Cote d'Voire Orange Project Daily Report 20150219

6
document.xlsx 文文文文 07/20/2022 文文文文文文,文文文文文文文文 文1文 6文 Cote d'iv Issues Opeyemi Dada No. Risk and challenges 1 2 3 4 5 2. Today's Progress 1. Low UL throughput of 3G network; 2. Poor voice quality of 3G network in Plat 3. EDGE attach issue at the coverage border Team management Leader and Custer interface 4 SIMs Provided for Test can only support voice, Management need to push customer reconfigure 2 of them to support data for throughput test; Building detail name list with Indoor Coverage and Voice Quality issues need to be provided to RF team for walk test; Configuration, license and Alarms data need to be provided to RF team for detail analysis; (Plateau RNC) Software/methods to trace Air/Iub/IU interfaces need assistance from customer Timingly Monitoring method/Software to trace the number of Users and RTWP 1. Tools and SIMs preparsion; 2. Logfile Analysis of drive test; 3. High RTWP cells root causes analysis based on KPI s 4. HSUPA and R99 traffic ratio analysis for 12 RNCs; Feb 16 Feb 17 Feb 18 Feb 19 Fe

description

CIV

Transcript of Cote d'Voire Orange Project Daily Report 20150219

Page 1: Cote d'Voire Orange Project Daily Report 20150219

document.xlsx 文档密级

04/19/2023 华为保密信息,未经授权禁止扩散 第1页,共6页

Cote d'ivoire Orange Project Daily Report 20150219

Issues

Opeyemi Dada

1. Top Risks and Challenges

No. Risk and challenges

1

2

3

4

5

2. Today's Progress Update

1. Low UL throughput of 3G network;2. Poor voice quality of 3G network in Plateau(Indoor);3. EDGE attach issue at the coverage border;

Team management Leader and Custer interface

4 SIMs Provided for Test can only support voice, Management need to push customer reconfigure 2 of them to support data for throughput test;

Building detail name list with Indoor Coverage and Voice Quality issues need to be provided to RF team for walk test;

Configuration, license and Alarms data need to be provided to RF team for detail analysis;(Plateau RNC)

Software/methods to trace Air/Iub/IU interfaces need assistance from customer

Timingly Monitoring method/Software to trace the number of Users and RTWP

1. Tools and SIMs preparsion;2. Logfile Analysis of drive test;3. High RTWP cells root causes analysis based on KPI statistics;4. HSUPA and R99 traffic ratio analysis for 12 RNCs;

Feb 16 Feb 17 Feb 18 Feb 19 Feb 20

Page 2: Cote d'Voire Orange Project Daily Report 20150219

document.xlsx 文档密级

04/19/2023 华为保密信息,未经授权禁止扩散 第2页,共6页

Issues No. Content

1

2 UL Data Stationary Test

3 Parameters audit/Analysis and Soft tuning output

4 License Utilization checking

5

6

7

8 Data Upload test in the chosen area

3G Poor Voice Quality

1 Voice Drive test in Plateau Area

2 Drive test log analysis and RF tuning

3 Indoor Walk test for the building provided by customer

4 Parameters soft tuning

5 Redrive in Plateau Area

EDGE Coverage Issue

1 BSC/Cell configuration and parameter checking

2 IRAT Cooperation parameters checking and analysis

3 Drive test and coverage analysis

Low UL Througput of 3G Network

Network&RNC Level UL throghput, Volume KPI check

Resource(Power/CE/CODE/IUB) and Capacity Analysis

2rd Carrier load balance, Service Strategy, DRD, Neighbor, HO Parameter Analysis and Optimization

High RTWP Cell, Pilot polution, High number of Users, External Interference, Analysis with Geography Distrubtion

Page 3: Cote d'Voire Orange Project Daily Report 20150219

document.xlsx 文档密级

04/19/2023 华为保密信息,未经授权禁止扩散 第3页,共6页

Cote d'ivoire Orange Project Daily Report 20150219

Ryan Sihongbiao DT and RF arrangement

1. Top Risks and Challenges

Priority Responsibility Date to resolve Current Progress

High 2/18/2015 Data SIM card now available but modem not compactible with probe for the investigation

