DRAFT RESTORATION PLAN AND ENVIRONMENTAL ASSESSMENT FOR THE CORNELL-DUBILIER ELECTRONICS, INC. SUPERFUND SITE SOUTH PLAINFIELD, MIDDLESEX COUNTY, NEW JERSEY FEBRUARY 2021 Prepared by: Cornell-Dubilier Electronics, Inc. Trustee Council U.S. Fish and Wildlife Service on behalf of the U.S. Department of Interior National Oceanic and Atmospheric Administration on behalf of the U.S. Department of Commerce New Jersey Department of Environmental Protection on behalf of the State of New Jersey

Transcript of CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2....

Page 1: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

DRAFT

RESTORATION PLAN AND ENVIRONMENTAL ASSESSMENT

FOR THE

CORNELL-DUBILIER ELECTRONICS, INC. SUPERFUND SITE

SOUTH PLAINFIELD, MIDDLESEX COUNTY, NEW JERSEY

FEBRUARY 2021

Prepared by:

Cornell-Dubilier Electronics, Inc. Trustee Council

U.S. Fish and Wildlife Service on behalf of the U.S. Department of Interior

National Oceanic and Atmospheric Administration on behalf of the U.S. Department of

Commerce

New Jersey Department of Environmental Protection on behalf of the State of New Jersey

Page 2: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

ii

TABLE OF CONTENTS

CHAPTER 1 INTRODUCTION AND SUMMARY ................................................................ 1

1.1 Overview .............................................................................................................................. 1

1.2 Purpose and Need for Restoration ........................................................................................ 1

1.3 Natural Resource Trustees and Authorities .......................................................................... 2

1.3.1 CERCLA Compliance ................................................................................................... 2

1.3.2 NEPA Compliance ........................................................................................................ 2

1.4 Site Background ................................................................................................................... 3

1.5 Summary of Response Actions ............................................................................................ 5

1.6 Summary of Natural Resource Injuries ................................................................................ 6

1.7 Summary of Settlements ...................................................................................................... 7

1.8 Administrative Record ......................................................................................................... 8

1.9 Public Involvement ............................................................................................................... 8

CHAPTER 2 CERCLA RESTORATION PLANNING PROCESS ....................................... 10

2.1 Restoration Objective ......................................................................................................... 10

2.2 Restoration Strategy ........................................................................................................... 10

2.3 Primary Evaluation Criteria ................................................................................................ 11

2.4 Secondary Evaluation Criteria and Project Tiers ............................................................... 12

2.5 Restoration Alternative Identification and Screening ........................................................ 14

CHAPTER 3 EVALUATION OF RESTORATION ALTERNATIVES ................................ 16

3.1 No Action ........................................................................................................................... 18

3.2 Preferred Tier I Alternative: Island Farm Weir Fish Passage ............................................ 19

3.3 Preferred Tier I Alternative: Headgates Dam Removal ..................................................... 23

3.4 Preferred Tier I Alternative: Califon Dam Removal .......................................................... 27

3.5 Preferred Tier I Alternative: Blackwells Mills Dam Removal ........................................... 30

3.6 Preferred Tier I Alternative: Nunn’s Mill Dam Removal .................................................. 34

3.7 Preferred Tier I Alternative: Pond Removal on Tributary to Rockaway Creek ................. 37

3.8 Preferred Tier I Alternative: County Boat Launch and Fishing Platform at Lincoln Avenue

Park ..................................................................................................................................... 39

Page 3: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

iii

3.9 Preferred Tier I Alternative: Lost Valley Nature Park ....................................................... 42

3.10 Preferred Tier I Alternative: North Branch Raritan River Corridor Riparian Buffer

Restoration .......................................................................................................................... 44

3.11 Preferred Tier I Alternative: East Brunswick Swamp Pink Restoration ............................ 47

3.12 Preferred Tier I Alternative: Stony Brook Green Infrastructure Demonstration Project ... 49

3.13 Preferred Tier II Alternative: Rockafellows Mills Dam Removal ..................................... 51

3.14 Preferred Tier II Alternative: Klines Mill Dam Fish Passage ............................................ 55

3.15 Preferred Tier II Alternative: Beisler Lake Dam Removal ................................................ 57

3.16 Preferred Tier II Alternative: Mill Street Dam Removal ................................................... 60

3.17 Preferred Tier II Alternative: Lake Manalapan Riparian Restoration ................................ 63

3.18 Preferred Tier II Alternative: North Branch Raritan River, Lamington River, and Stony

Brook Mussel Restoration .................................................................................................. 66

3.19 Preferred Tier II Alternative: Trash Trap Installation in the Lower Raritan River

Watershed ........................................................................................................................... 69

3.20 Preferred Tier II Alternative: Rutgers Ecological Preserve Accessible Trail .................... 71

3.21 Preferred Tier II Alternative: Bridge over the Delaware and Raritan Canal Spillway ...... 73

3.22 Non-Preferred Tier III Alternative: Cherry Brook Preserve Constructed Wetland ........... 75

3.23 Non-Preferred Tier III Alternative: Raritan Bay Oyster Restoration ................................. 78

3.24 Non-Preferred Tier III Alternative: South River Tidal Marsh Restoration ........................ 79

3.25 Non-Preferred Tier III Alternative: Edison Landfill Capping and Wetland Restoration ... 82

CHAPTER 4 NEPA AFFECTED ENVIRONMENT .............................................................. 84

4.1 Affected Environment ........................................................................................................ 84

4.2 Physical Environment ......................................................................................................... 85

4.2.1 Surface Water ............................................................................................................. 85

4.2.2 Regional Geology and Soils ....................................................................................... 87

4.2.3 Land Cover ................................................................................................................. 87

4.2.4 Air ............................................................................................................................... 88

4.2.5 Climate........................................................................................................................ 88

4.3 Biological Environment ..................................................................................................... 89

4.3.1 Terrestrial and Aquatic Habitat ................................................................................. 89

4.3.2 Fish and Wildlife ........................................................................................................ 89

Page 4: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

iv

4.3.3 Threatened and Endangered Species ......................................................................... 91

4.4 Socioeconomic Resources .................................................................................................. 91

4.4.1 Environmental Justice ................................................................................................ 92

4.5 Cultural and Historic Resources ......................................................................................... 93

CHAPTER 5 NEPA ENVIRONMENTAL CONSEQUENCES ............................................. 95

5.1 NEPA Environmental Consequences ................................................................................. 95

5.2 Scope of NEPA Analysis and Trustee Approach ............................................................... 95

5.3 Impacts of Proposed Alternatives ....................................................................................... 96

5.3.1 No Action .................................................................................................................... 96

5.3.2 Planning, Feasibility Studies, Design Engineering, and Permitting .......................... 97

5.3.3 Implementation and Effectiveness Monitoring ........................................................... 97

5.3.4 Fish and Wildlife Monitoring ..................................................................................... 98

5.3.5 Environmental Education Classes, Programs, Centers, Partnerships,

and Materials ......................................................................................................... 100

5.3.6 Riverine and Coastal Habitat Restoration: Debris Removal ................................... 102

5.3.7 Fish Passage: Dam and Culvert Removal, Modification or Replacement ............... 103

5.3.8 Fish Passage: Technical and Nature-Like Fishways ............................................... 107

5.3.9 Fish, Wildlife, Vegetation Management: Invasive Species Control ......................... 109

5.3.10 Freshwater Stream Restoration: Channel Restoration ............................................ 111

5.3.11 Freshwater Stream Restoration: Bank Restoration and Erosion Reduction ............ 112

5.3.12 Shellfish Reef Restoration ......................................................................................... 114

5.3.13 Road Upgrading and Decommissioning: Trail Restoration..................................... 117

5.3.14 Road Upgrading and Decommissioning: Signage and Access Management........... 118

5.3.15 Wetland Restoration: Levee and Culvert Removal, Modification, and Set-Back ..... 119

5.3.16 Wetland Restoration: Restoration and Shoreline Stabilization Techniques ............ 121

5.3.17 Wetland Restoration: Wetland Planting ................................................................... 122

5.3.18 Impacts Not Addressed in the PEIS .......................................................................... 124

5.3.19 Summary of Impacts ................................................................................................. 126

5.4 Cumulative Impacts .......................................................................................................... 126

5.4.1 Cumulative Impacts of No Action Alternative .......................................................... 126

Page 5: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

v

5.4.2 Cumulative Impacts of Preferred Alternatives ......................................................... 126

5.4.3 Cumulative Impacts of Non-Preferred Alternatives ................................................. 127

CHAPTER 6 COMPLIANCE WITH OTHER LAWS AND REGULATIONS ................... 128

6.1 Federal Laws .................................................................................................................... 128

6.1.1 National Environmental Policy Act .......................................................................... 128

6.1.2 Federal Water Pollution Control Act (Clean Water Act) ......................................... 128

6.1.3 Fish and Wildlife Coordination Act.......................................................................... 128

6.1.4 Endangered Species Act ........................................................................................... 129

6.1.5 Migratory Bird Treaty Act ........................................................................................ 129

6.1.6 National Historic Preservation Act .......................................................................... 129

6.1.7 Occupational Safety and Health Act ........................................................................ 129

6.1.8 Americans with Disabilities Act ............................................................................... 130

6.1.9 Coastal Zone Management Act................................................................................. 130

6.1.10 Magnuson-Stevens Fishery and Conservation Management Act ............................. 130

6.1.11 Rivers and Harbors Act ............................................................................................ 130

6.1.12 Floodplain Management, Executive Order 11998 ................................................... 130

6.1.13 Protection of Wetlands, Executive Order 11990 ...................................................... 131

6.1.14 Federal Actions to Address Environmental Justice in Minority Populations and Low-

Income Populations, Executive Order 12898 .......................................................... 131

6.2 State and Local Laws ....................................................................................................... 131

List of Preparers and Reviewers ................................................................................................. 132

List of Agencies and Persons Consulted ..................................................................................... 132

Literature Cited ........................................................................................................................... 133

Page 6: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

vi

LIST OF FIGURES

Figure 1. Map of Cornell-Dubilier Site and environs. ................................................................... 4

Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

(circles). All restoration alternatives are located within the Raritan River watershed,

New Jersey .................................................................................................................................... 16

Figure 3. Island Farm Weir aerial view showing layout of major structures............................... 20

Figure 4. Island Farm Weir spillway and associated infrastructure shown from downstream

facing north bank. ......................................................................................................................... 22

Figure 5. Headgates Dam aerial view showing layout of major structures. ................................ 24

Figure 6. Headgates Dam shown from downstream facing west bank. ....................................... 25

Figure 7. Califon Dam shown facing north. Photo depicts approximate 30-foot breach. ........... 28

Figure 8. Blackwells Mills Dam shown from upstream facing west. .......................................... 31

Figure 9. Nunn’s Mill Dam shown from downstream facing northeast. ..................................... 35

Figure 10. Inline farm pond on an unnamed tributary to Rockaway Creek. ................................ 38

Figure 11. County Boat Launch in Lincoln Avenue Park, Manville, New Jersey....................... 40

Figure 12. Example of accessible fishing platform along a small river in Virginia. Photo credit:

Hawksbill Greenway Foundation. ................................................................................................ 41

Figure 13. Conceptual design for the Lost Valley Nature Park, Mott MacDonald 2017. ........... 43

Figure 14. Map of potential areas for riparian buffer restoration in the North Branch Raritan

watershed. ..................................................................................................................................... 45

Figure 15. Swamp Pink plant from the East Brunswick, New Jersey population. ...................... 48

Figure 16. Rockafellows Mills Dam shown from downstream facing southwest. ...................... 52

Figure 17. Klines Mill Dam shown from downstream facing southeast. .................................... 56

Page 7: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

vii

Figure 18. Beisler Lake in fall of 2019. The impoundment was permanently drained through the

outflow structure embedded in the earthen dam in 2017, and the impoundment was partially

revegetated in 2018. ...................................................................................................................... 58

Figure 19. Mill Street Dam shown facing northeast. Water has eroded the stream bank along the

northeastern edge of the dam, and visibly flows around the weir. ............................................... 61

Figure 20. Riparian Restoration on Lake Manalapan’s southern shoreline; this project is very

similar to the proposed project. ..................................................................................................... 64

Figure 21. Green floater and brook floater shells. Photo credit: Allan Barlow. .......................... 67

Figure 22. Example of Bandalong Litter Trap™, installed on a tributary to the Anacostia River,

Washington, DC. Photo credit: United Nations Information Center, Washington DC. ............... 70

Figure 23. Proposed location of Rutgers Ecological Preserve ADA Trail. Frame A shows

general location of trail within the Preserve, denoted by the red circle. Frame B shows a close-up

of the trail, denoted by dashed red lines. ...................................................................................... 71

Figure 24. Existing trail along Buell Brook that will be modified for ADA compliance. ........... 72

Figure 25. Map showing D&R Canal spillway and proposed location of bridge site. ................ 74

Figure 26. Cherry Brook Pond, Montgomery Township, New Jersey. Photo Credit: Kleinfelder

and Omni Environmental 2012. .................................................................................................... 76

Figure 27. Example of oyster castle reefs at Nantuxent Creek, New Jersey. Photo credit: Steve

Jacobus. ......................................................................................................................................... 78

Figure 28. Proposed location of South River Tidal Marsh Restoration project, denoted by hashed

orange lines. .................................................................................................................................. 81

Figure 29. Proposed location of Edison Landfill Capping and Wetland Restoration project,

denoted by hashed orange lines. ................................................................................................... 83

Figure 30. The major rivers and tributaries of the Raritan River Watershed, NJDEP 1972. ....... 84

Figure 31. Raritan River sub-watersheds. Source: SRRI 2016. ................................................... 86

Figure 32. Land cover in the Raritan River watershed. Source: SRRI 2016. .............................. 87

Page 8: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

viii

LIST OF TABLES

Table 1. Restoration alternatives tiered by primary and secondary criteria. ................................ 17

Table 2. Preliminary cost estimates for Tier I and Tier II preferred alternatives. ........................ 18

Page 9: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

1

CHAPTER 1 INTRODUCTION AND SUMMARY

1.1 Overview

The U.S. Department of Interior (DOI) acting through the U.S. Fish and Wildlife Service (Service),

the U.S. Department of Commerce acting through the National Oceanic and Atmospheric

Administration (NOAA), and the State of New Jersey acting through the New Jersey Department

of Environmental Protection (NJDEP; collectively referred to as Trustees) initiated a natural

resource damage assessment and restoration (NRDAR) process under the Comprehensive

Environmental Response, Compensation and Liability Act (CERCLA; 42 U.S.C. § 9601 et seq.)

for the Cornell-Dubilier Electronics, Inc. Superfund Site (Cornell-Dubilier Site or Site), located in

South Plainfield, Middlesex County, New Jersey. As part of the NRDAR process, the Trustees

developed and jointly filed natural resources damages claims with potentially responsible parties

seeking monetary compensation for injuries to natural resources caused by the release of hazardous

substances and pollutants at or from the Cornell-Dubilier Site, as summarized in Section 1.7.

Recovered damages are intended to restore, replace, rehabilitate and/or acquire the equivalent of

injured natural resources, including their supporting habitats, to compensate the public for injuries

to natural resources. The Trustees developed this Draft Restoration Plan and Environmental

Assessment (Draft RP/EA) in accordance with 43 C.F.R. § 11.93 to identify and evaluate proposed

restoration alternatives and to inform the public of the proposed restoration actions to be

undertaken towards compensating the public for injuries to natural resources.

1.2 Purpose and Need for Restoration

The Trustees prepared this Draft RP/EA to address natural resources injured or lost due to releases

of hazardous substances at and from the Cornell-Dubilier Site. Pursuant to Section 111(i) of

CERCLA (42 U.S.C. § 9611(i)), and the CERCLA NRDAR regulations (43 C.F.R § 11.93), the

Trustees have developed this Draft RP/EA to identify and evaluate proposed restoration

alternatives to restore, replace, rehabilitate and/or acquire the equivalent of injured natural

resolves, including their supporting habitats, to compensate the public for natural resource injuries

caused by the release of hazardous substances at the Site. Consistent with NRDAR regulations,

this Draft RP/EA includes a reasonable number of restoration alternatives and identifies “preferred

Page 10: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

2

alternatives” for funding and implementation. Public comments are being sought on this Draft

RP/EA and will be considered and incorporated in the Final RP/EA as appropriate.

1.3 Natural Resource Trustees and Authorities

Pursuant to Section 107(f) of CERCLA, 42 U.S.C. § 9607(f); the Federal Water Pollution Control

Act (Clean Water Act or CWA), 33 U.S.C. § 1321(f)(4) and (5); Subpart G of the National Oil and

Hazardous Substances Pollution Contingency Plan, 40 C.F.R. §§ 300.600, 300.605; and other

applicable federal and state laws, designated federal and state authorities may act on behalf of the

public as natural resource Trustees to pursue natural resource damages for injury to, destruction

of, or loss of natural resources resulting from the release of hazardous substances to the

environment. The State Trustee (i.e., NJDEP) also acts pursuant to the Spill Compensation and

Control Act, N.J.S.A. 58:10-23.11 et seq.; the Water Pollution Control Act, N.J.S.A. 58:10A-1 et

seq.; and the authority vested in the Commissioner of the Department by N.J.S.A 13:1D-1 et seq.

This Draft RP/EA was prepared jointly by the Trustees in accordance with Section 111(i) of

CERCLA (42 U.S.C. § 9611(i)) and the NRDAR implementing regulations (43 C.F.R. § 11.93).

1.3.1 CERCLA Compliance

In compliance with CERCLA, this Draft RP/EA evaluates a reasonable number of proposed

restoration alternatives, including a No Action alternative (i.e., natural recovery; 43 C.F.R. §

11.82). In this document, the Trustees select from among the possible alternatives the alternative(s)

most appropriate to restore, rehabilitate, replace, or acquire the equivalent of those natural

resources injured or lost due to the release of hazardous substances, in part by considering factors

outlined in 43 C.F.R. § 11.82(d). Consistent with federal law, the Trustees also evaluated the

proposed restoration alternatives for compliance with other applicable laws and regulations, as

documented in Chapter 6.

1.3.2 NEPA Compliance

The Trustees must comply with the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C.

§ 4321 et seq., and its regulations, 40 C.F.R. § 1500 et seq., when planning restoration projects.

NEPA is generally applicable to any project that involves federal funding, work performed by the

federal government, or permits issued by a federal agency. NEPA and its implementing regulations

Page 11: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

3

outline the responsibilities of federal agencies under NEPA, including preparing environmental

documentation. In general, federal agencies contemplating implementation of a major federal

action must produce an Environmental Impact Statement (EIS) if the action is expected to have

significant impacts on the quality of the human environment. When it is uncertain whether a

contemplated action is likely to have significant impacts, federal agencies prepare an

Environmental Assessment (EA) to evaluate the need for an EIS. If the EA demonstrates that the

Preferred Alternative(s) will not significantly impact the quality of the human environment, the

agency issues a Finding of No Significant Impact (FONSI), which satisfies the requirements of

NEPA, and no EIS is required. For a proposed restoration plan, if a FONSI determination is made,

the Trustees may then issue a final restoration plan describing the selected restoration action(s).

In compliance with NEPA, this Draft RP/EA summarizes the current environmental setting where

the proposed restoration actions may take place, describes the purpose and need for restoration

actions, identifies a reasonable range of alternatives, and assesses the potential environmental

consequences of those alternatives, including cumulative impacts. Actions undertaken by the

Trustees to restore natural resources under CERCLA must also comply with other applicable laws

and regulations, as documented in Chapter 6.

The Service is acting as the lead federal agency for NEPA compliance for this Draft RP/EA, and

NOAA is participating as a cooperating federal agency pursuant to NEPA (40 C.F.R. § 1508.5).

NOAA may adopt the Final RP/EA, as appropriate, in accordance with 40 C.F.R. § 1506.3 and

agency-specific NEPA procedures.

1.4 Site Background

The Cornell-Dubilier Site is a 26-acre industrial facility (Facility) and adjacent areas that were

contaminated as a result of releases of hazardous substances at and from the Facility, located in

South Plainfield, Middlesex County, New Jersey (Figure 1). Cornell-Dubilier Electronics, Inc.

(CDE) manufactured electronic parts and components, including capacitors, from 1936 to 1962 at

the Facility. CDE allegedly released and buried materials contaminated with polychlorinated

biphenyls (PCBs) which contaminated Site soils; groundwater in the aquifer beneath the Site; soils

and groundwater of nearby residential and commercial properties; and the surface water, soils, and

sediments of an unnamed tributary, the Bound Brook, and adjacent wetlands. The contaminant of

Page 12: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

4

greatest concern at the Site is PCBs, however, elevated concentrations of heavy metals, chlorinated

volatile organic compounds (VOCs), polycyclic aromatic hydrocarbons (PAHs),

dichlorodiphenyltrichloroethane (DDT), dioxins, and furans have also been identified at levels of

ecological concern.

Figure 1. Map of Cornell-Dubilier Site and environs.

Of particular ecological concern is contamination that migrated to or was released into the surface

water and sediments of the unnamed tributary, Bound Brook, and adjacent wetlands. The unnamed

tributary flows approximately 0.5 mile along the southeast corner of the Facility to its confluence

with Bound Brook. Bound Brook flows approximately 3.3 miles to the New Market Pond Dam,

then continues for an additional 6 miles to the confluence with the Raritan River. Contaminated

material was historically disposed of directly into the unnamed tributary, adjacent wetlands, and

Bound Brook, and analytical results indicated the presence of elevated PCB contamination

extending downstream of the Site to the New Market Pond Dam in Piscataway, New Jersey.

The Facility was owned by the Dana Corporation (Dana) from about 1913 until 1956. Dana leased

the Facility to CDE from 1936 until 1956, when Dana sold the property to CDE. CDE occupied

Page 13: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

5

the Facility from 1936 to 1962, manufacturing electronic components, primarily capacitors. In

1961, CDE sold the Facility to two companies that jointly held title, Lamitex, Inc. and C.R.D.

Realty Corporation, but remained at the property as a tenant until 1962. Sometime prior to 1976,

Lamitex, Inc. and C.R.D. Realty Corporation merged into the Marco Investing Corporation, which

later merged into DSC Enterprises, Inc., now known as D.S.C. of Newark, Inc., the most recent

property owner. The Facility was operated as a rental property for commercial and light industrial

tenants after 1962 until the Facility was closed in the late 1990s.

1.5 Summary of Response Actions

The U.S. Environmental Protection Agency (EPA) added the Cornell-Dubilier Site to the National

Priorities List (NPL) on July 28, 1998. The NPL is a list of hazardous waste sites in the United

States that are eligible for long-term remedial action (i.e., clean up) under the Federal Superfund

Program. The EPA divided the Site into four operable units (OUs) to address remedial actions,

where Operable Unit 1 (OU1) addressed nearby residential and commercial properties; Operable

Unit 2 (OU2) addressed Facility soils; Operable Unit 3 (OU3) addressed contaminated

groundwater; and Operable Unit 4 (OU4) addressed contamination found in adjacent stream

channels (i.e., unnamed tributary and 10 miles of Bound Brook) and floodplain sediments.

The selected remedial action for OU1 was addressed first, and required the excavation, off-site

transportation, and disposal of PCB-contaminated soils, property restoration, and cleaning of

interior dust at residential and commercial properties in the vicinity of the former Facility. EPA

began remediating OU1 in 2005, and work was substantially complete by 2014. The selected

remedial action for OU2 included the demolition of Facility buildings; excavation of the most

highly contaminated soil; on-site treatment of excavated soils using low temperature thermal

desorption or off-site disposal if warranted; backfilling of excavated areas with clean fill or treated

soil; and installation of a multi-layer cap or hardscape. Remediation of OU2 began in 2006, and

was substantially complete by 2012. The selected remedial action for OU3 included institutional

controls and long-term monitoring of groundwater and vapor intrusion, and incorporated a waiver

for groundwater treatment due to technical infeasibility. The remedial action associated with OU3

was initiated in 2012 and continues to be implemented. The selected remedial action for OU4

includes excavation and off-site disposal of capacitor debris located along the portion of Bound

Brook that is adjacent to the former Facility property; the relocation of a waterline that transects

Page 14: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

6

the former Facility property; capping and treatment of groundwater along the boundary of the

former Facility property and Bound Brook; and excavation and removal of contaminated sediment

and floodplain soils along a three-mile stretch of Bound Brook. The complete remedial design for

OU4 is pending, and no remedial actions have been implemented to date.

Generally, “clean-up” actions address risks to human health and the environment from

contamination, while the focus of NRDAR (and this Draft RP/EA) is to restore, replace,

rehabilitate, and/or acquire the equivalent of natural resources injured or lost as a result of the

release of hazardous substances to “make the public whole”. Additional information on the EPA’s

clean-up activities can be found at: https://cumulis.epa.gov/supercpad/cursites/csitinfo.cfm?

id=0201112.

1.6 Summary of Natural Resource Injuries

For the purposes of developing natural resource damages claims for the Dana Corporation

bankruptcy settlement, the Cornell-Dubilier Electronics, Inc. settlement, and the D.S.C of Newark

settlement (discussed in Section 1.7), the Trustees quantified ecological injuries in Bound Brook,

the unnamed tributary, and the wetlands located within the 100-year floodplain and within 25 feet

of the brook and tributary. Evidence used to determine injury to natural resources from Site-related

releases included concentrations of Site-related contaminants (i.e., PCBs) in sediments in excess

of guidelines developed for the protection of ecological receptors, and concentrations of Site-

related contaminants (i.e., PCBs) in fish tissue in excess of values known to cause adverse effects

to fish. The Trustees determined that Site-related contamination resulted in injury to at least 252

acres of forest wetland and 132 acres of emergent freshwater wetland, including open water areas

of the Bound Brook corridor extending from the Site downstream to the New Market Pond Dam.

In addition to injuries to ecological resources, Site-related contamination resulted in injuries to

recreational fishing. NJDEP issued a fish consumption ban in 1997 for all species in Bound Brook

due to PCB contamination, and this fish consumption advisory currently remains in effect.

Damages associated with the potential losses to recreational fishing associated with the fish

consumption ban were estimated using information from studies of recreational fishing at other

similar sites and information derived from NOAA’s Marine Recreation Fishing Statistics Survey,

since Site-specific information regarding recreational fishing was not available. The recreational

Page 15: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

7

fishing injury was calculated on a per-mile basis and applied to Bound Brook based on a

calculation of the total number of miles affected. The value per mile accounted for past and future

damages from 1997 to 2030, where 2030 represented the year that the Trustees assumed the Bound

Brook corridor would be fully remediated and restored. The Trustees determined that between

1997 and 2030, at least 260 recreational fishing trips were lost per stream mile per year along 9.13

miles of Bound Brook and its tributaries.

1.7 Summary of Settlements

To date, there have been three NRDAR settlements associated with the Cornell-Dubilier Site.

Dana Corporation Bankruptcy Settlement: In June 2008, the Federal Trustees settled

environmental claims against Chapter 11 debtors Dana Corporation and 40 affiliated companies

(DANA) under CERCLA. The Federal Government claimed that DANA was liable at the CDE

Site based on its prior ownership of the real property and buildings at the CDE Site from 1936 to

1956. According to the Federal Government’s Proof of Claim, during that time, DANA leased the

property and buildings to CDE. The Government alleged that PCB contamination from CDE’s

operations during DANA’s ownership caused injury to natural resources at the Cornell-Dubilier

Site, including injuries to migratory birds and fish. Under the DANA settlement for the Cornell-

Dubilier Site, the Departments of Commerce and Interior recovered DANA stock for natural

resource damages, with a 2008-cashed value of $88,900.

Cornell-Dubilier Electronics, Inc. (ability to pay) Settlement: In October 2014, the Federal

Trustees settled environmental claims against CDE under CERCLA, and the State additionally

found CDE liable under the New Jersey Spill Compensation and Control Act, N.J.S.A. 58:10-

23.11 et seq.; the Industrial Site Recovery Act, N.J.S.A. 13:1K6, et seq.; and the common law of

nuisance, negligence and strict liability. The U.S. Department of Justice (DOJ) entered a judgment

against CDE for $75,040,000. However, the DOJ examined the company’s financial and insurance

information and determined that CDE had limited financial ability to pay for response costs and

natural resource damages. Therefore, the DOJ ordered CDE to pay $75,040,000 using their best

effort to maximize insurance proceeds from companies against which CDE has asserted a claim.

To date, natural resource damages collections from CDE total $20,030,783.

Page 16: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

8

D.S.C. of Newark Enterprises, Inc. Settlement: In February 2015, the Federal and State Trustees

settled environmental claims against D.S.C. of Newark Enterprises, Inc. under CERCLA, and the

State additionally found D.S.C. of Newark Enterprises, Inc. liable under the New Jersey Spill

Compensation and Control Act, N.J.S.A. 58:10-23.11 et seq., and the Industrial Site Recovery Act,

N.J.S.A 13:1K-6, et seq. The Federal Government and State of New Jersey charged that D.S.C. of

Newark Enterprises, Inc. was liable based on its current ownership of real property and buildings

at the Site, having owned and operated the Site since 1976 as an industrial park, and having owned

and operated the Site at a time at which hazardous substances were disposed of. The Trustees

recovered $4,821,005 in natural resource damages in the D.S.C. of Newark Enterprises, Inc.

settlement.

1.8 Administrative Record

The Trustees have maintained records documenting the information considered and actions taken

by the Trustees during the NRDAR process. These records collectively compromise the Trustees’

administrative record supporting this Draft RP/EA. These electronic records are available at:

https://www.diver.orr.noaa.gov/web/guest/diver-admin-record?diverWorkspaceSiteId=6229. For

additional information, contact:

Carl Alderson

NOAA Restoration Center

J.J. Howard Marine Fisheries Science Center

74 Magruder Road

Highlands, New Jersey 07732

732-872-3087

[email protected]

Arrangements must be made in advance to review or obtain hard copies of these records by

contacting the office listed above. Access to and copying of these records is subject to all

applicable laws and policies including, but not limited to, copying fees and the reproduction or use

of any material that is copyrighted.

1.9 Public Involvement

Public review of this Draft RP/EA is an integral and important part of the restoration planning

process and is consistent with all applicable state and federal laws and regulations, including the

guidance for restoration planning found within 43 C.F.R. Part 11. Through the public review

Page 17: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

9

process, the Trustees seek public comment on the restoration alternatives and the Trustees’

preferred restoration alternatives to restore injured natural resources.

The Draft RP/EA will be open for review and comment by the public for a period of 30 days.

The document can be found at: https://www.cerc.usgs.gov/orda_docs/DocHandler.ashx?

task=get&ID=6394. Interested individuals, organizations, and agencies may submit written

(email or letter) comments to:

Cathy Marion

U.S. Fish and Wildlife Service

New Jersey Field Office

4 E. Jimmie Leeds Road, Suite 4

Galloway, New Jersey 08205

609-569-5770

[email protected]

The Trustees will consider all written comments received during the public comment period prior

to preparing the Final RP/EA. Based on the public’s comments, or other information, the Trustees

may amend the Draft RP/EA if significant changes are made to the type, scope, or impact of the

projects. Written comments received and the Trustees’ responses to those comments, whether in

the form of project revisions or written explanations, will be summarized in the Final RP/EA.

