BASE CONNECTION SECTION
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 201.8 19.2
A
B
C
D
E
F
G
H
J
K
MA
TC
HL
INE
AR
EA
B
MA
TC
HL
INE
AR
EA
A
MA
TC
HL
INE
AR
EA
B
MA
TC
HL
INE
AR
EA
A
RE-ENTRANT BARSREFER TO SECTION1/S0.4 FORINFORMATION. TYP.
CJ CJ CJ
CJ CJ CJ
CJ CJ CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
FOR CONTROL JOINTSREFER TO SECTION6/S0.04, TYP.
8
S0.4
8
S0.4
ELEV
FW1
STAIR-A STAIR-B
F3F3
C1 F3C1
C1
STEP FOOTINGSEE 2/S0.4, TYP
7.1 8.9
F1CC1F1CC1
CC1 F1
CC1
FW1
FW3
FW1
FW1
FW1
FW1FW1
FW1 FW1
FW2
FW1FW1
FW2
FW1
FW1FW1
FW2
FW2
FW2
FW2
FW1
FW1
FW1
FW1
FW1
FW1
FW4
FW2
FW1
T/FTG -8"
TYP AT INT. UNO
TYP AT EXT. UNO
T/FTG -1' - 6"
1
S5.0
3
S5.0
3
S5.0
SLAB ON GRADESEE NOTE 2
FW1
FW1
FW3
FW1
FW2
FW1
FW1
FW2
FW2
FW1FW1
FW1
FW1
FW3
FW1
FW2
FW2
FW1
C3 F2 C3 F2C3 F2
C3
F2
SEE NOTE 3
FW4
FW1FW1
FW1
FW1
FW1
FW1
FW1
2' - 5" 6' - 7" 3' - 6" 12' - 6" 12' - 6" 12' - 6" 12' - 6" 12' - 6" 12' - 6" 12' - 6" 14' - 6" 12' - 6" 12' - 6" 12' - 6" 12' - 6" 12' - 6" 12' - 6" 12' - 6" 12' - 6" 12' - 6" 3' - 6" 9' - 0"
239' - 6"6
' - 0
"4
' - 0
"6
' - 0
"2
7' -
1 1
/2"
5' -
10
1/2
"2
3' -
6"
4' -
0"
29
' - 0
"6
' - 0
"
11
1' -
6"
24' - 0"
FW1
F1
C3
C3
F1
C3
C3
F2F2
FW1
0.1
T/FTG -3' - 0"
TYP.
SEE NOTE 3
C3C2C2C3
T/FTG -4' - 0"
3
S5.0
20
S5.0
19
S5.0
1
S5.0
1
S5.0
1
S5.0
2
S5.0
7
S5.0
7
S5.0
7
S5.0
7
S5.0
1
S5.0
1
S5.0
1
S5.0
1
S5.0
1
S5.0
C3
TY
P
3' -
0"
A.00
C3
10
' - 3
1/2
"1
2' -
5"
7' -
4 7
/8"
8
S5.0
9
S5.0
FW1 FW1
5
S5.0
A.01
3"
27
' - 0
1/4
"
3' -
0"
PED 1 PED 1PED 1
T/PED -8"
TYP.