High 2/18/2015

High 2/18/2015 WMS installed but password denied so we can not login yet

Medium 2/18/2015

Medium Oyeme; 2/19/2015 Disscuss with customer and confirm the availability;

2. Today's Progress Update 3. Actions Plan for the next Day

2. Poor voice quality of 3G network in Plateau(Indoor);3. EDGE attach issue at the coverage border;

Technical Leader

Koffi Dominique;Shengongjian;

Koffi Dominique;Shengongjian;

Request has been escalated to customer and wait for the feedback, need Management team push for speeding up;

Koffi Dominique;Shengongjian;

Oyeme;Koffi Dominique;Shengongjian;

Request has been escalated to customer and wait for the feedback, need Management team push for speeding up;

3. High RTWP cells root causes analysis based on KPI statistics;1. 3G UL throughput stationary test in choosen locations(Customer office) and analysis;2. Cells Recommendation for phusical optimization 3. Configuration/Parameter, License Analysis if data provided;4. High RTWP cells recommendations;

Feb 20 Feb 21 Feb 22 Feb 23 Feb 24 Feb 25

Page 4: Cote d'Voire Orange Project Daily Report 20150219

document.xlsx 文档密级

04/19/2023 华为保密信息,未经授权禁止扩散 第4页,共6页

Deadline Process Status

2/17/2015 Close

2/19/2015 0% Open

2/24/2015 0% Open

2/23/2015 █ 5% Open

2/24/2015 Ongoing

2/24/2015 0% Open

2/20/2015 Ongoing

2/23/2015 0% Open

2/18/2015 Close

2/23/2015 Ongoing

2/19/2015 0% Open

2/25/2015 0% Open

2/26/2015 0% Open

2/24/2015 0% Open

2/25/2015 0% Open

2/24/2015 0% Open

█ █ █ █ █ █ █ █ █ █ █ █ █ █100%

█ █ █ 20%

█ █ █ █ █ █ █ █ █ █ █ █ █ 90%

█ █ █ █ █ █ █ █ █ █ █ █ █ █100%

█ █ █ █ █ █ █ █ █ █ █ █ █ █ 100%

Page 5: Cote d'Voire Orange Project Daily Report 20150219

document.xlsx 文档密级

04/19/2023 华为保密信息,未经授权禁止扩散 第5页,共6页

Cote d'ivoire Orange Project Daily Report 20150219

DT and RF arrangement Komenan Bakary

1. Top Risks and Challenges

Current Progress

Data SIM card now available but modem not compactible with probe for the investigation

WMS installed but password denied so we can not login yet

Disscuss with customer and confirm the availability;

3. Actions Plan for the next Day

Request has been escalated to customer and wait for the feedback, need Management team push for speeding up;

Request has been escalated to customer and wait for the feedback, need Management team push for speeding up;

1. 3G UL throughput stationary test in choosen locations(Customer office) and analysis;2. Cells Recommendation for phusical optimization 3. Configuration/Parameter, License Analysis if data provided;4. High RTWP cells recommendations;

Feb 25 Feb 26 Feb 27 Feb 28

Page 6: Cote d'Voire Orange Project Daily Report 20150219

document.xlsx 文档密级

04/19/2023 华为保密信息,未经授权禁止扩散 第6页,共6页

Remark

Available modem not compactible with genex probe

Configuration is unavailable

Counters compararism ongoing

Configuration is unavailable

Analysis in progress

Will be ready before noon of 19/02/2015

Need the building name list provided by customer

Configuration is unavailable

Configuration is unavailable

Configuration is unavailable

(1). HSUPA utilization of Cocody_2 RNC is 75% in BH hour(21:00)lower than the average value other BSC, 95%;(2). Need license and configuration check further;

As aggreement, Will only focus on Plateau area due to large number of cells and time limitation