Page 18: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

10

CHAPTER 2 CERCLA RESTORATION PLANNING PROCESS

2.1 Restoration Objective

Restoration of resources injured or lost due to the release of hazardous substances is the goal of

the Cornell-Dubilier Site NRDAR process. The purpose of the actions identified in this Draft

RP/EA is to restore, rehabilitate, replace, or acquire the equivalent of natural resources that were

injured or destroyed, and recreational use that was lost as a result of releases of hazardous

substances and pollutants, pursuant to the requirements of applicable federal and state laws and

regulations.

2.2 Restoration Strategy

In accordance with NRDAR regulations, the Trustees identified and evaluated multiple restoration

project alternatives to compensate for natural resource injuries, including a “No Action”

alternative. The Trustees identified restoration alternatives through a variety of approaches,

including: 1) reviewing information on potential projects from existing reports and datasets; 2)

consulting individuals and/or local groups with knowledge of specific projects or restoration

opportunities; and 3) soliciting input on potential ecological and recreational restoration

opportunities from the public as part of a Restoration Scoping effort (https://pub-

data.diver.orr.noaa.gov/admin-record/6229/CornellDubilier_RestorationScopingReport.pdf).

Project opportunities very near the Site boundaries are limited due to dense urban development in

this area, persistent contamination in the surrounding Bound Brook watershed, and pending

remedial actions at both the Site and other nearby contaminated areas that are managed by the EPA

(e.g., Woodbrook Road Dump Superfund Site). However, since injured resources included similar

habitats, species assemblages, and recreational opportunities as found in the larger Raritan River

watershed, the Trustees determined that natural resource injury restoration completed within the

Raritan River watershed would be appropriate to compensate for natural resource injuries.

The Trustees consider the ecological and recreational restoration categories listed below as

potentially appropriate for the purpose of restoring, rehabilitating, replacing, or acquiring the

equivalent of the natural resources and recreational opportunities that were injured or lost as a

result of the release of hazardous substances at and from the Cornell-Dubilier Site.

Page 19: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

11

Ecological Restoration Project Categories

Tidal Wetland Restoration

Freshwater Wetland Restoration

Technical Fish Passage (e.g., fish ladders, rock ramps, bypass channels)

Dam Removal

Submerged Aquatic Vegetation Restoration

Oyster Restoration

Riparian Restoration

Floodplain Restoration

Land Acquisition (parcels under imminent risk of development)

Aquatic Connectivity (including culvert replacement)

Freshwater Mussel Conservation and Enhancement

Native Fish Conservation and Enhancement

Instream Enhancement

Recreational Use Restoration Project Categories

Boat Launches

River Trails

Land Trails

Interpretive Signage

Docks and Piers

Americans with Disabilities Act Accessibility

2.3 Primary Evaluation Criteria

To ensure the appropriateness and acceptability of restoration options addressing ecological and

recreational loss, the Trustees first evaluated each restoration alternative using “primary”

evaluation criteria. Primary evaluation criteria incorporate the “factors to consider when selecting

the alternative to pursue” as described in the NRDAR regulations found at 43 C.F.R. § 11.82(d)(1-

10).

Page 20: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

12

Consistent with the NRDAR regulations, the following primary evaluation criteria were used to

evaluate restoration project alternatives and identify projects preferred for implementation.

RELATIONSHIP TO INJURY

Criteria Description

Nexus to Injury Project restores natural resources similar to those injured.

Location Project is located within the Raritan River watershed.

Scale of Benefits Quality/quantity of benefits provided by project (increase in acres, species, etc.) per

dollar spent.

LIKELIHOOD OF SUCCESS

Criteria Description

Proven Technology

Can the project be accomplished with available technology? Is the technology well

documented / studied? Are there biological, chemical, physical limitations and

uncertainties that may require actions beyond technical capabilities?

Documented Success Have similar projects succeeded in the past? Is success well documented / studied? Is

success measurable?

Self-Sustaining Are benefits expected to be long-lived? Will maintenance and/or supplemental (future)

action be required?

Cost Effective Are costs reasonable related to expected benefits? Are costs reasonable in comparison

to alternative projects?

REGULATORY/POLICY CONSIDERATIONS

Criteria Description

Compliant with Applicable

Federal/State Law

Project complies with applicable federal, state, local laws and regulations. Based on

current regulatory framework, policies, rules, and requirements is this potentially

permittable work?

Site Ownership/Availability

Project site is available, ownership is clear, and owner is willing to consent to

restoration action. Are there physical, legal, or technical limitations to site access? Is

site access safe?

Consistent with Trustee Policy,

Management Goals, Objectives Project meets stated goals (objectives) of Trustee council.

2.4 Secondary Evaluation Criteria and Project Tiers

The NRDAR regulations allow the Trustees discretion to use additional (secondary) evaluation

criteria, as appropriate. In developing this Draft RP/EA, the Trustees gave primary evaluation

criteria (Section 2.3, above) initial consideration since these factors are paramount to ensuring that

restoration actions will compensate the public for natural resource injuries. The Trustees

Page 21: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

13

additionally developed secondary evaluation criteria supplemental to the NRDAR primary (i.e.,

regulatory) criteria for which to evaluate potential restoration projects for the Cornell-Dubilier

Site.

The use of primary and secondary evaluation criteria allowed the Trustees to rank and categorize

preferred restoration alternatives into three tiers for the purpose of prioritizing projects for

implementation. Tier I alternatives are projects that the Trustees view as providing the most

appropriate restoration of natural resources injured, and can be funded using the existing settlement

funds to complete the project. Tier II alternatives are projects that would also result in appropriate

restoration of the injured natural resources, but would only be funded if settlement monies remain

after funding the higher priority Tier I projects. Tier III alternatives are projects that, as proposed,

are not preferred to compensate the public for injuries to natural resources resulting from the

release of hazardous substances at and from the Cornell-Dubilier Site.

The Trustees anticipate sufficient funding available for Tier I projects at the current estimated

funding levels. The Trustees acknowledge, however, that uncertainties may arise as the preferred

projects are implemented. For some projects, the Trustees may be able to modify the scale of the

project, increasing or decreasing the scope of the project to accommodate financial limitations, or

make the most cost effective use of funds relative to the environmental gains to be realized by a

project. Thus, final funding levels will be based, in part, on the final cost of each selected project

and Trustee judgments regarding what actions are most pertinent to compensate for natural

resource injuries associated with the Cornell-Dubilier Site. The Trustees may choose to increase

funding levels of one or more Tier I preferred projects, if determined necessary to complete the

project in a manner that best compensates the public for natural resource injuries. Conversely, if a

preferred project is not progressing in a timely manner that the Trustees deem suitable to

compensate for natural resource injures in a reasonable timeframe, the Trustees may withdraw

funds from the project and reallocate the funds to another Tier I or Tier II preferred project. The

Trustees also reserve the right to consider future projects not currently identified or included in

this Draft RP/EA; such actions must be justified under the criteria stated in this document and will

warrant additional documentation under CERCLA, NEPA, and other applicable law.

Consistent with the NRDAR regulations, the following secondary evaluation criteria were used to

evaluate restoration project alternatives and identify the projects preferred for implementation.

Page 22: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

14

SECONDARY EVALUATION CRITERIA

Criteria Description

Consistent with Local, Regional, National

Restoration Goals / Initiatives

Will the project be consistent with / contribute to existing local, regional,

national initiatives?

Timeframe of Potential Benefits What is the timeframe to expected benefits?

Integration with Existing Management

Programs / Leverage Potential Will the project integrate with existing programs and leverage external funds?

Aquatic / Terrestrial Connectivity Will the project increase/enhance aquatic and/or terrestrial connectivity?

Proximity to Areas with Protected Status Will the project provide access to / connectivity with protected areas? Will the

project increase the size of protected areas?

Benefits to Species of Concern / Sensitive

Habitats Will the project benefit federal and/or state SOC or their identified habitats?

Potential for Public Outreach / Education /

Recreation / Public Access

Will the project provide benefit to the public in the form of outreach,

education, recreation, and/or public access?

Benefits More than One Natural Resource Will the project benefit multiple types of natural resources?

Monitoring / Measurable Results Will the project include monitoring? Will there be measureable results? Is

monitoring cost-effective?

Climate Change

Will the project provide resilience to anticipated environmental changes due

to climate change? Will the project withstand anticipated environmental

changes due to climate change?

2.5 Restoration Alternative Identification and Screening

The Trustees compiled a list of potential restoration alternatives in the Raritan River watershed

that were informed by the restoration strategy outlined in Section 2.2. The Trustees narrowed this

list of potential restoration alternatives to reflect those potential alternatives that met some or all

of the Trustees primary evaluation criteria (43 C.F.R. § 11.82(d), Section 2.3). Projects meeting

some or all of the primary criteria requirements were further screened using the Trustees secondary

evaluation criteria (Section 2.4). Tier I and Tier II projects ranked highest among primary and

secondary criteria, and Tier III projects ranked lowest among criteria.

CERCLA requires the Trustees to evaluate a “No Action” restoration alternative. Under this

alternative, the Trustees would take No Action to restore injured resources. In addition to the No

Action alternative, the following alternatives were retained for detailed evaluation in this Draft

RP/EA.

Page 23: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

15

Island Farm Weir Fish Passage

Headgates Dam Removal

Califon Dam Removal

Blackwells Mills Dam Removal

Nunn’s Mill Dam Removal

Pond Removal on Tributary to Rockaway Creek

County Boat Launch and Fishing Platform at Lincoln Avenue Park

Lost Valley Nature Park

North Branch Raritan River Corridor Riparian Buffer Restoration

East Brunswick Swamp Pink Restoration

Stony Brook Green Infrastructure Demonstration Project

Rockafellows Mills Dam Removal

Klines Mill Dam Fish Passage

Beisler Lake Dam Removal

Mill Street Dam Removal

Lake Manalapan Riparian Restoration

North Branch Raritan River, Lamington River, and Stony Brook Mussel Restoration

Trash Trap Installation in the Lower Raritan River Watershed

Rutgers Ecological Preserve Accessible Trail

Bridge Over the Delaware and Raritan Canal Spillway

Cherry Brook Preserve Constructed Wetland

Raritan Bay Oyster Restoration

South River Tidal Marsh Restoration

Edison Landfill Capping and Wetland Restoration

Page 24: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

16

CHAPTER 3 EVALUATION OF RESTORATION ALTERNATIVES

In this section, the Trustees evaluate the restoration alternatives using the primary and secondary

evaluation criteria described in Sections 2.3 and 2.4. Each of the restoration alternatives identified

by the Trustees in Section 2.5 are described in greater detail in the following sections. Figure 2

shows the locations of restoration alternatives within the Raritan River watershed. Table 1 provides

a tabular summary of the Trustees’ criteria-based screening process and preferred alternative

restoration projects that will accomplish the goal of restoring, replacing, rehabilitating, and/or

acquiring the equivalent of injured natural resources, including their supporting habitats, to

compensate the public for injuries resulting from the release of hazardous substances at and from

the Cornell-Dubilier Site. Table 3 provides preliminary cost estimates for Tier I and II preferred

alternatives.

Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

(circles). All restoration alternatives are located within the Raritan River watershed, New Jersey.

Page 25: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

17

Table 1. Restoration alternatives tiered by primary and secondary criteria.

Restoration Alternative

T

ier

N

exu

s to

In

jury

L

oca

tio

n

S

cale

of

Ben

efit

s

P

rov

en T

ech

no

log

y

D

ocu

men

ted

Su

cces

s

S

elf-

Su

stai

nin

g

C

ost

Eff

ecti

ve

C

om

pli

ant

wit

h A

pp

lica

ble

Fed

era

l /

S

tate

Law

S

ite

Ow

ner

ship

/ A

vai

lab

ilit

y

C

on

sist

ent

wit

h T

rust

ee P

oli

cy,

M

anag

emen

t G

oal

s, O

bje

ctiv

es

C

on

sist

ent

wit

h L

oca

l, R

egio

nal

,

N

atio

nal

Res

tora

tio

n G

oal

s /

Init

iati

ves

T

imef

ram

e o

f P

ote

nti

al B

enef

its

In

teg

rati

on

wit

h E

xis

tin

g M

anag

emen

t

P

rog

ram

s /

Lev

erag

e P

ote

nti

al

A

qu

atic

/ T

erre

stri

al C

on

nec

tiv

ity

P

rox

imit

y t

o A

reas

wit

h

P

rote

cted

Sta

tus

B

enef

its

to S

pec

ies

of

Co

nce

rn /

S

ensi

tiv

e H

abit

ats

P

ote

nti

al f

or

Pu

bli

c O

utr

each

/ E

du

cati

on

/ R

ecre

atio

n /

Pu

bli

c A

cces

s

B

enef

its

Mo

re t

han

On

e

N

atu

ral

Res

ou

rce

M

on

ito

rin

g /

Mea

sure

able

Res

ult

s

C

lim

ate

Ch

ang

e

Island Farm Weir Fish Passage 1 X X X X X X X X X X X X X X X X X X

Headgates Dam Removal 1 X X X X X X X X X X X X X X X X X X X

Califon Dam Removal 1 X X X X X X X X X X X X X X X X X X

Blackwells Mills Dam Removal 1 X X X X X X X X X X X X X X X X X X X X

Nunn's Mill Dam Removal 1 X X X X X X X X X X X X X X X X X X X

Pond Removal on Tributary to Rockaway Creek 1 X X X X X X X X X X X X X X X X X

County Boat Launch and Fishing Platform at Lincoln Avenue

Park 1 X X X X X X X X X X X X X X X X X

Lost Valley Nature Park 1 X X X X X X X X X X X X X X X X X X X

North Branch Raritan River Corridor Riparian Buffer

Restoration 1 X X X X X X X X X X X X X X X X X X X X

East Brunswick Swamp Pink Restoration 1 X X X X X X X X X X X X X X X X X X

Stony Brook Green Infrastructure Demonstration Project 1 X X X X X X X X X X X X X X X X X X X

Rockafellows Mills Dam Removal 2 X X X X X X X X X X X X X X X X X

Klines Mill Dam Fish Passage 2 X X X X X X X X X X X X X X X

Beisler Lake Dam Removal 2 X X X X X X X X X X X X X X X X

Mill Street Dam Removal 2 X X X X X X X X X X X X X X X X X

Lake Manalapan Riparian Restoration 2 X X X X X X X X X X X X X X

North Branch Raritan River, Lamington River, and Stony

Brook Mussel Restoration 2 X X X X X X X X X X X X X X X X X

Trash Trap Installation in the Lower Raritan River Watershed 2 X X X X X X X X X X X

Rutgers Ecological Preserve Accessible Trail 2 X X X X X X X X X X X X X X X X

Bridge over the Delaware and Raritan Canal Spillway 2 X X X X X X X X X X

Cherry Brook Preserve Constructed Wetland 3 X X X X X X X X X X

Raritan Bay Oyster Restoration 3 X X X X X X X X X X X X X X

South River Tidal Marsh Restoration 3 X X X

Edison Landfill Capping and Wetland Restoration 3 X X X

Page 26: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

18

Table 2. Preliminary cost estimates for Tier I and Tier II preferred alternatives.

Restoration Alternative $0 -

$100,000

$100,000 -

$1,000,000

$1,000,000

-$3,500,00

$3,500,000

-$8,000,000

Tier I Alternatives

Island Farm Weir Fish Passage X

Headgates Dam Removal X

Califon Dam Removal X

Blackwells Mills Dam Removal X

Nunn’s Mill Dam Removal X

Pond Removal on Tributary to Rockaway Creek X

County Boat Launch and Fishing Platform at Lincoln Avenue Park X

Lost Valley Nature Park X

North Branch Raritan River Corridor Riparian Buffer Restoration X

East Brunswick Swamp Pink Restoration X

Stony Brook Green Infrastructure Demonstration Project X

Tier II Alternatives

Rockafellows Mills Dam Removal X

Klines Mill Dam Fish Passage X

Beisler Lake Dam Removal X

Mill Street Dam Removal X

Lake Manalapan Riparian Restoration X

North Branch Raritan River, Lamington River, and Stony Brook Mussel

Restoration X

Trash Trap Installation in the Lower Raritan River Watershed X

Rutgers Ecological Preserve Accessible Trail X

Bridge over the Delaware and Raritan Canal Spillway X

3.1 No Action

Under the No Action (i.e., natural recovery) alternative, the Trustees would take No Action to

restore, rehabilitate, replace, and/or acquire the equivalent of injured natural resources, including

their supporting habitats and the services they provide. Natural resources at the Site were injured

due to the release of hazardous substances, including PCBs. While consideration of the No Action

(i.e., natural recovery) alternative is required by CERCLA, given the long-term environmental

persistence of PCBs and the other hazardous substances at the Site, natural recovery would not

meet the requirements of CERCLA and the NRDAR process under CERCLA to restore injured

natural resources and services. In addition, restoration funds must be spent on restoration,

rehabilitation, replacement, or acquisition of the equivalent of injured natural resources (42 U.S.C.

§ 111(i)), and the No Action alternative would preclude the appropriate use of funds under federal

law and in accordance with the Site’s relevant Consent Decrees. The No Action alternative is not

Page 27: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

19

appropriate for the Cornell-Dubilier Site given that injured natural resources cannot be addressed

through natural recovery.

3.2 Preferred Tier I Alternative: Island Farm Weir Fish Passage

The Island Farm Weir (IFW) is located just downstream of the confluence of the Raritan and

Millstone Rivers, in Franklin and Bridgewater Townships, Somerset County, New Jersey. The

proposed restoration project includes the installation of a rock ramp fishway at the IFW to enhance

fish passage. This Alternative meets the Trustees identified project categories of technical fish

passage, aquatic connectivity, and native fish conservation and enhancement.

The IFW is currently the downstream-most barrier on the Raritan River, since the removal of the

Calco Dam in 2011. The IFW is only a partial barrier to fish passage, since the current weir

includes a concrete vertical slot fishway and supplemental flow chamber that supplies attraction

water (Figure 3). However, an ongoing fish passage study conducted by the NJDEP Office of

Natural Resource Restoration and Rutgers University indicates that overall fish passage at the IFW

is relatively poor for all species, but particularly for anadromous species (NJDEP 2013, Jensen

2017). Such findings are not uncommon; Brown et al. 2012 reported that the mean passage

efficiencies of conventional fishways (i.e., fish ladders) on three major Atlantic coast rivers was

less than three percent for American shad (Alosa sapidissima).

The initial configuration of the IFW was completed by the New Jersey Water Supply Authority

(NJWSA) in 1994. The IFW was built to supplement the State’s public water supply system;

extraction varies daily, but the IFW impoundment can supply upwards of 225 million gallons of

water per day in summer months, and the facility is considered critical to New Jersey American

Water’s (NJAW) operations. As such, the IFW cannot be removed, and the headpond elevation of

the impoundment cannot be altered. A reasonable alternative that will preserve NJAW’s water

withdrawal operations and provide enhanced fish passage involves retrofitting the weir with a rock

arch rapids fishway.

Dam removal is the preferred solution for instream barriers, since dam removal provides

immediate and permanent improvements to fish passage and benefits water quality and sediment

transport. However, for sites such as the IFW where barriers cannot be removed, nature-like

fishways (e.g., rock ramps, stream-like bypass channels) offer an alternative to previous

Page 28: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

20

conventional fishway designs (e.g., fish ladders, fish lifts). Historically, conventional fishways

were built from conventional materials such as metals and concrete, and often did not reflect

natural stream conditions (e.g., contain right angles, high walls, chutes). Conventional fishways

are generally unsuccessful for fish passage on Atlantic Coast rivers (Brown et al. 2012). In

contrast, nature-like fishways simulate natural stream materials and environmental conditions, and

provide suitable passage conditions and habitat for a wide variety of fish species and sizes

(Katopodis et al. 2001). Emerging research indicates that nature-like fishways have greater

passage success than conventional fishways (Franklin et al. 2012). However, very few studies have

been conducted on rock ramps in larger rivers, and recent studies have found that fish passage

success varies widely among species, sizes, and years (Landsman et al. 2018; Raabe et al. 2019).

As such, rock-ramp fishways should be carefully designed for a particular location and for a

particular target species, rather than assuming that all species will pass successfully.

Figure 3. Island Farm Weir aerial view showing layout of major structures.

The original IFW and vertical slot fishway were built in 1994. The original weir was approximately

200-feet-long, 8-feet-high, and 24-feet-wide, including a 15-foot-long section extending from the

weir crest to the downstream apron. Following a series of boater fatalities in 1996, the downstream

Page 29: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

21

weir geometry was redesigned as a stepped spillway in 1997. The revision consisted of installing

a series of steps of varying widths (1 to 2 feet), and extending the downstream apron by an

additional 10 feet. The existing vertical slot fishway remains in the same configuration as

constructed in 1994. The fishway is located in a 20-feet-wide bay, with a labyrinth configuration

and pool dimensions of 8 feet by 12 feet. An adjacent chamber (approximately 8-feet-wide)

provides supplemental attraction flow. Downstream fish passage is provided by a single 4-feet-

long by 1.2-feet-deep weir notch that directly abuts the fishway. Additional infrastructure

associated with NJAW’s water withdrawal operation is present on the north bank, including water

intakes and a sediment bypass channel (Figure 4).

Rock ramps are a sloped watercourse that link two pools of different elevations (e.g., headwater

and tailwater of dam). Design plans for a rock ramp (i.e., nature-like fishway) at the IFW are being

prepared as part of a partial NRDAR settlement agreement for the American Cyanamid Company

Superfund Site (Bridgewater Township, New Jersey). The proposed design includes a rock arch

rapids fishway that spans the full length of the weir, although a portion of flow will be diverted for

the sediment bypass channel and the water intake system. The design includes at least 8 rock

(boulder) arches, spaced and positioned appropriately to provide adequately sized zones of

passage, resting pools, water depths, and velocities to facilitate passage of ‘target’ anadromous

species (i.e., American shad, blueback herring, alewife), and possibly other ‘non-target’ resident

and diadromous species. The design will not impact water withdrawal operations nor the headpond

elevation of the impoundment. The 2016 Federal Interagency Nature-like Fishway Passage Design

Guidelines for Atlantic Coast Diadromous Fishes and the Service’s 2019 Region 5 Fish Passage

Engineering Design Criteria guided the fish passage design elements (Turek et al. 2016; USFWS

2019).

The IFW is owned by the NJWSA and downstream adjacent properties are owned by Pfizer. The

Pfizer properties house the now defunct American Cyanamid facility, a partially remediated EPA

Superfund Site. The southern edge of the IFW meets the Delaware and Raritan (D&R) Canal State

Park and towpath, owned and managed by the State of New Jersey Division of Parks and Forestry.

Visitors can view and access the IFW from the D&R Canal State Park towpath.

Restoration of fish passage at the IFW will benefit diadromous species such as American shad

(Alosa sapidissima), alewife (Alosa pseudoharengus), and blueback herring (Alosa aestivalis). The

Page 30: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

22

proposed nature-like fishway is specifically designed to pass the clupeid species mentioned above,

but may also benefit American eel (Anguilla rostrata), hickory shad (Alosa mediocris), sea

lamprey (Petromyzon marinus), and striped bass (Morone saxatillis).

Figure 4. Island Farm Weir spillway and associated infrastructure shown from downstream

facing north bank.

Long-term fish passage monitoring at the IFW is critical to demonstrate the efficacy of the rock

ramp in comparison to the existing conventional vertical slot fishway, and to track the recovery of

several anadromous populations. Telemetry is the most useful tool for assessing fishways,

especially for determining fish passage efficiency and fish passage duration (Lucas and Baras

2001; Bunt et al. 2012; Raabe et al. 2019). The Trustees recommend the use of boat electrofishing

to capture and tag adult fishes downstream of the IFW as part of a robust monitoring program. The

Trustees recommend the use of stationary (e.g., acoustic) telemetry stations placed strategically at

multiple stations upstream and downstream of the IFW. The Trustees additionally recommend

developing methods to quantify juvenile anadromous populations in the Raritan River, and

Page 31: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

23

utilizing novel techniques to sample and quantify both adults and juvenile populations, as feasible

(e.g., sonar imaging, eDNA).

The installation of a rock-ramp at the IFW may be accomplished by leveraging additional funds

through other federal and state sources. Alternative 3.2 is a Tier I preferred alternative for this

restoration plan because it meets the Trustees’ identified restoration objectives and criteria to

address the injuries caused by the release of hazardous substances. Restoration of fish passage at

the IFW will reestablish fish movement in the mainstem Raritan River, expand critical spawning

habitat for diadromous fishes, and enhance recreational boating and fishing opportunities.

3.3 Preferred Tier I Alternative: Headgates Dam Removal

The Headgates Dam is located on the mainstem Raritan River in Bridgewater and Hillsborough

Township, Somerset County, New Jersey. The proposed restoration project involves the removal

of the Headgates Dam; appropriate relocation or reconfiguration of the Bridgewater North Branch

Trunk sewer line located approximately 90 feet upstream; appropriate adjustment or modification

of the Raritan Water Power Canal located approximately 0.15 mile upstream; appropriate

restoration and stabilization of the adjacent stream reaches and impoundment area; revegetation of

exposed and newly formed banks; and scour protection measures, as warranted (Figure 5). This

Alternative meets the Trustees identified project categories of dam removal, riparian restoration,

aquatic connectivity, freshwater mussel conservation and enhancement, native fish conservation

and enhancement, instream enhancement, and river trail recreation.

The Headgates Dam is a 235-feet-wide, 14-feet-tall, concrete, run-of-river, gravity dam that

provides no water storage or flood attenuation function (Figure 6). The original timber crib dam

was built in the 1930s; its original purpose was likely to deliver flow into the Raritan Water Power

Canal. Various repairs, modifications, and upgrades took place prior to 1959, when the spillway

failed and was reconstructed that same year. The current training walls were reconstructed

sometime between 1964 and 1965, and the retaining walls were replaced on both the north and

south banks in the 1960s.

An intake culvert that siphons flow from the Raritan River into the Raritan Water Power Canal is

located approximately 0.15 mile upstream of Headgates Dam. The culvert has a reinforced

concrete pipe inlet structure that is approximately 120-feet-long and 24 inches in diameter. The

Page 32: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

24

Raritan Water Power Canal is a 3-mile-long canal built in the early 1840s to supply water power

for nearby mills. By the mid-1900s, the mills had closed, and the canal was used to provide

drinking water to neighboring towns. In the 1970s, the canal and adjacent parcels were purchased

by Somerset County and transformed into a recreational park. The canal is now part of the Raritan

Water Power Canal Historic District, and cannot be removed or modified. However, it may be

necessary to adjust the canal intake structure to ensure a consistent water supply after dam removal

if hydrologic and hydraulic modeling indicates that the dam supplies water to the canal.

Figure 5. Headgates Dam aerial view showing layout of major structures.

A submerged active sewer line (Bridgewater North Branch Trunk Sewer) is located approximately

90 feet upstream of the Headgates Dam, and crosses the river perpendicular to its flow. The sewer

pipe is composed of a 54-inch reinforced concrete pipe fully encased in a minimum of 6 inches of

concrete, and serves as the main sewer line for both Bridgewater and Branchburg Townships.

Manholes are located on both sides of the river. The sewer line will be exposed after dam removal,

putting the section at risk of degradation and failure. The exposed line would also likely become a

barrier for fish passage. Therefore, the sewer line will either be relocated under the riverbed or

rerouted, as determined in the design phase.

Page 33: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

25

Dam removal will consist of demolishing, removing, and disposing of approximately 3,000 cubic

yards of dam material. Approximately 400 cubic yards of sediment that have accumulated

immediately upstream of the dam would be resuspended and transported downstream following

dam removal. This sediment will redistribute to downstream reaches, but is unlikely to have a

measurable impact on benthic habitat quality. The removal design may include minor grading of

the riverbed and banks, revegetation of exposed areas, and scour protection measures, as

warranted.

Figure 6. Headgates Dam shown from downstream facing west bank.

The Headgates Dam is currently the only complete fish passage barrier on the mainstem Raritan

River. The downstream Island Farm Weir, in its current configuration, houses a fish ladder that

that has provided fish passage to tens of thousands of fish since installation in 1994. The

installation of a rock ramp at Island Farm Weir is proposed as a Tier I project in this Draft RP/EA,

which will dramatically increase fish passage success at the Island Farm Weir structure. After fish

passage issues are addressed at the Island Farm Weir, the removal of the Headgates Dam would

restore fish passage for approximately 13.5 miles to the next two upstream dams (i.e., Mill Street

Page 34: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

26

Dam on the North Branch Raritan, and Rockafellows Mills Dam on the South Branch Raritan),

and would provide fish passage for an additional 27.8 miles downstream to the Raritan Bay.

Somerset County owns the Headgates Dam, and adjacent upstream and downstream land parcels

are owned by the NJDEP, Somerset County, private landowners, and the Dukes Farms Foundation.

Somerset County’s Duke Island Park is located along the northern side of the dam. Duke Island

Park is a 343-acre county-managed park that flanks the Raritan Power Canal and provides a variety

of recreational opportunities and special events, including but not limited to: picnicking,

playgrounds, athletic fields, ice skating and cross country skiing, biking, running, and fishing. A

127-acre protected parcel owned by the Somerset County and the NJDEP is located along the

southern side of the dam. Duke Farms, a 2,740-acre protected property is located approximately 1

mile downstream on the southern side of the Raritan River. Approximately 1,000 acres of Duke

Farms is open to the public for recreational and educational opportunities.

Restoration of fish passage at the Headgates Dam will benefit diadromous species such as:

American eel (Anguilla rostrata), American shad (Alosa sapidissima), alewife (Alosa

pseudoharengus), blueback herring (Alosa aestivalis), hickory shad (Alosa mediocris), sea

lamprey (Petromyzon marinus), and striped bass (Morone saxatillis). Habitat improvements may

improve conditions for several species identified by the State of New Jersey as having Greatest

Conservation Need, including: American brook lamprey (Lethenteron appendix), bluespotted

sunfish (Enneacanthus gloriosus), bridle shiner (Notropis bifrenatus), comely shiner (Notropis

amoenus), cutlips minnow (Exoglossum maxillingua), eastern mudminnow (Umbra pygmaea),

fallfish (Semotilus corporalis), margined madtom (Noturus insignis), redbreast sunfish (Lepomis

auritus), satinfin shiner (Cyprinella analostana), shield darter (Percina peltata), swallowtail

shiner (Notropis procne), white catfish (Ameiurus catus), and yellow bullhead (Ameiurus natalis).

Habitat and fish passage improvements may also improve conditions for several mussel species,

including: eastern elliptio (Elliptio complanata), eastern pondmussel (Ligumia nasuta), and

eastern floater (Pyganodon cataracta).

Removal of the Headgates Dam will enhance the safety and experience of recreational paddling

on the mainstem Raritan River. The 6.6-mile reach extending between the Old York Road

(Somerville, New Jersey) and Duke Park launches brings boaters by the scenic areas of the Duke

Island Park and Duke Farms, but is currently interrupted by a dangerous, but necessary portage at

Page 35: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

27

the Headgates Dam. The dam is also a safety hazard for boaters unaware of the upwelling and

drowning hazards associated with small low-head dams.

The removal of the Headgates Dam may be accomplished by leveraging additional funds through

other federal and state sources. Alternative 3.3 is a Tier I preferred alternative for this restoration

plan because it meets the Trustees’ identified restoration objectives and criteria to address the

injuries caused by the release of hazardous substances. Removing the Headgates Dam restores

river habitat, improves water quality, reestablishes fish and mussel movement, and enhances

fishing and recreational boating opportunities.