STEP FOOTING AS REQ'DSEE DEATIL 2/S0.4. TYP
STEP FOOTINGSEE 2/S0.4 TYP
FW2
FW2FW2 FW2
FW2FW2FW2FW2
FW2
FW2
FW2
FW2
18
S5.0
3
S5.0
4
S5.0
4
S5.0
14
S5.0
SIM
F2
F2
15
S5.0
TYP
TYP
FW1
4
S5.0
FW1
3
S5.0
3
S5.0
4
S5.03
S5.0
6
S5.0
SIM
FW1 FW1 FW1
6
S5.0
6
S5.0
3
S5.0
4
S5.0
4
S5.0STEP FOOTINGSEE 2/S0.4
3
S5.0
STEP FOOTINGSEE 2/S0.4
STEP FOOTINGSEE 2/S0.4
FW1
19
S5.0
3
S5.0
3
S5.0
4
S5.0
4
S5.0
3
S5.0
3
S5.0
4
S5.0
4
S5.0
19
S5.0
4
S5.0
3
S5.0
4
S5.0
3
S5.0
CONT
CONT
CONTCONT
CONT
FW1
TYP
FW2
19
S5.0
FW1
FW1
T/FTG -2' - 6"
FW4FW4FW1
T/FTG -3' - 6"
T/FTG -2' - 6"
T/FTG -4' - 6"
FW4FW4 FW4 FW4
T/FTG -2' - 6"
T/FTG -2' - 6"
FW4FW4 FW4FW4
T/FTG -1' - 6"
T/FTG -1' - 6"T/FTG -1' - 6"
T/FTG -1' - 6"T/FTG -1' - 6"
T/FTG -1' - 6"
FW2
T/FTG -2' - 6"
T/FTG -2' - 6"
T/FTG -2' - 6"
T/FTG -1' - 6"
T/FTG -1' - 6"
T/FTG -2' - 6"
T/FTG -4' - 0"
T/FTG -2' - 0"
T/FTG -2' - 0"
T/FTG -3' - 6"
T/FTG -1' - 6" T/FTG -1' - 6"
T/FTG -2' - 6"
T/FTG -3' - 0"
T/FTG -3' - 0"
FW2
C3
F2
TY
P
3' -
0".
PED1
PED1
PED1
S5.024 TYP AT
FW4
7
S5.0
FW4 FW4FW4
#
-
FOUNDATION AND FIRST FLOOR PLAN NOTES:
1. FINISHED FLOOR ELEVATION = 100'-0" (SEE ARCH / CIVIL)
2. SLAB ON GRADE: 4" CONCRETE SLAB, REINFORCEDWITH WWR 6x6 - W2.1xW2.1 OVER 10 MIL VAPORBARRIER AND 4" COMPACTED FILL, REFER TO
GEOTECHNICAL REPORT FOR SUB-GRADE PREPARATION.SLOPE SLAB TO DRAIN AS REQUIRED, SEE ARCH PLANS FOR
LOCATIONS. SUPPORT WWR AT 36" EW MAX. (TYP.)
3. 5" CONCRETE SLAB WITH WWR 6x6 - W2.9xW2.9 CENTER IN SLAB. COORD. LOCATIONS WITH
ARCHITECT DRAWINGS. SEE NOTE 2 FOR ADDITIONALREQUIREMENTS. SUPPORT WWR AT 36" EW MAX. (TYP.)
4. PROVIDE SLAB CONTROL JOINTS ABOUT AN AREA OFSLAB NOT TO EXCEED 256 SQUARE FEET. IN CORRIDORS,SPACING IS NOT TO EXCEED 10'-0" (UNO). SEE 6/S0.4.
5. SEE FOOTING/FOUNDATION SCHEDULE ON S5.0 FOR SIZE AND REINFORCING.
6. SEE COLUMN SCHEDULE ON S5.0 FOR SIZE AND BASE PLATE.
7. COORDINATE AND VERIFY ALL DIMENSIONS WITHARCHITECTURAL DRAWINGS PRIOR TO BEGINNINGCONSTRUCTION.
8. CONTRACTION JOINTS ARE TO BE SOFT CUT OR TOOLEDIMMEDIATELY AFTER CONCRETE PLACEMENT.
9. (T/FTG = x'-x") REPRESENTS TOP OF FOOTINGREFERENCED FROM FINISHED FLOOR (100'-0") (GC TOVERIFY WITH FINISHED GRADE SHOWN ON CIVIL DWGS).
10. FD = FLOOR DRAIN (COORD. W/ ARCH)
11. COORDINATE ALL FOOTING ELEVATIONS WITH PLUMBINGDRAWINGS.
12. PROVIDE A MINIMUM 8" STEM WALL WITH #5 AT 12" EAWALL WHERE FOOTING DEPTH EXCEEDS 24"
13. FOR PEDESTAL SIZE AND REINFORCING, REFER TOSECTION 7/S5.0.
217 Ward CircleBrentwood, Tennessee 37027
Phone: 615.661.7979 Fax: 615.661.0644www.trcww.com
ENG. JOB NO. 15BRW073
Tyson a
nd B
illy A
rchitects
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd, IL
61107
(815)
229-8
222
FA
X (
815)
229-8
218
ww
w.tysonandbilly
.com
Sheet No:
of 1 sheets
Drn
.A
ppd.
