Corporation Limited PRODUCT PIPELINE NETWORK · PDF fileHaldia Koyali Ratlam Mathura Tinsukia...

5
11-02-2014 1 1 Future full of energy Presentation on Disaster Management in LPG & Petroleum product pipeline transportation 31 st January 2014 By J S Prasad GM-Pipelines, HPCL Hindustan Petroleum Corporation Limited 2 Vijayawada Mangalore Bahadurgarh Awa Salawas Raman Mandi Bhatinda PRODUCT PIPELINE NETWORK INDIA (PSU) 2012-13 Mundra Barauni Guwahati Siliguri Haldia Koyali Ratlam Mathura Tinsukia Digboi Numaligarh Bina Kota IOCL HPCL BPCL OIL Total Network Length : 14,034 Kms Total Capacity : 85 MMTPA GAIL

Transcript of Corporation Limited PRODUCT PIPELINE NETWORK · PDF fileHaldia Koyali Ratlam Mathura Tinsukia...

Page 1: Corporation Limited PRODUCT PIPELINE NETWORK · PDF fileHaldia Koyali Ratlam Mathura Tinsukia Digboi Numaligarh Bina Kota IOCL HPCL BPCL ... 11-02-2014 2 3 Product Pipeline Network

11-02-2014

1

1Future full of energy

Presentation on

Disaster Management in LPG & Petroleum product pipeline

transportation

31st January 2014

By

J S Prasad

GM-Pipelines, HPCL

Hindustan Petroleum Corporation Limited

2

Vijayawada

Mangalore

Bahadurgarh

Awa

Salawas

Raman Mandi

Bhatinda

PRODUCT PIPELINE NETWORK

INDIA (PSU)

2012-13

Mundra

Barauni

GuwahatiSiliguri

HaldiaKoyali

Ratlam

Mathura

TinsukiaDigboi

Numaligarh

Bina

Kota

IOCL

HPCL

BPCL

OIL

Total Network Length : 14,034 Kms

Total Capacity : 85 MMTPA

GAIL

Page 2: Corporation Limited PRODUCT PIPELINE NETWORK · PDF fileHaldia Koyali Ratlam Mathura Tinsukia Digboi Numaligarh Bina Kota IOCL HPCL BPCL ... 11-02-2014 2 3 Product Pipeline Network

11-02-2014

2

3

Product Pipeline Network (PSU)

Company Total Product Pipeline network length in Kms

Total Capacity in MMTPA

IOC 6,632 41.56

HPCL 2,769 22.60

GAIL 2,038 3.24

BPCL 1,941 15.50

OIL 654 1.72

TOTAL 14,034 85

47%

20%

14%

14%5%

Network Share

IOCL HPCL BPCL GAIL OIL

49%

27%

4%18%

2%

Capacity Share

IOC HPCL GAIL BPCL OIL

LPG Pipelines of 2312 Km and 3.94 MMTPA in India

Future Full Of Energy 4

DescriptionLength (KMs)

Capacity (MMTPA)

Year of Comm

Mumbai-Pune-Solapur P/L & Other P/L 544 6.8 1985 /2006

Visakh-Vijayawada-Secunderabad P/L 572 5.38 1998 /2002

Mundra-Delhi P/L & BTPL 1068 6.06 2007

Ramanmandi-Bahadurgarh and Ramanmandi-Bathinda P/L

273 5.86 2012

Mangalore Hassan Bengaluru P/L (JV) 364 2.14 2002

Total 2823 26.22

HPCL Pipelines

Operating Pipelines

DescriptionLength

(KMs)

Capacity

(MMTPA)

Scheduled

Completion

Rewari - Kanpur 442 7.9 Nov, 2015

Awa - Salawas 93 2.3 Nov, 2015

Mangalore Hassan Mysore Solur (LPG) 397 3.1 Nov, 2015

Total 932 13.3

Under Construction Pipelines

Future Full Of Energy

Page 3: Corporation Limited PRODUCT PIPELINE NETWORK · PDF fileHaldia Koyali Ratlam Mathura Tinsukia Digboi Numaligarh Bina Kota IOCL HPCL BPCL ... 11-02-2014 2 3 Product Pipeline Network

