Corporate Presentation, JSPL
-
Upload
bikramdevpadhi -
Category
Documents
-
view
225 -
download
0
Transcript of Corporate Presentation, JSPL
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 1/52
1
JINDAL STEEL & POWER LIMITEDJINDAL STEEL & POWER LIMITED
1 CORPORATE PRESENTATIONCORPORATE PRESENTATION
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 2/52
2
JSPL Group CompaniesJSPL Group Companies
Jindal Steel & Power Limited (JSPL)
Jindal Power Limited (JPL)
Jindal Petroleum Limited (JPTL)
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 3/52
3
SnapshotSnapshot -- SteelSteel
Operating 3 Million Ton capacity Steel Plant in Central India (Chhattisgarh)
Operating largest Coal Based Sponge Iron Plant in the world(Capacity - 1.4 Million ton)
The Company has track record of continuous growth of 10 years
The corporate philosophy of JSPL has been consistent growth throughfocus on its core sectors
Produces ‘A Class’ 120 meter long rails, the world’s longest rails
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 4/524
SnapshotSnapshot -- PowerPower
Set up 1000 MW Thermal Power Plant in Central India (Chhattisgarh)
First Mega Power Project in the Private Sector
Constructed 258 Km long 400 KV double circuit transmission line
Constructed 55 Km long 220 KV double circuit transmission line
Operating 340 MW power plant based on washery rejects & waste gases
2nd largest power producer in the private sector in India
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 5/525
Coal & Iron Ore Mines
Extracting 12 MT thermal coal from captive mines
Largest producer of Coal in private sector
Operating 6 MT capacity coal washery
Setting up additional 6 MT capacity coal washery
Extracting about 3.0 MT iron ore from captive mine
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 6/526
Industrial Park
Established an Industrial Park where 32 Industrial Units are already in
operation
Supplying 100 MW power to these units through 220 KV dedicatedtransmission line
Total 70 units are planned in this Industrial Park
- Ultimately 300 MW power will be supplied to the Industrial Park
Tariff of power supply is far less as compared to State Governmenttariff
Holding distribution license for supply of power to Industrial Park
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 7/527
Business Segments
Iron and Steel Manufacturing
Iron Ore and Coal Mining
Power Generation
Product Portfolio
Sponge Iron / Pig Iron Hot Rolled Parallel Flange
Beams & Structurals
Semis (Slabs, Blooms, Rounds, Billets)
Rails
Plates & Coils
Power
Product MixProduct Mix
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 8/528
IntegrationIntegration
Iron Orefrom Mines
Coal fromMines
Coal Washery
BF
Coking
Coal
Pig Iron
POWER
PLANT*CSEB/OTHERS
EAF
RAIL & UNIVERSAL BEAM
MILL
ROTARY KILNS
Rails Structurals
WasheryRejects
Sponge
Iron
Char/ Flu Gases
Rounds/
Blooms/Slabs/Billets
Sale
Sale
Sale
Sale
Sale
Sale
SINTER PLANT
PLATE MI LL
Sale
PLATES & COILS
Sinter
COKEOVEN
COKE
* Captive Power Plant supplies power to all facilities
COAL
FINES
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 9/529
Raigarh, Chhattisgarh
FacilitiesFacilities
Existing Capacity (MTPA)
Sponge Iron (coal based) 1,370,000
Steel 3,000,000
Rails & Structurals 750,000
Plates 1,000,000
Slabs,Rounds,Blooms & Billets 1,250,000
Hot Metal 1,500,000
Captive Power Plant 340 MW
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 10/5210
Steel Production Globally: 2008Steel Production Globally: 2008
•Global crude steel output has shrunk 1.2% (-) in 2008. It is nearly 25% lower, yoy.•Liquidity shrinkage has discouraged inventory holding and encouraged excessive inventory liquidation, raised speculationon prices, caused raw materials supply disruptions and affected Steel producers.
