COSL Drilling Europe AS
Bringing new rigs to the North SeaBy: Bjørn Angeltveit
Venue: SEMTECH 2018
Agenda
o COSL`s rig status & performance
o Focus areas going forward
3
COSL Drilling Europe – Management Team
CFO - Li Baozhong
President/CEO – Jørgen
Arnesen
VP Marketing &
Contracts – Magnar
Fagerbakke
VP Operations – Lage
Nordby
VP Business Development –
Bjørn Angeltveit
R & HR Director –
Osvald Borgen
Assistant to CEO –
Zhou Bingwen
HSE&Q Director – Kjetil
Andrew Tangen
Accommodation units
4
COSLRival COSLRigmar
5
Drilling units – midwater <750m (DP & mooring)
COSLPioneer (2010) COSLPromoter (2012)COSLInnovator (2011)
Re-Drilling of production wells on the
Troll field.
Water depth: 306 – 340 m - DP
Horizontal multi lateral wells with
intelligent completions. Horizontal X-
mas trees
COSLInnovator has been engaged in 12
wells from 13.01.2012 to 30.12.2015.
Client: LUNDIN, Norway, from Feb. 18
Re-Drilling of production wells on the
Troll field.
Water depth: 306 – 340 m - DP
Horizontal multi lateral wells with
intelligent completions
Horizontal X-mas trees
COSLPromoter has been engaged in 20
wells from 30.07.13 until present
Client: STATOIL, firm until 04-2021
3 x Exploration wells in 2011 – 2012
Water depth: 110 – 134,5m moored
1 x Production well in 2012
Water depth: 109 m - Moored
1 x Exploration well in 2012 Faroe
Islands (West of Shetland)
Water depth: 460 m – DP
9 x Production wells in 2012 - 2014
Water depth: 291 – 378 m moored
Visund oilfield (FMC trees)
Client: NEXEN, UK from April 18
6
Drilling unit – midwater / deepwater <1500m
COSLProspector (2014)
South China Sea
Client: CNOOC
3 x Exploration wells in 2015
Waterdepth: 1289 – 1368 – 1374 m
2 x Exploration wells in 2017
Waterdepth about 1200m
At CCB, Norway, preparing for drilling a 120-
days well West of Shetland in June 2018
Design: GG 5000 design
DNV-GL, 1A1 Column-Stabilized Drilling Unit (N)
Clean, Ice (T), Winterized (Basic)
DP 3 & mooring (POSMOOR ATA)
Variable Deck Load 5000 mT
130 persons in single cabins
Norsok S-002 for work environment
9 ea. Utility stations for 690/230 + 460 voltage. 60 Hz. +++++
Cementing unit (BJ Seahawk 1600 hp El, remote oper)- Installed
LWD/MWD/ Directional drilling (BHI)- Prepared
Casing services- Prepared, Using Rig Hydraulic Ringline
Wireline logging- Prepared
Well testing- Prepared
Coiled tubing- Prepared
Subsea completion- Prepared
Technical specifications based on «Statoil Standard Spec.»
Light Ship Weight 26.000 mT
Operational Displacement 40.700 mT
Moonpool 24,2 x 7,2 meter (8,7 in Centre, retrac. rails)
Deckbox 69,5 x 83,6 m (W x L)
Pontoons 105,4 x 16,5 x 10,05 (L x W x H)
ROV moonpools 2 ea. 5,5 x 5,5 m
COSL rig status
7
Rig Client Jan Feb Mar Apr MayJuneJuly Aug Sep Oct Nov Dec Jan Feb Mar Apr MayJuneJuly Aug Sep Oct Nov Dec Jan Feb Mar Apr MayJuneJuly Aug Sep Oct Nov Dec Jan Feb Mar Apr MayJuneJuly Aug Sep Oct Nov Dec
COSLPioneer Nexen - UK
COSLInnovator Lundin CCB 7 X 1 Well Options
COSLPromoter Statoil-Troll OPTIONS 1 x 8 Years
COSLProspector TBA
COSLRIVAL
COSLRIGMAR
CCB
2 Wells
Warm lay-up Kristiansand
Warm lay-up Kristiansand
1 Well incl DST UKCCB
FIRM P&A
8 Years contract
Rig-line COSL Drilling Europe AS
2018 2019 2020 2021
Personnel 2008 - 2018
2010 (Apr) COSLRival, COPNO
2011 (Aug) COSLPioneer, Statoil
(Apr) COSLRigmar, COPNO
(Apr) COSLRival to COPUK / BP (UK)
2012 Manning up for Innovator/Promoter
2013 (Jan) COSLInnovator, Statoil
(Apr) COSLPromoter, Statoil
2014 (Nov) COSLRigmar, Hess (DK)
2015 (May) COSLProspector, CNOOC (CHN)
(Aug) COSLPioneer, off contract
(Sep) COSLRigmar, Maersk Oil (DK)
2016 (Mar) COSLInnovator, contract cancellation
(Apr) COSLRigmar, off contract
(Apr) COSLProspector, off contract
2017 Maintaining crew for 2018 activities
2018 (Mar) COSLPioneer, Nexen UK
(Feb) COSLInnovator, Lundin
(May) COSLProspector, Nexn, UK
Onshore 69 (Forus, Mongstad, Aberdeen, Dalian)
Offshore 483 (Management & Crew)� COSLPromoter - 159
� COSLInnovator - 141
� COSLPioneer 98
� COSLProspector - 46
� Accommodation units – 9
� Resource pool – 30Manning per 28.02.18
Rig technical projects - optimized
COSLPioneer
COSLInnovator
COSLPromoter
2014 2015 2016 2017 2018
Contr.