3.4 Preferred Tier I Alternative: Califon Dam Removal

The Califon Dam (also known as Coles Mill Dam) is located on the South Branch Raritan River,

in Califon, Hunterdon County, New Jersey. The proposed restoration project involves the removal

of the Califon Dam; appropriate restoration, stabilization, and revegetation of adjacent stream

reaches and the impoundment area; appropriate characterization, dredging, removal, and

storage/disposal of upstream sediments, as warranted; and scour protection measures at the

Highway 512 Bridge and other areas, as warranted. This Alternative meets the Trustees identified

project categories of dam removal, riparian restoration, aquatic connectivity, freshwater mussel

conservation and enhancement, native fish conservation and enhancement, instream enhancement,

and river trail recreation.

The Califon Dam is an approximately 210-feet-long concrete and rock-fill run-of-river gravity

dam that creates an approximate 7-acre impoundment on the South Branch Raritan River (Figure

7). The dam and former mill were originally constructed sometime between 1830 and 1840 by

Aaron Sutton, and sometime prior to 1950, Benjamin Cole purchased the property and operated

the facility as a flour mill. At this time, the dam became known as Cole’s Mill Dam. The mill

operation became defunct by the end of the 1800s, and the dam is now obsolete. In January of

2018, approximately 30 feet of the dam was damaged by ice, resulting in a breach. The breach

caused the water level in the impoundment to drop 8 to10 inches over a 24-hour period. Due to

this incident, the NJDEP Bureau of Dam Safety notified the current dam owner in writing that the

dam must be repaired or removed. The breach and associated debris accumulation has accentuated

Page 36: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

28

a bifurcated flow pattern just downstream of the dam that threatens to erode and undermine a small

local road (Raritan River Road).

Figure 7. Califon Dam shown facing north. Photo depicts approximate 30-foot breach.

The dam is currently in private ownership, and the impoundment is flanked by parcels of both

private and public ownership. The Borough’s Califon Island Park, and the County’s South Branch

River Reservation are located approximately 0.25 mile upstream of the dam along the upper

impoundment, and the Ken Lockwood Gorge Wildlife Management Area (WMA) is located

approximately 0.85 miles downstream. The Ken Lockwood Gorge WMA is a 533-acre state-

owned and managed protected parcel that flanks the South Branch Raritan River along a 2.5-mile

stretch, and is valued as a trout fishing destination. The Columbia Trail, a 15.1-mile rails-to-trails

conversion, runs along the South Branch Raritan and passes by the Califon Dam at approximately

0.1 mile to the southeast.

Removal of the Califon Dam would restore fish passage for approximately 11 miles to Nunn’s

Dam, the next dam upstream. The removal of the Nunn’s Mill Dam is also proposed as a Tier I

Page 37: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

29

restoration project in this Draft RP/EA. Removal of the Califon Dam would additionally provide

resident fish passage for five miles downstream, through Ken Lockwood Gorge to the Lake

Solitude Dam. Summertime fish kills are not uncommon at the Ken Lockwood Gorge due to water

quality issues, particularly increased water temperature. Removal of the Califon Dam would help

to conserve cold water habitat in the South Branch Raritan and improve recreational fishing in the

Ken Lockwood Gorge.

Dam removal will improve fish passage for resident and diadromous species such as American eel

(Anguilla rostrata), and will reduce stream temperatures for coldwater species such as brook trout

(Salvelinus fontinalis), brown trout (Salmo trutta), and rainbow trout (Oncorhynchus mykiss).

Water quality and habitat improvements will improve conditions for all species, including several

species identified by the State of New Jersey as having Greatest Conservation Need, including:

American brook lamprey (Lethenteron appendix), bluespotted sunfish (Enneacanthus gloriosus),

cutlips minnow (Exoglossum maxillingua), eastern mudminnow (Umbra pygmaea), fallfish

(Semotilus corporalis), margined madtom (Noturus insignis), redbreast sunfish (Lepomis auritus),

satinfin shiner (Cyprinella analostana), shield darter (Percina peltata), swallowtail shiner

(Notropis procne), and yellow bullhead (Amerius natalis). Water quality and habitat improvements

will also benefit several mussel species, including: alewife floater (Anodonta implicata), eastern

elliptio (Elliptio complanata), and eastern floater (Anodonta cataracta).

Sediments that have accumulated upstream of the Califon Dam would need to be characterized

and quantified as part of the dam removal feasibility process, and construction actions may require

dredging, removal, or storage/disposal of sediments. The dam removal design may include minor

grading of the riverbed and banks, revegetation of exposed areas, and scour protection measures,

as warranted.

The most recent New Jersey Integrated Water Quality Assessment Report for EPA 303d

requirements1 indicate that South Branch Raritan waters upstream of the Califon Dam attain the

1 Section 303(d) of the Clean Water Act, 33 U.S.C. § 1313(d), requires states to identify and develop a list of

impaired waters (waters that do not meet water quality standards) and develop Total Maximum Daily Loads

(TMDLs) for every pollutant / waterbody combination on the list. This process ensures that polluted waters are

monitored and assessed until applicable water quality standards are met. See https://www.epa.gov/tmdl/overview-

identifying-and-restoring-impaired-waters-under-section-303d-cwa

Page 38: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

30

following designated uses: aquatic life general; and aquatic life-trout (NJDEP 2019). However,

waters upstream of Califon do not attain the following designated uses: public water supply (due

to arsenic); and recreation (due to Escherichia coli). Data is insufficient to determine if waters

upstream of Califon meet their designated use for fish consumption. In contrast, South Branch

Raritan waters downstream of the Califon Dam do not attain any designated uses, including:

aquatic life general (due to pH); aquatic life-trout (due to temperature); fish consumption (due to

mercury in fish tissue); public water supply (due to arsenic); and recreation (due to Escherichia

coli).

The removal of the Califon Dam and restoration of its associated impoundment will likely improve

water quality conditions in the impoundment reach and downstream of Califon, namely by

reducing pH, temperature, and Escherichia coli levels. The impoundment created by the Califon

Dam is very shallow with predominant sand and clay substrates. Shallow, slow moving, unshaded

waters are highly susceptible to thermal impacts at all times of year, but particularly during summer

months. In addition, shallow and slow waters tend to host intense aquatic plant growth. Excessive

photosynthesis in slackwater impoundments can cause pH to rise to high, basic levels that are

intolerable to some fish and macroinvertebrate species. Small, shallow impoundments are also

attractive to numerous wildlife species such as Canada goose (Branta canadensis), which can

contribute to increased Escherichia coli levels.

The removal of the Califon Dam may be accomplished with technical assistance and leveraging

additional funds from the Raritan Headwaters Association and other state and federal sources.

Alternative 3.4 is a Tier I preferred alternative for this restoration plan because it meets the

Trustees’ identified restoration objectives and criteria to address the injuries caused by the release

of hazardous substances. Removing the Califon Dam restores river habitat, improves water quality,

reestablishes fish and mussel movement, and enhances recreational fishing and boating

opportunities.

3.5 Preferred Tier I Alternative: Blackwells Mills Dam Removal

The Blackwells Mills Dam is located on the Millstone River in Franklin Township, Somerset

County, New Jersey. The proposed restoration project involves the removal of the Blackwells

Mills Dam; appropriate restoration and stabilization of the adjacent stream reaches; native

Page 39: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

31

plantings to stabilize banks; installation, relocation and/or recalibration of U.S. Geological Survey

(USGS) stream gaging equipment; and scour protection measures at the Blackwells Mills Road

bridge and other areas, as warranted. This Alternative meets the Trustees identified project

categories of dam removal, riparian restoration, floodplain restoration, aquatic connectivity,

freshwater mussel conservation and enhancement, native fish conservation and enhancement,

instream enhancement, and river trail recreation.

The Blackwells Mills Dam is an approximately 90-feet-long and 3-feet-high, concrete, run-of-

river, gravity dam (Figure 8). The current dam structure was built in 1933, and it is unknown

whether the current structure incorporated the remnants of the original dam at this location, built

in 1747. A remnant millrace and associated spillway is located approximately 280 feet upstream.

Figure 8. Blackwells Mills Dam shown from upstream facing west.

The current 1933 Blackwells Mills Dam was likely constructed by the USGS, when it was

reconfigured as the control weir for the USGS gage 01402000 Millstone River at Blackwells Mills,

Page 40: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

32

New Jersey. This USGS gage measures stage and discharge, and has been in continuous use at its

current location since 1921, with water quality measurements taken in 1962-1969, 1973, 1976-

1980, and 1991 to present (USGS 2019). The gage’s stage measurements are currently used to

inform local water supply operations, therefore dam removal must preserve this capability along

this stretch of the Millstone River. A 2018 report found that the USGS gage only provides accurate

readings at low flows, primarily due to the fact that there is bifurcated flow between the main

channel and the former millrace entrance located just upstream (Princeton Hydro 2018). The

remnant millrace is prone to debris jams and the abutments of the dam itself may create accuracy

issues at higher flows as well (Princeton Hydro 2018). As such, project proponents have proposed

to relocate the USGS gage at Blackwells Mills Dam to an alternate location, or update existing

equipment and recalibrate the gage at its current position or relocate to a new position. Such actions

would preserve the capability of stage measurements in this stretch of the Millstone River, while

also facilitating dam removal. Depending on the new configuration of the USGS gage, this

restoration project may include closing the millrace channel to prevent flows less than bankfull

from entering. Stakeholder discussions regarding how to deal with the gage appropriately are

ongoing; further feasibility investigations may be warranted to determine the best approach to

balancing the dual needs of dam removal and stream gaging.

The Blackwells Mills Dam is currently the downstream-most barrier on the Millstone River since

the removal of the Weston Mills Dam in 2017. Multiple formal reports by the USGS, the Service,

and Princeton Hydro, LLC, have determined that the Blackwells Mils Dam is a barrier to

anadromous fish passage. The NJDEP has classified the dam as a Significant Hazard Structure

(Class II), as several structural deficiencies exist that require maintenance. Dam removal is the

most parsimonious solution to achieve fish passage and eliminate ageing infrastructure that poses

a public safety hazard.

The NJDEP owns the Blackwells Mills Dam and adjacent land parcels. Parcels located to the east

of the Blackwells Mills Dam are managed by the NJDEP Division of Parks and Forestry as part of

the Delaware and Raritan Canal (D&R Canal) State Park and towpath. The D&R Canal was built

in the 1830s and connects the Delaware River to the Raritan River. Most of the canal system was

declared a state park in 1974, and is currently used for boating, fishing, biking, hiking, running,

and wildlife viewing.

Page 41: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

33

The most recent New Jersey Integrated Water Quality Assessment Report for EPA 303d

requirements indicate that Millstone River waters above and below the Blackwells Mills Dam do

not attain the following designated uses: aquatic life general (due to total phosphorus); fish

consumption (due to mercury in fish tissue); and public water supply (due to arsenic; NJDEP

2019). Both upstream and downstream waters do attain the use of recreation. TMDL regulations

are in place for total suspended solids. The removal of the Blackwells Mills Dam will likely

improve water quality conditions in the impounded reach and downstream, namely by restoring

natural sediment transport and contributing to the reduction of total suspended solids.

Removal of the Blackwells Mills Dam would restore fish passage for approximately 9.7 miles to

the Kingston Mill Dam, the next dam upstream. Dam removal would also provide fish passage for

6.25 miles downstream, to the Island Farm Weir. Restoration of fish passage at the Island Farm

Weir is proposed as a Tier I project in this Draft RP/EA. Once fish passage issues at the Island

Farm Weir are addressed, the removal of the Blackwells Mills Dam would restore a total of

approximately 35.7 miles of fish passage connectivity along the Millstone River and Raritan River

mainstem extending to the Raritan Bay.

Restoration of fish passage at Blackwells Mills will benefit diadromous species such as American

eel (Anguilla rostrata), sea lamprey (Petromyzon marinus), blueback herring (Alosa aestivalis),

and American shad (Alosa sapidissima). After the removal of the lowermost dam on the Millstone

River in the fall of 2017 (Weston Mill Dam), juvenile American shad were documented as far

upstream as the base of the Blackwells Mill Dam by the fall of 2018, confirming that shad are

migrating and spawning in the Millstone River for the first time in approximately 278 years. A

2017 report determined that the Blackwells Mills Dam is a hydrological barrier to upstream fish

passage for American shad for approximately seventy percent of the migration season during the

period of record (Haro et al. 2017). Dam removal is the best method to further improve fish passage

in the Millstone River.

Water quality and habitat improvements will improve conditions for several species identified by

the State of New Jersey as having Greatest Conservation Need, including: bluespotted sunfish

(Enneacanthus gloriosus), comely shiner (Notropis amoenus), and satinfin shiner (Cyprinella

analostana). Habitat and water quality improvements may also benefit several mussel species,

including: alewife floater (Anodonta implicata), eastern elliptio (Elliptio complanata), eastern

Page 42: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

34

floater (Pyganodon cataracta), eastern lampmussel (Lampsilis radiata), and triangle floater

(Alasmidonta undulata).

Removal of the Blackwells Mills Dam will enhance recreational paddling on the Millstone River.

Boaters will be able to paddle the reach extending from the Kingston Mill Dam near Kingston,

New Jersey to the County Boat Launch in Manville, New Jersey. Restoration of the County Boat

Launch is proposed as a Tier I project in this Draft RP/EA. The reach between Kingston and

Manville is currently interrupted by a necessary portage at the Blackwells Mills Dam. The dam is

a safety hazard for boaters unaware of the upwelling hazards associated with small low-head dams.

The removal of the Blackwells Mills Dam will be accomplished through funding and technical

assistance from The Watershed Institute based in Pennington, New Jersey, and may be

accomplished by leveraging additional funds through private, state, and/or federal sources.

Alternative 3.5 is a Tier I preferred alternative for this restoration plan because it meets the

Trustees’ identified restoration objectives and criteria to address the injuries caused by the release

of hazardous substances. Removing the Blackwells Mills Dam restores river habitat, improves

water quality, reestablishes fish and mussel movement, and enhances recreational fishing and

boating opportunities.

3.6 Preferred Tier I Alternative: Nunn’s Mill Dam Removal

The Nunn’s Mill Dam is located on the South Branch Raritan River in Washington Township,

Morris County, New Jersey. The proposed restoration project involves the removal of the Nunn’s

Mill Dam; appropriate characterization, dredging, removal, and storage/disposal of upstream

sediments, as warranted; appropriate restoration, stabilization, and revegetation of adjacent stream

reaches and the impoundment area; and scour protection measures at the Four Bridges Road bridge

and other areas, as warranted. This Alternative meets the Trustees identified project categories of

freshwater wetland restoration, dam removal, riparian restoration, floodplain restoration, aquatic

connectivity, freshwater mussel conservation and enhancement, native fish conservation and

enhancement, instream enhancement, and river trail recreation.

Nunn’s Mill Dam is approximately 150-feet-long and the spillway is approximately 6-feet-tall

(Figure 9). Approximately 40 feet of the dam’s width is a concrete gravity dam spillway, and the

remaining 110 feet is an earthen embankment. The earthen embankment consists of two concrete

Page 43: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

35

walls with a rock rubble interior fill. There is a 7.5-feet-wide double gate sluice on the north end

of the dam and a 5-feet-wide single gate sluice on the south end. The single sluice gate drains two

48-inch diameter reinforced concrete pipes that run beneath Four Bridges Road. The dam retains

an approximate 2.5-acre impoundment. The dam owner reported that sediment has recently

collected at a rapid rate just upstream of the dam.

Figure 9. Nunn’s Mill Dam shown from downstream facing northeast.

The dam was constructed at least 100 years ago to provide power for a small mill located on the

north bank of the river. It is unknown whether the current dam structure incorporates the remnants

of any type of historic structure. After an inspection in August of 2019, the NJDEP Division of

Dam Safety and Flood Engineering determined that Nunn’s Mill Dam was damaged and not

maintaining normal pool. As a result, the NJDEP directed the dam owner to conduct an official

engineering inspection, including recommendations for permanent decommissioning or repair, to

bring the dam into compliance with the New Jersey Safe Dam Act (N.J.S.A. 58-4.1 et seq.).

Page 44: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

36

The dam is currently in private ownership, and the impoundment is flanked by parcels of both

private and public ownership. The State of New Jersey, including the State’s Green Acres Program,

owns several large parcels of land on the western side of the impoundment and upstream reaches

of the South Branch Raritan. The Columbia Trail, a 15.1-mile rails-to-trail conversion, runs along

the South Branch Raritan and passes by the dam and impoundment on their eastern side.

Sediments that have accumulated upstream of the Nunn’s Mill Dam would need to be

characterized and quantified as part of the dam removal feasibility process, and the removal may

require dredging, removal, and storage/disposal of sediments. The dam removal design may

include minor grading of the riverbed and banks, revegetation of exposed areas, and scour

protection measures, as warranted.

Removal of the Nunn’s Mill Dam would restore fish passage for approximately 1 mile to the next

upstream dam, and would provide fish passage for approximately 11 miles downstream to the

Califon Dam. The removal of the Califon Dam is proposed as a Tier I project in this Draft RP/EA.

Once fish passage is restored at the Califon Dam, an additional five miles would be gained to the

Lake Solitude Dam.

Dam removal will improve fish passage for resident and diadromous species such as American eel

(Anguilla rostrata), and will reduce stream temperatures for coldwater species such as brook trout

(Salvelinus fontinalis), brown trout (Salmo trutta), and rainbow trout (Oncorhynchus mykiss).

Water quality and habitat improvements will improve conditions for all species, including several

species identified by the State of New Jersey as having Greatest Conservation Need, including:

American brook lamprey (Lethenteron appendix), bluespotted sunfish (Enneacanthus gloriosus),

cutlips minnow (Exoglossum maxillingua), eastern mudminnow (Umbra pygmaea), fallfish

(Semotilus corporalis), margined madtom (Noturus insignis), redbreast sunfish (Lepomis auritus),

satinfin shiner (Cyprinella analostana), shield darter (Percina peltata), swallowtail shiner

(Notropis procne), and yellow bullhead (Amerius natalis). Water quality and habitat improvements

will also benefit several mussel species, including: alewife floater (Anodonta implicata), eastern

elliptio (Elliptio complanata), and eastern floater (Anodonta cataracta).

Recreational trout fishing is popular along the upper South Branch Raritan River. Cold water is

released from Budd Lake (located 6 miles upstream) during most of the year, which allows for

Page 45: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

37

stocked rainbow and brown trout to holdover well. The section of the river in proximity to the

Nunn’s Mill Dam ranges from 20 to 40 feet in width, has ample public fishing access, and has

appropriate habitat heterogeneity to support trout.

The most recent New Jersey Integrated Water Quality Assessment Report for EPA 303d

requirements indicate that South Branch Raritan waters do not attain the following uses: aquatic

life general (due to biological - cause unknown); aquatic life – trout (due to temperature); fish

consumption (due to mercury in fish tissue); public water supply (due to arsenic); and recreation

(due to Escherichia coli; NJDEP 2019). TMDL regulations are in place for total phosphorus and

total suspended solids.

The removal of Nunn’s Mill Dam will likely improve water quality conditions in the impounded

reach and downstream, namely by reducing temperature, total phosphorus, total suspended solids,

and Escherichia coli levels. The impoundment created by Nunn’s Mill Dam is shallow with

predominant sand and clay substrates. Shallow, slow moving, unshaded waters are highly

susceptible to thermal impacts at all times of year, but particularly during summer months. In

addition, shallow and slow waters tend to host intense plant growth that can negatively affect

dissolved oxygen and pH. Small, shallow impoundments attract numerous wildlife species such as

Canada goose (Branta canadensis), which can contribute to high Escherichia coli levels. The

removal and revegetation of the impoundment will also help trap nutrients and sediments that may

runoff and increase total phosphorus and total suspended solid loads.

The removal of the Nunn’s Mill Dam may be accomplished by leveraging additional funds through

other state and/or federal sources. Alternative 3.6 is a Tier I preferred alternative for this restoration

plan because it meets the Trustees’ identified restoration objectives and criteria to address the

injuries caused by the release of hazardous substances. Removing Nunn’s Mill Dam restores river

habitat, improves water quality, reestablishes fish and mussel movement, and enhances

recreational fishing and boating opportunities.

3.7 Preferred Tier I Alternative: Pond Removal on Tributary to Rockaway Creek

This project will remove a small inline farm pond on a private property. The pond is located on an

unnamed tributary to Rockaway Creek, in Readington Township, Hunterdon County, New Jersey.

The proposed restoration project includes: the removal of a small pond weir structure; the

Page 46: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

38

restoration of the stream corridor within and adjacent to the small pond; the removal of exotic

invasive plant species; the revegetation and stabilization of stream banks; and the

creation/restoration of floodplain topography to restore floodplain hydrology and improve

connectivity between the stream and its floodplain. This Alternative meets the Trustees identified

project categories of freshwater wetland restoration, dam removal, aquatic connectivity, and

instream enhancement.

Figure 10. Inline farm pond on an unnamed tributary to Rockaway Creek.

The farm pond is situated on an unnamed tributary located approximately 0.7 mile upstream of

Rockaway Creek; Rockaway Creek flows for 2.5 miles to the Lamington River, and the Lamington

River flows another 2.5 miles to the confluence with the North Branch Raritan River. The farm

pond weir is approximately 12 to 15 feet long, and retains an approximate 0.25-acre impoundment

(Figure 10). The pond is located on private property, and the landowner wishes to remove the pond

and restore the stream and floodplain to their natural state. The surrounding watershed of the

Page 47: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

39

unnamed tributary is comprised mostly of forest and fallow agricultural fields, although a private

golf course is located near the headwaters.

The Rockaway Creek watershed exhibits healthy biological communities, and recent

improvements have been attained in water quality (NJDEP 2019). However, the section of

Rockaway Creek that the unnamed tributary flows to does not attain the following uses: aquatic

life general (due to pH and total phosphorus); aquatic life – trout (due to temperature); public water

supply (due to arsenic); and recreation (due to Escherichia coli). Data is insufficient to determine

the use of fish consumption. TMDL regulations are in place for total phosphorus and total

suspended solids.

The farm pond removal will likely contribute to the improvement of water quality conditions in

Rockaway Creek, by helping to reduce pH and total suspended solids. The shallow, sediment-

laden pond hosts excessive plant growth. Excessive photosynthesis in slackwater ponds can cause

pH to rise to high, basic levels that are intolerable to fish and macroinvertebrate species. The

removal and revegetation of the impoundment will help reduce pH and the removal design is

tailored to help to trap nutrients and sediments that may runoff and increase total suspended solid

loads.

The farm pond removal will be accomplished with the assistance of the Natural Resources

Conservation Service (NRCS). NRCS has prepared engineering design plans, will assist the

landowner with construction contracting, will provide technical assistance and project

management assistance, and will provide partial funds for the project. Alternative 3.7 is a Tier I

preferred alternative for this restoration plan because it meets the Trustees’ identified restoration

objectives and criteria to address the injuries caused by the release of hazardous substances.

Removing the Rockaway Creek tributary farm pond is cost-effective, increases floodplain habitat,

and improves water quality.

3.8 Preferred Tier I Alternative: County Boat Launch and Fishing Platform at Lincoln

Avenue Park

The County Boat Launch is located on the lower Millstone River in Lincoln Avenue Park,

Manville, Somerset County, New Jersey. The proposed recreational restoration project includes:

the restoration of an existing dirt and gravel boat launch at the Lincoln Avenue Park; the

Page 48: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

40

installation of an accessible fishing platform, as feasible, in the vicinity of the boat launch; the

installation of appropriate safety and informational signage associated with the boat launch and

platform; and the creation or expansion of unpaved parking, as warranted. This Alternative meets

the Trustees identified project categories of boat launch recreation, river trail recreation, docks and

piers, and ADA accessibility.

The existing boat launch is located in the southwest corner of Lincoln Avenue Park, on the western

edge of the Millstone River, approximately 1.5 miles upstream of the confluence with the Raritan

River (Figure 11). The boat launch is located immediately downstream of the Royce Brook

tributary, and approximately 450 feet downstream of the former Weston Mill Dam, which was

removed in 2017. The existing boat launch is composed of hard-packed gravel to approximately

the water line, then is gravel and riprap into the river. New riprap and gravel were added to the in-

river portion of the launch in 2017, as part of the equipment access route for the Weston Mill Dam

removal. The new slope of the in-water portion of the ramp precludes easy trailer launching at low

water levels.

Figure 11. County Boat Launch in Lincoln Avenue Park, Manville, New Jersey.

Page 49: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

41

The existing parking area is an extension of the gravel and dirt drive that provides vehicle access

to the Lincoln Avenue Park. No signage is visible to instruct visitors as to the types of boats

permitted to be launched, where visitors should park their vehicles, or the hours of operation. There

is currently no river or fishing access to visitors with disabilities.

This recreational restoration project involves enhancing public access to the Millstone and Raritan

Rivers, in part, by upgrading the existing boat launch at Lincoln Avenue Park. Boat launch

upgrades may include regrading the launch to a greater slope and resurfacing the launch with

appropriately sized gravel and riprap, or regrading the launch to an appropriate slope and replacing

the existing gravel/rip-rap with pre-cast concrete slabs. The launch should be able to handle both

non-motorized and small motorized boats. Boaters that launch at the County Boat Launch can

currently travel to the mainstem Raritan River as well as travel 4.7 miles upstream the Millstone

River to the Blackwells Mills Dam.

Fishing access will be enhanced by installing an accessible fishing platform, as feasible. Figure 12

provides an example of the type of fishing platform that could be installed at or near the County

Boat Launch. The fishing platform should provide access, given the provisions of the Americans

with Disabilities Act of 1990 (ADA; 42 U.S.C. § 12101 et seq.), and should incorporate appropriate

signage. The fishing platform should be designed in a manner as to not exacerbate erosion of the

Millstone River and Royce Brook banks.

Figure 12. Example of accessible fishing platform along a small river in Virginia. Photo credit:

Hawksbill Greenway Foundation.

Page 50: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

42

This restoration project may additionally include the creation or expansion of the existing parking

area associated with the boat launch. Parking materials will consist of gravel or parking pavers.

Appropriate signage will be installed to provide instruction on the safe use of the launch, and other

general information about the park, as warranted.

The proposed restoration project may be accomplished through leveraging additional funding

and/or technical assistance from the Borough of Manville, the Manville Green Team, the

Somerset County Planning Division, and other private, state, and federal partners. Alternative 3.8

is a Tier I preferred alternative for this restoration plan because it meets the Trustees’ identified

restoration objectives and criteria to address the recreational injuries caused by the release of

hazardous substances. Repairing the County Boat Launch and installing an accessible fishing

platform, as feasible, will enhance recreational fishing and boating opportunities on both the

Millstone and Raritan Rivers.

3.9 Preferred Tier I Alternative: Lost Valley Nature Park

The Lost Valley is an area of Manville, Somerset County, New Jersey that is situated along the

western side of the Millstone River, just upstream of the confluence with the mainstem Raritan

River. The Borough of Manville, Somerset County, The Nature Conservancy, and other partners

have proposed to transform the Lost Valley Area into a multi-use Nature Park. The proposed

restoration project includes a mix of recreational and ecological improvements, that may include

but are not limited to: the removal of existing impervious surfaces; trail and path development;

planting pollinator garden areas; installing rain gardens; expansion and revegetation of wetland

areas; tree plantings; upland meadow plantings; improvements to a gravel driving path; installation

of a new gravel parking area; and installation of educational and wayfinding signage. This

Alternative meets the Trustees identified project categories of freshwater wetland restoration,

riparian restoration, floodplain restoration, land trail recreation, interpretive signage, and ADA

accessibility.

The 65-acre Lost Valley Nature Park will include portions of the Lost Valley neighborhood and

Lincoln Avenue Park. The Lost Valley neighborhood was comprised of roughly 500 homes and

businesses, but after unprecedented flooding following Hurricane Floyd in 1999, the State’s Blue

Acres buyout program has reduced the community to only 377 homes and 4 remaining commercial

Page 51: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

43

properties. The Lost Valley Nature Park will be situated along the southeastern portion of the Lost

Valley neighborhood, and will completely incorporate the Lincoln Avenue Park. Somerset County

owns and maintains the Lincoln Avenue Park, and the Manville Borough owns the reclaimed

portion of the Lost Valley neighborhood.

The Nature Park will be located within the 100-year floodplain of the lower Millstone River,

approximately 1 mile upstream of the confluence with the Raritan River. Royce Brook flows along

the southwestern edge of the park, and portions of the proposed park are wetlands. The existing

Lincoln Avenue Park has ball fields, a playground, and a boat ramp, but the site is underutilized

by visitors.

The Nature Conservancy produced a recommendations report (TNC 2017) and the Borough of

Manville produced a draft Master Plan report for the site in 2017 (Mott MacDonald 2017). The

draft Master Plan for the Lost Valley Nature Park includes a conceptual design, as well as

information regarding the existing natural and anthropogenic characteristics of the park. The

Master Plan conceptual design is depicted in Figure 13.

Figure 13. Conceptual design for the Lost Valley Nature Park, Mott MacDonald 2017.

The Lost Valley Nature Park has the potential to transform an area considered a community

impediment into a community asset. Draft and final designs will be produced as part of this project.

The available conceptual design indicates that the park may include: floodplain habitat, forested

riparian buffer zones, pollinator gardens, rain gardens, tree plantings, picnic areas, impervious

Page 52: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

44

surface removal, vegetated wetlands, upland meadow, and lawn. The conceptual design indicates

that the park may provide human recreational areas, including active recreation (e.g., basketball

court, baseball field, playground) and passive recreation (e.g., trails, roads, lawn). The Trustees

will work with project partners to create a design that meets the goals and objectives of both the

local community and the Trustee Council.

The proposed Lost Valley Nature Park restoration project may be accomplished through

partnerships, additional funding, and technical assistance from the Borough of Manville, Somerset

County, The Nature Conservancy, Manville’s Green Team, and other state and federal sources.

Alternative 3.9 is a Tier I preferred alternative for this restoration plan because it meets the

Trustees’ identified restoration objectives and criteria to address the ecological and recreational

injuries caused by the release of hazardous substances. Creation of the Lost Valley Nature Park

will increase and enhance public recreation and environmental education opportunities; will

remove impervious surfaces and enhance water retention and storage capacity; and will improve

pollinator habitat and habitat for small mammals and birds.

3.10 Preferred Tier I Alternative: North Branch Raritan River Corridor Riparian Buffer

Restoration

The headwaters of the North Branch Raritan River are located in Mendham Borough, Morris

County, New Jersey and the river flows generally southward through Somerset County, joining

the South Branch Raritan River in Bridgewater and Branchburg Townships to form the mainstem

Raritan River. The North Branch Raritan River watershed has a drainage area of approximately

187 square miles. The proposed restoration project includes the establishment and restoration of

riparian buffers on publicly-owned open space properties along the North Branch Raritan River

corridor (Figure 14). This Alternative meets the Trustees identified project categories of riparian

restoration, floodplain restoration, land freshwater mussel conservation and enhancement, native

fish conservation and enhancement, and instream enhancement.