Source: Steel and Natural Resources Strategy Research ( SNRSR)
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 11/52
11
Top ten Steel Producing Countries in the World(Production figures in million tones)
Country Rank 2008 2007
China 1 502.0 489.2
Japan 2 118.7 120.2
UnitedStates 3 91.5 98.2
Russia 4 68.5 72.4
India 5 55.1 53.1SouthKorea 6 53.5 51.5
Germany 7 45.8 48.6
Ukraine 8 37.1 42.8
Brazil 9 33.7 33.8
Italy 10 30.5 31.5
Source: Steel and Natural Resources Strategy Research ( SNRSR)
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 12/52
12
Source: Steel and Natural Resources Strategy Research ( SNRSR)
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 13/52
13
IndiaIndia -- Projected Trends of Steel ConsumptionProjected Trends of Steel Consumption
Source: Steel and Natural Resources Strategy Research ( SNRSR) Estimates based on Joint Plant Committee (JPC) and industry information
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 14/52
14
FinancialsFinancials
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 15/52
15
Consolidated Financials at a GlanceConsolidated Financials at a Glance
(Rupees in Mill ion)2007-08 2008-09
AUDITED AUDITED
(12 months) (12 months)
INCOME STA TEMENT
Gross Turnov er 61005 113709
Net Turnov er 55387 109133
Net Profit A fte r Tax 12511 30071
Cash Pro fit 18169 42502
BA LA NCE SHEET
Gross Fixed A sset s ( incl. WIP) 106796 149277Networth 37278 70211
Borrowings 69960 81133
Share Capital:
Preference
Equity 154 155
SIGNIFICA NT RA TIOS
Operat ing Margin (%) 41% 48%
Net Profit to Sa les (%) 23% 28%
Return on Net Wort h (%) 34% 43%
Long Term Debt Equity Rat io (Time) 1.74 1.03
Book Value (INR/ Share) 242# 453#EPS (INR/ Share) 81# 194#
# EPS adjusted to reflect a 1:5 stock split w.e.f 27 Dec,07
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 16/52
16
Consistent GrowthConsistent Growth-- 30 Quarterly PAT30 Quarterly PAT
(Consolidated)(Consolidated)
3191
2774
1571
1531
296
263 263
316
389
603
595
502
583
802
1166
1215
123512391466
1502
1454
1264
15061899
2025
2501
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Se
p-0 1
De
c -0 1
Ma
r -02
Ju
n-02
S e
p-02
De
c -02
Ma
r -03
Ju
n-03
S e
p-03
De
c -03
Ma
r -04
Ju
n-0 4
S e
p-04
De
c -0 4
Ma
r -0 5
Ju
n-05
Se
p-05
De
c -05
Ma
r -06
Ju
n-0 6
S e
p-0 6
De
c -06
Ma
r -07
Ju
n-07
Se
p-07
De
c -0 7
Ma
r -08
Ju
n-08
S e
p-0 8
De
c -08
Ma
r -0 9
*
(Rupees in Mill ion
8998
7647
4436
4097
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 17/52
17
Financials at a GlanceFinancials at a Glance (Rupees in Mill ion
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-0 AUDITED AUDITED AUDITED AUDITED AUDITED AUDITED AUDIT
(12 Months) (12 Months) (12 Months) (12 Months) (12 months) (12 months) (12 months
INCOME STATEMENT
Gross Turnov er 10017 14039 24673 29055 39487 61807 8580
Net Turnov er 8891 12729 2271 26177 35488 54560 7799Net Profit A fter Tax 1451 3054 5157 5729 7030 12369 1536
Cash Prof it 2671 4342 7658 8581 11745 17681 2074
BA LA NCE SHEET
Gross Fixed A sset s (incl. WIP) 15040 19669 28759 43893 58669 65794 9680
Networth 5712 8539 13174 18379 24742 37211 5384Borrowings 8852 10260 14959 27454 35077 38633 4962
Share Capital:
Preference 100
Equity 146 154 154 154 154 154 15
SIGNIFICA NT RA TIOS
Opera t ing Margin (%) 39% 40% 40% 40% 41% 40% 33%
Net Profit t o Sales (%) 16% 24% 23% 22% 20% 23% 20%
Return on Net Wort h (%) 25% 36% 39% 31% 28% 33% 29%
Long Term Debt Equity Rat io (Time) 1.41 1.09 1.11 1.20 1.07 0.90 0.7
Book Value (INR/ Share) 195 277 428 597 803 242# 348#
EPS (INR/ Share) 52 100 167 186 228 80# 99#
# EPS adjusted to reflect a 1:5 stock split w.e.f 27 Dec,07
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 18/52
18
9,932
CAGR 34 %
8185 10566
17826 20214
30781
53060
80918
1301
24382682
2857
2467
1428
5789
5559
446 1965
42355883
0
10000
20000
30000
40000
50000
60000
70000
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09
Year
R s .