Pro
ject N
um
ber
Date
Rev. Date
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
15-1
08
50
--
AB
KEYPLAN:
12
/4/2
015 3
:51
:11 P
MC
:\U
ser s
\jwells
\Docum
ents
\15B
RW
07
3-
Centr
al R
16_
JW
ells
.rvt
COUNTRY INNS & SUITES BY CARLSON
CANTON, TX
S1.0
FOUNDATION & FIRST FLOOR PLAN_AREA A
CANTON HOTEL JOINT VENTURE
12-0
4-2
015
1/8" = 1'-0"S1.0
1 FOUNDATION AND FIRST FLOOR PLAN_AREA A
N
REF.
1 21.8
A
B
C
D
E
F
G
H
J
K
0
MA
TC
HL
INE
AR
EA
B
MA
TC
HL
INE
AR
EA
A
MA
TC
HL
INE
AR
EA
B
MA
TC
HL
INE
AR
EA
A
RE-ENTRANT BARSREFER TO SECTION1/S0.4 FORINFORMATION. TYP.
RE-ENTRANT BARSREFER TO SECTION0112/S0.4 FORINFORMATION. TYP.
CJ CJ CJ
CJ CJ CJ
CJ CJ CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
FOR CONTROL JOINTSREFER TO SECTION6/S0.04, TYP.
CJ CJ
CJ CJ
CJ CJ
CJ
CJ
CJ
FW1
FW1
FW2FW2
FW2
FW2
FW2
FW2
FW2
FW2
FW2FW2
FW2
FW2FW2
FW2
FW2
FW1
FW2
FW2
FW2
FW2
FW2
FW2
FW2
FW2
FW2
FW2
FW2
FW2
FW2
FW2
FW2
T/FTG -8"
TYP AT INT. UNO
STEP FOOTINGSEE 2/S0.4
T/FTG -1' - 6"
TYP AT EXT. UNO
2' - 5" 6' - 7" 3' - 6"
6' -
0"
4' -
0"
6' -
0"
27
' - 1
1/2
"5
' - 1
0 1
/2"
23
' - 6
"4
' - 0
"2
9' -
0"
6' -
0"
10
' - 0
"1
01
' - 6
"
125' - 0"
FW1
FW1
0.2
18' - 0 1/2"
0.30.5 0.40.6
6' - 0" 8' - 0" 2' - 8" 12' - 10" 51' - 6"
0.10.7
G.1
G.2
6"
22
' - 6
"6
"
4
S5.0
FW2
STEP FOOTINGSEE 2/S0.4
STEP FOOTINGSEE 2/S0.4
STEP FOOTINGSEE 2/S0.4
STEP FOOTINGSEE 2/S0.4
1
S5.0
3
S5.0
3
S5.0
18
S5.0
SIM
1
S5.0
1
S5.0
CC1
CC1
F2
F2
20
S5.0
TYP
FW1
FW1
T/FTG -2' - 6"
FW2
FW2
FW2
STEP FOOTINGSEE 2/S0.4
#
-
FOUNDATION AND FIRST FLOOR PLAN NOTES:
1. FINISHED FLOOR ELEVATION = 100'-0" (SEE ARCH / CIVIL)
2. SLAB ON GRADE: 4" CONCRETE SLAB, REINFORCEDWITH WWR 6x6 - W2.1xW2.1 OVER 10 MIL VAPORBARRIER AND 4" COMPACTED FILL, REFER TO
GEOTECHNICAL REPORT FOR SUB-GRADE PREPARATION.SLOPE SLAB TO DRAIN AS REQUIRED, SEE ARCH PLANS FOR
LOCATIONS. SUPPORT WWR AT 36" EW MAX. (TYP.)
