Cosq of india (1)

26
looking forward………………. By: Mainak Bhattacharjee Kamalendu Das Gumesh Ch. Murmu Mainak Sarkar

Transcript of Cosq of india (1)

Page 1: Cosq of india (1)

looking forward……………….

By: Mainak Bhattacharjee

Kamalendu Das

Gumesh Ch. Murmu

Mainak Sarkar

Page 2: Cosq of india (1)

Basic needs..

1.Food

2.Clothes

3.Shelter

4.what??

Page 3: Cosq of india (1)

“power”

Page 4: Cosq of india (1)
Page 5: Cosq of india (1)

Current Scenario in

India

Presently Installed: 185.5GWatt

5th largest in World

Per capita consumption:778KWh

Page 6: Cosq of india (1)
Page 7: Cosq of india (1)
Page 8: Cosq of india (1)

At present 300million without

electricity!

Avg. Per capita consumption of

world:2600KWh;

6200Kwh for European Union

countries

But India:778KWh!!!

35-45% transmission loss(highest in

world!!)

Power failure, poor regulation

Page 9: Cosq of india (1)
Page 10: Cosq of india (1)

What Are They Thinking??

Page 11: Cosq of india (1)

GDP at present:6.9% & expected 7.6% after this fiscal year(2012-13)

Stress given on more industry

customs duty exemption on imported fuel and lower levy on overseas funds for projects to provide relief to crisis-hit power sector.

More private investment.

India needs at least $135billion to produce 600-1200GW within next 40 years ,which is urgent.

Reduction in power tariff..

Page 12: Cosq of india (1)

New & Upcoming

projects

Page 13: Cosq of india (1)

ASIA’s 1st TIDAL POWER PLANT(50mw)

Page 14: Cosq of india (1)

Solar power generation

park,having 620 MW generation

capability, started last week in

Gujrat…

India’s Largest and one of the

largests in Asia…

Page 15: Cosq of india (1)
Page 16: Cosq of india (1)

125 biomass power plants of almost 1300 MW power plant

30 solar power plants.

3 Nuclear power plants of 2720MW including Kudankulam.

More hydro electric power plants

Page 17: Cosq of india (1)

Research Area1.35000 KM^2 Thar desert is

sufficient in generating 700 to

2100GW solar power .It can meet

the increasing demand of modern

India

2. India is suffering from acute

T&D loss of 35% almost. For a

standard power system it is 7-

8%.Modern technologies should

be invented.

3.More dependence on Wind

power surrounding sea area.

Page 18: Cosq of india (1)
Page 19: Cosq of india (1)

Efficient Energy Use

Page 20: Cosq of india (1)
Page 21: Cosq of india (1)
Page 22: Cosq of india (1)
Page 23: Cosq of india (1)

NEW projects

West Bengal Green Energy Corporation Limited (WBGECL), the state’s nodal renewable energy agency, has outlined investments worth Rs 700-750 crore over the next two to three years.(within 2012-13).

Katwa thermal power project of 1600 MW by NTPC.

1600MW power project by L&T Power.

2*600MW DVC project at Raghunathpur.

2*250MW DPL Project

2*660MW WBPDCL project at murshidabad.

Page 24: Cosq of india (1)

CLEAN ENERGY West Bengal playing major role in Solar&

Biomass energy.10% of total power

consumption of Howrah will be from Solar

energy.

Total 28MW biomass power plant at North

dinajpur, Birbhum & Burden by pvt.

Organizations.

Page 25: Cosq of india (1)

Resistance

Page 26: Cosq of india (1)