suspended
04.01.16
29.11.16
21.06.17
Wave
incident
Contr.
Start
Rep
5 yr cert.
Suspension
Lay-up (max 3 yrs)
Slow SPS
5 yr cert.
Lay-up (max 3 yrs)
Reactivate
Reactivate 5 yr cert.
5 yr cert.
SPS
SPS
Contr.
Start
Ops. prepCOSLProspector
Benefits of identical rigs
10
COSLPioneer COSLInnovator COSLPromoter COSLProspector
Benefits of identical rigs
11
COSLPioneer COSLInnovator COSLPromoter COSLProspector
� Same drilling equipment & design
� Personnel - Identical competence requirements - ”One fits all”
� Experience transfer & common operating procedures
� Less spare part stock required
� Measure and compare performance
Standardizing operations
COSLInnovator COSLPromoter
Comparing rig performance
� Identical rigs allow for performance comparison – op timizing results
What is Operating Performance?
13
1. No incidents
� Barrier control
� Activities performed correctly
2. Maximize Uptime
� Equipment uptime
� Reduce Waiting Time
3. Efficient operations
� Crew / Equipment performance
� 3rd party deliveries
� Reduce flat spot activities
� Consistency
4. Measure and communicate results
Total Well Delivery / $$$ for CLIENT
=
Strong and consistent drilling performance
14
COSLPioneer COSLInnovator COSLPromoter COSLProspector
Statoil Rig of the month (COSLPromoter)
Jan Feb Mar Apr Mai Jun Jul Aug Sep Okt Nov Des
2016
2017
(5)(5)
SPS
Focus on performance
Focus areas going forward:
16
o Operational performance focus
o Rig technical project execution
o Strengthening our market position (UK presence etc)
o Integrated Rig Services
o Digitalization
Integrated Rig Services will strengthen the drilling
contracts position:
17
Drilling Unit
Directional Drilling
Cementing
Completions
Fluids
Mudlogging
MWD….
Drilling Contractors Major Service Companyo Schlumberger
o Halliburton
o BHGE
Potential/to be
included in contracts: o Casing Running (TRS)
o Wireline/slickline/e-line unit
o Manage Pressure Drilling
o Downhole drilling tools (Jars etc)
o ROV services
o Cementing unit
o Waste management
o Mooring Services
o Other…..
COSL Innovation Center
18
[email protected] cannot solve our problems with the same thinking we used when we created them.
Albert Einstein
Very conservative business within certain areas!
1970-1980 2017����
19
Very conservative business within certain areas!
1970-1980 2017����
20
…while other industries has changed dramatically
1970-1980 2017����
21
Reaching 50 million users
22
Digitalization in COSL
Dedicated Innovation/Digitalization group since January 2017 working on optimizing work processes
�Implementing� NOV MMC (facilitate for NOVOS)
� Tablet EX-maintenance system
� E-invoices & app-based approvals
� Workplace by facebook
�Planned� Electronic PTW system
� Barrier monitoring tool (technical/administrative/competency)
� Dashboard
� Software upgrades (OCS, DM, Office, Rig Manager)
23
Top barriers to digitalization relate to people and cult ure!
24
No, thanks!
We have no time!
Thank you!