3. 5" CONCRETE SLAB WITH WWR 6x6 - W2.9xW2.9 CENTER IN SLAB. COORD. LOCATIONS WITH
ARCHITECT DRAWINGS. SEE NOTE 2 FOR ADDITIONALREQUIREMENTS. SUPPORT WWR AT 36" EW MAX. (TYP.)
4. PROVIDE SLAB CONTROL JOINTS ABOUT AN AREA OFSLAB NOT TO EXCEED 256 SQUARE FEET. IN CORRIDORS,SPACING IS NOT TO EXCEED 10'-0" (UNO). SEE 6/S0.4.
5. SEE FOOTING/FOUNDATION SCHEDULE ON S5.0 FOR SIZE AND REINFORCING.
6. SEE COLUMN SCHEDULE ON S5.0 FOR SIZE AND BASE PLATE.
7. COORDINATE AND VERIFY ALL DIMENSIONS WITHARCHITECTURAL DRAWINGS PRIOR TO BEGINNINGCONSTRUCTION.
8. CONTRACTION JOINTS ARE TO BE SOFT CUT OR TOOLEDIMMEDIATELY AFTER CONCRETE PLACEMENT.
9. (T/FTG = x'-x") REPRESENTS TOP OF FOOTINGREFERENCED FROM FINISHED FLOOR (100'-0") (GC TOVERIFY WITH FINISHED GRADE SHOWN ON CIVIL DWGS).
10. FD = FLOOR DRAIN (COORD. W/ ARCH)
11. COORDINATE ALL FOOTING ELEVATIONS WITH PLUMBINGDRAWINGS.
12. PROVIDE A MINIMUM 8" STEM WALL WITH #5 AT 12" EAWALL WHERE FOOTING DEPTH EXCEEDS 24"
13. FOR PEDESTAL SIZE AND REINFORCING, REFER TOSECTION 7/S5.0.
217 Ward CircleBrentwood, Tennessee 37027
Phone: 615.661.7979 Fax: 615.661.0644www.trcww.com
ENG. JOB NO. 15BRW073
Tyson a
nd B
illy A
rchitects
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd, IL
61107
(815)
229-8
222
FA
X (
815)
229-8
218
ww
w.tysonandbilly
.com
Sheet No:
of 1 sheets
Drn
.A
ppd.
Pro
ject N
um
ber
Date
Rev. Date
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
15-1
08
50
--
AB
KEYPLAN:
12
/4/2
015 3
:51
:12 P
MC
:\U
ser s
\jwells
\Docum
ents
\15B
RW
07
3-
Centr
al R
16_
JW
ells
.rvt
COUNTRY INNS & SUITES BY CARLSON
CANTON, TX
S1.1
FOUNDATION AND FIRST FLOOR PLAN _
AREA B
CANTON HOTEL JOINT VENTURE
12-0
4-2
015
1/8" = 1'-0"S1.1
1 FOUNDATION AND FIRST FLOOR PLAN_AREA B
N
FINISH GRADE,SEE ARCH
CONC SLAB, SEE PLAN
SEE FOOTING SCHEDULE ONSHEET S5.0 FOR FOOTINGSIZE AND REINFORCING
CL
R
3"
VAPOR BARRIER
CLR3"
SE
E P
LA
N
1
1
2x6" WOOD STUD WALL
#4 AT 12" OC
MIN6"
EQ 8" EQ
PROVIDE 1-#5AT 12" MAXHORIZONTALLY
2-#5 CONTON #5 AT 24"
CONT 2x PRESSURETREATED PLATE TYP
2x6 WOOD STUDSAT 16" MAX
POWDER DRIVEN FASTENERS(POWERS 0.143" DIA WITH 1 1/2"EMBEDED INTO CONCRETE OREQUAL) AT 24"
VAPORBARRIER
CONC SLABSEE PLAN
1' - 4"
FOR FTG SIZE ANDREINFORCING SEEFOOTING SCHEDULE S5.0
3"
CL
R
3" CLRNOTE: CENTERFOOTING ON WALL
SE
E P
LA
N8
" M
IN
#6 DOWELS AT48" (ALT HOOKS)
FINISH GRADE,SEE ARCH
CONC SLAB, SEE PLAN
WOOD STUD WALLBEYOND
SEE FOOTING SCHEDULE ONSHEET S5.0 FOR FOOTINGSIZE AND REINFORCING
CL
R3
"
VAPOR BARRIER
CLR3"
SE
E P
LA
N
1
1
MIN6"
#4 AT 12" OC
PROVIDE 1-#5AT 12" MAXHORIZONTALLY
CLR3"
CL
R3
"
#4 TIES AT 12"
WRAP COLUMN WITH FELT
OF COL AND FTGCL
CONCRETE SLABSEE PLAN
FOR COLUMN SIZE, BASEPLATE AND ANCHOR BOLTS.SEE COLUMN SCHEDULE ONSHEET S5.0
SEE FOOTING SCHEDULE ONSHEET S5.0 FOR FOOTINGSIZE AND REINFORCING
EQ EQ
24"x24" PEDESTAL REINF.WITH 8-#8 VERT. AND #4TIES AT 12" U.N.O.
