    Cost

    of Quality

    Asad-Ur-RehmanChef Operating OfficerPlexus (Pvt) Limited

    [email protected]

  • 8/2/2019 Cost of Q v2

    2/14

    SQA

    Find Out . . .

    Does higher quality means higher cost ?

    Does higher quality takes longer time todevelop?

    Is there any relation between high qualityand business performance?

  • 8/2/2019 Cost of Q v2

    3/14

    SQA

    Traditional concepts of Quality

    Quality is defined by producer, not the customer.

    Quality relates only to the final product.

    Software development (coding) is the biggestcontributor to defect.

    Improving Quality always cost more money.

    Quality is responsibility of QA dept.

    Concepts of Quality

  • 8/2/2019 Cost of Q v2

    4/14

    SQA

    Concepts of Quality

    Real concepts of Quality

    The customer (user) defines Quality.

    Quality is determined by every process, sub-product

    and support function.

    Software defects are traceable to the requirements asmajor contributor, and can occur during any phase.

    Improving Quality will result in lower life cycle & cost.

    Quality is everyone's job, on every task they perform.

  • 8/2/2019 Cost of Q v2

    5/14

    SQA

    Organizations need to be aware of the costsassociated with making errors as a way ofidentifying areas for improvement.

    Every time something is done and not donecorrectly, money is lost due to rework.

    It is also a powerful tool for identifying

    waste either iso of effortso of time

    o or resource

    Cost of Quality

  • 8/2/2019 Cost of Q v2

    6/14

    SQA

    The cost of quality is essentially a tool formeasuring the cost to an organization of not gettingthings right first time.

    A key consideration in any analysis of cost of qualityis its visibility.

    It is the visibility gained through CoQ analysis that

    enables the project team to focus their attention onthose activities which discovers and correct the rootcause of software defects.

    Cost of Quality

  • 8/2/2019 Cost of Q v2

    7/14

    SQA

    Cost of Quality

    Quality is Free; slogan given by Philip Crosby.

    Everyone speaks of Crosbys concept, but no oneactually believes software equality is free.

    The real issue is of investment, not the cost.

    The cost of quality generally focuses on three majorcomponents:

    o Cost of identification of defectso Cost of correcting defectso Cost of reducing defects

  • 8/2/2019 Cost of Q v2

    8/14

    SQA

    Cost of SW Quality

    Rs.50

    0

    Rs.25

    0

    Rs.50

    0

    Rs.25

    0

    Cost of Software Quality represents all costs thatorganization incurs from having to repeat a process(more than once) in order to complete the work as perrequirements.

    CoSQ = Cost Conformance + Cost of Non-Conformance

    Prevention Appraisal Failures

  • 8/2/2019 Cost of Q v2

    9/14

    SQA

    Cost of SW Quality

    Cost of Conformance Cost of Non-Conformance

    Prevention AppraisalInternalFailure

    ExternalFailure

    CoSQ

    ProcessesDevelopmentStaff TrainingPlanning

    TestingInspectionAudits

    Defect reportRe-inspectionRe-testingRe-work

    Product returned &replacementWarranty Expenses

    Loss of market shareCustomer dissatisfaction

  • 8/2/2019 Cost of Q v2

    10/14

    SQA

    Components of CoSQ

    CoSQ = Cost Conformance + Cost of Non-Conformance

    The cost of quality is essentially a tool for measuring the cost

    to an organization ofnot getting things right first time

    Doing my workright first time

    Correction ofpoor work

    CoSQ = 80 hrsDev 60 hrsQA 20 hrs

    Dev 12 hrsQA 06 hrs

    Dev 08 hrsQA 04 hrs

    CoSQ = 80 hrsDev 60 hrsQA 20 hrs

    Dev 20 hrsQA 10hrs

    Dev 12 hrsQA 08 hrs

    Dev 09 hrsQA 05 hrs

    21-Dec 24-Dec 30-Dec 08-Jan

    144 hrs

    110hrs

  • 8/2/2019 Cost of Q v2

    11/14

    SQA

    Economics SW Quality

    You must put a quality product into test before youcan expect to get out one, otherwise rework will bevery high.

    Software quality largely concern with defect preventionand appraisal.

    Finding a requirement error in test can be veryexpensive. Finding a code error during code review will

    generally cost much less.

  • 8/2/2019 Cost of Q v2

    12/14

    SQA

    Quality Cost Analysis

    The objective of the quality cost analysis is not toreduce the cost, but to make sure that the costspent are the right kind of cost and that maximizebenefit derived from that investment.

    Cost benefit analysis can be used for almostanything, it is most commonly done on financialquestions.

    The cost of quality is a tool for measuring the cost,an organization has to bear for not getting thingsright first time.

  • 8/2/2019 Cost of Q v2

    13/14

    SQA

    Quality Cost Analysis

    0 %10

    20

    30 %40

    50

    60 %

    1 2 3 4 5

    Prevention (QA)Appraisal (QC)

    Int FailureExt Failure

    Total Cost of Quality

    Years

    Percentage

    oftotal

    projectcos

    t

    CMM Level-3

    Stephen T. Knox

  • 8/2/2019 Cost of Q v2

    14/14

    SQA

    Quality Cost Analysis

    1

    5

    10

    1

    2 3 4 5 6 7

    CoSQ

    SoftwareQuality

    Business

    Performance

    Years

    ImprovementMultiplier

    Herb Krasner