Corrugated Steel Bridge and Tunnel Solutions

72
2 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Dominic Turner, Ing. / Eng. Regional Engineer Armtec, Drainage Solutions Cody Neath Technical Sales Representative Armtec, Drainage Solutions STORM SEWER & CULVERT SOLUTIONS FRIDAY APRIL 17 TH, 2015 / 9AM PST / 11AM CST / 12PM EST APPLICATIONS AND BEST PRACTICES

Transcript of Corrugated Steel Bridge and Tunnel Solutions

Page 1: Corrugated Steel Bridge and Tunnel Solutions

2© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Dominic Turner, Ing. / Eng.Regional EngineerArmtec, Drainage Solutions

Cody NeathTechnical Sales RepresentativeArmtec, Drainage Solutions

STORM SEWER & CULVERT SOLUTIONS

FRIDAY APRIL 17 TH, 2015 / 9AM PST / 11AM CST / 12PM EST

APPLICATIONS AND BEST PRACTICES

Page 2: Corrugated Steel Bridge and Tunnel Solutions

3© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

YOUR HOST

Janine YetkeDirector Of Marketing Armtec, Drainage Solutions

LinkedIn: ca.linkedin.com/in/janineyetke/enEmail: [email protected]

Page 3: Corrugated Steel Bridge and Tunnel Solutions

5© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

CPD CREDIT CERTIFICATES

• Qualifies in most jurisdictions in Canada & USA for 1 Hour Technical Informal• Formal completion certificates are emailed within one week of attending• Check your local guidelines if unsure of your requirements

Email your complete attendee list should there be multiple individuals viewing the same screen:

• Full Name• Title• Email

[email protected]

Armtec will send a certificate to all participants

Page 4: Corrugated Steel Bridge and Tunnel Solutions

6© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Armtec is one of Canada’s largest infrastructure companies supplying precast, corrugated steel and HDPE products and solutions. Every day, our proven products, engineered solutions and dedicated people are counted on to support construction and infrastructure projects in communities everywhere. With a national presence and a local focus on exceptional customer service, we are dedicated to building excellence.

ABOUT ARMTEC

Page 5: Corrugated Steel Bridge and Tunnel Solutions

7© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Stormwater & Wastewater Management

Underground Utilities Water Control

PRODUCT CATEGORIES

Highway Barriers & Safety Products

Bridge Materials Landscape & Amenities Parking Structures Pipe & Culverts

Precast Building Systems Septic & Holding Tanks Soil Retention & Stabilization

Soundwall SystemsPrecast Concrete Steps

ABOUT ARMTEC

Page 6: Corrugated Steel Bridge and Tunnel Solutions

8© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

SECTORS

Armtec specializes in all infrastructure markets and segments and can help with any project to ensure you have the right products for the job. Our people have extensive experience and access to resources all across the country, and can help with all facets of product selection, installation and support.

Stormwater Solutions

Mining & Energy

Commercial & Retail Constructions

Transportation Underground & UtilityInfrastructure

Sports & Entertainment

Institutional Construction Industrial Construction Agriculture

Commercial & Residential Landscaping

Forestry Residential & Hospitality

ABOUT ARMTEC

Page 7: Corrugated Steel Bridge and Tunnel Solutions

9© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Armtec Drainage Solutions’ centralized engineering department consists of design engineers, a drafting team, and estimators.

Additionally, professionally licensed Regional engineers are located in all Market Areas across the country.

DRAINAGE ENGINEERING SUPPORTABOUT ARMTEC

Page 8: Corrugated Steel Bridge and Tunnel Solutions

10© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

DESIGN BUILD

Armtec can draw on a comprehensive range of expertise to help you take your project through all phases of the design and construction process – from concept through to completion.