SE
E P
LA
N
8"
CONCRETE SLABSEE PLAN
1/4
GR
OU
T1
1/2
"
2"
3"
3"
8- #8 VERT.
"A - A"
A A
2-#5 CONT.
8"
6" 6"
CONCRETE SLAB,SEE PLAN
CONT. PT 2x
SEE STRUCT. GENERALNOTES FOR WOOD STUDS.
VAPOR BARRIERTYP
OF COL AND FTGCL
PL
AN
SE
E
CL
R3
"
CLR3"
CONCRETE SLABSEE PLAN
SEE PLAN
WRAP COLUMN WITH FELT
FOR COLUMN SIZE, BASEPLATE AND ANCHOR BOLTS.SEE COLUMN SCHEDULE ONSHEET S5.0
SEE FOOTING SCHEDULE ONSHEET S5.0 FOR FOOTINGSIZE AND REINFORCING
CONCRETE SLABSEE PLAN
VE
RIF
Y W
ITH
EL
EV
AT
OR
DE
TA
ILS
#5 AT 12" EA WAYTOP AND BOTTOM
#5 DOWELS AT 12"(TYP ALL 4 WALLS)
#5 AT 12" EA WAYWITH #5 CORNER BARS(TYP ALL 4 WALLS)
1-#5 CONTTYP
CONC SLAB,SEE PLAN
1' - 6" TYP
FIN FL
SEE PLAN
SEE PLAN 8" 4' -
0"
6"
1' -
0"
CONT. PT 2xSEE STRUCT. GENERALNOTES FOR WOOD STUDS.
VE
RIF
Y W
ITH
EL
EV
AT
OR
DE
TA
ILS
#5 AT 12" EA WAYTOP AND BOTTOM
#5 DOWELS AT 12"(TYP ALL 4 WALLS)
#5 AT 12" EA WAYWITH #5 CORNER BARS(TYP ALL 4 WALLS)
1-#5 CONTTYP
CONC SLAB,SEE PLAN
1' - 6" TYP
FIN FL
SEE PLAN
SEE PLAN 8" 4' -
0"
6"
1' -
0"
ELEVATOR PIT SLAB,SEE 9/S5.0
#5 AT 12"EA WAY (TYP)
ELEVATOR PITSLAB BEYOND
SUMP PIT
ELEVATOR PIT WALL
NOTE:COORDINATE ELEVATORSUMP PIT DETAILS WITHELEVATOR MANUF.
