CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE...

40
CORPORATE PROFILE 2016

Transcript of CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE...

Page 1: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

CORPORATE PROFILE 2016

Page 2: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

Table of contents

1. CORPORATE PROFILE

2. INTERNATIONAL PRESENCE

3. CERTIFICATES

4. MANUFACTURING FACILITIES

5. TECHNICAL FURNITURE

6. ERGO SOLUTIONS

7. HIGH TECH INFRASTRUCTURE

8. SERVICES

9. MOST RELEVANT REFERENCES

10. CASE STUDIES

Page 3: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

1. Corporate Profile

RoomDimensions is a company expert in infrastructuredevelopment and provision of added-value solutions for24x7 operations environments, focusing its activity inthe execution of turnkey projects and technologyconsultancy:

• Control & command centers.• Crisis Room & conference environments.• Emergency centers.• Meeting rooms.• High-tech environments.• 24x7 corporative environments.

Page 4: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

2. International presence

RoomDimensions is a Spanish group which operates, through strategic partnershipsand business collaborations with local players, within a vast international market,stretching from Europe to Middle East and South America, spanning multiple sectorsfocused on 24x7 operations environments.

Offices:

Barcelona, Madrid

Segments:

RailwayTrafficTransportSecurityIndustryUtilities (gas, water. electricity)Ports authoritiesTelecomPublic administartionChemicalScience & Technology

Markets:

EuropeNorthern AfricaQatarUnited Arab EmiratesSaudi ArabiaIsraelMexicoVenezuelaBrazil

Page 5: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

3. Certificates

• UNE-EN ISO 11064(Ergonomic Design for Control Centers).

•Define all the standards to follow inside a 24x7 environments or the rules to take into account at the moment to design a Command Center.

• FNEW 83-269EPerformance test method for intensive products.

• REA AprovalCertification like an aproved company to offer turn key solutions.

• ISO 9001Under process

Page 6: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

4. Manufacturing facilities

• Facilities well prepared to manufacture

technical furniture for control room.

• High-tech tools to guarantee high quality

products and solutions.

• 3500 Square meter facilities & wharehouse

to assembly prototypes & organize all the

logistics.

Page 7: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

5. Products / Technical furniture and ergonomics

Technical furniture and ergonomics

CRAE CONSOLE CRAE EVO CRAE MEETING KOMPAS CONSOLE

LAN CONSOLE KOMPAS LITE LAN LAB AUDIOVISUAL TOTEM

Pro

duct

ran

ge

Page 8: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

5.1 Products / CRAE Console

• High storage capacity of the PC equipment.• Facilitates the creation of large workstations.• Rapid access to the equipment and cabling.• Easily adaptable work surfaces.• Possibility to add blocks for extra storage space. • Lateral sides can house elevation pistons.

Page 9: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

5.2 Products / CRAE Evo

• Integrates 19” hinged sections in the worksurface. • Integrates a 19” structure extractable from both

the rear or the frontal part .• Integrates a rear panel mounted at middle height.• Access doors to the compartment with double

opening.• Decorative LED lighting system.

Page 10: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

5.3 Products / CRAE Meeting

• High capacity to integrate a huge

quantity of electronic components

and infrastructure.

• Robust and modular solution with

innovative design.

• Non standard solution-High capacity

to adapt to any environment.

Page 11: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

5.4 Products / KOMPAS Console

• Modular, flexible and adaptable product.• Manufactured with high quality materials.• Allows personalization of colours.• Integrated power, voice & data sockets.• 19” compartments included.• Phenolicum adjustable work surfaces.

Page 12: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

5.5 Products / LAN Console

• Effective and practical technical concept.• Able to integrate a large quantity of equipment.• Optimal management of the structured wiring.• Connectivity accoding to each customer’s needs.• Customization of colors and finishes.

Page 13: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

5.6 Products / KOMPAS Lite

• Complementary range to Kompas console.• Environments annexed to the control centres.• Simple, effective management of structured cabling.• Integrated power, voice & data sockets.• Complete range of ergonomic accessories.• Archive and printing modules.

Page 14: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

5.7 Products / LAN Lab

• Vertical architecture for laboratorios.• Perfectly ordered and concealed cabling

management.• Integration of connectivity elements.• Height and inclination adjustment of the trays.• Integrates 19” Rack compartments for the

location of electronic equipment.• 19” sections adapted beneath the trays for the

location of communication equipment.

Page 15: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

5.8 Products / Audiovisual Totem

• Solution designed to the location of LCD audiovisual screens.