Commercial

Sports & Entertainment Venues

Industrial Institutional Power & Energy

Total Precast Solutions

ABOUT ARMTEC

Page 9: Corrugated Steel Bridge and Tunnel Solutions

11© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

11© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Actual2014

Employees

Locations

1,690

43

DRAINAGE SOLUTIONS & PRECAST CONCRETE SOLUTIONS

Drainage Locations

Precast Locations

ABOUT ARMTEC

Page 10: Corrugated Steel Bridge and Tunnel Solutions

12© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

YOUR SPEAKERS

Dominic TurnerIng. / Eng. Region EngineerArmtec, Drainage SolutionsLinkedIn: http://ca.linkedin.com/in/dominicturner2

[email protected]

Cody NeathTechnical Sales Representative, Armtec, Drainage SolutionsLinkedIn: ca.linkedin.com/pub/cody-neath/18/372/68b/en

[email protected]

Page 11: Corrugated Steel Bridge and Tunnel Solutions

13© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

AGENDA

STORM SEWER & CULVERT SOLUTIONS

Storm Sewer & Culvert Solutions

• Introduction to Flexible Pipes

• Corrugated HDPE Pipes• Drainage Tubing (Big O)• BOSS 2000 (Dual-wall)• DuroMaxx (Steel Reinforced PE)

• Corrugated Steel Pipes• Hel-Cor (Corrugated Steel Pipes)• UltraFlo (Spiral Rib Steel Pipes)

• Installation of Flexible Pipes

• Project Profiles

Page 12: Corrugated Steel Bridge and Tunnel Solutions

14© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Storm Sewer & Culvert Solutions

INTRODUCTION TO FLEXIBLE PIPES

Page 13: Corrugated Steel Bridge and Tunnel Solutions

15© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PIPE / SOIL INTERACTION

STORM SEWER & CULVERT SOLUTIONS

Soil ComponentGranular backfill envelope with known properties.

Pipe ComponentTypically a steel or HDPE pipe that has a great compression strength.

Page 14: Corrugated Steel Bridge and Tunnel Solutions

16© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

FLEXIBLE VS. RIGID PIPE

STORM SEWER & CULVERT SOLUTIONS

FLEXIBLE PIPE

Uniform pressure distribution

RIGID PIPE

• Non-uniform pressure distribution

• Higher bearing pressure

Page 15: Corrugated Steel Bridge and Tunnel Solutions

17© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

TYPICAL LOADING CONDITIONS

STORM SEWER & CULVERT SOLUTIONS

TRAFFIC LOAD

FLEXIBLE PIPEDIA.

HEIGHT OF COVER (H)

LIVE LOAD

DEAD LOAD

Page 16: Corrugated Steel Bridge and Tunnel Solutions

18© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

TYPICAL LOADING CONDITIONS

STORM SEWER & CULVERT SOLUTIONS

SUPPORT FROM BACKFILL

LIVE LOAD

DEAD LOAD

SUPPORT FROM

BACKFILL

Page 17: Corrugated Steel Bridge and Tunnel Solutions

19© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

RING COMPRESSION THEORY

STORM SEWER & CULVERT SOLUTIONS

Uniform radial distributionthat becomesshell compression

LIVE LOAD

DEAD LOAD

Page 18: Corrugated Steel Bridge and Tunnel Solutions

20© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

STORM SEWER & CULVERT SOLUTIONS

PIPE ARCHES

External pressure is inversely proportional to radius• Higher pressure at tight corners• Lower bearing pressure at flat arcs

Page 19: Corrugated Steel Bridge and Tunnel Solutions

21© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

LIVE LOAD PRESSURES

TRAFFIC LOAD

FLEXIBLE PIPEDIA.

HEIGHT OF COVER (H)

LIVE LOAD

DEAD LOAD

STORM SEWER & CULVERT SOLUTIONS

Page 20: Corrugated Steel Bridge and Tunnel Solutions

22© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

ADVANTAGES OF FLEXIBLE PIPES

Advantages of flexible pipes over rigid pipes

• Flexible pipes are lighter

• Uniform distribution of the pressure through the backfill material

• Lower bearing pressure

• Signs and symptoms before failure

• Signs visible over a long period of time

• Deformation may reach over 20%

STORM SEWER & CULVERT SOLUTIONS

Page 21: Corrugated Steel Bridge and Tunnel Solutions

23© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Storm Sewer & Culvert Solutions