* - VERIFY WITH ARCH ANDVENDOR DRAWINGS
8"
SQUARE
2' - 10" *
CLASS B TENSION SPLICE LENGTHS
CONC PSI
BAR LOCATION
SPACINGSIZE
#3
#4
#5
#6
#7
#8
#9
#10
#11
f'c=2500/3000 PSI
REGULAR TOP
>3db >6db >3db >6db
16"
22"
27"
35"
48"
63"
80"
102"
125"
14"
22"
27"
32"
38"
43"
48"
58"
71"
21"
28"
35"
48"
63"
82"
104"
132"
162"
21"
28"
35"
42"
49"
58"
63"
76"
93"
f'c=4000 PSI
REGULAR TOP
>3db >6db >3db >6db
f'c=5000 PSI
REGULAR TOP
>3db >6db >3db >6db
16"
19"
23"
31"
42"
55"
69"
88"
108"
16"
19"
23"
28"
33"
37"
42"
60"
82"
16"
24"
30"
40"
54"
71"
90"
114"
140"
16"
24"
30"
36"
42"
46"
55"
65"
80"
16" 16" 16" 18"
17" 17" 22" 22"
21" 21" 27" 27"
27" 25" 38" 33"
37" 29" 48" 38"
49" 33" 64" 43"
52" 38" 81" 48"
79" 45" 102" 59"
97" 65" 128" 72"
STDLAP
12"
15"
18"
23"
26"
30"
34"
38"
42"
ENCLOSEDW/SPIRALTIES
f'c=ALL
COMP. BARS
12"
12"
14"
17"
28"
23"
25"
28"
32"
NOTES:
1. TOP BARS ARE ANY HORIZONTAL BARS PLACED SO THAT MORE THAN 12" OF FRESH CONCRETE IS CAST IN THE MEMBER BELOW THE REINFORCEMENT.
2. UNLESS NOTED OTHERWISE LAP SPLICES IN CONCRETE BEAMS, SLABS, WALLS AND FOOTINGS SHALL BE CLASS "B" TENSION LAP SPLICES AND LAP SPLICES IN CONCRETE COLUMNS SHALL COMPRESSION LAP SPLICES.
3. CONTACT STRUCTURAL ENGINEER IF CENTER TO CENTER SPACING OF REINFORCEMENT IS LESS THAN OR EQUAL TO 3 BAR DIAMETERS (<3db).
= COLUMN BELOW
= COLUMN THRU
= COLUMN ABOVE
COLUMN LEGEND
T/SLAB
0'-0"
EM
BE
DM
EN
T
2"
GR
OU
T
AN
CH
OR
BO
LT
PR
OJE
CT
ION
=G
RO
UT
TH
K +
BA
SE
PL
AT
E T
HK
+ A
NC
HO
RB
OL
T D
IAM
ET
ER
+ 2
"M
IN
BASEPLATE SEESCHEDULE
ANCHOR BOLTS,SEE SCHEDULE
COL SEESCHEDULE
BP1
TYP2"
TY
P2
"
TY
P2
"
TYP2"
TY
P2
"
TYP2"
3/16TYP
EQ EQ
EQ
EQ
CL
R3
"
OF COL AND FTGCL
SEE FOOTING SCHEDULE ONSHEET S5.0 FOR FOOTINGSIZE AND REINFORCING
EQ EQCLR3"
EXTERIOR CONC SLAB,SEE ARCH
1/4
CONCRETE SLABSEE PLAN
WRAP COLUMN WITH FELT
FOR COLUMN SIZE, BASEPLATE AND ANCHOR BOLTS.SEE COLUMN SCHEDULE ONSHEET S5.0
SEE
SLAB
GR
OU
T1
1/2
" 1' -
6"
WOOD COLUMN, FORSIZE, SEE COLUMNSCHEDULE ON SHEET S5.0
OF COL AND FTGCLCLR
3"
CL
R3
"
SEE FOOTING SCHEDULE ONSHEET S5.0 FOR FOOTINGSIZE AND REINFORCING
MIN
1' -
6"
SIMPSON COLUMN CONN.
EXISTING SURFACE,SEE ARCH
WRAP COLUMN BELOWGRADE (TYP)
FINISH GRADE,SEE ARCH
EXTERIOR CONC SLAB,SEE ARCH
VAPOR BARRIER1
1
#4 AT 12" OC
1' - 0"
1' -
6"
MIN
2- #5 CONT.