11-02-2014

3

5

Salient Points to be discussed

ONSITE DISASTER MANAGEMENT

RISKS

OPERATION PRACTICES TO MITIGATE RISKS

EMERGENCY PREPRAREDNESS – SYSTEMS

AND PROCEDURES

OFFSITE DISASTER MANAGEMENT

RISKS

MAJOR STAKE HOLDERS

EMERGENCY PRERPAREDNESS – SYSTEMS

& PROCEDURES

SYSTEM DESIGN

INNOVATIONS

CASE STUDIES 6

DESIGN FEATURES

OF PIPELINES

DESIGN FEATURES

OF PIPELINES

Future Full Of Energy

Page 4: Corporation Limited PRODUCT PIPELINE NETWORK · PDF fileHaldia Koyali Ratlam Mathura Tinsukia Digboi Numaligarh Bina Kota IOCL HPCL BPCL ... 11-02-2014 2 3 Product Pipeline Network

11-02-2014

4

7

Safety Features – Design/ Construction Stage

Future Full Of Energy

De

sig

n Various National and International codes like ASME B31.4, API 1104, API 1102, API 5L,

Petroleum Rules 2002, OISD 141, 117, 214

Corrosion Allowance of 0.5 MM

Safety Factor of 0.72 as per ASME B31.4

Str

ength

Selection of line pipe based on API 5L standard spec

Automatic / Semi-Automatic welding ensuring strength of weld area greater than parent material

100% Radiography is ensured for the weld joints as per API 1104

Pipeline is shop floor tested at 95% of SMYS

Pipeline is site tested at either 1.25 times the design pressure or 95% of SMYS

Concrete coating of Pipes as anti-buoyancy measure

Sa

fety

The pipeline routes are selected based on urbanization and population

Laid at the minimum depth of 1.2 Meters

Environmental Impact assessment (EIA) and Quantitative risk analysis (QRA) studies

Higher wall thickness in Highway and Rail Crossings with casings ref. API 1102

Pipeline Laid 2 Meters below the Scour Depth using HDD while crossing Perennial rivers

Adequate safety margins considered for withstanding longitudinal stresses because of earthquakes / Tectonic Plate Movement

Mobile Cold Flare Systems for LPG Pipelines at Remote SVs

8

Integrity of Pipelines

Future Full Of Energy

Corrosion Protection

Process Control

Safety/Security

Emergency preparedness

Internal corrosion:

� Dosing by Corrosion Inhibitor� Online Corrosion

Monitoring using Corrosion Probes

External corrosion:

� Anti corrosive coating using Denso/ 3 LPE coating.

� Corrosion protection thru Impressed Current Cathodic Protection

system

� PLC based onsite

control of various process and equipment parameters

� OFC Based dedicated telecommunication system for effective and

quick communication between stations.

� SCADA based control

of entire pipeline for control of Process and equipment

� Dynamic and Steady state leak detection system based on

mathematical model of Pressure, temperature, volume and flow.

� Day and Night Patrolling of Line walkers

� CCTV Cameras in all stations and SV stations

� Security Tracking System to monitor the movement of line

walkers on a daily basis

� Pipeline Intrusion

Detection System to detect third party intrusion on our

pipeline ROU

� Offsite and On Site mock drill

� Village awareness and

Village coordination meet

� Security Coordination

meets

Page 5: Corporation Limited PRODUCT PIPELINE NETWORK · PDF fileHaldia Koyali Ratlam Mathura Tinsukia Digboi Numaligarh Bina Kota IOCL HPCL BPCL ... 11-02-2014 2 3 Product Pipeline Network

11-02-2014

5

9

Periodic Checks

CAT: Current Attenuation Test

CIPL: Closed Interval Potential Logging

TLP : Test Lead Points

IP : Intelligent Pigging

Pipeline Checks Periodicity as per OISD 188 and 138

CAT survey Once in 5 years

CIPL survey Once in 5 years

On/off TLP survey Once in a year.

IP survey Once in 10 years CIPL Survey

Intelligent PIG

10

ONSITE DISASTER

MANAGEMENT

ONSITE DISASTER

MANAGEMENT