HIGH DENSITY POLYETHYLENE CORRUGATED PIPES

Page 22: Corrugated Steel Bridge and Tunnel Solutions

24© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

HDPE DRAINAGE TUBING

Description: Single-wall flexible HDPE pipe with interior and exterior corrugations

Manufacturing standard: BNQ 3624-115Diameters: 100, 150, 200, 250 and 300mmLength: Coils of 30, 45 or 75m (6m for 200, 250 and 300mm)Stiffness: 210 kPaTypes: Solid

PerforatedPerforated with geotextile sock

Applications• Foundation Drainage• Agricultural Drainage

STORM SEWER & CULVERT SOLUTIONS

Page 23: Corrugated Steel Bridge and Tunnel Solutions

25© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

TUBING FITTINGS

STORM SEWER & CULVERT SOLUTIONS

Page 24: Corrugated Steel Bridge and Tunnel Solutions

26© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

BOSS 1000 VS. BOSS 2000

(1st Generation)

STORM SEWER & CULVERT SOLUTIONS

Page 25: Corrugated Steel Bridge and Tunnel Solutions

27© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

BOSS 2000 & BOSS POLYTITE

Description: Dual-wall semi-rigid corrugated HDPE pipe with smooth interior.Manufacturing Standards: CAN/CSA-B182.8, BNQ 3624-120

CAN/CSA-B182.6 (Polytite)Diameters: 100 to 900mm (Up to 750 mm for Polytite)Length: 6mStiffness: 210 and 320 kPaJoints: Bell & Spigot, Split Coupler, Double Bell SnapTypes: Solid / PerforatedManning Coefficient: 0.012

Applications• Culverts• Storm Sewers• Road Drains

STORM SEWER & CULVERT SOLUTIONS

Page 26: Corrugated Steel Bridge and Tunnel Solutions

28© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

BOSS JOINING SYSTEMS

WATER TIGHTSOIL TIGHT

Ultra-Stab 75 Coupler (CSA B182.8)BOSS 2000 (100mm – 900mm)75 kPa

Ultra-Stab 100 Coupler (CSA B182.6)BOSS Polytite (100mm – 740mm)100 kPa

STORM SEWER & CULVERT SOLUTIONS

Page 27: Corrugated Steel Bridge and Tunnel Solutions

29© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

HDPE PIPES 1050, 1200 & 1500 MM

Description: Dual-wall semi-rigid corrugated HDPE pipe with smooth interior.

Manufacturing Standard : AASHTO M294Diameters: 1050, 1200 and 1500mmLength: 6.1 mStiffness: 179 kPa (1050mm), 145 kPa (1200mm) and 95 kPa (1500mm)Types: Solid / PerforatedJoints: Bell & SpigotManning Coefficient: 0.012

Applications• Culvert• Storm Sewer• Detention Systems

STORM SEWER & CULVERT SOLUTIONS

Page 28: Corrugated Steel Bridge and Tunnel Solutions

30© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

HDPE FITTINGS

Available Fittings

• 22.5°, 45° and 90° Elbows• Tee, Reducing Tee• Cross• 45° “Y”• Reducer• End Cap• Inserta Tee• Beveled End• Manhole Adaptor• Transition Coupling

STORM SEWER & CULVERT SOLUTIONS

Page 29: Corrugated Steel Bridge and Tunnel Solutions

31© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

HDPE MANHOLES

Triple-Wall ManholeDual-Wall Manhole

STORM SEWER & CULVERT SOLUTIONS

Page 30: Corrugated Steel Bridge and Tunnel Solutions

32© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

ADVANTAGES OF HDPE

Easy to Cut Easy to Handle High Impact Resistance

STORM SEWER & CULVERT SOLUTIONS

Page 31: Corrugated Steel Bridge and Tunnel Solutions

33© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

HDPE HIGH RESISTANCE

Abrasion Resistant• High slopes• Abrasive bed load

Chemical Resistant• Extreme pH• De-Icing salt• Organic, industrial and chemical wastes