The Raritan Headwaters Association (RHA) will identify, prioritize, and implement riparian buffer

restoration in the North Branch Raritan River watershed. The RHA is a non-profit conservation

organization based in Bedminster, Somerset County, New Jersey. RHA operates under the

guidance of a Board of Trustees, and has 20 staff members, an AmeriCorps Watershed

Page 53: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

45

ambassador, nature educators, interns, and over 180 volunteers. RHA’s mission is to protect clean

water in the rivers, streams, and homes of the North and South Branch Raritan watersheds, a region

covering 38 municipalities in Hunterdon, Somerset, and Morris counties.

Figure 14. Map of potential areas for riparian buffer restoration in the North Branch Raritan

watershed.

The RHA analyzed land cover and water quality data collected from the North Branch Raritan

River and tributaries, including the Lamington/Black River, Chambers Brook, Mine Brook,

Peapack Brook, and Rockaway Creek, and found that there has been a decline in water quality

over time. The primary causes of impairment include non-point source pollution, impervious cover

associated with increased development, and the decline of forested stream riparian buffers. RHA

encourages green infrastructure and reducing nonpoint source pollution through their

programming, and the State requires a 50-foot, 150-foot, or 300-foot riparian buffer depending on

how the State classifies the adjacent stream or waterbody. However, RHA recently conducted a

Page 54: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

46

GIS analysis of riparian buffers on the North Branch Raritan River and its tributaries, and found

that long segments of riparian areas had inadequate or no riparian buffer, even when located on

publicly-owned parcels.

The proposed project will establish or restore riparian buffers to at least their State-required length

at select municipal, county, and state properties along the North Branch Raritan River and its

tributaries. The RHA has a minimum goal of establishing 10,000 native trees and shrubs in

partnership with municipalities and other public landowners. As part of the project, RHA will

monitor water quality parameters including benthic macroinvertebrate and fish communities

before and after restoration as part of their robust stream monitoring program. This will provide

data on the effectiveness of stream buffer plantings on restoring water quality.

Streams of this region provide drinking water to 1.5 million people in New Jersey; therefore, water

quality improvements are of utmost importance to the health of citizens, the local economy, and

the natural ecology of the area. Healthy riparian buffers contain trees and other vegetation that

help protect water quality. Riparian buffers intercept non-point source pollutants carried by

rainwater runoff and help to trap excess nutrients and other chemical pollutants that degrade

waterbodies. Riparian buffers help to stabilize stream banks and minimize erosion and

sedimentation. Riparian buffers help to flatten the hydrograph by infiltrating and slowing down

runoff from rain events prior to entering the stream; this capability helps to decrease the frequency

and intensity (i.e., flashiness) of flood events. Riparian buffers provide shade over waterbodies,

which helps to reduce stream temperatures and reduce large fluctuations in stream temperatures

over time. Streams and their riparian buffers also play an important role in water storage and

groundwater recharge. During high water events, riparian buffers can help to store subsurface

water, allowing it to slowly percolate to the stream over time and also percolate vertically to

groundwater reserves. As a result, riparian buffers help to maintain stream flow in the late summer

when rain is minimal and help to maintain groundwater resources. Riparian buffers contribute

towards aquatic habitat heterogeneity by providing large wood and other organic inputs that help

provide a diversity of habitats (and food sources) for a variety of different species.

Improvements to water quality and aquatic/riparian habitat would benefit a number of sensitive

wildlife species, including several species identified by the State of New Jersey as having Greatest

Conservation Need, including: longtail salamander (Eurycea longicauda), wood turtle (Glyptemys

Page 55: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

47

insculpta), American brook lamprey (Lethenteron appendix), comely shiner (Notropis amoenus),

fallfish (Semotilus corporalis), margined madtom (Noturus insignis), redbreast sunfish (Lepomis

auritus), satinfin shiner (Cyprinella analostana), shield darter (Percina peltata), spotfin shiner

(Cyprinella spiloptera), swallowtail shiner (Notropis procne), and yellow bullhead (Amerius

natalis). Water quality and habitat improvements may also benefit several mussel species,

including: brook floater (Alasmidonta varicosa), triangle floater (Alasmidonta undulata), alewife

floater (Anodonta implicata), eastern elliptio (Elliptio complanata), and eastern floater

(Pyganodon cataracta).

The North Branch Raritan River riparian restoration project may be accomplished by leveraging

additional funds and technical assistance from RHA, and other state, federal, or local sources.

Alternative 3.10 is a Tier I preferred alternative for this restoration plan because it meets the

Trustees’ identified restoration objectives and criteria to address the injuries caused by the release

of hazardous substances. Creating and restoring riparian buffers along the North Branch Raritan

River and its tributaries will benefit water quality and aquatic habitat for sensitive aquatic taxa,

will benefit species that use stream edge as habitat, and will also provide a high potential for public

outreach and education.

3.11 Preferred Tier I Alternative: East Brunswick Swamp Pink Restoration

The proposed restoration project involves the protection of an extant swamp pink (Helonias

bullata) population and the restoration and protection of adjacent Atlantic white cedar

(Chamaecyparis thyoides) habitat in East Brunswick, New Jersey. This Alternative meets the

Trustees identified project categories of freshwater wetland restoration and floodplain restoration.

Swamp pink is a perennial herb in the lily family, characterized by smooth evergreen oblong-

spatulate leaves that lay flat on the ground in a basal rosette, and a stocky, hollow flower stem (one

to three feet) that is topped by a cluster of unique pink flowers in the spring. Swamp pink is only

found in wetlands along streams and seepage areas in freshwater swamps. It often grows on

hummocks formed by trees, shrubs, and sphagunum moss. The hummocks keep the roots moist

but not submerged in the standing water and hydric soil characteristic of the plant’s habitat. In

New Jersey, the plant is often found in Atlantic white cedar or red maple (Acer rubrum) dominated

swamps.

Page 56: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

48

Swamp pink was listed as threatened under the Endangered Species Act of 1973 (ESA; 16 U.S.C.

§ 1531 et seq.) in 1988. The species once inhabited wetland areas from New York to Georgia, but

now only ranges from New Jersey to Virginia and a few isolated areas in the Southern Appalachian

Mountains. The East Brunswick swamp pink population, located in East Brunswick, New Jersey,

represents the northernmost occurrence of the species within its extant range. The protection of

this remnant population is important for maintaining the distribution and genetic diversity of the

species.

Figure 15. Swamp Pink plant from the East Brunswick, New Jersey population.

The East Brunswick swamp pink population is currently comprised of less than 20 individual

plants (Figure 15). The population is negatively impacted by deer browse; only a small number of

swamp pink plants flower each spring and their flowers are preferentially consumed by deer. In

addition, the adjacent Atlantic white cedar stand is aging, and at risk of windfall. As a result,

canopy gaps and other changes that may alter the specialized wetland habitat required by swamp

pink. Recently germinated Atlantic white cedar seedlings are present in the understory, but their

growth is suppressed by the high level of deer browse at the site. Because of inadequate canopy

cover, the invasive plant Japanese stilt grass (Microstegium vimineum) is encroaching on the

project site, causing further risk. Appropriate restoration at the site involves the protection of

Page 57: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

49

swamp pink using deer exclusion fencing, and the enhancement and protection of its adjacent

Atlantic white cedar habitat.

The proposed restoration project is comprised of three general phases: 1) conduct a current swamp

pink survey (last survey conducted in 2018) to determine the appropriate footprint for deer

exclusion fencing, and conduct a survey of the adjacent white cedar stand to determine appropriate

habitat enhancement actions; 2) install 6- to 8-foot-high deer exclusion fence around the swamp

pink area, install anti-herbivory cages around individual plants, and implement appropriate habitat

suitability actions (e.g., thin the adjacent white cedar stand to promote new growth; plant white

cedar saplings an house with browse tubes, and/or provide additional fencing around the white

cedar stand; remove invasive species within fenced area); and 3) monitor swamp pink plants and

the Atlantic white cedar stand for a minimum 5-year period, and monitor and repair the fencing,

as warranted.

The protection of the East Brunswick swamp pink population may be accomplished by leveraging

additional funds and technical assistance through other federal sources. Alternative 3.11 is a Tier

I preferred alternative because it meets the Trustees’ identified restoration objectives and criteria

to address the injuries caused by the release of hazardous substances. Protection of the East

Brunswick swamp pink population benefits a federally endangered species and protects critical

wetland habitat in New Jersey.

3.12 Preferred Tier I Alternative: Stony Brook Green Infrastructure Demonstration

Project

The Watershed Reserve is a property owned and operated by The Watershed Institute, and is

located in Pennington, Mercer County, New Jersey. The proposed recreational and ecological

restoration project involves the removal of impervious driving surfaces and the 14,000 square feet

impervious parking area located on The Watershed Reserve property; the installation of multiple

demonstration porous paving alternatives; the installation of bioswales to capture and treat

stormwater along the entry drive; the removal of invasive species along the entry drive and

adjacent tributary stream; and native plantings along the entry drive and adjacent tributary stream.

This project will serve as a green infrastructure demonstration project to educate Watershed

Reserve visitors on alternative green infrastructure practices and will also serve as a research site

Page 58: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

50

for local academic groups. This Alternative meets the Trustees identified project categories of

riparian restoration, floodplain restoration, instream enhancement, interpretive signage, and ADA

accessibility.

The Watershed Reserve is owned and managed by The Watershed Institute (a nonprofit formerly

known as the Stony Brook Millstone Watershed Institute). The Watershed Reserve spans nearly

1,000 acres of forest, wetlands, meadows, and farmland; houses a 15,256 square foot LEED-

Platinum certified educational center (i.e., The Watershed Center); and attracts tens of thousands

of visitors each year who attend more than 300 programs including summer camps, educational

classes, school field trips, conferences, and environmental festivals. The Watershed Reserve hosts

over 10 miles of hiking trails for general recreation (e.g., hiking, wildlife viewing, educational

center).

The current parking lots, entry drive, and exit roads used to access The Watershed Reserve are

comprised of asphalt and gravel and do not infiltrate stormwater. Runoff and sediments, especially

from the gravel parking lot, drain directly into an unnamed tributary to Stony Brook and also drain

indirectly into the tributary through various storm sewer drains. Invasive plants that perform poorly

at stormwater infiltration and retention dominate riparian areas along the entry drive and the

parking lot. Cumulatively, there is concern that the existing road and parking infrastructure at the

Watershed Reserve is promoting the degradation of water quality in the Stony Brook.

The proposed recreational and ecological restoration project will play a significant role in

educating tens of thousands of people that visit The Watershed Reserve each year about stormwater

runoff and the role that runoff plays in degrading our local waterways. Though signage, brochures,

presentations, and educational programs, this project will demonstrate and explain the principals

of stormwater mitigation and green infrastructure. Watershed Center staff will incorporate

monitoring of water quality changes associated with project installation, and will work with local

academic groups to monitor other aspects of the efficacy of the multiple types of impervious

surfaces installed onsite.

Approximately 0.73 mile of tributary stream leading to the Stony Brook will be immediately

enhanced with the implementation of this green infrastructure project, and water quality uplift will

have a lasting impact for miles downstream. At least 3 acres of wetland, 9 acres of riparian buffer,

Page 59: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

51

and 12 acres of upland habitat will be improved through the riparian planting program, and 11

acres of upland will be protected through the implementation of green infrastructure that will

reduce the negative effects of stormwater runoff and erosion.

Aquatic species that may benefit from the reduction of stormwater runoff in Stony Brook include

diadromous species such as American eel (Anguilla rostrata), and several coldwater species (brook

trout – Salvelinus fontinalis, rainbow trout – Oncorhynchus mykiss). The project may also benefit

species identified by the State of New Jersey as having Greatest Conservation Need, including:

comely shiner (Notropis amoenus), margined madtom (Noturus insignis), redbreast sunfish

(Lepomis auritus), satinfin shiner (Cyprinella analostana), and swallowtail shiner (Notropis

procne). Water quality improvements may additionally benefit several mussel species, including:

alewife floater (Anodonta implicata), brook floater (Alasmidonta varicosa), creeper (Strophitus

undulatus), eastern elliptio (Elliptio complanata), eastern floater (Pyganodon cataracta), eastern

pondmussel (Ligumia nasuta), green floater (Lasmigona subviridis), and triangle floater

(Alasmidonta undulata).

The installation of green infrastructure at The Watershed Reserve may be accomplished with

funding and technical assistance from The Watershed Institute, and may leverage additional funds

through private and/or federal sources. Alternative 3.12 is a Tier I preferred alternative for this

restoration plan because it meets the Trustees’ identified restoration objectives and criteria to

address the recreational and ecological injuries caused by the release of hazardous substances.

Creating a green infrastructure demonstration project at The Watershed Reserve will provide a

high potential for public outreach and education, and will also provide ecological benefits by

improving water quality and benefitting species of concern.

3.13 Preferred Tier II Alternative: Rockafellows Mills Dam Removal

The Rockafellows Mills Dam is located on the South Branch Raritan River, in Readington and

Raritan Townships, Hunterdon County, New Jersey. The proposed restoration project involves the

removal of the Rockafellows Mills Dam; appropriate stabilization, restoration and vegetation of

the adjacent stream reaches and impoundment area; appropriate characterization, dredging,

removal, and storage/disposal of upstream sediments, as warranted; and scour protection measures

for the Black River & Western Railroad Flemington through truss bridge, the Rockafellows Mill

Page 60: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

52

Road bridge, and other areas, as warranted. This Alternative meets the Trustees identified project

categories of dam removal, riparian restoration, aquatic connectivity freshwater mussel

conservation and enhancement, native fish conservation and enhancement, instream enhancement,

and river trail recreation.

The Rockafellows Mills Dam is the downstream-most barrier on the South Branch Raritan River.

The dam is an approximately 290-feet-long, 14-feet-high (maximum height) concrete and rock-fill

run-of-river gravity dam that creates an approximate 12.5-acre impoundment on the South Branch

Raritan River (Figure 16). The concrete overflow spillway is connected to an undershot water

wheel structure at the southern end of the dam, but the low-level outlet valves that supply water to

the wheel, as well as the wheel, are no longer operable.

Figure 16. Rockafellows Mills Dam shown from downstream facing southwest.

The original construction date for Rockafellows Mills Dam is unknown. The dam was rebuilt in

1919 to supply power for a small mill located along the southern edge of the dam. In 1930 and

1978, dam failures were recorded. The cause and extent of the failure in 1930 and/or resulting

Page 61: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

53

damage is unknown. The 1978 failure consisted of a 30-foot breach at the southern end of the main

spillway (USACE 1981). All damage has been since been repaired. The dam and most of the land

flanking the impoundment is currently in private ownership. The state-owned South Branch WMA

is situated along the northern bank of the river just downstream of the dam.

Removal of the Rockafellows Mills Dam would restore fish passage for approximately 9.4 miles

upstream to the Hamden Pump Dam, which is mostly permeable to migratory fish, and an

additional 3 miles upstream to the next impermeable dam, the Clinton Mills Dam. Dam removal

would also provide- fish passage for approximately 12 miles downstream to the Headgates Dam

located on the mainstem Raritan River. The Headgates Dam removal is proposed as a Tier I project

in this Draft RP/EA. The Headgates Dam is the last remaining complete barrier on the mainstem

Raritan; as such, the removal of both the Headgates and Rockafellows Mills Dam could allow for

approximately 55 miles of fish passage connectivity along the South Branch and mainstem Raritan

Rivers extending to the Raritan Bay.

Sediments that have accumulated upstream of the Rockafellows Mills Dam would need to be

characterized and quantified as part of the dam removal feasibility process, and the removal may

require dredging, removal, and storage/disposal of sediments. The dam removal design may

include minor grading of the riverbed and banks, revegetation of exposed areas, and scour

protection measures, as warranted.

The most recent New Jersey Integrated Water Quality Assessment Report for EPA 303d

requirements indicate that South Branch Raritan waters in the vicinity of the Rockafellows Mills

Dam do not attain any of the following uses: aquatic life general (due to total phosphorus); aquatic

life – trout (due to temperature); fish consumption (due to mercury in fish tissue); public water

supply (due to arsenic); and recreation (due to Escherichia coli; NJDEP 2019). Total Maximum

Daily Load (TMDL) regulations are in place for total phosphorus and total suspended solids.

The removal of the Rockafellows Mills Dam and restoration of its associated impoundment will

likely improve water quality conditions in the impounded reach and downstream of the dam,

namely by reducing temperature, total phosphorus, and total suspended solids. Shallow, slow

moving, unshaded waters are highly susceptible to thermal impacts, particularly during summer

months. Altered flow regimes also modify nutrient and chemical cycling, and sediment transport.

Page 62: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

54

The impoundment created by the Rockafellows Mills Dam is very shallow with predominant sand

and clay substrates, very little physical and hydrological habitat heterogeneity, and very little

cover. The reintroduction of the river’s natural flow regime will provide more suitable habitat

conditions for aquatic biota.

Dam removal will improve fish passage for resident and diadromous species such as American eel

(Anguilla rostrata), blueback herring (Alosa aestivalis), sea lamprey (Petromyzon marinus), and

striped bass (Morone saxatillis) after fish passage issues are addressed at the Island Farm Weir and

Headgates Dam. Water quality and habitat improvements will improve conditions for all species,

including several species identified by the State of New Jersey as having Greatest Conservation

Need, including: American brook lamprey (Lethenteron appendix), bluespotted sunfish

(Enneacanthus gloriosus), cutlips minnow (Exoglossum maxillingua), eastern mudminnow

(Umbra pygmaea), fallfish (Semotilus corporalis), margined madtom (Noturus insignis), redbreast

sunfish (Lepomis auritus), satinfin shiner (Cyprinella analostana), shield darter (Percina peltata),

swallowtail shiner (Notropis procne), and yellow bullhead (Amerius natalis). Water quality and

habitat improvements will also benefit several mussel species, including: brook floater

(Alasmidonta varicosa), eastern elliptio (Elliptio complanata), eastern floater (Anodonta

cataracta), and triangle floater (Alasmidonta undulata).

Removal of the Rockafellows Mills Dam will enhance recreational paddling on the South Branch

River. The reach extending from Clinton, New Jersey to the confluence with the mainstem Raritan

River is currently interrupted by a necessary portage at the Rockafellows Mills Dam, which is not

recommended due to the fact that the dam is located on private property. The dam is also a safety

hazard for boaters unaware of the upwelling hazards associated with small low-head dams.

The removal of the Rockafellows Mills Dam may be accomplished with technical assistance and

leveraging additional funds from the Raritan Headwaters Association and other state and federal

sources. Alternative 3.13 is a Tier II preferred alternative for this restoration plan because it meets

the Trustees’ identified restoration objectives and criteria to address the injuries caused by the

release of hazardous substances, but project access and permissions are uncertain at this time.

Removing the Rockafellows Mills Dam restores river habitat, improves water quality,

reestablishes fish and mussel movement, and enhances recreational fishing and boating

opportunities.

Page 63: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

55

3.14 Preferred Tier II Alternative: Klines Mill Dam Fish Passage

The Klines Mill Dam is located on the North Branch Raritan River in Bedminster Township,

Somerset County, New Jersey. The proposed restoration project involves the restoration of fish

passage at the Klines Mill Dam through dam removal, partial dam removal, or the installation of

a nature like fishway. The project may also include appropriate restoration, stabilization, and

revegetation of the adjacent stream and millrace reaches; and scour protection measures at the

Klines Mill Road and bridge, as warranted. This Alternative meets the Trustees identified project

categories of dam removal or technical fish passage, riparian restoration, floodplain restoration,

aquatic connectivity, freshwater mussel conservation and enhancement, native fish conservation

and enhancement, instream enhancement, and river trail recreation.

The Kline’s Mill Dam is an approximately 145-feet-long, v-shaped, concrete, run-of-river gravity

dam (Figure 17). The northern arm of the v-shaped dam is approximately 90-feet-long, and

contains a small notch toward its southern end that is approximately 15 feet in length and 1 foot in

depth; this arm passes the river’s thalweg. The southern arm of the v-shaped dam is approximately

55-feet-long and contains a small, vertical-rising sluice gate that opens to a historic millrace. The

millrace runs approximately 780 feet to a fork where a portion of flow can be diverted back to the

North Branch Raritan, and remaining water runs in a smaller, more constricted millrace for an

additional 800 feet past the historic McDonalds-Klines Mill before rejoining the North Branch

Raritan.

The Klines Mill Dam is associated with the historic McDonalds-Klines Mill, originally constructed

as an up-and-down sawmill mill built in 1744 by William McDonald. The mill was converted to a

grist mill and willed to the wife of Jacob Kline in 1836, and the property remained in the Kline

family until 1899. While the dam and mill are now obsolete, the mill building has been refurbished

in modern times and retains functional sawmill machinery inside. The McDonalds-Klines Mill as

well as the Klines Mill Road located 0.2 mile downstream are listed on the National and New

Jersey Registers of Historic Places. The dam is currently privately owned; land to the south is

privately held (preserved farmland), and land to the north is owned by Bedminster Township.

Restoration of fish passage at the Klines Mill Dam will benefit diadromous species such as

American eel (Anguilla rostrata) and sea lamprey (Petromyzon marinus), and after fish passage is

Page 64: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

56

addressed at the Island Farm Weir and Headgates Dam will additionally benefit American shad

(Alosa sapidissima) and blueback herring (Alosa aestivalis). Water quality and habitat

improvements will improve conditions for all species, including several species identified by the

State of New Jersey as having Greatest Conservation Need, including: American brook lamprey

(Lethenteron appendix), comely shiner (Notropis amoenus), fallfish (Semotilus corporalis),

margined madtom (Noturus insignis), redbreast sunfish (Lepomis auritus), satinfin shiner

(Cyprinella analostana), shield darter (Percina peltata), spotfin shiner (Cyprinella spiloptera),

swallowtail shiner (Notropis procne), and yellow bullhead (Amerius natalis). Restoration of fish

passage at the Kline Mill Dam may also benefit several mussel species, including: triangle floater

(Alasmidonta undulata), alewife floater (Anodonta implicata), eastern elliptio (Elliptio

complanata), and eastern floater (Pyganodon cataracta).

Figure 17. Klines Mill Dam shown from downstream facing southeast.

Removal of the Klines Mill Dam would restore fish passage for approximately 5.6 miles to the

next upstream dam (Ravine Lake Dam), and would provide fish passage for approximately 8.1

miles downstream to the Mill Street Dam. Once fish passage is addressed at the Mill Street Dam

and remaining mainstem Raritan River Dams, the removal of the Klines Mill Dam would provide

approximately 43.6 miles of fish passage connectivity along the North Branch and mainstem

Raritan Rivers extending to the Raritan Bay.

Page 65: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

57

Restoration of fish passage at the Klines Mill Dam may be accomplished by leveraging additional

funds through other state and federal sources. Alternative 3.14 is a Tier II preferred alternative for

this restoration plan because it meets the Trustees’ identified restoration objectives and criteria to

address the injuries caused by the release of hazardous substances, but project access and

permissions are uncertain at this time. Removing the Klines Mills Dam restores river habitat,

improves water quality, and reestablishes fish and mussel movement.

3.15 Preferred Tier II Alternative: Beisler Lake Dam Removal

Beisler Lake is located in Lebanon Township, Hunterdon County, New Jersey. This restoration

project includes the partial removal of the earthen dam at Beisler Lake; stream channel restoration

and stabilization in the former impounded area and downstream; revegetation of the former

impounded area and other disturbed areas; and the creation of vernal pools in and around the

former impoundment footprint. This Alternative meets the Trustees identified project categories

of dam removal, riparian restoration, floodplain restoration, aquatic connectivity, native fish

conservation and enhancement, and instream enhancement.

Beisler Lake is created by the impoundment of Spruce Run Creek, and is situated approximately

9.4 miles upstream of the Spruce Run Reservoir. Spruce Run Reservoir meets the South Branch

Raritan River just downstream of the reservoir’s dam. The Beisler Lake Dam is a 630-feet-long

and 17.1-feet-high earthen dam that retains a 6.8-acre impoundment (Figure 18). In 2015, the

NJDEP requested that the dam owner perform a dam failure analysis. The analysis resulted in the

recommendation to designate the earthen dam as a Class I – High Hazard Potential, indicating that

its failure would likely cause the loss of life or extensive property damage. Due to the Class I

designation, the property owner was required to either reconstruct the dam to meet minimum

hazard requirements or remove the dam. After determining the reconstruction option to be cost-

prohibitive, the dam owner chose to remove the dam, reclaim the former impoundment, and restore

the section of Spruce Run Creek that flows through the impoundment.

To date, the dam owner has taken several actions towards removing the Beisler Lake Dam. In fall

of 2017, there was a permanent drawdown of the lake and a complete fish removal and relocation

effort. The drawdown was facilitated by permanently opening an existing outflow structure and

conveyance pipe that is embedded in the earthen dam. Immediately following the drawdown, the

Page 66: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

58

lakebed was hydroseeded with native rye grass to minimize sediment transport. In summer of

2018, a total station survey was conducted to assist in the development of dam removal and

impoundment restoration design plans. In fall of 2018, approximately 750 native trees and shrubs

were planted in the former impounded area.

Figure 18. Beisler Lake in fall of 2019. The impoundment was permanently drained through the

outflow structure embedded in the earthen dam in 2017, and the impoundment was partially

revegetated in 2018.

Conceptual project designs include dam removal, stream reconstruction, and native plant

reclamation. The dam removal design calls for the removal of the existing spillway structure, and

excavation of a breach through the dam. The embankment breach will be excavated to a slope of

at least 5:1, taking into consideration ease of access as well as constriction during high water

events. Excavated soils will be relocated to adjacent areas within the former impoundment. The

streambed will be graded to match the existing upstream bed elevation through the breach, and

rock cross vanes will be installed for gradient control. The designed channel dimensions through

Page 67: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

59

the dam will allow for minimal retention of floodwaters within the impoundment. The breach will

be stabilized with riprap, non-woven geotextiles, and erosion control matting.

Once dam removal is complete, the reach of Spruce Run Creek that flows through the

impoundment will be stabilized by the revegetation of stream banks and modifications to the

channel dimensions to reflect those upstream and downstream of the Beisler Lake impoundment.

Meanders and pools will be excavated to create fish and macroinvertebrate habitat. Riffles will be

created with excavated gravels and imported gravels, as needed. The flow line will be relocated

within the upstream reach of the impoundment to the creek’s assumed historic streambed. A

channel block may be installed to direct the stream’s flow into its historic channel. Vernal pools

will be established at appropriate locations within and adjacent to the former impoundment

footprint.

The Beisler Lake Dam was built in 1973 to support a local summer camp, and is currently in

private ownership. There are no significant historic resources in the general area. Beisler Lake is

situated at the headwaters of Spruce Run Creek, although five, small (two to three acre), off-

channel impoundments are located within 0.5 to 0.75 mile upstream. Most of the upstream ponds

are located within a Hunterdon County open space preserved land parcel. There are no

impoundments for 9.4 miles downstream to the Spruce Run Reservoir.

Beisler Lake was built for swimming and boating recreation by a local summer camp. The restored

impoundment area will be used for environmental education and alternate recreational purposes

(e.g., nature-hikes, wildlife viewing). The section of Spruce Run Creek running from Beisler Lake

to the Spruce Run Reservoir is a popular trout-fishing destination, and the removal of the Beisler

Lake Dam and the revegetation of the former impoundment will help keep downstream waters

sufficiently cool to support trout.

The most recent New Jersey Integrated Water Quality Assessment Report for EPA 303d

requirements indicate that Spruce Run Creek waters in the vicinity of Beisler Lake do not attain

the following uses: aquatic life – trout (due to temperature); and recreation (due to Escherichia

coli), but do attain the uses of aquatic life general and public water supply (NJDEP 2019). There

is insufficient data to determine the use of fish consumption. Spruce Run Creek in the vicinity of

Beisler Lake is listed on the Raritan Water Region Restoration Priority Watershed List (NJDEP

Page 68: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

60

2019), indicating high potential in achieving water quality improvements to restore designated

uses. The removal of the Beisler Lake Dam and the revegetation of the former impoundment will

help to reduce stream temperature, and will help reduce Escherichia coli by dissuading use by

Canada goose and by infiltrating and capturing other Escherichia coli sources before entering the

creek.

Restoration of fish passage and other water quality and habitat improvements at Beisler Lake will

improve conditions for all fish species, including several cold water recreational game species

(brook trout - Salvelinus fontinalis, brown trout - Salmo trutta, and rainbow trout - Oncorhynchus

mykiss), and diadromous species such as American eel (Anguilla rostrata). Water quality and

habitat improvements may also benefit several mussel species, including: brook floater

(Alasmidonta varicosa), eastern elliptio (Elliptio complanata), eastern floater (Pyganodon

cataracta), and triangle floater (Alasmidonta undulata).

The Beisler Lake Dam removal may be accomplished by leveraging additional funds and technical

assistance from other non-profit, state, and/or federal sources. Alternative 3.15 is a Tier II preferred

alternative for this restoration plan because it meets the Trustees’ identified restoration objectives

and criteria to address the injuries caused by the release of hazardous substances, but the project

may not yield ecological benefits of the magnitude of other Tier I preferred projects. Removing

the Beisler Lake Dam restores headwater aquatic habitat, improves water quality, and enhances

recreational opportunities at the adjacent summer camp.

3.16 Preferred Tier II Alternative: Mill Street Dam Removal

The Mill Street Dam is located on the North Branch Raritan River in Branchburg and Bridgewater,

Somerset County, New Jersey. The proposed restoration project involves the removal of the Mill

Street Dam; relocation and/or recalibration of an adjacent USGS stream gage; appropriate

restoration and stabilization of the adjacent stream reaches and impoundment area; revegetation of

exposed and newly formed banks; and scour protection measures at the U.S. Route 202 bridge and

other areas, as warranted. This Alternative meets the Trustees identified project categories of dam

removal, riparian restoration, aquatic connectivity, freshwater mussel conservation and

enhancement, native fish conservation and enhancement, instream enhancement, and river trail

restoration.

Page 69: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

61

The Mill Street Dam is an approximately 180-feet-long, less than 5-feet-high, concrete, run-of-

river gravity dam (Figure 19). The dam slows the water of the North Branch Raritan River, but

does not produce an apparent impoundment, and does not noticeably trap sediments upstream. The

dam is owned by NJDEP, and is flanked by land owned by the NJDEP to the west and by Somerset

County Park Commission on the east. Land downstream is owned by the NJDEP and is part of the

Chipman Tract, a 109-acre undeveloped preserved parcel.

Figure 19. Mill Street Dam shown facing northeast. Water has eroded the stream bank along the

northeastern edge of the dam, and visibly flows around the weir.

The Mill Street Dam acts as the control weir for USGS gage 01400000 North Branch Raritan River

near Raritan, New Jersey. This USGS gage measures stage and discharge, and has been at use in

its current location since 1923. The USGS reports that records are generally good except for

estimated discharges, which are fair due to variable-stage backwater from the confluence with the

South Branch Raritan River. The riverbank at the northeastern edge of the weir is currently eroded,

and water actively circumvents the weir, which may also reduce the accuracy of the USGS gage

at this location.

Page 70: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

62

Removal of the Mill Street Dam would restore fish passage for approximately 8.1 miles to Klines

Mill Dam, the next upstream dam. Restoration of fish passage Klines Mill Dam is proposed as a

Tier II project in this Draft RP/EA. Removal of the Mill Street Dam would also provide fish

passage for 2.1 miles downstream, to the Headgates Dam on the mainstem Raritan River. Fish

passage projects at the two remaining Raritan River mainstem dams, the Headgates Dam and the

Island Farm Weir, are proposed as Tier I projects in this Draft RP/EA. Once fish passage issues at

these remaining mainstem dams are addressed, the removal of the Mill Street Dam would restore

approximately 38 miles of fish passage connectivity along the North Branch Raritan and mainstem

Raritan Rivers extending to the Raritan Bay.