i n C r o
r e s
Others^
Power
Steel
13,959 24,499 28,779
FinancialsFinancials -- Revenue MixRevenue Mix (Rupees in Mill ion
39,198 61,316 84,338
*Net of Inter Divisional Transfers
^Incl. Iron Ore Fines
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 19/52
19
FinancialsFinancials – – Investing in Grow thInvesting in Grow th
Yearly Capex to Cash Flows (Rupees in Mill ion Yearly Capex to Cash Flows
2313
48153838
5071
7268
9492
5464
15574
11570
1580514118
7657
2702025691
0
4000
8000
12000
16000
20000
24000
28000
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09
Cash Flows
Capex
0.951.3 2.9 1.4 0.6Times 2.1 1.3
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 20/52
20
FinancialsFinancials – – Investors FaithInvestors Faith (Rupees in Mill ion
Promoters
59%
FI/Banks/MFs/
FIIs
24%
Public
17%
15446 3167757655
72303
389523
0
50000
100000
150000
200000
250000
300000
350000
400000
2003-04 2004-05 2005-06 2006-07 15 Jun'09
2 5 T i m e
s
2 5 T i m e
s
Market CapitalisationMarket CapitalisationShareholding PatternShareholding Pattern-- Mar,09Mar,09
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 21/52
21
Future Growth DriversFuture Growth Drivers
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 22/52
22
Future Growth DriversFuture Growth Drivers -- OrissaOrissaProject ProfileProject Profile
PROJECT : Phase – I
6 MTPA Integrated Steel Plant& 900 MW Captive Power Plant
LOCATION : Angul, Orissa
PROPOSED FACILITIES
1. Coal Gasification & Gas Based DRI : 4.0 MTPA2. Blast Furnace : 3.0 MTPA3. Steel Making Facilities : 6.0 MTPA
4. Flat Products (Plates and HR Coils) : 6.0 MTPA5. Power Plant : 810 MW
RESOURCES
I. Coal Block, Utkal B-1 with extractable reserves of 147 Million Tons allotted by GOI forsteel projectII. Iron Ore Mine to be allotted by State Government as per MOU signed with the Govt. of
Orissa
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 23/52
23
Future Growth DriversFuture Growth Drivers -- JharkhandJharkhand
Project ProfileProject Profile
PROJECT : Phase-I
6 MTPA Integrated Steel Plant& 1000 MW Captive Power Plant
LOCATION : Patratu, Jharkhand
PROPOSED FACILITIES
1. Blast Furnace : 6.0 MTPA2. Steel Making Facilities (BOF Route) : 6.0 MTPA3. Flat Products : 3.0 MTPA
4. Long Products : 3.0 MTPA5. Power Plant : 1000 MW
RESOURCESI. Two Coal Blocks, Jitpur with extractable reserves of 65 Million Tons & Amarkonda -
Murgadangal with extractable reserves of about 200 Million Tons allotted by GOI for2000 MW capacity CPP & 1000 MW IPP to be set up by group co. Gagan Power Ltd.II. Iron Ore Mine with estimated reserves of 70 Million Tons allotted by State
