11
COST ESTIMATION SHEET PROJECT : HYDRAULIC ROBOT (JCB) NAME OF PART: BASE PLATE (18 MM) PART NO:1 CLASS: MECHANICAL (6 TH SEM / 2 ND SHIFT) YEAR:2010 -2011 MATERIAL : WOOD MATERIAL COST LENGTH *WIDTH 3*2 RATE/MM 44 QTY 1 TOTAL 260 MACHINING COST PROCESS COST/ HOUR MINS NET COST CUTTING 20 60 20 SLOTTING 10 15 10 DRILLING TOTAL 75 30 LABOUR COST LABOUR COST 50 TRANSPROTATION COST (ALL DIMENSION IN FOOT)

description

product

Transcript of Costing Format

Page 1: Costing Format

COST ESTIMATION SHEET

PROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: BASE PLATE (18 MM)

PART NO:1

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 3*2RATE/MM 44QTY 1TOTAL 260

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20SLOTTING 10 15 10DRILLINGTOTAL 75 30

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 2: Costing Format

COST ESTIMATION SHEET

PROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: CIRCULER LINK(12MM)

PART NO:2

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 2*2RATE/MM 45QTY 1TOTAL 180

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20TURNING 10 15 10DRILLINGTOTAL 75 30

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 3: Costing Format

COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: VERTICAL LINK (18MM)

PART NO:3

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 3*3RATE/MM 60QTY 2TOTAL 540

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20DRILLINGTOTAL 60 20

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 4: Costing Format

COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: HORIZONTAL LINK-1 (8MM)

PART NO:4

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 3*3RATE/MM 27QTY 2TOTAL 245

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20DRILLINGTOTAL 60 20

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 5: Costing Format

COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: HORIZONTAL LINK-2 (6MM)

PART NO:5

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 3*3RATE/MM 23QTY 2TOTAL 210

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20DRILLINGTOTAL 60 20

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 6: Costing Format

COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: TOOL LINK-1(6MM)

PART NO:6

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 2*2RATE/MM 7QTY 2TOTAL 30

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20SHAPING 20 15 20DRILLINGTOTAL 75 40

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 7: Costing Format

COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: TOOL LINK-2 (6MM)

PART NO: 7

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 0.5*0.5RATE/MM 7QTY 2TOTAL 30

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 30 20DRILLINGTOTAL 30 20

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 8: Costing Format

COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: CONNECTING LINK-1/2 (6MM)

PART NO:8

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 1*1RATE/MM 7QTY 4TOTAL 45

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20DRILLINGTOTAL 60 20

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 9: Costing Format

COST ESTIMATION SHEET

PURCHASED PART ESTIMATION SHEET

PURCHASED MATERIAL QTY RS

SMALL GEAR PLASTIC 1 30

BIG GEAR PLASTIC 2 120

THREADED SHAFT M.S. 12 200

RACK PLASTIC 2 30

SYRINGE FIBER 12 350

FLEXIBLE PIPE (HARD) P.V.C 6 FOOT 60

BOLT NUT AND OTHER FASTERNES M.S. AS PER USE 30

HOOK M.S. 10 50

TOTAL 870