The most recent New Jersey Integrated Water Quality Assessment Report for EPA 303d

requirements indicate that North Branch Raritan waters in the vicinity of the Mill Street Dam do

not attain the following uses: aquatic life general (due to pH and turbidity); public water supply

(due to arsenic); and recreation (due to Escherichia coli); and there is insufficient data to determine

if waters in the vicinity of the Mill Street Dam meet their designated use for fish consumption

(NJDEP 2019). TMDL regulations are in place for total phosphorus and total suspended solids.

The removal of the Mill Street Dam will likely improve water quality conditions in the impounded

reach and downstream, namely by restoring natural sediment transport and contributing to the

reduction of turbidity and total suspended solids.

Restoration of fish passage at the Mill Street Dam will benefit diadromous species such as

American eel (Anguilla rostrata) and sea lamprey (Petromyzon marinus), and will additionally

benefit American shad (Alosa sapidissima) and blueback herring (Alosa aestivalis) after fish

passage is addressed at the remaining mainstem Raritan River dams. Water quality and habitat

improvements will improve conditions for all species, including several species identified by the

State of New Jersey as having Greatest Conservation Need, including: American brook lamprey

(Lethenteron appendix), comely shiner (Notropis amoenus), fallfish (Semotilus corporalis),

margined madtom (Noturus insignis), redbreast sunfish (Lepomis auritus), satinfin shiner

(Cyprinella analostana), shield darter (Percina peltata), spotfin shiner (Cyprinella spiloptera),

swallowtail shiner (Notropis procne), and yellow bullhead (Amerius natalis). Restoration of fish

passage at the Mill Street Dam may also benefit several mussel species, including: triangle floater

Page 71: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

63

(Alasmidonta undulata), alewife floater (Anodonta implicata), eastern elliptio (Elliptio

complanata), and eastern floater (Pyganodon cataracta).

Removal of the Mill Street Dam will enhance recreational paddling on the South Branch Raritan

River. The commonly paddled reach extending from the Lamington River confluence to the

mainstem Raritan River is currently interrupted by a necessary portage at the Mill Street Dam. The

dam is a safety hazard for boaters unaware of the upwelling hazards associated with small low-

head dams.

The removal of the Mill Street Dam may be accomplished by leveraging additional funds through

other state and federal sources. Alternative 3.16 is a Tier II preferred alternative for this restoration

plan because it meets the Trustees’ identified restoration objectives and criteria to address the

injuries caused by the release of hazardous substances, but project access and permissions are

uncertain at this time. Removing the Mill Street Dam restores river habitat, improves water quality,

reestablishes fish and mussel movement, and enhances fishing and recreational boating

opportunities.

3.17 Preferred Tier II Alternative: Lake Manalapan Riparian Restoration

Lake Manalapan is located in Monroe Township, Middlesex County, New Jersey. The 30-acre

lake is situated within Thompson Park, a 616-acre county park that is a popular spot for fishing,

boating, and general recreation. The proposed restoration project would create 600 feet of riparian

buffer along the western shoreline of Lake Manalapan to stabilize banks and reduce erosion, reduce

sediment and nutrient loading from runoff, and deter Canada geese. This Alternative meets the

Trustees identified project categories of riparian restoration and floodplain restoration.

Specific project components would include: re-grading and installing erosion control blankets, coir

logs, and native vegetation; creation of a vegetated buffer to dissipate and resist wind-driven wave

action along the shoreline and deter Canada goose (approximately 600-feet-long and 20-feet-

wide); and planting of aquatic vegetation to reduce wind-driven wave energy associated with the

long fetch of Lake Manalapan. The primary objective of these design measures is to improve water

quality in Lake Manalapan and downstream by reducing total suspended solids originating from

the continued erosion and degradation of Lake Manalapan’s shoreline.

Page 72: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

64

Lake Manalapan is an impoundment of Manalapan Brook, a tributary to the South River and

situated 14.5 miles upstream of the Raritan River mainstem. The western shoreline is currently

bare, and the current landscaping regime dictates mowing up to the shoreline banks. Shoreline

erosion is exacerbated by upland runoff, foot traffic, and wave action from recreational users and

by Canada goose who congregate in the area and eat shoreline vegetation. Excess sediment

increases turbidity and total suspended solids, and can carry pollutants that further degrade water

quality.

Figure 20. Riparian Restoration on Lake Manalapan’s southern shoreline; this project is very

similar to the proposed project.

The most recent New Jersey Integrated Water Quality Assessment Report for EPA 303d

requirements indicates that Manalapan Branch waters at Lake Manalapan attain the designated use

of public water supply (NJDEP 2019), but do not attain the following designated uses: aquatic life

general (due to total phosphorus); fish consumption (due to chlordane, DDT, PCBs in fish tissue);

and recreation (due to Escherichia coli). Waters downstream of Lake Manalapan attain the use of

Page 73: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

65

aquatic life general, but do not attain the following uses: fish consumption (due to mercury in fish

tissue); public water supply (due to arsenic); and recreation (due to Escherichia coli). In general,

biological communities in the Manalapan Brook are healthy and fully supporting (NJDEP 2019),

and the Manalapan Brook watershed is one of seven Raritan sub-watersheds that has a nine-

element watershed-based plan (WBP). WBPs can be an effective alternative to a formal TMDL to

characterize pollutant sources, the reductions needed to attain EPA 303d surface water quality

standards, and the means to achieve those reductions (e.g., EPA 319(h) grants).

In 2016, the Freehold Soil Conservation District received a 319(h) grant to install a 600-feet-long

and 20-feet-wide riparian buffer along the southern shoreline of Lake Manalapan (Figure 20). The

project was completed by the District in partnership with Princeton Hydro, Middlesex County, and

the Rutgers Cooperative Extension of Middlesex County. The buffer incorporated native plants

and biodegradable erosion control materials to stabilize the soil and reduce erosion. The project

was part of an ongoing effort within the Manalapan Brook watershed to implement restoration

projects that benefit water quality (as outlined in the WBP). Additional past projects include the

installation of floating wetland islands at Lake Manalapan and naturalized detention ponds to

reduce stormwater runoff. The proposed restoration project will add to these ongoing conservation

efforts.

A total of 0.52 acre of wetland and riparian habitat would be enhanced from the proposed riparian

restoration. Plant species that will benefit include wetland plants that typically populate the littoral

zone of lakes, floodplains, and emergent wetland habitats, including but not limited to: pickerel

weed (Pontederia cordata), broadleaf arrowhead (Sagittaria latifolia), northern blue flag (Iris

versicolor), green bulrush (Scirpus atrovirens), softstem bulrush (Schoenoplectus

tabernaemontani), crimsoneyed rosemallow (Hibiscus moscheutos), river birch (Betula nigra),

silky dogwood (Cornus amomum), and red chokeberry (Aronia arbutifolia). The restoration of the

riparian area would improve habitat for many native birds, mammals, reptiles, and amphibians.

Along with stabilizing the shoreline and providing benefits to local biota, the restoration will also

provide recreational aesthetic benefits to Thompson Park.

Thompson Park staff will engage community volunteers to help plant native species once the

buffer surface is prepared. Volunteer engagement will help to educate the local population and

help to reduce overall project costs. Additional potential project partners include the Rutgers

Page 74: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

66

Cooperative Extension of Middlesex County and the Middlesex County Office of Parks and

Recreation, Princeton Hydro, and the Middlesex County Office of Planning. Princeton Hydro has

completed the initial engineering design plans.

The Lake Manalapan riparian restoration project may be accomplished by leveraging additional

funds and technical assistance from other state, federal, or local partners. Alternative 3.17 is a Tier

II preferred alternative for this restoration plan because it meets the Trustees’ identified restoration

criteria and objectives to address the injuries caused by the release of hazardous substances, but

the project may not yield ecological benefits of the magnitude of other Tier I preferred projects.

Installing a riparian buffer at Lake Manalapan will improve water quality, restore habitat, and serve

as a community demonstration project for stormwater runoff and erosion prevention practices.

3.18 Preferred Tier II Alternative: North Branch Raritan River, Lamington River, and

Stony Brook Mussel Restoration

The North Branch Raritan River, the Lamington River, and the Stony Brook are home to several

state-listed mussel species, including the brook floater (Alasmidonta varicosa), green floater

(Lasmigona subviridis), triangle floater (Alasmidonta undulata), and eastern lampmussel

(Lampsilis radiata). The green floater is an at-risk species that is currently under candidate review

for listing under the Federal ESA, and in New Jersey is only known top potentially occur in two

river systems, including the Stony Brook. The brook floater was recently determined to not warrant

listing under the ESA, although the species is only found in four to five known locations in New

Jersey, including locations in the North Branch Raritan River and the Lamington River.

The proposed project involves: expanding current mussel surveys within the North Branch Raritan

River, the Lamington River, and the Stony Brook; determining environmental correlates to mussel

decline in those waterways; and determining and potentially implementing appropriate restoration

actions that may benefit imperiled mussel species. The identification of survey areas may include

a review of historic and current distribution information, identification of locations that have never

been surveyed or are under-surveyed, and the use of eDNA as a survey location screening tool.

Determination of environmental correlates may involve habitat surveys, habitat modeling, and GIS

modeling. Determination and implementation of appropriate restoration actions may include:

genetic and genomic studies; relocation of non-reproducing mussels to areas with suitable stable

Page 75: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

67

habitat; and propagation and stocking of mussels as a long-term conservation strategy. Special

focus will be given to the brook floater and green floater, since they are both state-listed

endangered and have both been considered for federal listing. This Alternative meets the Trustees

identified project categories of freshwater mussel conservation and enhancement.

The brook floater is a small freshwater mussel that ranges from the Savannah River Basin in South

Carolina, to the St. Lawrence River Basin in Canada, and west to the Ohio River Basin in West

Virginia (Figure 21). In New Jersey, low numbers of brook floater have been historically reported

in Stony Brook, Lamington River, North Branch of the Raritan River, Musconetcong River, and

the upper Delaware River. The brook floater requires clean flowing water over stable cobble, sand,

and gravel substrates of small streams and rivers, little to no siltation, high dissolved oxygen,

appropriate spawning temperatures, and adequate food availability. Reported host fishes include,

but are not limited to, the slimy sculpin (Cottus cognatus), longnose dace (Rhinichthys cataractae),

blacknose dace (Rhinichthys atratulus), golden shiner (Notemigonus crysoleucas), pumpkinseed

(Lepomis gibbosus), yellow perch (Perca flavescens), and margined madtom (Noturus insignis).

Figure 21. Green floater and brook floater shells. Photo credit: Allan Barlow.

The brook floater was listed as state endangered in 2002. Low population numbers of brook floater

reported in occupied habitats indicate that little new reproduction is occurring. However, brook

floater populations are under-surveyed in New Jersey. In 2010, the Service received a petition to

list the brook floater as threatened or endangered under the ESA. As of 2019, the Service

determined that the species did not warrant listing under the ESA.

Page 76: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

68

The green floater is a small, rare mussel with an ovate trapezoid bivalve shell (Figure 21). The

green floater ranges from the Cape Fear River Basin in North Carolina to the St. Lawrence River

Basin in New York. The species is often found in small streams with pools, eddies, and sand-

gravel substrates. The host fish are unknown, and there is some evidence that host fish are not

obligatory for the green floater to complete its life cycle.

The green floater was listed as state endangered in 2002. There is currently only one known live

record of the green floater in the Raritan River watershed, located in the Stony Brook. However,

green floater populations are likely under-surveyed in New Jersey. The Service is currently

reviewing the status of green floater under the ESA.

Freshwater mussels are an important component of freshwater systems. Adult mussels filter-feed

and consume phytoplankton, diatoms, and other microorganisms, as well as detritus and bacteria.

The fact that mussels filter-feed makes them highly beneficial to water quality. Some mussels can

filter up to 15 gallons of water per day. Mussels are also food sources for fish, aquatic birds,

mammals, and humans. Mussels are commonly used as indicators of water quality; for example, a

sudden increase in mortality of mussels is a reliable indicator of contamination.

Although mussels are critical to freshwater systems, their populations are too often in decline due

to habitat loss and degradation; water flow alterations; loss of host fish; and contamination.

Frequent and increasingly intense flood events are a major threat to mussel populations in New

Jersey and the Mid-Atlantic region. In addition, mussels are frequently under-surveyed, since it

requires a high level of expertise and resources to locate and identify mussels. The purpose of this

restoration project is, in part, to expand mussels surveys to increase our knowledge where mussels

are found, what species are abundant (or rare), and what anthropogenic correlates are related to

their decline. Expansion of mussel surveys may lead to more robust efforts to protect New Jersey

mussel populations and identify areas where practitioners can target appropriate restoration efforts

that will benefit mussels, including but not limited to relocation of existing populations to suitable

habitat as well as propagation and stocking.

Implementing mussel surveys, determining environmental correlates, and determining and

implementing restoration actions in the North Branch Raritan River, the Lamington River, and the

Stony Brook may be accomplished by leveraging additional funds and technical assistance from

Page 77: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

69

other state and/or federal sources. Alternative 3.18 is a Tier II preferred alternative for this

restoration plan because it meets the Trustees’ identified restoration objectives and criteria to

address the injuries caused by the release of hazardous substances, but project access and

permissions are uncertain at this time. Implementing mussel surveys will benefit species of

concern and sensitive habitats, and has a high potential for public outreach.

3.19 Preferred Tier II Alternative: Trash Trap Installation in the Lower Raritan River

Watershed

This restoration project involves the installation and maintenance of a trash trap device at an easily

accessible trash ‘hotspot’ location on a tributary to the Raritan River between Cuckels Brook at

State Route 287 and the mouth of the Raritan River at Perth Amboy. The project area may include

portions of South Bound Brook Borough, Highland Park Borough, Sayreville Borough, Perth

Amboy, and South Amboy. This Alternative meets the Trustees identified project categories of

freshwater mussel conservation and enhancement, native fish conservation and enhancement, and

instream enhancement.

Trash that is improperly disposed of can enter freshwater and coastal systems, and can eventually

make its way to the ocean. Aquatic trash decreases water quality and degrades habitat, in addition

to causing aesthetic blight, ecological effects, economic impacts, and possible human health risks.

Of particular concern is that plastics tend to break down to tiny pieces called microplastics (five

millimeters or smaller). Microplastics both absorb and give off harmful pollutants and can be

harmful to wildlife and humans via direct ingestion or trophic transfer.

Trash is the most visible form of pollution in the Raritan River and many of its urban tributaries,

including Green Brook, Mile Run Brook, Mill Brook, and the South River. The proposed

restoration project involves the installation of a trash reduction technology at an appropriate trash

‘hotspot’ location in a tributary to the lower Raritan River. An appropriate trash ‘hotspot’ should

be located in a highly urbanized area that tends to accumulate trash originating from a population-

dense area. The location should be easily accessible for trash trap installation and routine

maintenance.

An existing trash reduction technology that may be appropriate in the lower Raritan River system

is the Bandalong Litter Trap™ (Bandalong). The Bandalong is a floating device that uses passive

Page 78: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

70

downstream currents to direct and trap floating trash items. The Bandalong can operate year-round

at a variety of different flow conditions without any mechanical assistance, but the trash will need

to be emptied at appropriate intervals. Bandalongs can capture tens of thousands of pounds of trash

each year, but the actual success will be highly dependent on where it is installed. An example of

a Bandalong device in the Anacostia River is featured in Figure 22.

Figure 22. Example of Bandalong Litter Trap™, installed on a tributary to the Anacostia River,

Washington, DC. Photo credit: United Nations Information Center, Washington DC.

The Lower Raritan Watershed Partnership and partners currently host more than 12 stream cleanup

events each year to remove trash and other floatables within the Raritan River tributaries and

floodplain. The installation of a trash reduction device would help to alleviate the manpower

associated with riverine cleanup, and would also engage the public as an education and outreach

tool. The Lower Raritan Watershed Partnership may engage a partial-volunteer trash removal

program that includes training on how to measure and remove trash from the trash traps, which

will help to further strengthen community ties and current environmental education outreach

efforts. Reduction of plastic debris would also benefit aquatic and semi-aquatic wildlife by

reducing microplastic ingestion and potential exposure to contaminants.

Page 79: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

71

In addition to the positive benefits to water quality and aquatic taxa, the implementation of a trash

trap would benefit the aesthetics of the area and enhance public perception and usability of

recreational areas along the lower Raritan River.

The installation of a trash trap device in the lower Raritan River watershed may be accomplished

by leveraging additional funds and technical assistance from other non-profit, private, state

and/or federal sources. Alternative 3.19 is a Tier II preferred alternative for this restoration plan

because it meets the Trustees’ identified restoration objectives and criteria to address the

recreational and ecological injuries caused by the release of hazardous substances, but project

access and permissions are uncertain at this time. Installing a trash trap at an appropriate location

in the lower Raritan watershed will help improve water quality, restore habitat, and serve as a

community demonstration and educational project for the local populace.

3.20 Preferred Tier II Alternative: Rutgers Ecological Preserve Accessible Trail

The Rutgers Ecological Preserve is located adjacent to the Rutgers University’s Livingston

Campus in New Brunswick, Middlesex County, New Jersey. The proposed recreational restoration

project would create a 0.4-mile ADA accessible trail through the Rutgers Ecological Preserve,

create a small pullout area for direct access to the Buell Brook, and install educational signage

(Figure 23). This Alternative meets the Trustees identified project categories of land trail

recreation, interpretive signage, and ADA accessibility.

Figure 23. Proposed location of Rutgers Ecological Preserve ADA Trail. Frame A shows general

location of trail within the Preserve, denoted by the red circle. Frame B shows a close-up of the

trail, denoted by dashed red lines.

Page 80: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

72

The 316-acre Rutgers Ecological Preserve was established in 1976 by the Rutgers Board of

Governors to preserve the natural ecological characteristics of the site and serve as an outdoor

teaching area. Today, the Ecological Preserve maintains this balance between preserving and

restoring the area’s ecological system and natural values while continuing to expand the its role as

an educational, recreational, and aesthetic resource for University students, faculty and staff, as

well as local citizens. The Ecological Preserve has approximately eight miles of multiuse trails for

hiking, running, and mountain biking, but no trails are ADA-accessible.

Figure 24. Existing trail along Buell Brook that will be modified for ADA compliance.

The proposed recreational restoration project includes: the construction of a 0.4-mile ADA-

accessible loop trail (approximately 3.5-feet-wide) at the Rutgers Ecological Preserve that runs

through mature forest and provides close-up views of Buell Brook; resurfacing the trail loop with

fine, compacted red shale; and the construction of a level pullout and bench near Buell Brook

(Figure 24) . The pullout would allow access to a shallow section of Buell Brook so visitors have

the opportunity to explore the stream in a safe manner. Rutgers University students will develop a

series of educational signage to install along the trail and highlight the area’s natural and cultural

Page 81: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

73

history. The trail would be open to Rutgers University’s students, faculty and staff, as well as the

broader community.

Final project designs will be produced and implemented as part of this project. The project designs

will ensure that the trail and pullout do not exacerbate runoff and contribute negatively to erosion

and sediment loads introduced to Buell Brook.

The construction of an ADA-accessible trail and pullout at the Rutgers Ecological Preserve may

be accomplished by leveraging additional funds and technical assistance from Rutgers University.

Alternative 3.20 is a Tier II preferred alternative for this restoration plan because it meets the

Trustees’ identified restoration objectives and criteria to address the recreational injuries caused

by the release of hazardous substances, but may not yield recreational benefits of the magnitude

of other Tier I preferred projects. Creation of the ADA trail and pullout area will enhance public

recreational and educational opportunities in the Raritan River watershed.

3.21 Preferred Tier II Alternative: Bridge over the Delaware and Raritan Canal

Spillway

The Delaware and Raritan Canal State Park (D&R Canal Park) is a 70-mile park and towpath that

follows the Delaware River from Frenchtown to Trenton, then follows the Delaware and Raritan

Canal from Trenton to New Brunswick. In New Brunswick, the D&R Canal Park terminates just

past where the towpath intersects with Landing Lane, northwest of Buccleuch Park. At this

location, the towpath is interrupted by an impassible 200-foot spillway where the D&R Canal

drains to the Raritan River. The proposed recreational restoration project involves constructing a

bridge over the 200-foot spillway to provide connectivity between the D&R Canal Park towpath

and a 2.2-mile section of riverside trail that runs from the spillway east towards Boyd Park in New

Brunswick (Figure 25).

The D&R Canal State Park is one of New Jersey's most significant historic and recreational

resources as it provides over 70 miles of hiking and biking trails as well as opportunities for canoe

and kayak access to the Raritan River. However, a 200-foot spillway separates residents of the

City of New Brunswick from direct access to the recreational offerings of this greenway. Likewise,

the spillway separates users of the D&R Canal towpath from easy access to the riverside Boyd

Park, historic D&R Canal locks, and New Brunswick Landing. The existing disconnected riverside

Page 82: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

74

trail on the eastern side of the spillway is approximately 2.2 miles long and runs from the spillway

to Boyd Park in New Brunswick. The first 1.3 miles of the disconnected trail are referred to locally

as “the trench”, since the trail runs along a narrow corridor flanked by the Raritan River to the

north, and New Jersey Route 18 to the south.

Figure 25. Map showing D&R Canal spillway and proposed location of bridge site.

The proposed action is a recreational project that would increase public access through

construction of a prefabricated steel bridge over the 200-foot spillway and water intake. The

spillway is owned and operated by the NJDEP. The proposed bridge would be at least 200-feet-

long and approximately10-feet-wide and would likely be installed by crane onto concrete pilings

and abutments. The pilings and abutments would be constructed so that flow of water across the

spillway is not impeded. The proposed action would ensure that the bridge installation would not

cause erosion along the riverbanks that flank the spillway.

The construction of a pedestrian and biking bridge would improve access to the Raritan River

waterfront in the most densely populated area of the Raritan River watershed. The bridge is an

important missing link to a regional network of trails, including the Rutgers University bicycle

Page 83: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

75

trail network and the East Coast Greenway. The bridge would extend access from the 70-mile-

long D&R Canal State Park into the City of New Brunswick, effectively restoring the historic

extent of the original towpath which was severed with the construction of the Route 18 highway

and other infrastructure improvements. The proposed project complements other Raritan River

initiatives being considered by other agencies and institutions in the area, including waterfront

access projects proposed in the Rutgers University 2030 Physical Master Plan (Rutgers 2015).

Improved access to the Raritan River waterfront afforded by this project will increase recreational,

educational, and research opportunities for the community. In addition, this project may provide

positive public health and recreation benefits to the predominantly low socioeconomic status

population of New Brunswick.

The construction of a bridge over the D&R Canal Park spillway may be accomplished by

leveraging additional funds and technical assistance from other state, federal, private, and non-

governmental sources. Alternative 3.21 is a Tier II preferred alternative for this restoration plan

because it meets the Trustees’ identified restoration objectives and criteria to address the

recreational injuries caused by the release of hazardous substances, but project access and

permissions are uncertain at this time. Construction of a bridge over the D&R Canal Park spillway

will improve connectivity between the D&R Canal Park and New Brunswick, and would increase

and enhance recreational opportunities for a heavily urbanized population.

3.22 Non-Preferred Tier III Alternative: Cherry Brook Preserve Constructed Wetland

The Cherry Brook Preserve is located in Montgomery Township, Somerset County, New Jersey.

The proposed restoration project is to convert an aging farm pond (i.e., Cherry Brook Pond) into a

constructed freshwater wetland. Project components may include: dredging approximately 780

cubic yards of accumulated sediment and silt; regrading of the dredged pond area to create a

constructed wetland with varying water depths; reconstruction and/or repair of portions of the

existing pond retaining wall; reconstruction of the pond’s outlet control structure; replacement of

the outlet pipe to a larger box culvert; reconstruction of the downstream outlet headwall; and

revegetation (Kleinfelder and Omni Environmental 2012). This Alternative meets the Trustees

identified project categories of wetland restoration and floodplain restoration.

Page 84: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

76

Cherry Brook Pond is located on the Cherry Brook Preserve, a Montgomery Township Open Space

property, and is situated adjacent to a preserved farmland parcel (Figure 26). The 0.75-acre Cherry

Brook Pond is created by the impoundment of a small unnamed tributary to Cherry Brook. The

pond is located approximately 0.6 mile upstream of the confluence with Cherry Brook, and the

unnamed tributary is likely intermittent along most or all of its length. The Cherry Brook Pond

watershed is approximately 150 acres, comprised of forest, active row crop agriculture, and

residential urban land cover. The pond is formed by a concrete and stone retaining wall that is in

poor condition; water exits the pond by flowing over an 18-inch-wide weir in the retaining wall

and through a 30-inch-diameter reinforced concrete pipe that discharges into to the unnamed

tributary to Cherry Brook.

Figure 26. Cherry Brook Pond, Montgomery Township, New Jersey. Photo Credit: Kleinfelder

and Omni Environmental 2012.

During summer months, pond depths are less than one foot, with patches of exposed sediment

throughout. The upstream and downstream reaches surrounding the pond are classified as

freshwater forested/shrub wetland. The pond is thought to be a source of phosphorus and sediment

to Cherry Brook, although no formal sampling has confirmed this hypothesis. Once the unnamed

Page 85: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

77

tributary meets Cherry Brook, Cherry Brook flows approximately 0.5 mile to the confluence with

Beden Brook. The most recent New Jersey Integrated Water Quality Assessment Report for EPA

303d requirements indicates that TMDL regulations are in place for total phosphorus and total

suspended solids in the portion of Beden Brook that receives flow from Cherry Brook (NJDEP

2019).

The proposed restoration project involves converting the Cherry Brook Pond into a constructed

wetland, wherein the accumulated sediment will be dredged and regraded to create three water

depth zones: deep pool, shallow, and mid-elevation in order to accommodate the different water

height requirements of emergent wetland plant species. A shallow “bench” would be located

around the periphery of the existing pond, with depths of less than 6 inches during normal

conditions. The mid elevation bench would be located further out from the shoreline, with depths

of 6 to 18 inches. The deep pool would be located in the center of the existing pond, with water

depths of approximately 4 feet. Appropriate native plant species would be planted at these depths

and at the upland edge of the constructed wetland.

Recent research on small headwater ponds indicates that in general, small ponds may be beneficial

in that they are collectively responsible for trapping a substantial amount of nutrients and

sediments that are exported annually from headwaters (Schmadel et al. 2019). The Cherry Brook

Pond may serve as a nutrient and sediment sink, rather than source; further investigation of water

quality conditions over a variety of annual flow conditions should be performed prior to pond

removal or modification. In addition, there may be technical uncertainties in the project’s ability

to provide hydrological conditions necessary to support freshwater wetlands and unknown water

quality issues from runoff from active row crop and residential urban land cover within the projects

drainage area.

Alternative 3.22 is a Tier III non-preferred restoration project. Technical uncertainties, in addition

to uncertainty regarding the project’s cost-benefit ratio indicate that this project, as proposed, does

not meet the Trustees’ identified restoration objectives and criteria to address injuries caused by

the release of hazardous substances.

Page 86: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

78

3.23 Non-Preferred Tier III Alternative: Raritan Bay Oyster Restoration

This restoration project involves the establishment of oyster reefs within the Raritan Bay. The

Raritan Bay is located between the southern portion of Staten Island and the northern edge of New

Jersey from Perth Amboy to Sandy Hook. This project would include performing environmental

condition indexing, site survival, and growth rate testing to determine appropriate restoration sites;

culturing seed oysters in an aquaculture facility; constructing appropriate structures (e.g., reefs,

Figure 27) to support oysters; and oyster monitoring. This Alternative meets the Trustees identified

project categories of oyster restoration.

Figure 27. Example of oyster castle reefs at Nantuxent Creek, New Jersey. Photo credit: Steve

Jacobus.

Human development during the past several centuries led to the extirpation of Raritan Bay oysters;

overharvest, habitat degradation by sedimentation, changes in salinity, and industrial pollution

precipitated their decline (MacKenzie 1984). However, with the passage of environmental laws,

water quality within the New York-New Jersey Harbor has greatly improved and it may be possible

to restore aquatic species that have suffered declines in the past to areas of historic presence (Ravit

Page 87: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

79

et al. 2012; Rutgers CUES 2013). Reintroduction of the Eastern Oyster (Crassostrea virginica),

could potentially support further improvements in water quality, contribute to the stabilization of

coastal shorelines, and accelerate ecosystem-level restoration processes. Oyster reef creation is a

technique to support continued water quality improvement and to reestablish habitat utilized by

other aquatic species, as well as serve as a natural method to reduce shoreline erosion.

There would be many ecological and human use benefits from restoring oysters within Raritan

Bay. Oyster beds are an important component of the ecosystem, as they provide structurally

complex habitat for aquatic organisms at many trophic levels. Oysters clean the surrounding waters

and can filter sediment and excess nutrients from up to 50 gallons of water per day, contributing

to both water column and benthic productivity. Reef restoration also directly benefits waterfront

communities by providing storm surge protection for waterfront structures and serves to protect

and fortify existing wetlands, which improves their function as protective barriers to storm surge

as well.

Alternative 3.23 is a Tier III non-preferred restoration project. The Trustees agree that oyster

restoration in the Raritan Bay will offer many ecological and human use benefits. However, this

Draft RP/EA presents numerous feasible projects that restore freshwater environments that contain

natural resources more similar to those injured by hazardous substances at the Cornell-Dubilier

Site than those proposed by this restoration alternative. Therefore, in comparison to other higher-

ranked feasible projects, this project does not meet the Trustees’ identified restoration goals and

objectives criteria to address injuries caused by the release of hazardous substances.

3.24 Non-Preferred Tier III Alternative: South River Tidal Marsh Restoration

The South River Tidal Marsh Restoration Project is a proposed marsh restoration project on the

lower South River, in South River and Sayreville, New Jersey. The proposed restoration project

includes: creation of improved tidal marsh habitat; expansion of high marsh habitat; reduction and

control of Phragmites australis; implementation of shoreline erosion control measures; creation

of living shoreline areas; protection of restored vegetation areas with a goose exclusion fence; and

if warranted, the excavation and relocation of contaminated soils and sediments and backfilling

with clean material. This Alternative meets the Trustees identified project categories of tidal

wetland restoration and floodplain restoration.

Page 88: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

80

The South River Tidal Marsh Restoration is a proposed marsh restoration of approximately 258

acres of existing marsh situated between the lower South River and the Washington Canal and

adjacent to the mainstem Raritan River (Figure 28). The site is part of a larger 650-acre tidal salt

marsh that spans between the lower South River and Washington Canal. The site is dominated by

Phragmites australis, and most of the wetlands within the project area have been altered by

anthropogenic activity including soil removal, dredge material deposition, brick/asphalt/concrete

waste fill, and ditching for mosquito control (USACE 2002). There are approximately 38,836 feet

of streams within the site footprint.