• Various formats available 1x1, 1x2, 2x2 until 55”• Allows the location of a PC in the interior of its

structure.• Integrates 19” sections for mounting connectivity

elements.• Perfect solution for a concealed and ordered

cabling management.

Page 16: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

5.9 Products / Special consoles

• Company focused on solutions.• Facility adapted to produce added value products.• R+D team expert developing Technical furniture.• Short time to market.• High flexibility & customer adaptation.• Fully customization.

Page 17: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

6. Products / Ergo Solutions

Ergo Solutions

24x7 CHAIRS SUPPORT ARMS / LIGHTING DRAWERS & CABINETS

Pro

duct

Ran

ge

Page 18: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

6.1 Products / Accessories

• Filing and Auxiliary partitioning solutions.• Cabinet modules.• Filing and printing modules.• Mobile drawers.

Page 19: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

6.2 Products / CXO

• Ergonomic high-class product.

• EnersorbTM foam filling solution.

• Ergonomic design, high degree of comfort.

• Allows adjustments in depth of the seat.

• Product certified according to FNEW 83-269E.

Page 20: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

6.3 Products / Ergo solutions

• Articulated supports for management of TFT o LCD.

• Front End adjustement system.

• Keyboard platform, PC supports.

• Lamps for the control post.

Page 21: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

7. Products / High Tech solutions

High Tech solutions

KVM INFRASTRUCTURE AUDIOVISUAL SOLUTIONS POP-UP SCREENS

Pro

duct

ran

ge

Page 22: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

7.1 High Tech Soluitons / KVM infrastructure

• IP or LAN remote control.• Signal extension via Fiber optics or RJ45.• KVM commuting.• Server monitoring via 19” consoles.

Page 23: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

7.2 High Tech Solutions / Audiovisual infrastructure

Back projection

4K Led screens

Front projection

Page 24: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

7.3 High Tech Solutions / Pop-up screens

• Retractable monitors.

• Folding monitors.

• Option to integrate retractable microphones.

Page 25: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

8. Services

3D PRESENTATIONS TECHNICAL DRAWINGS TECHNICAL SPECIFICATIONS

PROJECT PLANNING PROJECT EXECUTION ¨AS BUILT¨

Pre

-sal

es S

ervi

ces

Pos

t-sa

les

Serv

ices

Page 26: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

• Integral development of the 3D planimetry.

• Full rendering of the accessories.

• Virtual representation of the real space.

• Virtual representation of the technical furniture to be used in the command center.

• Definition of the interior desing and architectural elements.

• Integration of the audiovisuals and technological elements in the space.

8.1 Pre-sales services / 3D Presentations

Page 27: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

8.2 Pre-sales services / Technical drawings

• Preparation of technical drawings, sections and construction details.

• 3D presentations.

• Ergonomic arrangement of all used elements.

Page 28: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

8.3 Pre-sales services / Technical specificacions

• Complete instalation guide for each product.

• Comprehensive descriptive and argumentative documentation.

• Preparation of technical specifications, descriptive and argumentative memories.

Page 29: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

8.4 Post-sales services / Project planning

• Reconsideration of each proposal.

• Proper definition of the spatial dimensions.

• Approval of distribution before works.

• Definition of the necessary infrastructure for the implementation

of the operational environment.

Page 30: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

8.5 Post-sales services / Project execution

• Technical capacity to carry out the implementation of the

environment & different solutions.

• Implementation of added-value technical solutions.

• Customization of the technical furniture.

• Technical assistance on site.

Page 31: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

8.6 Post-sales services / As built

• Registration of changes, modifications, variations occured

during the execution of the project.

• Preparation of the final project documentation.

• Maximum fidelity guaranteed between the tendered

project and the final result.