Government for steel project
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 24/52
24
Future Growth DriversFuture Growth Drivers -- RaigarhRaigarh
Project ProfileProject Profile
PROJECT : Phase-I
Addition of 3 MTPA Integrated Steel Plant
& 600 MW Captive Power Plant
LOCATION : Raigarh, Chhattisgarh
PROPOSED FACILITIES
1. DRI (Gas based) : 2.0 MTPA2. Steel Making Facilities : 3.0 MTPA3. Medium Section Mill : 0.6 MTPA4. Power Plant : 540 MW
RESOURCES
I. Existing Coal Mines at Raigarh having extractable reserves of about 200 MillionTons for existing steel plant
II. Existing Iron Ore Mines in district Sundergarh, Orissa with extractable reserves ofabout 20 Million Tons
III. Prospecting license for Iron Ore over 1162 hectares area in Bailadila districtDantewada recommended by State Government to GOI for prior approval
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 25/52
25
Future Growth DriversFuture Growth Drivers -- ElEl MutunMutun, Bolivia, Bolivia
Project ProfileProject Profile
Agreement with the Bolivian governmentapproved by the parliament
Estimated reserves of Iron Ore in area of exploitation - 20 Bi l lion tons
The Company proposes to set up the followingfacilities.
• Pelletization Plant - 10.00 Mil l ion MTPA
• Direct Reduced Iron - 6.00 Mi ll ion MTPA
• Steel Making Faci li ties - 1.81 Mi ll ion MTPA
• Pow er Plant - 450 MW The total investment proposed is $2.1 bill ion over
the next 8 years
Proposed financing at a debt-equity ratio of 60 :40
The revenues w ill start flow ing from the year2010
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 26/52
26
Future Growth DriversFuture Growth Drivers
Captive Power GenerationCaptive Power Generation
Jindal Steel & Power LimitedJindal Steel & Power Limited
Existing Capacity at Raigarh 340 MW Operational
Additional proposed Raigarh (135 MWx4) 540 MW by 2010-11
Proposed addition at Orissa (135 x 6) 810 MW by 2010-11
Proposed addition at Jharkhand 1000 MW by 2011-12
Total Proposed Capacity (between 2012-15) 2690 MW
Expected Date ofCommissioning
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 27/52
27
JSPLJSPL’’ss Coal To Liquid ProjectCoal To Liquid Project
Government of India allotted Ramchandi Promotional Coal Block in theState of Orissa with estimated reserves of 1,500 Million MT
Production Capacity of 80,000 Barrels per day (4.0 MMTPA)
Technical tie-up with M/s Lurgi of Germany
Fixed Bed Dry Bottom Technology will be used
Total Project Cost : Rs. 42,000 Crores
The above project is aimed at enhancement of energy security by reducingdependence on imported Crude.