Past studies have shown that residential communities adjacent to the South River, located in flood-

prone areas, have a history of flooding following storms (USACE 2002). The projected impacts

of sea level rise will further exacerbate the impacts of future storms potentially resulting in

continued socioeconomic losses. The stated goal of the proposed project is to restore marsh habitat

to serve as flood protection for adjacent communities, and provide high quality, non-degraded

habitat for aquatic and terrestrial species.

The proposed restoration project includes restoration features roughly described in the U.S. Army

Corps of Engineers’ 2002 South River Hurricane and Storm Damage Reduction Feasibility Study

and Environmental Impact Statement (USACE 2002). This document evaluated a range of

structural and nonstructural measures that would increase hurricane and storm damage reduction

and determined that the preferred alternative for the South River is to construct a levee/floodwall

system with an upstream storm surge barrier. Although the proposed restoration project will not

involve the construction of a levee/floodwall system, it will include restoration actions that were

selected in the USACE 2002 as potential mitigation for levee/floodwall construction activities.

The proposed restoration project includes the following elements: creation of improved tidal marsh

habitat; expansion of high marsh habitat; reduction and control of Phragmites australis;

implementation of shoreline erosion control measures; creation of living shoreline areas; and

protection of restored vegetation areas with a goose exclusion fence. If contamination is identified

during feasibility or construction phases, then this project may involve the excavation, relocation,

and/or capping of contaminated soils or sediments and backfilling with clean material.

Page 89: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

81

Figure 28. Proposed location of South River Tidal Marsh Restoration project, denoted by hashed

orange lines.

The proposed project site is comprised of both public and privately owned parcels. Most of the

site is at least partially owned by the Borough of Sayreville. Complete tax parcel and ownership

information are not available for the proposed project site. Due to the industrialized nature of the

surrounding project area, it is likely that the proposed restoration parcels contain contaminants

consistent with those present throughout the lower Raritan River watershed.

Alternative 3.24 is a Tier III non-preferred restoration project. Technical uncertainties,

uncertainties regarding the amount and extent of potential onsite contamination, and uncertainty

regarding the project’s cost-benefit ratio, indicate that this project, as proposed, does not meet the

Trustees’ identified restoration objectives and criteria to address the injuries caused by the release

of hazardous substances.

Page 90: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

82

3.25 Non-Preferred Tier III Alternative: Edison Landfill Capping and Wetland

Restoration

The Edison Landfill Wetland Restoration project is a proposed landfill capping and restoration of

an adjacent wetland. The Edison Landfill is located along the mainstem Raritan River in Edison

Township, Middlesex County, New Jersey. The proposed wetland restoration project includes:

excavation and relocation of municipal waste, soils, and sediments of the lower Edison landfill;

backfilling with clean material and regrading; capping of relocated waste materials; and replanting

with native tidal salt marsh grasses and protection of those grasses with a goose exclusion fence.

This Alternative meets the Trustees identified project categories of tidal wetland restoration and

floodplain restoration.

The Edison Landfill spans for 4,839 feet along the mainstem Raritan River, and is located just

south of the Kin-Buc Landfill Superfund Site (Figure 29). The landfill consists of two main areas:

the main landfill mound located on the upper portion of the site, and the lower landfill area located

to the southwest and immediately adjacent to the Raritan River. The main landfill mound is unlined

and accepted waste between 1958 and 1990. Waste at the main landfill mound is approximately

80 to 100 feet thick and is covered with 1 to 4 feet of soil. The lower landfill is also unlined and

accepted waste during the 1950s and 1960s. The lower landfill is heavily vegetated with

Phragmites australis, and surficial waste is exposed along the edge of the Raritan River.

The Edison Landfill accepted municipal solid waste, construction debris, dry industrial waste,

animal processing waste, and vegetative and bulky waste. Previous groundwater monitoring results

show that some water quality parameters exceed Ground Water Quality Standards, although the

quantity of waste and extent of potential contamination is unknown. Edison Township has

submitted versions of landfill closure plans in 1992, 2004, 2010, and 2013, but the NJDEP has

found them deficient and therefore an official closure plan has never been approved.

The proposed action is to remove waste from the 26.9-acre lower landfill, relocate the waste to the

main landfill mound, and cap the main landfill mound. The lower landfill will be excavated and

regraded to improve tidal flushing and maintain elevations conducive to native saltwater wetland

marsh grasses. Some clean backfill material may be necessary to bring the lower landfill’s

Page 91: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

83

elevation to proper grade after removal of the waste materials. Replanting of native marsh plant

species would encourage native wetland plant species to flourish, especially Spartina species.

Figure 29. Proposed location of Edison Landfill Capping and Wetland Restoration project,

denoted by hashed orange lines.

The proposed project site is comprised primarily of land parcels owned by Edison Township.

Complete tax parcels and ownership information are not publicly available for the proposed project

site. Due to the industrialized nature of the surrounding project area, the fact that the site is a

historic landfill, and the fact that the site is adjacent to the Kin-Buc Landfill Superfund Site, it is

likely that the proposed restoration parcels contain contaminants of concern, consistent with those

present throughout the lower Raritan River watershed.

Alternative 3.25 is a Tier III non-preferred restoration project. Technical uncertainties, the lack of

an approved closure plan, uncertainties regarding the amount and extent of onsite contamination,

and uncertainty regarding the project’s cost-benefit ratio indicate that this project, as proposed,

does not meet the Trustees’ identified restoration objectives and criteria to address the injuries

caused by the release of hazardous substances.

Page 92: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

84

CHAPTER 4 NEPA AFFECTED ENVIRONMENT

This section describes the general environmental setting that may be affected by the restoration

alternatives proposed in this Draft RP/EA. This section includes information on the physical,

biological, and socioeconomic environments of the Raritan River Watershed, as well as specific

resources that may be affected by the preferred restoration alternatives described in Chapter 3.

4.1 Affected Environment

The Raritan River watershed is located entirely within the State of New Jersey and includes the

mainstem Raritan River, the North and South Branches of the Raritan River, and major tributaries

including the Manalapan Brook, South River, Lawrence Brook, Millstone River, Stony Brook,

Green/Bound Brook, Neshanic Creek, Lamington/Black River, and Rockaway Creek (Figure 30).

The affected environment includes portions of these waterways and adjacent lands that may be

affected by the preferred restoration alternatives presented in Chapter 3.

Figure 30. The major rivers and tributaries of the Raritan River Watershed, NJDEP 1972.

Page 93: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

85

4.2 Physical Environment

4.2.1 Surface Water

The Raritan River watershed spans 1,105 square miles and encompasses 98 municipalities.

Approximately 1.3 million people live in the watershed and more than 793,000 work in the

watershed (NJDOL 2020). The watershed includes portions of Morris, Hunterdon, Union,

Somerset, Middlesex, Mercer, and Monmouth counties. The Raritan River basin is the largest

watershed located entirely within New Jersey. The watershed contains three primary

subwatersheds: the Upper Raritan, the Lower Raritan, and the Millstone (Figure 31). The Upper

Raritan includes the North and South Branch Raritan Rivers and spans approximately 468 square

miles. Major tributaries to the North Branch Raritan include the Lamington/Black River and

Rockaway Creek. Major tributaries to the South Branch River include Neshanic Creek. The North

and South Branch Raritan Rivers meet to form the mainstem Raritan River, which demarks the

upstream boundary of the Lower Raritan watershed. The Lower Raritan watershed is 352 square

miles and includes the Green/Bound Brook, Lawrence Brook, the Manalapan Brook, and the South

River. The Lower Raritan drains to the Raritan Bay. The Millstone watershed meets the Lower

Raritan watershed near Manville, New Jersey. The Millstone watershed covers 285 square miles

and includes the Stony Brook and Millstone River as well as a significant section of the Delaware

and Raritan Canal.

The top ten causes of water quality impairment in the Raritan River watershed include: Escherichia

coli (impairs recreation); arsenic (impairs water supply); total phosphorus, pH, temperature,

dissolved oxygen, and biological cause unknown (impairs aquatic life); and mercury, PCB, and

dioxin in fish tissue (impairs fish consumption; NJDEP 2019). Many of these water quality

impairments are covered under an approved TMDL.

Impervious surface land cover is the best and most reliable predictor of water quality (as indicated

by biological integrity) in the Raritan River watershed (NJDEP 2019). When watershed

impervious land cover exceeds ten percent, biological integrity declines. Maintenance of

appropriately sized riparian buffer zones that include wetlands are particularly important to water

quality and watershed health. New Jersey has Surface Water Quality (SWQ) antidegradation

policies that provide special protection to Category One (C1) waters; a designation based on

Page 94: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

86

ecological significance, exceptional water supply, recreation and fisheries. The State SWQ

guidelines for C1 streams dictate a 300-foot riparian buffer to protect the water quality, aesthetic

value, and ecological integrity of these high-value streams. The State also dictates that 150-foot

riparian buffers be maintained along trout production waters and all upstream tributaries; 150-foot

riparian buffers be maintained along trout maintenance waters and within 1-mile upstream; and

requires a 50-foot buffer along all other waters.

Figure 31. Raritan River sub-watersheds. Source: SRRI 2016.

Although the biota in the Raritan River watershed reflect extensive water quality impairment, there

are large areas where water quality is good and biological communities are healthy, particularly in

the Upper Raritan watershed, the Stony Brook, and Manalapan Brook watersheds (NJDEP 2019).

The NJDEP routinely monitors fish and macroinvertebrate taxa as indicators of water quality in

this region.

Page 95: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

87

4.2.2 Regional Geology and Soils

The Raritan River watershed spans across three EPA level III ecoregions, including the

northeastern highlands, the northern piedmont, and the Atlantic coastal pine barrens (EPA 2013).

The northeastern highlands are characterized by high-gradient rugged ridge topography separated

by narrow valleys; this area is comprised mostly of igneous and sedimentary rock. The northern

piedmont is comprised of rolling plains separated by higher ridges, and is comprised mostly of

sedimentary and igneous rock. The Atlantic coastal pine barrens are characterized by low gradient

topography and sandy and acidic soils.

Figure 32. Land cover in the Raritan River watershed. Source: SRRI 2016.

4.2.3 Land Cover

Land cover in the region has changed drastically over the last 50 years and the most current land

use analysis (2012) revealed that the Raritan River watershed as a whole is 44% urbanized, 16%

in agricultural use, 25% forested, and 14% wetlands and waterbodies (SRRI 2016; Figure 32).

Page 96: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

88

Urban land is the dominant land cover in the Lower Raritan (60%) and Millstone (41%)

subwatersheds, while forest is the dominant land cover in the Upper Raritan (35%). The rate of

urban development in the watershed has slowed in recent years, however the increase in urban

cover was gained at the expense of a net loss in agricultural lands, wetlands, and forest cover.

These types of land cover conversions tend to have a negative impact on water quality and aquatic

health.

4.2.4 Air

The Raritan River watershed generally supports good air quality. Sources of air pollutants

include, but are not limited to, fuel combustion (stationary and mobile), industrial processes,

solvent uses, agriculture, dust, and fires. The Clean Air Act (CAA; 42 U.S.C. §§ 7401-7626)

regulates air emissions from stationary and mobile sources to protect human health and the

environment. Under the CAA, the EPA defines National Ambient Air Quality Standards

(NAAQS) for pollutants that are harmful to public health and the environment (EPA 2018). The

EPA is responsible for establishing primary and secondary NAAQS for six criteria pollutants:

carbon monoxide, lead, nitrogen dioxide, ozone, particulate matter, and sulfur dioxide. All seven

counties in the Raritan River watershed are currently in attainment of EPA’s NAAQS for all

criteria pollutants except ozone (8-hour ozone; EPA 2020b).

4.2.5 Climate

The Raritan River watershed has a relatively moderate climate characterized by cold winters and

warm, humid summers. Average annual precipitation is approximately 51 inches (ONJSC 2020).

Fall months are typically the driest, while other seasons average between 9 and 12 days per month

with measurable precipitation. Snow may fall from November to April. Climate change is affecting

New Jersey faster than much of the rest of the United States. As of 2019, New Jersey was one of

the fastest-warming states in the nation with an approximate two degree Celsius increase in

average temperatures since 1895 (Mufson et al. 2019).

Page 97: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

89

4.3 Biological Environment2

4.3.1 Terrestrial and Aquatic Habitat

The affected environment includes a variety of habitats that support fish, birds, and other wildlife.

The Raritan River watershed is heavily developed and has experienced an extensive loss and

fragmentation of grassland, wetland, and forest habitats over time (NJDEP 2008). Despite these

losses, the region maintains smaller habitat patches of grassland and agricultural areas, mixed-

deciduous forests, hardwood swamps, tidal freshwater and brackish marshes, and relatively

extensive riparian areas throughout the landscape. Streams and rivers range from low-gradient,

low-flow brackish and freshwater stream and swamp habitats to high-gradient, high-flow

freshwater habitats. Most aquatic environments show signs of historic stressors and degradation

over time.

4.3.2 Fish and Wildlife

A variety of endemic game and nongame mammals, birds, reptiles, amphibians, invertebrates, and

freshwater fish occur in the Raritan River watershed. New Jersey hosts approximately 90 mammal

species, over 400 bird species, 74 reptiles and amphibian species, 91 species of freshwater fish,

and numerous marine fish species. Because the Raritan River watershed ranges from coastal to

highland ecoregions, many of these species are found in the watershed.

Common mammals include: white-tailed deer (Odocoileus virginianus), eastern cottontail

(Sylvilagus floridanus), eastern gray squirrel (Sciurus carolinensis), eastern chipmunk (Tamias

striatus), groundhog (Marmota monax), red fox (Vulpes vulpes), coyote (Canis latrans), black bear

(Ursus americanus), raccoon (Procyon lotor), North American beaver (Castor canadensis),

striped skunk (Mephitis mephitis), Virginia opossum (Didelphis virginiana), northern short-tail

shrew (Blarina brevicauda), eastern mole (Scalopus aquaticus), American mink (Neovision

vison), and North American river otter (Lontra canadensis).

The Raritan River watershed is located within the Atlantic flyway and provides habitat for both

migrating and resident birds. Bird species that frequent the region include: American robin (Turdus

2 Biological resources described in Sections 4.3.1 and 4.3.2 are analogous to “living coastal and marine resources”

cited in Section 5.3, below.

Page 98: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

90

migratorius), Canada goose (Branta canadensis), red-winged blackbird (Agelaius phoeniceus),

common grackle (Quiscalus quiscula), gray catbird (Dumetella carolinensis), blue jay (Cyanocitta

cristata), northern cardinal (Cardinalis cardinalis), European starling (Sturnus vulgaris),

American crow (Corvus brachrhynchos), tufted titmouse (Baeolophus bicolor), herring gull

(Larus smithsonianus), mourning dove (Zenaida macroura), red-bellied woodpecker (Melanerpes

carolinus), wood thrush (Hylocichla mustelina), common yellowthroat (Geothlypis trichas), and

song sparrow (Melospiza melodia; Tsipoura et al. 2012).

Common reptiles and amphibians in the Raritan River watershed include: northern watersnake

(Nerodia sipedon), eastern ratsnake (Pantherophis alleghaniensis), common snapping turtle

(Chelydra serpentina), eastern painted turtle (Chrysemys picta picta), spotted turtle (Clemmys

guttata), eastern mud turtle (Kinosternon subrubrum subrubrum), eastern musk turtle

(Sternotherus odoratus), American bullfrog (Lithobates catesbeianus), northern green frog

(Lithobates clamitans), pickerel frog (Lithobates palustris), southern leopard frog (Lithobates

sphenocephalus), spring peeper (Pseudacris crucifer), marbled salamander (Ambystoma opacum),

northern dusky salamander (Desmognathus fuscus fuscus), northern two-lined salamander

(Eurycea bislineata), and slimy salamander (Plethodon glutinosus).

Common freshwater fish species include: American eel (Anguilla rostrata), rainbow trout

(Oncorhynchus mykiss), brown trout (Salmo trutta), brook trout (Salvelinus fontinalis), spottail

shiner (Notropis hudsonius), blacknose dace (Rhinichthys atratulus), creek chub (Semotilus

atromaculatus), channel catfish (Ictalurus punctatus), margined madtom (Noturus insignis), rock

bass (Ambloplites rupestris), bluegill (Lepomis macrochirus), redbreast sunfish (Lepomis auritus),

smallmouth bass (Micropterus dolomieu), largemouth bass (Micropterus salmoides), and

tessellated darter (Etheostoma olmstedi).

Common diadromous fish species include: American eel (Anguilla rostrata), American shad

(Alosa sapidissima), alewife (Alosa pseudoharengus), blueback herring (Alosa aestivalis), hickory

shad (Alosa mediocris), gizzard shad (Dorosoma cepedianum), sea lamprey (Petromyzon

marinus), and striped bass (Morone saxatillis).

Page 99: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

91

4.3.3 Threatened and Endangered Species

The Raritan River watershed provides habitat for several federally listed mammals, reptiles, and

plants. Federally listed species include the Indiana bat (Myotis sodalis), northern long-eared bat

(Myotis septentrionalis), bog turtle (Clemmys muhlenbergii), Knieskern’s beaked-rush

(Rynchospora knieskernii), small whorled pogonia (Isotria medeoloides), and swamp pink

(Helonias bullata; USFWS 2020). Approximately 65 U.S. Fish and Wildlife Service Birds of

Conservation Concern (BCC) are found in the vicinity of the Raritan River watershed, and are

protected under the Migratory Bird Treaty Act of 1918 (16 U.S.C. §§ 703-712), and the Bald and

Golden Eagle Protection Act (16 U.S.C. § 668). Several prominent BCC birds include: the bald

eagle (Haliaeetus leucocephalus), black-capped chickadee (Poecile atricapillus practicus), blue-

winged warbler (Vermivora cyanoptera), prarie warbler (Setophaga discolor), red-headed

woodpecker (Melanerpes erythrocephalus), and wood thrush (Hylocichla mustelina).

Numerous state listed threatened and endangered species are also found the Raritan River

watershed, including, but not limited to: bobcat (Lynx rufus), northern harrier hawk (Circus

hudsonius cyaneus), bobolink (Dolichonyx oryzivorus), upland sandpiper (Bartramia longicauda),

night-heron (Nycticorax nycticorax), upland sandpiper (Bartramia longicauda), peregrine falcon

(Falco peregrinus), wood turtle (Glyptemys insculpta), eastern box turtle (Terrapene carolina

carolina), longtail salamander (Eurycea longicauda), brook floater (Alasmidonta varicosa), green

floater (Lasmigona subviridis), triangle floater (Alasmidonta undulata), eastern lampmussel

(Lampsillis radiata), and eastern pondmussel (Ligumia nasuta).

4.4 Socioeconomic Resources

As of the 2010 U.S. Census, the Raritan River watershed had a population of 1,307,003 (SRRI

2016). The Lower Raritan had the highest population, with 819,136 individuals, and the Upper

Raritan and Millstone had similar population sizes, at 223,002 and 264,864 individuals,

respectively. The Raritan River watershed is located in the middle of one of the most densely

populated states in the nation. The population density of the Lower Raritan is approximately 2,327

persons per square mile, and the population densities of the Upper Raritan and Millstone is

approximately 476 and 929 persons per square mile, respectively. The New Jersey Department of

Page 100: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

92

Labor estimates that populations will continue to grow across the region in coming decades

(NJDOL 2020).

Median household income in the counties that make up the Raritan River watershed are higher

than the national median (national median = $63,937 in 2018 dollars), however the average cost

of living in New Jersey is also higher than the national average (Guzman 2019). Somerset and

Middlesex Counties are located almost entirely within the Raritan River watershed. The median

household income of Somerset County is $111,772 in 2018 dollars, and the median household

income of Middlesex County is $85,954 in 2018 dollars (U.S. Census Bureau 2018). A moderate

proportion of Morris and Hunterdon Counties are located within the Raritan River watershed. The

median household income of Morris County is $111,316 in 2018 dollars, and the median

household income of Hunterdon County is $112,535 in 2018 dollars. A small proportion of Mercer

and Monmouth Counties are located within the Raritan River watershed. The median household

income of Mercer County is $79,990 in 2018 dollars, and the median household income of

Monmouth County is $95,699 in 2018 dollars. A very small portion of Union County is located

within the Raritan River watershed. The median household income of Union County is $77,095 in

2018 dollars.

4.4.1 Environmental Justice

Executive Order 12898, titled “Federal Actions to Address Environmental Justice in Minority

Populations and Low-Income Populations,” guides federal agencies to “make environmental

justice part of its mission by identifying and addressing, as appropriate, disproportionally high and

adverse human health or environmental effects of its programs, policies, and activities on minority

populations and low-income populations.” The EPA Environmental Justice (EJ) Mapper indicated

that there may be sensitive EJ communities within the Raritan River watershed, based on

environmental and demographic indicators (EPA 2020). In general, the Lower Raritan

subwatershed has higher indicators of potential EJ communities than either the Upper Raritan or

the Millstone. On a county-basis, Mercer County has a 10.9% population poverty rate; Middlesex

has 8.2%; Monmouth has 6.7%; Somerset has 4.9%; Morris has 4.7%; Hunterdon has 4.4%, and

Union has 7.8% (U.S. Census Bureau 2018).

Page 101: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

93

4.5 Cultural and Historic Resources

The Raritan River watershed has played a central role in New Jersey’s history, beginning with the

Lenape Indians who inhabited the area prior to European settlement (Schneider 2019). The Dutch

and English arrived in 1683 and spread their farms and settlements throughout the watershed.

Coastal shipping and commerce became prevalent in the lower Raritan River throughout the 1700s,

and the river became a focal area for several Revolutionary War battles in 1777. By the early

1800s, the American industrial revolution was underway, and the Raritan River and its tributaries

became home to numerous mills and factories; most of the region’s dams were built in this period.

The Delaware and Raritan Canal was built in 1834 to move goods throughout the area and between

the Delaware and Raritan Rivers. However, railroads would soon make the canal obsolete. By

1888, the Raritan River Railroad was built, connecting the burgeoning industries throughout the

region to the shipping port at Raritan Bay. New Jersey’s population doubled between 1900 and

1930, and manufacturing became a four-billion dollar industry. During this time, the public

became increasingly aware of pollution due to local industry; the mainstem Raritan River was

closed to swimming in the 1920s after numerous reports that the river tasted and smelled bad.

Nonetheless, industry only expanded throughout the watershed during World War II, as

corporations established large-scale electronics and chemical industrial operations such as CDE.

Historic federal environmental protections of the early 1970s, including the Clean Water Act,

changed the Raritan River’s relationship with industry forever. As a navigable water of the United

States, the Raritan River gained legal protections against point-source pollution, marking the

beginning of a new era of environmental cleanup actions in the region. CERCLA (i.e., Superfund

Law) was enacted in 1980, and numerous contaminated sites located in the Raritan River

watershed were listed on the NPL shortly thereafter. Today the Raritan River watershed is home

to 20 NPL sites and 1,703 other State-listed known contaminated sites (SRRI 2019). Of these, 8

NPL sites and 469 other known contaminated sites have been fully closed with institutional

controls in place.

Many of the proposed projects in this Draft RP/EA involve dam removal and fish passage

enhancement. Dam construction in the Raritan River watershed dates to the 1600s to supply water

for private and municipal use, but early industry’s reliance on dams to supply hydropower to small

mills in the early 1800s marked the golden age of dam building in the Raritan River watershed.

Page 102: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

94

While some dams continue to serve specific purposes including water supply or flood control,

many dams are obsolete, in disrepair, and degrade local water quality and aquatic habitats. Today

it is estimated that there are 149 dams that are greater than 5 feet tall in the Raritan River watershed

(SRRI 2019). Sixty-six dams are located in the Upper Raritan, 38 dams are located in the Lower

Raritan, and 45 dams are located in the Millstone.

Page 103: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

95

CHAPTER 5 NEPA ENVIRONMENTAL CONSEQUENCES

5.1 NEPA Environmental Consequences

As noted in Section 1.3.2, this document constitutes the EA for the proposed restoration of natural

resources, to address the potential impact of proposed restoration actions on the quality of the

physical, biological, and cultural environment. The Trustees integrated the CERCLA and NEPA

processes in this Draft RP/EA, as recommended under 40 C.F.R. § 1500.2(c).

5.2 Scope of NEPA Analysis and Trustee Approach

Restoration actions taken by the Trustees under CERCLA and other federal laws are subject to

NEPA, 42 U.S.C. § 4321 et seq., and the NEPA regulations at 40 C.F.R. §§ 1500-1508. In general,

agencies contemplating implementation of a major federal action must produce an EIS if the action

is expected to have significant impacts on the quality of the human environment. When it is

uncertain whether the proposed action is likely to have significant impacts, agencies prepare an

EA to evaluate the need for an EIS. If the EA demonstrates that the proposed action will not

significantly impact the quality of the human environment, the agencies issue a Finding of No

Significant Impact (FONSI), which satisfies the requirements of NEPA, and no EIS is required.

This Draft RP/EA complies with NEPA by: (1) describing the purpose and need for restoration

(Section 1.2); (2) addressing public participation for this process (Section 1.8); (3) identifying and

describing restoration alternative actions (Chapter 3); (4) summarizing the affected environment

(Chapter 4); and (5) analyzing environmental consequences (Chapter 5).

In 2015, the NOAA Restoration Center developed a “Programmatic Environmental Impact

Statement for Habitat Restoration Activities Implemented throughout the Coastal United States”

(PEIS; NOAA 2015). NOAA developed the PEIS to evaluate coastal habitat restoration activities

funded or implemented through its existing programs. The Service documented their adoption of

the PEIS with a Record of Decision, dated August 20, 2019 (84 Federal Register 45515). The PEIS

is available at: https://www.fisheries.noaa.gov/resource/document/restoration-center-

programmatic-environmental-impact-statement. The PEIS includes an evaluation of typical

impacts for a suite of restoration activities that are inclusive of the preferred alternatives identified

in this Draft RP/EA, including:

Page 104: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

96

Planning, Feasibility Studies, Design Engineering, and Permitting

Implementation and Effectiveness Monitoring

Fish and Wildlife Monitoring

Environmental Education Classes, Programs, Centers, Partnerships, and Materials

Riverine and Coastal Habitat Restoration: Debris Removal

Fish Passage: Dam and Culvert Removal, Modification or Replacement

Fish Passage: Technical and Nature-Like Fishways

Fish, Wildlife, Vegetation Management: Invasive Species Control

Freshwater Stream Restoration: Channel Restoration

Freshwater Stream Restoration: Bank Restoration and Erosion Reduction

Shellfish Reef Restoration

Road Upgrading and Decommissioning: Trail Restoration

Road Upgrading and Decommissioning: Signage and Access Management

Wetland Restoration: Levee and Culvert Removal, Modification, and Set-Back

Wetland Restoration: Restoration and Shoreline Stabilization Techniques

Wetland Restoration: Wetland Planting

To avoid duplication of effort and streamline the NEPA analysis in this Draft RP/EA, the Trustees

are using the PEIS for NEPA compliance. Impacts are summarized briefly below in Section 5.3.

However, the full analysis covered by the PEIS is incorporated by reference (40 C.F.R. § 1502.21).

5.3 Impacts of Proposed Alternatives

5.3.1 No Action

Under the No Action alternative, there would be no direct impacts to the ecological and

socioeconomic environment since no actions would be taken to restore, rehabilitate, replace, and/or

acquire the equivalent of injured natural resources or the supporting habitats and services they

provide. Project area water, geological/soil, land cover, and climate conditions would not be

affected since no restoration would occur. Terrestrial and aquatic habitats would not be affected,

and the trajectory of any ecologically degraded areas would remain unchanged. Project area fish,

wildlife, and threatened and endangered species would not be affected. Project area fish, wildlife,

vegetation, and habitats would not be affected. Project area socioeconomic variables would not be

Page 105: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

97

affected, and potential economic and ecological benefits to EJ communities would not be realized.

There would be no effect on cultural and historic resources.

5.3.2 Planning, Feasibility Studies, Design Engineering, and Permitting

The PEIS Section 4.5.1.1 states the following regarding the potential impacts of Planning,

Feasibility Studies, Design Engineering, and Permitting.

“The completion of project planning, feasibility studies, design engineering studies, and permitting

activities would cause indirect, long-term, beneficial impacts to the affected environment. These

activities would support the continued implementation of the most successful projects and

therefore result in effective and efficient habitat restoration. Some feasibility studies would cause

direct, short-term, minor impacts through associated fieldwork, including drilling into soil or

sediment with an augur, drill rig, or other tools to remove surface, subsurface, or core samples.

These impacts would be very minor and localized to the project site given how small such areas

are in relation to an overall project area. Similar short-term impacts to living coastal

resources…essential fish habitat…and threatened and endangered species may include effects

from handling, noise, and displacement (see PEIS Section 4.7).”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. All restoration alternatives will involve planning and/or feasibility studies and/or design

engineering and/or permitting.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.3 Implementation and Effectiveness Monitoring

The PEIS Section 4.5.1.2 states the following regarding the potential impacts of Implementation

and Effectiveness Monitoring.

“The environmental consequences of the initial implementation of restoration monitoring could

cause direct and indirect, short-term, minor, localized, adverse impacts. Impacts to threatened

Page 106: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

98

and endangered species may include effects from handling, noise, turbidity, displacement, and

mortality (see PEIS Section 4.7). These impacts would result from activities associated with in-

water or on-site observation or experimentation, such as the use of equipment for sampling or

monitoring of organisms. Although these adverse impacts may occur, the monitoring products

would result in indirect, long-tem, minor to major beneficial impacts that extend beyond the

project site. The benefits would allow future restoration proposals to be planned with better

information and implemented more effectively by using the most successful methods, materials, or

equipment for achieving the goal of restoration.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. All restoration alternatives will involve implementation and effectiveness monitoring.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.4 Fish and Wildlife Monitoring

The PEIS Section 4.5.1.3 states the following regarding the potential impacts of Fish and Wildlife

Monitoring.

“Fish and wildlife monitoring activities are related to monitoring the performance and progress

of restoration projects relative to their established project goals. Because monitoring can allow

for smarter decision-making, projects using this technique could cause indirect, long-term, minor

to major beneficial impacts to geology and soils, water resources, living coastal and marine

resources, and threatened and endangered species that may be localized or extend beyond the

project site. The data gathered by trained individuals would be used to establish baseline

information on species abundance and diversity and then to evaluate changes in these metrics

through time. These data would be used as a basis for future aquatic habitat management decisions

to benefit various programs. The observational data gathered by trained individuals would be used

to develop baseline and ongoing measurements on species composition, diversity, and richness of

Page 107: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

99

habitat. These data would then be used as a basis for future habitat management decisions and

restoration actions to substantially benefit various wildlife species.”

“In addition, indirect and direct, short-term, localized, minor to moderate adverse impacts to

living coastal resources and essential fish habitat, and threatened and endangered species may

include effects from handling, noise, turbidity, displacement, and mortality (see PEIS Section 4.7).

Cultural and historic resources may be impacted if disturbed during monitoring activities. Projects

with successful monitoring programs would likely be more successful that those without such

programs because monitoring would allow problems and flaws to be identified quickly, contained,

and eradicated before they become widely established. Monitoring programs would have direct

and indirect, long-term, minor beneficial impacts on land use and socioeconomics that extend

beyond any project site, because the information gathered and any involvement of local citizens in

environmental projects would promote environmental stewardship, and understanding of

environmental issues, and a sense of community pride.”

