Summary report of project for
C5M Corrosion Protection
in compliance to ISO12944 & ISO20340 for
Ductile Iron Heavy Section Castings
A T Ansari
September – October 2010
Background
• Issue:– Customer complaints for corrosion
• Existing concerns– Supplier awareness
– Specification clarity
– Reference to international standards
Specification given to supplier
– Sand blasting according to ISO 12944-4 SA 2 1/2
– First Coat
– Intermediate coat
– Top coat
– Shade
– Nominal DFT
Concerns
– Issues observed once components reached to assembly plant or to customer
– Paint peel off
– Mud cracking
– Film thickness variation
– Poor SST life
– Catching early corrosion
Actions steps
– Plan
• Review and improve specification
– Do
• Assessment of supplier facilities
• Gap analysis
• Action plan
– Check
• Facilities verification
• Coating as per revised specification in improved facility
• Inspection
– Act
• Feedback from assembly plant
• Feedback from customer
Do
CheckAct
Plan
Specification Improvement
• Clarity in specification– Surface cleaning and preparation
• Instead of earlier sand blasting specified grit blasting
• Defined acceptance criteria for cleanliness
• Defined acceptance criteria for surface roughness after blasting
– Coating application• Recommended paint chemicals
– Inspection & testing• WFT inspection
• Paint DFT inspection as per ISO19840
• Pull off test
– Validation• Cyclic aging test as per ISO20340
Supplier assessment & actions
• Assessment gaps in areas of– Machinery and equipment
– Measurement & testing facilities
– Skilled work force
– Subject matter expertise
• Actions– Worked with suppliers to upgrade their facilities
– Arranged training sessions with Supplier’s team
– Worked with Suppliers HR team to identify training gaps and training calendar
Trial Run, inspection, testing & validation
• Production trial run - OK
• Individual layers WFT – OK
• Dry Film Thickness – OK
• Pull off Test – OK
• Sample submitted for aging test – Test OK
Steps taken during the project are explained in shortest possible way.
Contact [email protected] to understand in detail with specific question in case of any query.