Page 32: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

9. Most relevant references

INTERNATIONAL REFERENCES

1.RailwayTraffic management center, Vilnius, Lithuania

2.CRAE emergency center, Pozarica, México

3.Pemex crisis room, PozaRica, México

4.Drilling control room, Villahermosa, México

5.TCDD command center, Ankara, Turkey

6.Saudí Railway High-Speed control room, Meca, KSA

7.Royal Guard NOC, Riyadh, KSA

8.Royal Guard command center, Riyadh, KSA

9.Traffic management center, AbuDhabi, Emirates

10.Ministery of Presidentials affairs control room, A.D., Emirates

11.Prasarana command center, Kuala Lumpur, Malaysia

12.Aguas do Nordeste control room, Porto, Portugal

13.Invecem control room, Sansebastián, Venezuela

NATIONAL REFERENCES

1. Metro de Málaga control room, Málaga, Spain

2. DGT traffic management control room, Zaragoza, Spain

3. ETAP water consortium control room, Bilbao, Spain

4. ETAP water consortium control room, Tarragona, Spain

5. Euskal Trenbide Sarea control room, Bilbao, Spain

6. Security council control room, Bilbao, Spain

7. Feve Railway control room, Bilbao, Spain

8. Tarragona Port Authority control room, Tarragona, Spain

9. Ministery of interior penitenciary control room, Acebuche, Spain

10. Añarbe water consortium control room, San Sebastian, Spain

11. Barcelona Metropolitan Transports control room, Barcelona, Spain

12. Siemens Rail control room, Bilbao, Spain

13. CESICAT Security Control Room, Barcelona, Spain

Page 33: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

10. Case study: Traffic Management Control room

SCOPE OF THE PROJECT:

Organization of all the operational workstations of the main

control room and the annexed crisis room, employing solutions

designed and developed specifically for this particular operating

environment, such as the audiovisual TOTEMs of the operator.

The project was developed using our highly performant range of

technical furniture KOMPAS console, which allowed an excellent

distribution of space and the creation of a perfect workplace for

each user.

Page 34: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

10. Case study: Railway Management Control room

SCOPE OF THE PROJECT:

Specific illumination system | Decorative illumination system |

Technical acoustic ceilings | Technical floors at different levels |

13mm vertical phenolic coatings | Integrated panelled partitioning

| Coating for audiovisual system | Operations Control Consoles |

Crisis Room Consoles | Ergonomic chairs for 24x7 environments |

Articulated supports for monitors | Illumination system for the

work places | Specific archive cabinets.

Page 35: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

10. Case study: Málaga Metro control room

SCOPE OF THE PROJECT:

Operations and supervision Control Consoles | Chairs 24x7 CXO |

Ergonomic solutions | Meeting Area PCC | Archive and partitioning

solutions | KOMPAS consoles for the printing room | KOMPAS

consoles for the office of the room manager.

The solutions employed included the new console Kompas

Console, which was taken as a reference for the design of the

control centre environment.

Page 36: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

10. Case study: Prasarana control room

The project has been particularly sensitive to the creation of a

technological environment that serves as a benchmark in

metropolitan infrastructure management due to the large social

and economic impact that it will have for the city of Kuala Lumpur.

SCOPE OF THE PROJECT:

Operations and supervision Control Consoles | Chairs 24x7 CXO |

Ergonomic solutions | Meeting Area PCC | Archive and partitioning

solutions | KOMPAS consoles for the printing room | CRAE

consoles for the office of the room manager.

Page 37: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

10. Case study: BOC Saudi Railways-Meca

This project is based in the High speed Railway infrastructure

between Medina-La Meca.

SCOPE OF THE PROJECT:

Operations and supervision Control Consoles | Chairs 24x7 CXO |

Ergonomic solutions | Meeting Area PCC | Archive and partitioning

solutions | KOMPAS consoles for the printing room | CRAE

consoles for the office of the room manager.

Page 38: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

10. Case study: TCDD control room, Turkey

The project is based on the high speed railway infrastructure in

Turkey.

SCOPE OF THE PROJECT:

Operations and supervision Control Consoles | Chairs 24x7 CXO |

Ergonomic solutions | Meeting Area PCC | Archive and partitioning

solutions | Architectural Environment | Lighting design | CRAE

consoles for the office of the room manager.

Page 39: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

SCOPE OF THE PROJECT:

Design & interior remodeling of the Control Centre and the CPD |

raised floors | technical ceilings | lighting system | HVAC system| fire

detection| extinction system| graphic image | nomenclature operating

environments / storage wall cabinet| decorative wall cladding| KOMPAS

console units| CXO 24X7 chairs| filling modules | BARCO audiovisual

system OL-721 70” HD model /audiovisual TOTEM | 42U Racks

Schneider Electric | power and data infrastructure

10. Case study: ETAP DE VENTA ALTA Control Centre

Page 40: CORPORATE PROFILE 2016 - Room Dimensions. Case study:Traffic Management Control room SCOPE OF THE PROJECT: Organization of all the operational workstations of the main control room

Replacement of all existing furniture in the Bilbao City Council

Coordination emergency center with the new LAN control consoles,

specifically tailored to meet the technical requirements of the

environment, facilitating the integration of the 12 operators and their

systems, while contemplating all the ergonomic needs of the

workplace by integrating the 24x7 CXO Extreme chairs

SCOPE OF THE PROJECT:

Control consoles | CXO Extreme ergonomic chairs | Ergonomic

solutions for LCD monitors | BARCO 3x2 80” SXG+ Audiovisual system

10. Case study: Bilbao City Council Emergency Centre