STORM SEWER & CULVERT SOLUTIONS

Page 32: Corrugated Steel Bridge and Tunnel Solutions

34© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Resin Mixer

BOSS MANUFACTURING PROCESS

Extruder

Corrugator

STORM SEWER & CULVERT SOLUTIONS

Page 33: Corrugated Steel Bridge and Tunnel Solutions

35© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Storm Sewer & Culvert Solutions

STEEL REINFORCED HDPE PIPE (SRPE)

Page 34: Corrugated Steel Bridge and Tunnel Solutions

36© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

DUROMAXX

Description: Steel Reinforced HDPE Ribbed Pipe (SRPE)Manufacturing Standard: ASTM F2562Diameters: 900 to 3000mmLength: 4.3 and 7.3m (standards), custom lengths up to 15mManning Coefficient: 0.012Joints: Bell & Spigot, Flat Band Couplers, Electrofusion

Applications• Culvert• Culvert relining• Sanitary and storm sewers• Detention systems

STORM SEWER & CULVERT SOLUTIONS

Page 35: Corrugated Steel Bridge and Tunnel Solutions

37© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Soil Tight Culvert Joints – Plain end pipe with flat steel bandsNot watertight

Low Head – Non-reinforced bell & spigot ends (1050mm-1800mm)Watertight to 20 kPa (3 psi)

High Performance – Reinforced bell & spigot (1050mm-1800mm)Watertight to 100 kPa (15 psi)

Electro Fusion – Plain end pipe with flat steel alignment bands and interior extrusion welded coupler (1050mm-3000mm)

Watertight to 240 kPa (35 psi)

DUROMAXX JOINING SYSTEMS

STORM SEWER & CULVERT SOLUTIONS

Page 36: Corrugated Steel Bridge and Tunnel Solutions

38© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

DUROMAXX BELL & SPIGOT

STORM SEWER & CULVERT SOLUTIONS

Page 37: Corrugated Steel Bridge and Tunnel Solutions

39© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

DUROMAXX ELECTROFUSION

STORM SEWER & CULVERT SOLUTIONS

Page 38: Corrugated Steel Bridge and Tunnel Solutions

40© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

DUROMAXX – CULVERT RELINING

STORM SEWER & CULVERT SOLUTIONS

Page 39: Corrugated Steel Bridge and Tunnel Solutions

41© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Strom Sewer & Culvert Solutions

CORRUGATED STEEL PIPE

Page 40: Corrugated Steel Bridge and Tunnel Solutions

42© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Description: Helical locked seamed corrugated steel pipe (CSP)Manufacturing Standard: CSA G-401Diameters: 150 to 3600mmThickness: 1.6, 2.0, 2.8 and 3.5mmCorrugations: 38 x 6.5mm (150 to 250)

68 x 13mm (300 to 1800) 125 x 25mm (1400 to 3600)

Length: 6 and 9m, up to 15m (not re-rolled)Manning Coefficient: 0.012 to 0.025Coating: Galvanized

Aluminized type IIPolymer coated

Applications• Culvert• Detention systems

HEL-COR PIPE

STORM SEWER & CULVERT SOLUTIONS

Page 41: Corrugated Steel Bridge and Tunnel Solutions

43© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

HEL-COR PIPE - CORRUGATIONS

STORM SEWER & CULVERT SOLUTIONS

Page 42: Corrugated Steel Bridge and Tunnel Solutions

44© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

HEL-COR PIPE-ARCH

68 x 13 mm Corrugations• Ø400 to Ø1800 mm

125 x 25 mm Corrugations• Ø1600 to Ø3600 mm

STORM SEWER & CULVERT SOLUTIONS

Page 43: Corrugated Steel Bridge and Tunnel Solutions

45© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Description: Locked seamed spiral rib steel pipeManufacturing Standard: CSA G-401Diameters: 450 to 2600mmThickness: 2.0 and 2.8mmCorrugations: 190 x 19mm (Rib)Length: Up to 9mManning Coefficient: 0.013Coatings: Galvanized

