Project NameInternational CommunicationsCompany CorporateCampus Retrocommissioning

Project LocationAtlanta, Georgia

Project Team

Corporate CampusesMarkets

Specializations

Owner:Communications Company

Contractor: McKenney’s, Inc.

Energy Management

bdoc

Page 3: Corporate Campus Retrocommissioning

McKenney’s dramatically improved energy efficiency at a corporatecampus in Atlanta, following an HVAC system and controls retrocommissioning.

Page 4: Corporate Campus Retrocommissioning

The ChallengeThe system and older pneumatic controls were not functioning properly, and as a result, occupants were uncomfortable and they were consuming too much energy. Air compressors ran constantly due to leaks, several chilled water valves were not calibrated correctlyand a variable frequency drive (VFD) on one air handling unit was running in bypass. In addition, the building owner did not have aclear understanding of occupancy schedules.

The SolutionThe team repaired and replaced major leaks throughout the compressed air system, cutting run time in half and raising the airpressure to an acceptable level. Leaking chilled water valves were fixed, faulty VFD wiring was repaired and pneumatic controls,stats and sensors were recalibrated. The team also set controls to shut down areas of the building that did not need 24/7 conditioning.

The content of this document is not intended as an endorsement.

Page 5: Corporate Campus Retrocommissioning

The ResultsThe building is consuming 20 percent less energy—saving the company $120,000 annually—and attaining a projected two yearpayback in just twelve months.

Page 6: Corporate Campus Retrocommissioning

1056 Moreland Industrial BoulevardAtlanta, Georgia 30316P: 404-622-5000

[email protected]

3601 Performance RoadCharlotte, North Carolina 28214P: 704-357-1200

Atlanta Office:

Charlotte Office:

www.mckenneys.com