1000 MW O P Jindal Super Thermal Power Plant, Raigarh
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 28/52
28
1000 MW O P Jindal Super Thermal Power Plant, Raigarh
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 29/52
29
Installed Capacity of Top 5 CountriesInstalled Capacity of Top 5 Countries(In Thousand MW)(In Thousand MW)
Thermal Hydro Nuclear Others Total MW % of WorldGeneration Per CapitaCons. 2005-06 (KWH)
United States 689.5 79.4 98.7 17.4 884.9 25.22
9.64
6.75
13338
China 253 83 2.2 0 338 2180
Japan 168 22 46 0.7 237 8076
Russia 139.6 44.7 21.2 0.02 205 5.86 5642India 92.2 36.0 4.1 12.2 144.50 3.48 631
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 30/52
30
Comparative per capita consumption of electricityComparative per capita consumption of electricity((KwhKwh))
0
2500
5000
7500
10000
OCCD
Countries
Middle East Latin
America
China Asia Africa India World
Average
8365
2980
1695 1802
646 563 612
2596
Source: Central Electricity Authority
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 31/52
31
The Power Situation in IndiaThe Power Situation in India
•Capacity in 1947 : 1363 MW
•Capacity in 2008 : 144,000 MW
•Demand Rise : 10% p.a.•Present peak demand deficit : 12%
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 32/52
32
Generation Capacity (May 2008)Generation Capacity (May 2008)
Total 144550 MW
Generation Capacity (MW)
92216
12194
36033
4120
64% (Thermal)
8% (Renewable)
25% (Hydro)
3% (Nuclear)
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 33/52
33
Thermal (MW)
1202
76299
14716
(83% Coal)
(1% Diesel)
(16% Gas)
Thermal Installed Capacity till May 2008Thermal Installed Capacity till May 2008
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 34/52
34
Capacity Addition Target DuringCapacity Addition Target During
XI Plan (2007XI Plan (2007--2012)2012)
Thermal : 59,693 MW (75.8%)
Nuclear : 3,380 MW (4.3%)
Hydro : 15,627 MW (19.9%)
Total : 78,700 MW (100.0%)
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 35/52
35
1097
9340
660
11061
125 310 0435
0
2000
4000
6000
8000
10000
12000
Hydro Ther. Nec. Total
TargetAchievement
Generation Capacity Addition 2008Generation Capacity Addition 2008--0909
and Achievement till May 2008and Achievement till May 2008
Jindal Power Limited Subsidiary Company
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 36/52
36
Jindal Power Limited - Subsidiary Company
Commissioning of 1000 MW Power PlantCommissioning of 1000 MW Power Plant
250 MW - Unit 1 : December 2007
250 MW - Unit 2 : April 2008
250 MW - Unit 3 : June 2008
250 MW - Unit 4 : September 2008
S li t F t f 1000 MW P j tSalient Feat res of 1000 MW Project
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 37/52
37
Salient Features of 1000 MW ProjectSalient Features of 1000 MW Project First Mega Power Project in the Private Sector
JPL has been assigned ‘AA’ Rating by ICRA in the 1st year of Production
Salient FeaturesSalient Features
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 38/52
38
Salient FeaturesSalient Features… … …… … …
Constructed 6.948 kms. crosscountry pipe conveyor for coaltransportation. This is the longestpipe conveyor in India
Constructed a Dam which wascompleted in a record time period of2 working seasons
38
Salient FeaturesSalient Features
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 39/52
39
Salient FeaturesSalient Features………………
Operating largest coal mine inthe Indian private sector
Largest 6 Million Ton Capacity
Coal Washery in Indian Power Sector
Salient FeaturesSalient Features
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 40/52
40
Salient FeaturesSalient Features………………
Constructed 258 km long 400 kV double circuit transmission line whichwas completed in the record time of 1.5 years
This 400 KV transmission line is the first line constructed without any
Joint Venture with Power grid
First private power plant which is connected to the CentralTransmission Utility (CTU, Power Grid)
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 41/52
41
Financials at a GlanceFinancials at a Glance
Fin. Year 2007-08
Few Days Operation* Q1 Q2 Q3 Q4
Gross Generation
(Million units )125.3 962 1490 1951 1966 6369.0
PLF % 66% 59% 70% 88% 91% 79%
Net Sales (Rs Crores) 125.3 293.6 653.9 1160.7 1149.4 3257.5