Aluminized type IIPolymer coated

Applications• Culvert• Culvert relining

ULTRA-FLO PIPE

STORM SEWER & CULVERT SOLUTIONS

Page 44: Corrugated Steel Bridge and Tunnel Solutions

46© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Galvanized Steel25 to 50 years

Aluminized Type II75 years

Polymer-Laminated100+ years

COATINGS

STORM SEWER & CULVERT SOLUTIONS

Page 45: Corrugated Steel Bridge and Tunnel Solutions

47© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

COATINGS

STORM SEWER & CULVERT SOLUTIONS

Page 46: Corrugated Steel Bridge and Tunnel Solutions

48© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

HEL-COR & ULTRA-FLO FITTINGS

STORM SEWER & CULVERT SOLUTIONS

Page 47: Corrugated Steel Bridge and Tunnel Solutions

49© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PLAIN END CSP COUPLERS

Standard CouplerHugger Band Coupler

STORM SEWER & CULVERT SOLUTIONS

Page 48: Corrugated Steel Bridge and Tunnel Solutions

50© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

CSP MANUFACTURING PROCESS

Raw materials: Steel coils

Helical lockseam andcontrol of diameter Corrugation of the steel plate

STORM SEWER & CULVERT SOLUTIONS

Page 49: Corrugated Steel Bridge and Tunnel Solutions

51© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

RE-ROLLED ENDS

STORM SEWER & CULVERT SOLUTIONS

Page 50: Corrugated Steel Bridge and Tunnel Solutions

52© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

TRANSPORTATION OF PIPES

STORM SEWER & CULVERT SOLUTIONS

Page 51: Corrugated Steel Bridge and Tunnel Solutions

53© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Storm Sewer & Culvert Solutions

INSTALLATION OFFLEXIBLE PIPES

Page 52: Corrugated Steel Bridge and Tunnel Solutions

54© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

INSTALLATION OF FLEXIBLE PIPES

STORM SEWER & CULVERT SOLUTIONS

Page 53: Corrugated Steel Bridge and Tunnel Solutions

55© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

INSTALLATION OF PIPE-ARCHES

STORM SEWER & CULVERT SOLUTIONS

Page 54: Corrugated Steel Bridge and Tunnel Solutions

56© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

INSTALLATION OF PIPE-ARCHES

STORM SEWER & CULVERT SOLUTIONS

Page 55: Corrugated Steel Bridge and Tunnel Solutions

57© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

REFERENCE WORKS

• Handbook of Steel & Drainage HighwayConstruction Products, CSPI

• CSA G401-07 Standard

• Corrugated Polyethylene Pipe DesignManual & Installation Guide, PPI

• BNQ 3624-110/115/120 Standards• CAN/CSA 182.8/182.6 Standards

STORM SEWER & CULVERT SOLUTIONS

Page 56: Corrugated Steel Bridge and Tunnel Solutions

58© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Storm Sewer & Culvert Solutions

PROJECT PROFILES

Page 57: Corrugated Steel Bridge and Tunnel Solutions

59© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PROJECT HISTORYAGRIUM POTASH MINE – BRINE DRAINAGE

• 86 m length, 2130 mm (84” diameter)• 3 psi Bell & Gasket Joints

STORM SEWER & CULVERT SOLUTIONS

Page 58: Corrugated Steel Bridge and Tunnel Solutions

60© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PROJECT HISTORYROXUL – PARKING LOT (MILTON, ON)

• 50 m length, 3600 mm diameter• Corrugated couplers c/w fittings

STORM SEWER & CULVERT SOLUTIONS

Page 59: Corrugated Steel Bridge and Tunnel Solutions

61© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PROJECT HISTORYHUMBOLDT, SK – CSO TANKS

• 480 m length, 3050 mm (120” diameter)• Welded, leak-proof joints

STORM SEWER & CULVERT SOLUTIONS

Page 60: Corrugated Steel Bridge and Tunnel Solutions

62© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PROJECT HISTORYHUMBOLDT, SK – CSO TANKS