SEE ARCH. FOR STONECOLUMNS
1-#5 CONT
CONC SLAB, SEE PLAN
SEE FOOTING SCHEDULE ONSHEET S5.0 FOR FOOTINGSIZE AND REINFORCING
CL
R3
"
VAPOR BARRIER
CLR3"
SE
E P
LA
N
1
1
2x6" WOOD STUD WALL
#4 AT 12" OC
EQ 8" EQ
EXTERIOR CONCSLAB, SEE ARCH
EXPANSION JOINTCONC SLAB, SEE PLAN
SEE FOOTING SCHEDULE ONSHEET S5.0 FOR FOOTINGSIZE AND REINFORCING
CL
R
3"
VAPOR BARRIER
CLR3"
SE
E P
LA
N
11
#4 AT 12" OC
EQ 8" EQ
EXTERIOR CONCSLAB, SEE ARCH
EXPANSION JOINT
CLR3"
CL
R3
"
OF COL AND FTGCL
SEE FOOTING SCHEDULE ONSHEET S5.0 FOR FOOTINGSIZE AND REINFORCING
EQ EQ
SE
E P
LA
N
FOR COLUMN SIZE, SEECOLUMN SCHEDULE ONSHEET S5.0
EXTERIOR CONCSLAB, SEE ARCH
EXPANSION JOINT
LA
P
CL
AS
S "
B"
DOWELS FROM FTG.TO MATCH COLUMNVERTICAL BARS.
3" 3"1' - 6"
#4 AT 12" DOWELSVERTICAL WITH#4 TIES AT 12"
T/LEDGE
100'-0"
CL
R3
"
CLR3"
3- #5 x 10'-0"CTR ON GRID#5 AT 12"
3 #5 CONT.
FINISH GRADE,SEE ARCH
CONC SLAB, SEE PLAN
SEE FOOTING SCHEDULE ONSHEET S5.0 FOR FOOTINGSIZE AND REINFORCING
CL
R
3"
VAPOR BARRIER
CLR3"
SE
E P
LA
N1
1
2x6" WOOD STUD WALL
#5 AT 12"EA WAY WITHDOWELS TOMATCH
MIN6"
EQ 8" EQ
PROVIDE 1-#5AT 12" MAXHORIZONTALLY
1' -
0"
CONC SLAB, SEE PLAN
SEE FOOTING SCHEDULE ONSHEET S5.0 FOR FOOTINGSIZE AND REINFORCING
CL
R3
"
VAPORBARRIER
CLR3"
SE
E P
LA
N1
1
2x6" WOOD STUD WALL
EQ 8" EQ
PROVIDE 1-#5AT 12" MAXHORIZONTALLY
1' -
0"
#5 AT 12"EA WAY WITHDOWELS TOMATCH
11
D
5' - 0" 5' - 0"
3-#5 X 10'-0" TYPICALAT THE END OF SHEARWALLS AT FW4
SHEAR WALL
217 Ward CircleBrentwood, Tennessee 37027
Phone: 615.661.7979 Fax: 615.661.0644www.trcww.com
ENG. JOB NO. 15BRW073
Tyson a
nd B
illy A
rchitects
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd, IL
61107
(815)
229-8
222
FA
X (
815)
229-8
218
ww
w.tysonandbilly
.com
Sheet No:
of 1 sheets
Drn
.A
ppd.