PAT ( Rs Crores ) 19.4 41.3 314.7 574.6 651.3 1581.9
* For the Period 8th Dec '07 till 31st March '08
2008 -09
TotalParticulars
Financial Year 2008-09
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 42/52
42
Future Growth DriversFuture Growth Drivers
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 43/52
43
Future Growth DriversFuture Growth Drivers
Brownfield Expansion Plant (4x600 MW) : 2400 MW
Status :
Order placed on BHEL in December 2008 for BTG Unit
Order Value on BHEL - Rs. 5040 Crores
Water approvals received
Land for main plant already acquired
Technical Consultant ‘Development Consultant Pvt. Ltd.’ (DCPL)appointed
SBI Capital Markets Ltd. appointed as advisor and syndicator
F G h D i
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 44/52
44
Future Growth DriversFuture Growth Drivers
Project Cost :
Project Cost : 12,800 Crores
Financing on 75 : 25 Debt Equity
Debt : Rs. 9,600 Crores
Equity : Rs. 3,200 Crores
Equity to be funded from internal accruals
Financial closure expected by December, 2009
H d PH d P
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 45/52
45
Hydro PowerHydro Power
Two Joint Venture Agreements executed with Hydro Power DevelopmentCorporation of Arunachal Pradesh Limited (HPDCAPL) for development of4500 MW Hydro Projects in Arunachal Pradesh
Detailed Project Report (DPR) and infrastructure development to becompleted in 5 years
Setting up of these projects will take about 8 years after preparation of DPR
Estimated project cost of Etalin (4000 MW) is Rs. 21,820 Crores and Attunli(500 MW) is Rs. 4,172 Crores
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 46/52
46
Jindal Petroleum LimitedJindal Petroleum Limited
Jindal Petroleum LimitedJindal Petroleum Limited
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 47/52
47
Jindal Petroleum LimitedJindal Petroleum Limited
IntroductionIntroduction
Jindal Petroleum Ltd. is currently engaged in Oil & Gas Exploration
Awarded 4 Oil & Gas Exploration Blocks in Georgia in Jul./Aug. 2008
Awarded 1 Block in India under New Exploration Licensing Policy-
(NELP - VII) in Rajasthan
Development of Palmer Gas and Condensate Field in Bolivia in
progress
Jindal Petroleum LimitedJindal Petroleum Limited
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 48/52
48
Jindal Petroleum LimitedJ da et o eu ted
Planning for Exploration & Production of Oil & Gas inPlanning for Exploration & Production of Oil & Gas inGeorgiaGeorgia
Production Sharing Contract (PSC) for 4 Oil & Gas Exploration Blocks in
Georgia (Block No. - VIIA, IX, X & XIIIA) executed in January, 2009
Exploration activities commenced
Many blocks have large nos. of test wells done earlier showing oil
Looking forward to speedy Exploration of Oil & Gas in Georgia so as to be
able to contribute to Economic Development of Georgia
Jindal Petroleum LimitedJindal Petroleum Limited
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 49/52
49
Planning for Exploration & Production of Oil & Gas inPlanning for Exploration & Production of Oil & Gas inGeorgiaGeorgia
Block IXBlock X Block X
Photos of some of the test wells
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 50/52
50
Jindal Steel & Power Ltd.
Corporate Social Responsibilities
undertaken by the company in the vicinity
of its steel plant and upcoming projects
8/14/2019 Corporate Presentation, JSPL
http://slidepdf.com/reader/full/corporate-presentation-jspl 51/52
51
SAIL-HR Award for excellence in Human Resource Management, 2009
JSPL figures among Top-20 "BEST COMPANIES TO WORK FOR" as per a
survey by Business Today, January 2009
National Energy Conservation Awards 2001, 2002, 2003, 2004, 2005, 2007& 2008 in Integrated Steel Plants Category
One of the Ten Fastest Growing Large Size Companies (Dalal Street
Journal 2006)
2nd Most Investor Friendly Company, Business Today 2008
Golden Peacock National Quality Award, 2008
Golden Peacock Environment Management Award, 2008
Think Odisha Leadership Award in Corporate Social Responsibility, 2008 FICCI Annual Award in recognition of Corporate Initiatives in Sports, 2006
Greentech Environmental Excellence Award 2006 and 2003
Golden Peacock Award for CSR Initiatives, 2006
National Safety Award (Mines) 2004, 2005 and 2006
Some of the accolades that we have to our credit include;