“Despite the beneficial impacts expected from this activity, monitoring could cause adverse

impacts. Direct, short-term, localized, minor adverse impacts are expected to geology and soils

from human presence and movement around the project site (i.e., from soil compaction). Direct,

short-term, localized, minor adverse impacts are also expected to air quality and noise at the

project site due to the presence of crew members (and in the case of electrofishing, the operation

of gas- or battery-powered electrofishing equipment). Direct, short-term, localized, minor adverse

impacts may occur to water quality because, depending on the water body’s substrate, turbidity

may increase from the movement of crewmembers throughout the project site. Potential impacts

to air quality could include direct, short-term, minor adverse impacts to air quality during

construction or other on-the-ground activities. These impacts include exhaust emissions from off-

road construction equipment, boats, and employee commuting vehicles. These impacts may extend

beyond the project site. Direct, short-term, localized, minor, adverse impacts would occur to land

use and recreation because anglers or other individuals recreating the project site may need to

vacate or avoid the site in order to avoid interacting with monitoring activities.”

“Adverse population level effects are not expected from monitoring activities (e.g., electrofishing)

because the activity typically takes place over a relatively small area compared with the overall

distribution of the population being monitored. Regardless of the level of mortality observed from

Page 108: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

100

a monitoring event, it is reasonable to expect that areas that may observe mortality would be

rapidly recolonized by individuals from surrounding, connected waters (e.g., Berra and Gunning

1970; Smock 2006).”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. Island Farm Weir Fish Passage: pre- and- post-project monitoring.

ii. Headgates Dam Removal: pre- and- post-project monitoring.

iii. Califon Dam Removal: pre- and- post-project monitoring.

iv. Blackwells Mills Dam Removal: pre- and- post-project monitoring.

v. Nunn’s Mill Dam Removal: pre- and- post-project monitoring.

vi. North Branch Raritan River Corridor Riparian Buffer Restoration: pre- and post- project

monitoring.

vii. East Brunswick Swamp Pink Restoration: pre- and post-project monitoring.

viii. Rockafellows Mills Dam Removal: pre- and- post-project monitoring.

ix. Klines Mill Dam Fish Passage: pre- and- post-project monitoring.

x. Beisler Lake Dam Removal: pre- and post-dam removal monitoring.

xi. Mill Street Dam Removal: pre- and post-dam removal monitoring.

xii. North Branch Raritan River, Lamington River, and Stony Brook Mussel Restoration:

mussel and habitat surveys, genetic and genomic studies.

xiii. Raritan Bay Oyster Restoration: oyster monitoring.

xiv. South River Tidal Marsh Restoration: pre- and post-project monitoring.

xv. Edison Landfill Capping and Wetland Restoration: pre- and post-project monitoring.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.5 Environmental Education Classes, Programs, Centers, Partnerships, and Materials

The PEIS Section 4.5.1.4 states the following regarding the potential impacts of Environmental

Education Classes, Programs, Centers, Partnerships, and Materials.

Page 109: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

101

“Projects that provide environmental educational classes, programs, and centers; encourage and

maintain partnerships with local school systems; and fund the development of education materials

would have direct and indirect, long-term, minor beneficial impacts on geology and soils, water

resources, living coastal resources and essential fish habitat, threatened and endangered species,

land use, and socioeconomics. The beneficial impacts would result because education of local

citizens and youth about environmental issues in the community and beyond, habitat restoration,

and conservation would promote environmental stewardship, an understanding of living coastal

resources and environmental issues, and a sense of community pride. Educational materials

developed would encourage conservation and environmental stewardship, and educate the public

on the benefits of habitat restoration projects.”

“Projects that train volunteers to participate in restoration projects and provide outreach and

education to the community would have indirect, long-term, minor beneficial impacts on all

resources because training and involvement of local citizens in environmental projects would

promote environmental stewardship, an understanding of living coastal resources and

environmental issues, and a sense of community pride. Projects are not likely to adversely impact

threatened and endangered species.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. Lost Valley Nature Park: installation of educational and informational signage.

ii. North Branch Raritan River Corridor Riparian Buffer Restoration: volunteer and

education/outreach activities.

iii. Stony Brook Green Infrastructure Demonstration Project: education/outreach activities.

iv. Lake Manalapan Riparian Restoration: volunteer and education/outreach activities.

v. Trash Trap Installation in the Lower Raritan River Watershed: volunteer and

education/outreach activities.

vi. Rutgers Ecological Preserve Accessible Trail: volunteer and education/outreach activities.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

Page 110: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

102

5.3.6 Riverine and Coastal Habitat Restoration: Debris Removal

The PEIS Section 4.5.2.2 states the following regarding the potential impacts of Debris Removal.

“Most debris removal activities would have both adverse and beneficial impacts on the affected

environment in the project area, but would ultimately restore habitat for marine species and

reduce the hazards of debris to trust resources. Generally, debris removal projects would cause

direct, short- and long-term, localized, minor to moderate beneficial impacts. By identifying,

locating, and removing unwanted debris from the affected environments, beneficial impacts to

geology, soils, and land use and recreation would occur simply because areas are cleaner. In some

cases (e.g., general solid waste and unwanted natural debris), debris would re-accumulate in the

project area and benefits would be short-lived. In other cases (e.g., derelict fishing gear,

abandoned vessels, and pilings), pollution would no longer occur and benefits would be local and

long-term or even permanent in some cases. Whether short- or long-term, there would be direct,

moderate beneficial impacts to water quality when debris is removed and the debris or associated

leachate is no longer present in the coastal environment. Implementation of debris removal

projects would also result in indirect, long-term, moderate beneficial impacts on living coastal

resources and essential fish habitat, and on the threatened and endangered species because

habitats would be cleared of potentially injurious debris – these impacts would likely extend

beyond the project site.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. Trash Trap Installation in the Lower Raritan River Watershed: installation of trash

trap technology to remove unwanted debris from riverine environment.

ii. South River Tidal Marsh Restoration: identification, assessment, and the use of

machinery to remove unwanted debris.

iii. Edison Landfill Capping and Wetland Restoration: identification, assessment, and the

use of machinery to remove unwanted debris.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

Page 111: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

103

5.3.7 Fish Passage: Dam and Culvert Removal, Modification or Replacement

The PEIS Section 4.5.2.3.1 states the following regarding the potential impacts of Dam and Culvert

Removal, Modification, or Replacement.

“In general, dam and culvert removal, modification, or replacement projects… produce short-term

ecological impacts and considerations, but the long-term ecological benefits – improved water

quality, sediment transport, and native resident and migratory species recovery – demonstrate that

removal of these barriers could be an effective long-term and beneficial river restoration tool

(Bednarek 2001).”

“Barrier removals may include indirect and direct, short-term, minor, moderate, or major adverse

impacts on geology and soils, water resources, air quality, and living resources and essential fish

habitat, both localized to the project site and beyond the project site. They may also have direct,

long-term impacts to land use and recreation. Indirect and direct, short-term, minor, and moderate

adverse impacts to threatened and endangered species may include effects from handling, noise,

turbidity, contaminants, changes to hydraulics and local hydrology, additional habitat

quality/quantity, and displacement (see PEIS Section 4.7). However, indirect and direct, long-

term, moderate, and major benefits to threatened and endangered species, as well as other

resources may result as well.”

“Adverse impacts to geology and soils during project construction are direct and indirect, short-

term, and of minor to moderate effect, and may be localized to the project site or realized beyond

the project site. These impacts stem from the use of heavy machinery and construction equipment

and include soil compaction, temporary grading, minor bedrock removal, short-term downstream

sediment deposition, and increased soil erosion and runoff in the immediate area of construction

operations. The scales and duration of impacts may depend on the size of the dam or culvert to be

removed, but more often will depend on the magnitude of the overall project footprint and include

many factors such as the construction of haul roads, stockpile areas, cofferdams, or the size of

area to be cleared for equipment storage. Post-construction scouring of the channel bed caused

by a release of water and sediments that accumulated in the impounded area may occur, depending

on the size and spatial configuration of the quantity of impounded sediment, the grain size of

impounded sediments, flow competence, and other factors (Collins et al. 2007). Downstream

Page 112: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

104

migration of impounded sediments can increase downstream flood elevations. Changes to any

flood elevations would only occur after appropriate regulatory consultations.”

“Long-term, post-construction impacts from the removal of dams and culverts result in direct and

indirect, long-term, moderate, and major impacts to water resources. Such removals may

reintroduce nutrients downstream through sediment transport. The magnitude of changes is often,

but not always, based on the size of the dam and impoundment. The removal of small run-of-river

dams have shown in some cases to improve water quality to such a point that the river reach was

removed from state impaired water lists. Within the former impoundment area, the stream channel

may have higher dissolved oxygen levels than existed prior to removal.”

“Potential impacts to air quality could include direct, short-term, minor adverse impacts to air

quality during construction or other on-the-ground activities.”

“Adverse impacts to living coastal resources such as vegetation and wildlife are direct and

indirect, short-term, and of minor to moderate effect. Wildlife species near the project site,

including endangered or threatened species, may be temporarily displaced or harassed during

construction activities due to reverberations, noise, air quality impacts, and artificial lighting.

Habitat may be lost by the filling or cutting off side channels from sediment deposits following

dam removal, or when vegetation is uprooted by migrating stream channels. These types of habitat

loss impacts are anticipated to be temporary until a large flood event or groundwater sources

carve new channels in such areas. Human activities may also be temporarily affected.”

“Eroded sediments can impact downstream floodplain and aquatic habitat and spawning grounds,

as well as water and food quality. Sediment releases may also increase bed elevations, which can

cause shot-term increases in flood stages and potentially impact bridges, floodplain land uses

(including low-lying structures), and recreational uses. Sediments can be quickly flushed out

following a dam removal (Heinz Center 2002; Stanley and Doyle 2003), or may be released in

pulses over time (Pearson et al. 2011). Sediment deposition downstream does not always cause

measurable changes in algal or invertebrate communities (Stanley and Doyle 2003), and, if they

do show decreases, they may be short-term and can realize a relatively quick recovery (Orr et al.

2008). In other cases, there is evidence of shifts in downstream riverine and estuarine food webs

following dam removal that show animals with invertebrate diets shifting increasingly to

Page 113: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

105

terrestrial-based invertebrates for their food source (NIFC 2013). One study showed that some

fish were impacted by sediment accumulation downstream, but effects appeared short-term

(Bushaw-Newton et al. 2002).”

“Post-construction impacts to living resources also occur. A reduction in species preferring

reservoir habitats may occur, as conditions change to favor more lotic than lentic species. Without

obstruction, migratory fish can reach historic spawning areas (Baish et al. 2002). Additional

impacts are triggered by the shifts in temperature and nutrient gradients…which lead to changes

such as fish assemblages and behavior; re-establishment of natural flow regimes; sediment,

nutrient, and organic material being available to downstream habitats; and possible reductions in

flood elevations in the former impoundment upstream. Dam removal may increase the abundance

and diversity of aquatic insects, fish, and other organisms (Heinz Center 2002), and may even

decrease invasive and undesirable species (Bednarek 2001).”

“A dam and culvert removal, modification, or replacement project that results in a reduced

impoundment frequently causes changes in land use and recreation, along with the composition

of localized ecosystems. They may have direct, long-term, minor adverse impacts to land use that

extend beyond the project site, as well as direct, long-term, moderate beneficial impacts. This

includes direct impacts such as the conversion of wetland areas to uplands around the former

reservoir margins, as well as the potential colonization of invasive vegetation on newly exposed

soils. Barrier removal can impact some recreational users, as well as aesthetic conditions for

those who prefer flat water created by an impoundment. Beneficial impacts may also result.

Although wetlands may decrease at the former impounded area edge, they could redevelop both

above and below the dam site. The downstream channel may also improve its connection to the

floodplain, enhancing existing riparian wetlands. In addition, these projects can create new

recreational opportunities and waterfront revitalization, provide sediment to replenish beaches,

and decrease safety and liability concerns. Lastly, despite barrier removal costs and the value of

lost services (if applicable), removal may save financial resources otherwise required for

operating costs and rehabilitation of the dam for safety or ecological reasons.”

“Many dam and culvert removal, modification, or replacement projects result in long-term

changes to cultural and historic resources. In some cases, cultural and historic sites are made

accessible after a barrier removal where they were once submerged by reservoirs. Such activities

Page 114: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

106

may be considered to have direct, long-term, or potentially permanent, major beneficial impacts

to such cultural/historic resources. However, if the barrier (usually a dam) meets criteria for

eligibility in the National Register of Historic Places, removal will have major impacts to historic

resources. In such cases [the Trustees] will enter into agreement with the relevant agency (through

a memorandum of agreement or other formal or informal means) that will determine the specific

steps needed to mitigate adverse impacts to cultural and historic resources. Historic and cultural

resources will only be adversely affected under [the] PEIS once National Historic Preservation

Act consultation requirements are complete.”

“There are generally direct and indirect, long-term socioeconomic impacts related to changes in

aesthetics at a removal site, increased access for recreation, and increased business opportunities

for the local recreation sector, which are largely beneficial.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. Island Farm Weir Fish Passage: design and construction of dam infrastructure

modifications associated with installation of rock ramp fishway, scour protection.

ii. Headgates Dam Removal: design and construction of dam removal, restoration and

reconstruction of surrounding channel and habitat, scour protection, rerouting public utility

infrastructure.

iii. Califon Dam Removal: design and construction of dam removal, removal and disposal of

sediment, restoration and reconstruction of surrounding channel and habitat, scour

protection.

iv. Blackwells Mills Dam Removal: design and construction of dam removal, restoration and

reconstruction of surrounding channel and habitat, relocation and/or recalibration of USGS

gage infrastructure (similar to installation of new infrastructure to meet needs provided by

original barrier and rerouting public infrastructure), scour protection.

v. Nunn’s Mill Dam Removal: design and construction of dam removal, removal and

disposal of sediment, restoration and reconstruction of surrounding channel and habitat,

scour protection.

vi. Pond Removal on Tributary to Rockaway Creek: design and construction of weir removal,

restoration and reconstruction of surrounding channel and habitat.

Page 115: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

107

vii. Rockafellows Mills Dam Removal: design and construction of dam removal, removal and

disposal of sediment, restoration and reconstruction of surrounding channel and habitat,

scour protection.

viii. Klines Mill Dam Fish Passage: design and construction of dam removal or fishway,

removal and disposal of sediment, restoration and reconstruction of surrounding channel

and habitat, scour protection, diverting water flows through side channel.

ix. Beisler Lake Dam Removal: design and construction of dam removal, reconstruction of

surrounding channel and restoration of surrounding habitat, scour protection.

x. Mill Street Dam Removal: design and construction of dam removal, restoration and

reconstruction of surrounding channel and habitat, scour protection, relocation and/or

recalibration of USGS gage infrastructure (similar to installation of new infrastructure to

meet needs provided by original barrier and rerouting public infrastructure).

xi. Cherry Brook Preserve Constructed Wetland: reconstruction or repair of portions of the

existing pond retaining wall, replacement of the outlet pipe to a box culvert, reconstruction

of the outlet control structure and outlet headwall.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.8 Fish Passage: Technical and Nature-Like Fishways

The PEIS Section 4.5.2.3.2 states the following regarding the potential impacts of Technical and

Nature-Like Fishways.

“Fishway projects result in some adverse impacts, but the long-term ecological benefits to native

resident and migratory species make this an effective habitat restoration tool. During construction

direct, short-term, localized, minor to moderate, adverse impacts to geology and soils may result

including soil compaction, temporary grading, and increased erosion. These impacts would occur

due to the use of heavy machinery, construction equipment, and the movement of restoration

practitioners throughout the project site during construction of access roads, staging areas, and/or

the fishway itself. Water and air resources may also be affected during construction with direct,

short-term, minor to moderate, adverse impacts expected to water and air quality. Due to the

Page 116: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

108

introduction of fine sediment to the water column during construction, water turbidity would

increase at the project site, and may extend beyond the project site, depending on the degree of

attenuation. Also, as is the case during any construction activity, an accidental contaminant spill

(e.g., fuel, oil, grease, hydraulic fluid) may have short-term, direct adverse impacts on water

quality.”

“During construction, fishway projects could result in direct and indirect, short- to long-term,

minor to moderate adverse impacts to living coastal resources, and threatened and endangered

species, which are localized or extend beyond the project site. Most directly, these projects may

temporarily displace aquatic organisms from the immediate project area because construction

may require the use of a cofferdam or other method used to exclude aquatic organisms.

Additionally, fishway projects could delay upstream or downstream migration of aquatic

organisms during construction. However, this delay would only be temporary. Increased

sedimentation and turbidity during construction could also negatively impact aquatic organisms

with increased mortality, reduced physiological function, and decreases in available or apparent

food resources possible (Henley et al. 2000). These impacts could be localized or extend beyond

the project site, depending on the degree of attenuation. Riparian vegetation may also be removed

or crushed during construction in order to build staging areas, increase access to the project site,

or to make room for the fishway itself. This reduction in riparian vegetation could indirectly affect

aquatic organisms by altering water temperatures at the project site, or decreasing the amount of

large woody debris available for input into the water body.”

“Land use and recreation may be temporarily disturbed, as people not associated with the project

will be unable to access the project site during construction. Increases in noise from the operation

of heavy machinery and construction equipment could also result in short-term adverse impacts

to land use and recreational activities in the area surrounding the project site.”

“Fishway projects could also result in direct, long-term, localized, minor changes to adverse

impacts to cultural and historic resources. A fishway project site may meet criteria for eligibility

in the National Register of Historic Places and, consequently, altering these sites may have

impacts to historic resources. Construction would begin at these sites under this PEIS only after

a consultation that meets the requirements of the National Historic Preservation Act has been

completed.”

Page 117: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

109

“Fishway projects may also result in direct and indirect, short- and long-term, minor beneficial

impacts to socioeconomic resources, as we would expect a varying number of jobs to be created

and a beneficial impact on the local economy to result from the funding spent on project

construction.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. Island Farm Weir Fish Passage: design and construction of rock ramp fishway.

ii. Klines Mill Dam Fish Passage: design and construction of fishway, if applicable.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.9 Fish, Wildlife, Vegetation Management: Invasive Species Control

The PEIS Section 4.5.2.4.1 states the following regarding the potential impacts of Invasive Species

Control.

“The impacts of invasive species removal ultimately benefit the immediate ecosystem by allowing

native species the chance to re-establish. …Generally, invasive species removal activities may

cause direct, short-term, localized, minor adverse impacts to the affected area from mechanical

or human activities. For terrestrial and aquatic invasive plant removal, direct adverse impacts to

geology and soils may include compaction, whereas impacts to in-water substrate and water

resources may include ephemeral sedimentation, turbidity, or other water quality impacts.

However, long-term moderate to major beneficial impacts to geology and soils, water resources,

coastal resources and essential fish habitat, and threatened and endangered species would result

as non-native species are replaced by diverse native plant and animal communities.”

“Herbicide use for removal of invasive plant species could cause direct, short-term, moderate,

adverse impacts to geology and soils, water, air, living coastal resources and essential fish habitat,

threatened and endangered species, and land use and recreation. These impacts would result from

the potential for lethal effects on soil biota and the short-term loss of shading and habitat for prey

species provided by the invasive plant. The potential impacts to birds, aquatic organisms, and

Page 118: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

110

terrestrial organisms will be mitigated by the use of the least toxic herbicides, surfactants, and

spray pattern indicators available, but sub-lethal impacts are possible. These include impacts to

reproduction, survival to adulthood, and disrupted food webs (NMFS 2005). Potential impacts to

non-target plant species are reduced when proper application methods are prescribed, but rainfall

and wind may cause herbicides to leach into the surrounding soil or be transported to non-invasive

plants, causing unintentional damage. Appropriate herbicide application methods should reduce

the risk of such herbicide drift. Suggested methods include backpack spraying, cut stump, and

hack-and-squirt; however, other methods may be used as the site or target species dictates. These

methods also greatly reduce the chance of exposing surface waters and their ecological

communities to these chemicals due to the high level of applicator control. Methods that do not

require surfactants would be used when possible. If necessary, surfactants would be limited to

products determined to be the least toxic to the terrestrial, aquatic, and marine/estuarine

organisms found in the immediate area. Herbicide tracers (i.e., spray pattern indicators) should

be used whenever possible to track herbicide application progress. …Where feasible, the area will

be regularly monitored for regrowth of the target or new invasive species. Generally, use of

herbicides in project areas would be conducted according to established protocols for the locality,

as determined by a licensed herbicide applicator. Such protocols would include information and

guidelines for appropriate chemical to be used, timing, amounts, application methods, and safety

procedures relevant to the herbicide application.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. Pond Removal on Tributary to Rockaway Creek: invasive species control.

ii. Lost Valley Nature Park: invasive species control.

iii. North Branch Raritan River Corridor Riparian Buffer Restoration: invasive species

control.

iv. East Brunswick Swamp Pink Restoration: invasive species control.

v. Stony Brook Green Infrastructure Demonstration Project: invasive species control.

vi. Lake Manalapan Riparian Restoration: invasive species control.

vii. South River Tidal Marsh Restoration: invasive species control.

viii. Edison Landfill Capping and Wetland Restoration: invasive species control.

Page 119: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

111

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.10 Freshwater Stream Restoration: Channel Restoration

The PEIS Section 4.5.2.5.1 states the following regarding the potential impacts of Channel

Restoration.

“Construction activities related to restoration of in-stream channel and off-channel habitat can

cause direct and indirect, short- and long-term, minor and moderate, localized, beneficial and

adverse impacts. Geology and soils and water resources would receive direct, short-term, minor

adverse impacts due to a temporary increase in turbidity and exposure of bare stream banks as a

result of the restoration activity. Channel and in-stream restoration can involve the use of heavy

equipment, which could disturb soil and the channel beds.”

“Reconnection of side channels and installation of habitat features can redirect water flows within

the stream corridor, which can lead to bank erosion or channel evulsion, or expansion of invasive

species populations. Woody debris structures could mobilize and deposit in undesirable places

downstream. While these adverse impacts are possible, they are unlikely to occur or unlikely to

last at a restoration site because in-stream habitat features would likely be anchored in areas

without any human infrastructure, such as bridges, and habitat features would be installed by

specialists with the goal of reducing adjacent bank erosion and resulting turbidity. Direct, long-

term, moderate beneficial impacts (including increased bank stability, water oxygenation and in-

stream wood retention, diverse winter rearing habitat, and increased pool depth for aquatic

resources) would likely be the predominant result from this restoration activity.”

“In-stream and off-channel restoration could have direct and indirect, short- and long-term, minor

and moderate, beneficial and adverse impacts to living coastal resources and essential fish habitat

and threatened and endangered species. More in-stream complexity promotes higher benthic

organism productivity throughout the system, increased feeding opportunities, lowered predation

rates on juvenile fish, more suitable spawning substrate, and deeper rearing habitat – conditions

that are beneficial to living coastal resources and essential fish habitat, and threatened and

endangered species. In-stream restoration construction activities could cause temporarily

Page 120: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

112

alteration of essential fish habitat and disruption or mortality of living coastal resources and

threatened and endangered species.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. Headgates Dam Removal: side channel restoration.

ii. Blackwells Mills Dam Removal: side channel restoration.

iii. Pond Removal on Tributary to Rockaway Creek: excavating and creating floodplain

topography, creation of off-channel vernal pool habitat.

iv. Lost Valley Nature Park: design and implementation of rain gardens, constructed

wetlands, and other green infrastructure for stormwater management.

v. Stony Brook Green Infrastructure Demonstration Project: design and implementation of

bioswales and other green infrastructure for stormwater management.

vi. Klines Mill Dam Fish Passage: side channel restoration.

vii. Beisler Lake Dam Removal: creation of off-channel vernal pool habitat.

viii. Cherry Brook Preserve Constructed Wetland: dredging and regrading of accumulated

sediments and conversion of existing pond into wetland/floodplain environment.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.11 Freshwater Stream Restoration: Bank Restoration and Erosion Reduction

The PEIS Section 4.5.2.5.2 states the following regarding the potential impacts of Bank

Restoration and Erosion Reduction.

“Bank restoration and erosion reduction activities would cause direct and indirect, short-term,

minor adverse impacts on geology and soils, water, air quality, living coastal resources and

essential fish habitat, and threatened and endangered species during the on-the-ground

implementation phase. Impacts to threatened and endangered species may include effects from

handling, noise, turbidity, contaminant exposure, altered hydrology, additional habitat

quality/quantity, displacement, and mortality (see PEIS Section 4.7). These impacts would result

Page 121: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

113

from installation of natural features or geotextile materials, stabilization of slopes, removal of

bulkheads or other artificial shoreline armoring, or introduction of new vegetation (planting).

Depending on the nature of each project, the installation of materials and stabilization of slopes

could require small or large earth-moving machines, which would cause minor amounts of

localized soil compaction, may introduce non-native species if not properly decontaminated, and

other impacts as described above. The duration of impacts typically range from weeks to months,

depending on the length of the shoreline or stream bank. Wildlife would also be displaced

temporarily during construction activities. By protecting erodible or unstable soils, bank

restoration and erosion reduction would result in indirect, long-term, minor and moderate

beneficial impacts to water quality and benthic habitat in wetlands, water bodies, and other

sensitive riparian or coastal habitats where benthic habitat in wetlands, water bodies, and other

sensitive riparian or coastal habitats where erosion is a problem beyond the project site. Natural

processes (beginning after planting) would help stabilize banks and shorelines. Installation of

biologs or geotextile materials also would stabilize areas of high erosion.”

“Habitat restoration practices that are most likely to take place on stream banks, riparian habitat,

and coastal areas usually involve revegetation, placement of woody debris, stabilization of banks,

removal of bulkheads or other artificial shoreline armor, and stormwater management practices.

Revegetation usually results in minor disturbance of the surrounding habitat, which is quickly

remedied by the revegetation of the area itself. However, the placement of woody debris and other

wildlife habitat features, stabilization of banks, removal of bulkheads or other artificial shoreline

armor, and stormwater management practices may require the use of heavy machinery. The use

of heavy machinery can often cause damage to the surrounding riparian area such as clearing of

existing vegetation, compaction, and disruption of the soil. This, in turn, may cause sedimentation

in the adjacent stream, with turbidity plumes typically being short-term and quickly dispersed by

the river current.”

“The restoration activity will also have direct, short- and long-term, minor and moderate, adverse

and beneficial impacts to land use and recreation because increases in recreational opportunity

will likely occur in the project area and beyond in the larger river system in the long term;

however, short-term use may be curtailed during construction activities.”

Page 122: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

114

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. Lost Valley Nature Park: removal of impervious surfaces and replacement with pervious

surfaces, design and implementation of constructed wetland for stormwater management,

planting of native vegetation.

ii. North Branch Raritan River Corridor Riparian Buffer Restoration: stream bank riparian

plantings to improve water quality.

iii. Stony Brook Green Infrastructure Demonstration Project: design and implementation of

bioswales, removal of impervious surfaces and replacement with pervious surfaces, and

planting of native vegetation.

iv. Lake Manalapan Riparian Restoration: riparian shoreline plantings to improve water

quality.

v. Bridge over the Delaware and Raritan Canal Spillway: erosion and sediment control

measures, bank stabilization with biodegradable and plant material.

vi. Cherry Brook Preserve Constructed Wetland: design and implementation of constructed

wetland and planting of native vegetation.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.12 Shellfish Reef Restoration

The PEIS Section 4.5.2.6.2 states the following regarding the potential impacts of Shellfish Reef

Restoration.

“Shellfish reef restoration activities may have direct, short-term, minor adverse impacts as well

as indirect, long-term, moderate beneficial impacts.”

“Impacts to geology and soils may include short-term adverse impacts such as compaction to

underlying soils where reef material is placed. Long-term beneficial impacts may occur through

reductions in wave energy, thereby reducing erosion along adjacent shorelines.”

Page 123: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

115

“Direct, short-term, minor adverse impacts and indirect, long-term, minor beneficial impacts to

water resources could result from reef restoration. The direct impacts include increased turbidity

during project construction and the indirect impacts may include improvements to water quality

in the immediate project area as a result of increased oyster filtering capacity over the long term.

Turbidity related to construction activities can be reduced through the use of Best Management

Practices (BMPs). Few, if any, adverse effects are expected from building and operating small-

scale aquaculture facilities to assist in shellfish restoration. No long-term impacts to the aquatic

environment or marine species from the water discharge are anticipated; unlike some forms of

aquaculture, shellfish culture does not create high nutrient discharge because shellfish often feed

on phytoplankton in seawater, rather than needing nutrient-rich feed (Mugg et al. 2000).”

“When shells are imported from other locations, they may carry other organisms or diseases.

Several states have recognized the risk in transporting shells from one area to another and have

instituted requirements or recommendations for shells transplanted into state waters. Research

and biosanitary protocols are used to prevent the spread of invasive species and diseases through

the relocation of bivalve shells (Cohen and Zabin 2009). Although deployment of shellfish does

have the potential to spread shellfish diseases or non-native organisms, restoration will use BMPs

and follow state regulations that require that shellfish be certified as disease-free (Bushek et al.

2004).”

“Reef restoration projects have the potential to convert one habitat type into another. This

conversion frequently involves re-establishing a reef in a formerly degraded shellfish area. In

general, shellfish restoration projects convert shallow, open water habitats to subtidal or intertidal

reefs or beds (the latter in the case of

and some Atlantic state estuaries). While open water habitats are valuable, the historical loss of

shellfish habitat within the coastal United States has been significant. For example, in the United

States there has been an estimated 88 percent decline in oyster biomass and an estimated 63

percent decline in the spatial extent of oyster habitat over the past 100 years (zu Ermgassen et al.

2012), making this conversion a minor impact in most locations.”

“Coral reefs, artificial reef, and live/hard bottom – all in the marine environment – are not

impacted due to their location relative to typical oyster restoration sites. Oyster reefs or beds may

Page 124: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

116

promote the development (or re-establishment) of submerged aquatic vegetation beds or marsh

habitat in their landward or intertidal areas through increased shoreline stabilization. In either

configuration, oysters serve as habitat, providing food and refuge for recreationally and

commercially important fish and crustaceans (e.g., crabs and shrimp) and their pretty. In addition,

these habitats can help protect marsh habitat by reducing the erosion caused by wave action.”

“All restoration actions occurring in near shallow or intertidal habitat may displace living coastal

resources through the increased activity and noise associated with restoration project

construction. Vegetation may be disturbed if the shellfish restoration site is accessed from land

instead of by boat. These impacts are expected to be temporary. In most cases, fish return to

restoration sites almost immediately after construction.”

“Both water- and land-based recreation and land use activities near a shellfish restoration site

may be adversely impacted in short-term, minor ways by changing boat traffic or other resource

use patterns, or beneficially impacted by improved recreational fishing near successfully restored

oyster reefs. In building and operating small-scale aquaculture facilities to assist in shellfish

restoration, little or no impact is expected. Facilities are frequently located in areas of existing

marine industry.”

“The socioeconomic benefits of conducting reef restoration projects may result insofar as such

projects create viable habitat that support a diverse array of commercial and recreational fish

species, and therefore communities that benefit from these resources may realize benefits related

to increased ecological productivity.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. North Branch Raritan River, Lamington River, and Stony Brook Mussel Restoration:

mussel relocation, propagation at pre-permitted rearing facilities, and stocking.

ii. Raritan Bay Oyster Restoration: design and construction of oyster reefs in the Raritan

Bay.