Pro
ject N
um
ber
Date
Rev. Date
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
15-1
08
50
--
12
/4/2
015 3
:51
:13 P
MC
:\U
ser s
\jwells
\Docum
ents
\15B
RW
07
3-
Centr
al R
16_
JW
ells
.rvt
COUNTRY INNS & SUITES BY CARLSON
CANTON, TX
S5.0
FOUNDATION SECTIONS
CANTON HOTEL JOINT VENTURE
12-0
4-2
015
3/4" = 1'-0"S5.0
1 EXTERIOR SLAB AND FOOTING SECTION 3/4" = 1'-0"S5.0
3
INTERIOR BEARING / SHEAR WALL / THICKENED SLABSECTION
3/4" = 1'-0"S5.0
2 EXTERIOR SLAB AND FOOTING SECTION AT OPENING
3/4" = 1'-0"S5.0
7 INTERIOR COLUMN FOOTING AND PEDESTAL
3/4" = 1'-0"S5.0
4 SLAB DETAIL AT NON LOAD BEARING PARTITION
3/4" = 1'-0"S5.0
6 INTERIOR COLUMN FOOTING SECTION 3/4" = 1'-0"S5.0
8 ELEVATOR PIT SECTION 3/4" = 1'-0"S5.0
9 ELEVATOR PIT SECTION 3/4" = 1'-0"S5.0
10 ELEVATOR SUMP PIT SECTION
3/4" = 1'-0"S5.0
13 TENSION LAP SCHEDULE 3/4" = 1'-0"S5.0
12 COLUMN SCHEDULE AND BASE PLATE DETAILS
COLUMN SCHEDULE
MARK SIZE BASE PLATE SIZE HEADED ANCHOR BOLTS COMMENTS
C1 6x6 - - WOOD
C2 HSS5X5X3/8 3/4" X 13" X 13" 4-3/4"Ø HD. ANCHOR BOLTS - 9" EMBEDMENT BP1
C3 HSS5X5X1/4 3/4" X 13" X 13" 4-3/4"Ø HD. ANCHOR BOLTS - 9" EMBEDMENT BP1
CC1 18 x 18 - -8#6 VERT. #3@18" OC DOWELS TO MATCH
SEE 20/S5.0
3/4" = 1'-0"S5.0
14 EXTERIOR COLUMN FOOTING SECTION
3/4" = 1'-0"S5.0
17 FOOTING SCHEDULE
FOOTING SCHEDULE
MARKSIZE
REINFORCING COMMENTSWIDTH LENGTH THICKNESS
F1 5' - 0" 5' - 0" 1' - 0" 6 - #5 EA WAY BOTTOM
F2 4' - 0" 4' - 0" 1' - 0" 5 - #5 EA WAY BOTTOM
F3 2' - 0" 2' - 0" 1' - 0" 3 - #5 EA WAY BOTTOM
FW1 3' - 0" CONT 1' - 0" #5 AT 12" OC TRANSVERSE AND 3 #5 CONT.
FW2 2' - 0" CONT 1' - 0" #5 AT 12" OC TRANSVERSE AND 3 #5 CONT.
FW3 5' - 0" CONT 1' - 6" #6 AT 12" OC TRANSVERSE AND 6 #5 CONT. (T & B)
FW4 3' - 0" CONT 1' - 0"#5 AT 12" OC TRANSVERSE AND 3 #5 CONT. (BOTTOM)
3 - #5 X 10'-0" TOP STEEL CTR ON GRID FOOTING
3/4" = 1'-0"S5.0
15 WOOD COLUMN AND FOOTING SECTION
3/4" = 1'-0"S5.0
5 EXTERIOR SLAB AND FOOTING SECTION
3/4" = 1'-0"S5.0
18 EXTERIOR SLAB AND FOOTING SECTION 3/4" = 1'-0"S5.0
19
EXTERIOR SLAB AND FOOTING SECTION ATENTRANCE
3/4" = 1'-0"S5.0
20 EXTERIOR COLUMN FOOTING SECTION
3/4" = 1'-0"S5.0
21 FW4 FOOTING SECTION
NOTE:1. REFER TO GEOTECHNICAL
REPORT FOR SUB-GRADEPREPARATION.
2. WHERE FOOTING DEPTHEXCEEDS 24", REFER TO24/S5.0
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:1. REFER TO GEOTECHNICAL
REPORT FOR SUB-GRADEPREPARATION.
2. WHERE FOOTING DEPTHEXCEEDS 24", REFER TO23/S5.0
NOTE:1. REFER TO GEOTECHNICAL
REPORT FOR SUB-GRADEPREPARATION.
2. WHERE FOOTING DEPTHEXCEEDS 24", REFER TO23/S5.0
3/4" = 1'-0"S5.0
22 EXTERIOR SLAB AND FOOTING SECTION
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
NOTE:REFER TO GEOTECHNICAL REPORTFOR SUB-GRADE PREPARATION.
3/4" = 1'-0"S5.0
23 EXTERIOR SLAB AND FOOTING SECTION 3/8" = 1'-0"S5.0
24 FOOTING SECTION AT END OF SHEAR WALL
WOOD
CONCRETE