STORM SEWER & CULVERT SOLUTIONS

Page 61: Corrugated Steel Bridge and Tunnel Solutions

63© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PROJECT HISTORYLETHBRIDGE AIRPORT

• 375 – 750 mm diameter• 320 kPa, Bell & Gasket Joints• 3,500 m total length

STORM SEWER & CULVERT SOLUTIONS

Page 62: Corrugated Steel Bridge and Tunnel Solutions

64© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PROJECT HISTORYMTO-2014-6004 - ATIKOKAN, ON

• 27 m length, 2130 mm (84” diameter)• 3 psi, soil tight joints

STORM SEWER & CULVERT SOLUTIONS

Page 63: Corrugated Steel Bridge and Tunnel Solutions

65© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PROJECT HISTORYUNIVERSITY OF GUELPH – PARKING LOT

• 160 m length, 1800 mm diameter• Aluminized type II steel

STORM SEWER & CULVERT SOLUTIONS

Page 64: Corrugated Steel Bridge and Tunnel Solutions

66© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PROJECT HISTORYMARQUIS ST. - SASKATOON BOSS 2000 TRIAL

• 375 mm, 525 mm, 600 mm diameter• 2.0 – 3.0 m of cover• Per CSA B182.8, 320 kPa Pipe c/w Bell & Gasket Joints• Comprehensive review and report by AECOM:

• Bedding Material & Compaction Results• Pipe Deflection Testing & commentary• CCTV inspection• Leakage testing• Daily site reports

STORM SEWER & CULVERT SOLUTIONS

Page 65: Corrugated Steel Bridge and Tunnel Solutions

67© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PROJECT HISTORYMARQUIS ST. - SASKATOON BOSS 2000 TRIAL

• Approved for storm sewer use, up to 6.0 m of cover• Approval letter and report available on request

STORM SEWER & CULVERT SOLUTIONS

Page 66: Corrugated Steel Bridge and Tunnel Solutions

68© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PROJECT HISTORYSIMMS CREEK RELINE – CAMPBELL RIVER, BC

STORM SEWER & CULVERT SOLUTIONS

• DUROMAXX SLIP LINING (ABOVE)• FINAL REHABILITATED CULVERT (RIGHT)• DUROMAXX SLIP LINING (ABOVE)• FINAL REHABILITATED CULVERT (RIGHT)

Page 67: Corrugated Steel Bridge and Tunnel Solutions

69© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Contact Your Local Sales Rep:www.armtec.com/sales-offices/

Todays Speakers:

Dominic [email protected]

Cody [email protected]

Page 68: Corrugated Steel Bridge and Tunnel Solutions

70© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

UPCOMING WEBINARSStay connected or get involved with Armtec events. We are dedicated to the continuing education of our customers, colleagues and fellow employees through personalized lunch and learns and free online webinars.

For more info please visit www.armtec.com/events

Page 69: Corrugated Steel Bridge and Tunnel Solutions

71© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Follow us on social media to learn more about our company, projects and people, while getting all the latest Armtec and industry news.

Webinars will be posted with in five business days from the broadcast date. We will notify all subscribers over our social media channels.

Today’s session will be available on YouTube and SlideShare

Page 70: Corrugated Steel Bridge and Tunnel Solutions

72© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

STAY CONNECTED!

Armtec respects your privacy. All communications comply with CASL and general best practices. For more information, you can find links to privacy policy and options to unsubscribe in footer of any emails.

On Social Media On armtec.com WebinarsFollow us! After the webinar fill out our

survey and click yes!Fill out the form at armtec.com

and stay up to date on the latest/armtecltd

/ArmtecLtd

/company/armtec

Page 71: Corrugated Steel Bridge and Tunnel Solutions

73© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

QUESTIONS?

Page 72: Corrugated Steel Bridge and Tunnel Solutions

74© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Contact Your Local Sales Rep:www.armtec.com/sales-offices/

Todays Speakers:

Dominic [email protected]

Cody [email protected]