Page 125: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

117

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.13 Road Upgrading and Decommissioning: Trail Restoration

The PEIS Section 4.5.2.7 states the following regarding the potential impacts of Trail Restoration.

“Road upgrading and decommissioning, and trail restoration activities would cause direct and

indirect, short-term, minor and moderate adverse impacts, typically in riparian and upland

affected environments, resulting from temporary construction activities in the project area. Aside

from construction impacts, however, most of the impacts resulting from these activities would be

direct and indirect, moderate to major beneficial impacts, as they are designed to control access

to sensitive areas, limit the use of sensitive areas as routes for vehicular transportation, and reduce

a road’s propensity for erosion.”

“Trail restoration projects would take place in all types of habitat areas; however, they have

historically occurred most frequently in riparian and upland affected environments. These

activities would cause direct, short-term, minor, adverse impacts on geology and soils, water, and

air quality, and would cause direct and indirect, short-term, minor, adverse impacts on living

coastal resources and essential fish habitat, and threatened and endangered species, resulting

from temporary construction activities, as previously described. There may be direct, long-term

minor to moderate adverse impacts that result from increased shading over previously exposed

habitat that depends on photosynthetic processes. Areas that experience such impacts are

relatively small, and may be reduced with BMPs (e.g., increased spacing of boardwalk boards).

Trail restoration projects would cause indirect, short-term, minor impacts on land use, resulting

from construction activities required to restore the trail (e.g., temporarily blocking trails with

machinery). Impacts to threatened and endangered species may include effects from handling,

noise, turbidity, contaminant exposure, altered hydrology, additional habitat quality/quantity,

displacement, and mortality (see PEIS Section 4.7).”

“Trail restoration projects would also cause direct and indirect, long-term, minor to major

beneficial impacts on geology and soils, water, living coastal resources and essential fish habitat,

threatened and endangered species, cultural and historic resources, and socioeconomics. The

Page 126: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

118

beneficial impacts would result from reduced erosion potential and rates after projects were

implemented and from both allowing and controlling access to sensitive areas.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. County Boat Launch and Fishing Platform at Lincoln Avenue Park: resurfacing and

grading of existing boat launch and parking area, design and construction of raised

fishing platform (similar to raised walkway).

ii. Lost Valley Nature Park: design and construction of walkways and driving paths,

regrading and pervious material resurfacing of driving paths and parking areas.

iii. Rutgers Ecological Preserve Accessible Trail: creation and resurfacing of ADA

accessible trail and pullout area.

iv. Bridge over the Delaware and Raritan Canal Spillway: design and construction of

raised footbridge over spillway.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.14 Road Upgrading and Decommissioning: Signage and Access Management

The PEIS Section 4.5.2.8 states the following regarding the potential impacts of Signage and

Access Management.

“The installation of temporary or permanent fencing, signage, or netting would have direct, long-

term (fencing would likely have a long-term impact, but not netting), moderate beneficial impacts

on the geology and soils of the project site, and on water resources, living coastal resources and

essential fish habitat, and threatened and endangered species beyond the project site. The benefits

of these actions are reduced disturbance by humans, animals, and vehicles.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

Page 127: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

119

i. County Boat Launch and Fishing Platform at Lincoln Avenue Park: installation of

informational and wayfinding signage.

ii. Lost Valley Nature Park: installation of informational and wayfinding signage.

iii. East Brunswick Swamp Pink Restoration: installation of deer exclusion fencing and anti-

herbivory cages.

iv. Lake Manalapan Riparian Restoration: installation of temporary fencing to exclude geese

and humans.

v. Rutgers Ecological Preserve Accessible Trail: installation of educational signage.

vi. South River Tidal Marsh Restoration: installation of goose exclusion fencing.

vii. Edison Landfill Capping and Wetland Restoration: installation of goose exclusion

fencing.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.15 Wetland Restoration: Levee and Culvert Removal, Modification, and Set-Back

The PEIS Section 4.5.2.11.1 states the following regarding the potential impacts of Levee and

Culvert Removal, Modification, and Set-Back.

“The removal and/or modification of levees, dikes, culverts, and similar infrastructure would cause

direct and indirect, short-term, localized, minor adverse impacts on geology and soils, water, air,

living coastal resources and essential fish habitat, and threatened and endangered species during

the construction phase of the project. These impacts also apply to the construction of new or

replacement levees (set-back levees) as part of the overall project. The use of heavy machinery

and construction equipment is the primary cause of the direct, adverse impacts associated with

this activity, which may include soil compaction, emissions from heavy equipment, removal or

crushing of understory vegetation, increased soil erosion in the immediate area of construction

operations, and unintentional introduction of non-native, potentially invasive, species.”

“These restoration activities would provide direct and indirect benefits to geology and soils, water,

living coastal resources and essential fish habitat, and threatened and endangered species. These

projects result in benefits to riparian, stream and river channel habitats, and shoreline habitats

Page 128: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

120

such as wetlands, mangrove swamps, beaches, and mudflat areas. Restoration of natural

hydrology would aid in the development of vegetated communities that provide vital rearing,

feeding, and refuge habitat for fish and benthic communities and wildlife species. This technique

is beneficial for anadromous fish that need connected coastal waterways and rivers with unaltered

hydrology for passage during migration events, as well as for estuarine fish species that benefit

from increased habitat area. Long-term major beneficial effects to the quality of surface water

resources at the project site and beyond are expected due to restoration of tidal flow and water

movement. Restoration of these areas to natural states would enhance water quality and salinity,

reduce turbidity and soil erosion, increase carbon sequestration and storage capacity (providing

climate change mitigation), and enhance habitat quality, although some increases in turbidity in

the water column could result due to increased water movement. In areas where berms and levees

bounded ponded areas restored to wetland, indirect, long-term minor beneficial effects would be

expected by uptake and transformation of nutrients resulting from enhanced vegetative growth in

the restoration area.”

“Cultural and historic resources and land use could experience indirect, long-term, minor adverse

impacts resulting from levee modification or removal. The land use in the floodplain, including

any potentially culturally sensitive areas, would change as the water resources in the floodplain

changed. Because land use would stabilize in the floodplain over time, the impact would be

minor.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. South River Tidal Marsh Restoration: levee and/or berm modification, site grading and

placement of clean fill to establish appropriate marsh elevations.

ii. Edison Landfill Capping and Wetland Restoration: levee and/or berm modification, site

grading and placement of clean fill to establish appropriate marsh elevations.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

Page 129: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

121

5.3.16 Wetland Restoration: Restoration and Shoreline Stabilization Techniques

The PEIS Section 4.5.2.11.2 states the following regarding the potential impacts of Wetland

Restoration and Shoreline Stabilization Techniques.

“Construction impacts from sediment removal, materials placement, and shoreline stabilization

activities are similar, and would cause direct and indirect, short-term, localized, minor adverse

impacts on geology and soils, water, living coastal resources and essential fish habitat, and

threatened and endangered species during the implementation phase of the projects.”

“Potential impacts to air quality could include direct, short-term, minor adverse impacts to air

quality during construction or other on-the-ground activities. These impacts include exhaust

emissions from off-road construction equipment, on-road hauling, construction worker employee

commuting vehicles, and fugitive dust emissions from paved roads and earthmoving activities.”

“Impacts to living coastal resources, essential fish habitat, and threatened and endangered species

may include effects from handling, noise, turbidity, contaminants, changes to hydrology, and

displacement (see PEIS Section 4.7). In the case of any activities using heavy machinery to conduct

restoration work for marsh restoration activities, potential impacts are related to compaction of

the soils, leaking petroleum products, and increased turbidity at the restoration site. Many of these

impacts would be ameliorated through the use of BMPs.”

“These restoration activities may impact vegetation on the project site or nearby. Impacts to

vegetation should be minimal, as the most frequently removed mature plants would not be native

to the site or would be invasive species. For instance, shrub and tree species would be removed if

the end goal is a habitat dominated by wetland obligate species. The removed plant species may

not provide the same quality of habitat for fish as the goal habitat and consequently the overall

impact of this removal is low. In instances where sediment and vegetation are not removed from

the site, those working on the site may potentially trample existing vegetation or unintentionally

introduce non-native species, but this would be kept to a minimum through the use of BMPs.”

“Increased water turbidity and temporary decreases in water quality may result from sediment

removal, materials placement, and shoreline stabilization activities, which may in turn impact

living resources in the area. Behavior of species that use wetlands impacted by this restoration

Page 130: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

122

activity may be temporarily modified. Mitigation for potential impacts would focus on

implementation of BMPs. Direct short-term, localized moderate impacts would be expected on

benthic fauna and infauna smothered by sediment placement. Materials with contaminant

concentrations consistent with published sediment quality guidelines and background levels rarely

impact biota, and will be considered non-significant.”

“After construction, these projects would result in direct and indirect long-term or permanent,

moderate to major beneficial impacts to geology and soils, water, living coastal resources and

essential fish habitat, and threatened and endangered species, and minor beneficial impacts

related to socioeconomic resources as a result of increased tourism opportunities that could result

from an improved resource.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. South River Tidal Marsh Restoration: site grading and placement of clean fill to establish

appropriate marsh elevations, bank stabilization with biodegradable and plant materials,

shoreline erosion control measures and installation of living shorelines, installation of

stormwater management infrastructure.

ii. Edison Landfill Capping and Wetland Restoration: site grading and placement of clean

fill to establish appropriate marsh elevations, bank stabilization with biodegradable and

plant materials, shoreline erosion control measures, installation of stormwater management

infrastructure.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.17 Wetland Restoration: Wetland Planting

The PEIS Section 4.5.2.11.3 states the following regarding the potential impacts of Wetland

Planting.

“Wetland planting may occur as a separate restoration activity or in combination with other

restoration types described in this [PEIS] document. Planting may cause short-term, direct

Page 131: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

123

adverse impacts to living coastal and marine resources when existing vegetation is trampled

during the donor harvest or planting process. Planting is generally short-term in duration, lasting

days to weeks, but the length of time between the restoration efforts that prepare a site for planting

and when planting is begun may be several months, as planting cannot be completed outside the

local growing season. For this reason, active wetland restoration activities may last over a year,

even at smaller sites. Short-term damage to stands of healthy wetland vegetation may occur where

native species are harvested from donor sites using species-appropriate techniques. The growth

habit and length of the growing season determines how rapidly a donor site would recover.

Generally, the benefits of using a local, native plant source outweigh the damage to the donor site,

which is temporary. For restoration activities that involve building native plant nurseries,

although he nursery use may be long-term, the impacts are low because the sites are generally

constructed in areas that do not have existing habitat value (e.g., a school playground, a disturbed

upland area, or former sewage treatment plant or aquaculture pond). Minor adverse impacts to

cultural and historic resources may occur during wetland restoration, when historic structures

are present within a project site.”

“Long-term, moderate beneficial impacts to water resources, living coastal resources and

threatened and endangered species would occur due to the erosion reduction and increased shelter

provided by wetland plants. Wetland planting activities would result in beneficial impacts by

restoring or creating wetland and/or shallow-water habitats that provide areas for feeding and

shelter for fish, as well as nutrient cycling and carbon sequestration and storage capacity.”

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. Lost Valley Nature Park: installation of native plants for pollinator gardens, green

infrastructure, wetlands, uplands, meadows, and transitional areas.

ii. South River Tidal Marsh Restoration: planting of native marsh vegetation.

iii. Edison Landfill Capping and Wetland Restoration: planting of native marsh vegetation.

iv. East Brunswick Swamp Pink Restoration: implement best forestry practices to promote

new growth of white cedar stand and/or plant white cedar saplings.

Page 132: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

124

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives fall within the range of alternatives and scope of potential environmental impacts

analyzed in the PEIS and do not have significant adverse impacts.

5.3.18 Impacts Not Addressed in the PEIS

Riverine and coastal habitat projects that include environmental justice and contaminated debris

removal and associated remediation (e.g., capping) are not directly addressed in the PEIS,

therefore, the Trustees have provided additional NEPA analysis for projects that include these

potential activities and impacts.

Environmental Justice

Restoration activities supported by the Trustees help to ensure the enhancement of environmental

quality for all populations in New Jersey. The Trustees have determined that all proposed

restoration projects would provide long-term or permanent beneficial impacts to the

Environmental Justice communities described in Section 4.41 by improving the quality of the

natural environment and ecosystem services, and providing recreational and educational benefits

to local communities. None of the alternatives are expected to adversely impact minority or low-

income populations.

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. All restoration alternatives will involve Environmental Justice.

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives do not have significant adverse impacts to Environmental Justice.

Contaminated Sediment Debris Removal and Sediment Capping

Contaminated Sediment/Debris Removal: Sediment removal and/or dredging of wetland areas

affected by contamination would likely result in increased injury to wetlands and associated living

coastal resources, representing short-term minor to moderate adverse impacts due to physical

habitat disturbance, including the removal of well-developed wetland geology, soils, and existing

vegetation. Direct, short-term, localized, minor adverse effects to air quality and noise are expected

Page 133: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

125

at the project site due to the operation of heavy equipment and other on-the-ground activities.

Direct and indirect, short-term moderate beneficial impacts to socioeconomic resources are

expected from job creation as a result from the funding spent of the projects. Following sediment

and debris removal, clean fill would need to be brought in and the site revegetated. Losses in

habitat value would occur until the dredged areas recovered from remedial activities. The removal

of contaminated sediments and debris would have short- or long-term moderate beneficial impacts

to water quality, and short- or long-term moderate beneficial impacts on living coastal resources

and threatened and endangered species because habitats would be cleared of potentially deleterious

contamination. However, the site should be monitored for potential recontamination from external

sources, which may reinjure wetlands and habitats and put living coastal resources at risk of further

exposure to contaminants.

Sediment Capping: Sediment capping would likely require 1-2 feet of fill, and would alter the

bottom contours of the wetland causing changes in wetland sediments, hydrology, and associated

plant communities. Considerable time and effort would be required to revegetate capped areas,

including effort to keep invasive species at bay. Short-term losses of wetland habitat would occur

while remedial activities were conducted. Long-term negative impacts may result from changes in

hydrology that arise from partially filling the wetland. However, sediment capping will result in

direct, long-term benefits to water quality, geology and soils, and living coastal resources due to

the prevention of future leaching of contaminants.

There is potential for sediment/debris removal and sediment capping activities to impact cultural

and historic resources. Care would be taken to ensure such properties are avoided during removal,

and coordination with the State Historic Preservation Officer would be carried out, as appropriate.

Short- or long-term beneficial impacts to recreation would occur simply because the area is

cleaner.

The Trustees determined that the following restoration alternatives are relevant to this impact

category:

i. South River Tidal Marsh Restoration: contaminated sediment/debris removal and

sediment capping, as warranted.

Page 134: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

126

ii. Edison Landfill Capping and Wetland Restoration: contaminated sediment/debris

removal and sediment capping

The Trustees have preliminarily determined that the impacts from these proposed restoration

alternatives do not have significant adverse impacts.

5.3.19 Summary of Impacts

Based on the analysis in this Draft RP/EA, the Trustees have made the preliminary determination

that all proposed restoration alternatives are either within the range of alternatives and scope of

potential environmental consequences analyzed in the PEIS or in Section 5.3.18, and do not have

significant adverse impacts. Moreover, the Trustees have fully considered and determined that

there are no geographic, project- or site-specific conditions, sensitivities, unique habitat, or

resources that warrant additional NEPA analyses beyond which is provided in the PEIS or

Section 5.3.18.

As projects progress, if it is determined that project activities no longer fall within the scope of

the PEIS or Section 5.3.18, additional NEPA review may be warranted and would be conducted

and provided in a subsequent NEPA document.

5.4 Cumulative Impacts

5.4.1 Cumulative Impacts of No Action Alternative

The No Action alternative would have long-term, minor adverse effects to physical and biological

resources in the Raritan River watershed, since no active restoration would occur. Natural

resources would not return to baseline and interim losses would not be compensated for.

5.4.2 Cumulative Impacts of Preferred Alternatives

The preferred alternatives would have no major adverse impacts on habitats, lands, or waterways

in the Raritan River watershed. The preferred alternatives may result in minor, short-term adverse

impacts and both short- and long-term beneficial impacts to habitats and the natural resources they

support. When considered in tandem with other past, present, and reasonable foreseeable future

actions within the Raritan River watershed, the preferred alternatives are not anticipated to have

adverse cumulative impacts. Direct and indirect adverse impacts are likely to be short-term and

Page 135: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

127

will occur primarily during and immediately after periods of active construction. The preferred

alternatives are expected to result in long-term, beneficial cumulative impacts on the human

environment since they may positively impact the areas land use, recreational use, and economic

activity through habitat restoration, land preservation, and improved public access and recreational

activities.

5.4.3 Cumulative Impacts of Non-Preferred Alternatives

The Raritan Bay Oyster Restoration non-preferred alternative would have no major adverse

impacts on habitats, lands, or waterways. This alternative may result in minor, adverse impacts

during construction, but impacts would be localized and short-term. The Cherry Brook Preserve

Constructed Wetland non-preferred alternative may have some minor long-term adverse effects

on water quality, and the South River Tidal Marsh Restoration and the Edison Landfill Capping

and Wetland Restoration non-preferred alternatives may have some minor adverse impacts on

climate change ‘resiliency’, as currently proposed. These alternatives may additionally result in

minor, adverse impacts during construction, but impacts would be localized and short-term. When

considered in tandem with other past, present, and reasonably foreseeable future actions within the

Raritan River watershed, the non-preferred alternatives are not anticipated to have adverse

cumulative impacts, and may result in localized beneficial impacts to biological and habitat

resources.

Page 136: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

128

CHAPTER 6 COMPLIANCE WITH OTHER LAWS AND REGULATIONS

As appropriate, the Trustees will ensure compliance with applicable statutes, regulations, and

policies prior to implementation of any restoration alternatives. The following is a list of statutes

that may apply to proposed projects. Compliance with these authorities, and other authorities not

listed, is considered part of the restoration planning process. All projects that receive funding will

be responsible for obtaining necessary permits and complying with relevant statutes, regulations,

and policies.

6.1 Federal Laws

6.1.1 National Environmental Policy Act

The National Environmental Policy Act (NEPA; 42 U.S.C. § 4321 et seq.), requires that federal

agencies consider the environmental impacts of proposed actions and reasonable alternatives to

those actions. The Authorized Official will determine, based on the facts and recommendations in

this document and input from the public, whether this EA supports a FONSI or whether an EIS

should be prepared.

6.1.2 Federal Water Pollution Control Act (Clean Water Act)

The Clean Water Act (CWA; 33 U.S.C. § 1251 et seq.), is the principle law governing pollution

control and water quality of the nation’s waterways. Section 404 of the CWA regulates the

discharge of dredged or fill material into waters of the United States. Section 401 of the CWA

requires any applicant for a federal license or permit that conducts any activity that may result in

a discharge of a pollutant into waters of the United States to obtain a certification from the State

in which the discharge originates or would originate. The Trustees will require all necessary

permits to be in place prior to all construction activities.

6.1.3 Fish and Wildlife Coordination Act

The Fish and Wildlife Coordination Act (16 U.S.C. § 661 et seq.) requires that federal agencies

consult with the Service, NOAA, and state wildlife agencies regarding activities that affect,

control, or modify waters of any stream or bodies of water, in order to minimize the adverse

impacts of such actions on fish and wildlife resources and aquatic environments. This coordination

Page 137: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

129

is generally incorporated into compliance processes used to address the requirements of other

applicable statutes, such as Section 404 of the CWA.

6.1.4 Endangered Species Act

The Endangered Species Act (ESA; 16 U.S.C. § 1531 et seq.), is intended to protect species that

are threatened with extinction. It provides for the conservation of habitats and ecosystems that

these species depend on and produces a program for identification and conservation of these

species. Federal agencies are required to ensure than any actions are not likely to jeopardize the

continued existence of a threatened and endangered species. The Trustees will engage in required

ESA consultations prior to implementing any restoration actions.

6.1.5 Migratory Bird Treaty Act

The Migratory Bird Treaty Act of 1918 (16 U.S.C. §§ 703-712), protects all migratory birds and

their eggs, nests, and feathers and prohibits the taking, killing, or possession of migratory birds.

The proposed restoration actions would not result in the taking, killing, or possession of any

migratory birds.

6.1.6 National Historic Preservation Act

The National Historic Preservation Act (NHPA; 16 U.S.C. § 470 et seq.), is intended to preserve

historic and archaeological sites. Compliance with the NHPA would be fulfilled through

coordination with the State Historic Preservation Office (SHPO). Federal agencies will consult

with SHPO and Tribal Historic Preservation Officers (if applicable) to identify historic properties

that may be affected by a proposed project and to asses potential adverse effects of restoration

actions.

6.1.7 Occupational Safety and Health Act

The Occupational Safety and Health Act (OSHA; 29 U.S.C. § 651 et seq.), governs the health and

safety of employees from exposure to recognized hazards, such as exposure to toxic chemicals,

excessive noise, mechanical dangers, and unsanitary conditions. Work conducted on the proposed

restoration actions will comply with OSHA requirements.

Page 138: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

130

6.1.8 Americans with Disabilities Act

The Americans with Disabilities Act (ADA; 42 U.S.C. § 12101), is a civil rights law that prohibits

discrimination against individuals with disabilities in all areas of public life, including jobs,

schools, transportation, and all public and private places that are open to the general public. The

purpose of the law is to ensure that people with disabilities have the same rights as opportunities

as everyone else. The preferred recreational alternatives will comply with ADA requirements.

6.1.9 Coastal Zone Management Act

The Coastal Zone Management Act (CZMA; 16 U.S.C. §§ 1451-1464), encourages states to

preserve, protect, develop, and where possible, restore and enhance the nation’s coastal resources.

Restoration actions undertaken or authorized by federal agencies within a state’s coastal zone are

required to comply, to the maximum extent practicable, with the enforceable policies of a state’s

federally approved Coastal Zone Management Program. The proposed projects will comply with

the CZMA and be consistent with state policy.

6.1.10 Magnuson-Stevens Fishery and Conservation Management Act

The Magnuson-Stevens Fishery and Conservation Management Act (MSFCMA; 16 U.S.C. § 1801

et seq.), requires federal agencies to consult with the National Marine Fisheries Service when their

actions or activities may adversely affect habitat identified as essential fish habitat. The Trustees

will require MSFCMA consultation prior to implementing any pertinent restoration actions.

6.1.11 Rivers and Harbors Act

The Rivers and Harbors Appropriation Act (33 U.S.C. § 403 et seq.), regulates development and

use of the nation’s navigable waterways, and regulates obstruction or alteration of navigable

waters. The Trustees will require all necessary permits be in place prior to construction activities.

6.1.12 Floodplain Management, Executive Order 11998

Executive Order 11998 (42 Federal Register 26951) requires federal agencies to avoid to the extent

possible the long- and short-term adverse impacts associated with the occupancy and modification

of floodplains and to avoid direct and indirect support of floodplain development wherever there

Page 139: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

131

is a practicable alternative. The Trustees will ensure compliance with this executive order as part

of the state permitting process.

6.1.13 Protection of Wetlands, Executive Order 11990

Executive Order 11990 (42 Federal Register 26961) requires federal agencies to take action to

minimize the destruction, loss, or degradation of wetlands, and to preserve and enhance the natural

and beneficial values of wetlands in carrying out the agency’s responsibilities for acquiring,

managing, and disposing of federal lands and facilities; providing federally undertaken, financed,

or assisted construction and improvements; and conducting federal activities and programs

affecting land use, including but not limited to water and related land resources planning,

regulating, and licensing activities. The Trustees will ensure compliance with this executive order

as part of the state permitting process.

6.1.14 Federal Actions to Address Environmental Justice in Minority Populations and Low-

Income Populations, Executive Order 12898

Executive Order 12898 (59 Federal Register 7629) directs federal agencies to identify and address

the disproportionally high and adverse human health or environmental effects of their actions on

minority and low-income populations, to the greatest extent practicable and permitted by law. The

Executive Order directs each agency to develop a strategy for implementing Environmental

Justice, is intended to promote nondiscrimination in federal programs that affect human health and

the environment, and provides minority and low-income communities access to public information

and public participation.

6.2 State and Local Laws

The Natural Resource Trustees will ensure compliance with all applicable state and local laws and

other applicable federal laws and regulations relevant to the State of New Jersey. All projects that

receive funding will be responsible for obtaining necessary permits and complying with relevant

statutes, regulations, and policies.

Page 140: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

132

List of Preparers and Reviewers

Cathy Marion, U.S. Fish and Wildlife Service

Carl Alderson, NOAA

Reyhan Mehran, NOAA

Mark Walters, NJDEP

Tony Iavarone, NJDEP

Michael Palmquist, NJDEP

List of Agencies and Persons Consulted

NJDEP Office of Natural Resource Restoration

U.S. Fish and Wildlife Service, Ecological Services

NOAA Restoration Center

NOAA Assessment Restoration Division

Project Sponsors, including but not limited to: The Watershed Institute, New York-New

Jersey Harbor and Estuary Program, Rutgers University, Borough of Highland Park, City

of New Brunswick, Borough of Manville, Montgomery Township, Raritan Headwaters

Association, Lower Raritan Watershed Partnership, Rutgers Cooperative Extension of

Middlesex County, Natural Resources Conservation Service, Ridge and Valley Chapter of

Trout Unlimited, The Nature Conservancy, GreenTrust Alliance, Inc., Township of

Raritan, Franklin Township, Bethlehem Township, Township of Plainsboro, East Amwell

Township, East Windsor Township, City of Perth Amboy, Hunterdon County, Middlesex

County, and North Jersey Resource Conservation and Development.

Page 141: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

133

Literature Cited

Baish, S.K., S.D. David, and W.L. Graf. 2002. The complex decision-making process for

removing dams. Environment: Science and Policy for Sustainable Development 44(4):20-31.

Bednarek, A. 2001. Undamming rivers: a review of the ecological impacts of dam removal.

Environmental Management 27(6):803-814.

Berra, T.M. and G.E. Gunning. 1970. Repopulation of experimentally decimated sections of

streams by longear sunfish, Lepomis megalotis (Rafinesque). Transactions of the American

Fisheries Society 99(4):776-781.

Brown, J.J., K.E. Limburg, J.R. Waldman, K. Stephenson, E.P. Glenn, F. Juanes, and A. Jordaan.

2012. Fish and hydropower on the U.S. Atlantic coast: failed fisheries policies from half-way

technologies. Conservation Letters 6(4):280-286.

Bunt, C.M., T. Castro-Santos, and A. Haro. 2012. Performance of fish passage structures at

upstream barriers to migration. River Research and Applications 28:457-478.

Bushaw-Newton, K.L., D.D. Hart, J.E. Pizzuto, J.R. Thomson, J. Egan, J.T. Ashley, T.E.

Johnson, R.J. Horwitz, M. Keeley, J. Lawrence, D. Charles, C. Gatenby, D. A. Kreeger, T.

Nightengale, R.L. Thomas, and D.J. Velinsky. 2002. An integrative approach towards

understanding ecological response to dam removal; the Manatawny Creek Study. Journal of the

American Water Resources Association 38(6):1581-1599.

Bushek, D., D. Richardson, M.Y. Bobo, and L.D. Coen. 2004. Quarantine of oyster shell cultch

reduces the abundance of Perkinsus marinus. Journal of Shellfish Research 23:369-373.

Cohen, A.N. and C.J. Zabin. 2009. Oyster shells as vectors for exotic organisms. Journal of

Shellfish Research 28:163-167.

Collins, M. K. Lucey, B. Lambert, J. Kachmar, J. Turek, E Hutchins, T. Purinton, and D. Neils.

2007. Stream barrier removal monitoring guide. Gulf of Maine Council on the Marine

Environment. http://www.gulfofmaine.org/streambarrierremoval/Stream-Barrier-Removal-

Monitoring-Guide-12-19-07.pdf. Accessed May 2020.

Page 142: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

134

Franklin, A.E., A. Haro, T. Castro-Santos, and J. Noreika. 2012. Evaluation of nature-like and

technical fishways for the passage of Alewives at two coastal streams in New England.

Transactions of the American Fisheries Society. Symposium 35, Bethesda, Maryland.

Guzman, G. 2019. U.S. Median household income up in 2018 from 2017. United States Census

Bureau. https://www.census.gov/library/stories/2019/09/us-median-household-income-up-in-

2018-from-2017.html. Accessed May 2020.

Haro, A., K. Mulligan, T. Suro, J. Noreika, and A. McHugh. 2017. Hydraulic and biological

analysis of the passability of select fish species at the U.S. Geological Survey streamgaging weir

at Blackwells Mills, New Jersey. U.S. Geological Survey Scientific Investigations Report 2017-

5103. 28pp.

Heinz Center for Science, Economics and the Environment (Heinz Center). 2002. Dam removal:

science and decision making. Washington, D.C. 235pp.

Henley, W.F., M.A. Patterson, R.J. Neves, and A. D. Lemly. 2000. Effects of sedimentation and

turbidity on lotic food webs: a concise review for natural resource managers. Reviews in

Fisheries Science 8(2):125-139.

Jensen, O. P. 2017. Raritan River American shad and river herring project: end of season report

2017 and multi-year summary. Rutgers University, Department of Marine and Coastal Sciences.

New Brunswick, NJ. 14pp.

Katopodis, C., C.A. Kells, and M. Acharya. 2001. Nature-like and conventional fishways:

alternative concepts? Canadian Water Resources Journal 26:211-232.

Kleinfelder and Omni Environmental. 2012. Cherry Brook Pond restoration project: preliminary

design report - draft. December 2012. Princeton, NJ. 32pp

Landsman, S.J., N. McLellan, J. Platts, and M.R. van den Heuvel. 2018. Non-salmonid versus

salmonid passage at nature-like and pool-and-weir fishways in Atlantic Canada, with special

attention to Rainbow Smelt. Transactions of the American Fisheries Society 147:94-110.

Lucas, M.C. and E. Baras. 2001. Migration of freshwater fishes. Blackwell Scientific

Publications, Oxford, UK.

Page 143: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

135

MacKenzie, C.L. 1984. A history of oystering in Raritan Bay, with environmental observations.

In Pacheco, A. (1984). Raritan Bay: its multiple uses and abuses. American Littoral Society,

New Jersey Marine Sciences Consortium, National Marine Fisheries Service – Proceedings of

the Walford Memorial Convocation. Sandy Hook Laboratory Technical Series Report, 30 pages

37-66.

Mott MacDonald. 2017. Draft Lost Valley Nature Park Conceptual Design. Mott Macdonald

Company, Iselin, NJ. 12pp.

Mufson, S., C.Mooney, J. Eilperin, and J. Muyskens. 2019. 2°C: Beyond the limit.

https://www.washingtonpost.com/graphics/2019/national/climate-environment/climate-change-

america/. Accessed May 2020.

Mugg, J., A. Serrano, A. Liberti, and M. Rive. 2000. Aquaculture effluents: a guide for water

quality regulators and aquaculturists. Northeastern Regional Aquaculture Center Publication No.

00-003. North Dartmouth, Massachusetts. 12pp.

National Marine Fisheries Council (NMFS). 2005. Endangered Species Act Section 7 Formal

Consultation and Magnuson-Stevens Fishery Conservation and Management Act Essential Fish

Habitat Consultation for the Pacific Northwest Region Invasive Plant Program, Oregon and

Washington. 48pp.

National Oceanic and Atmospheric Administration (NOAA). 2015. Final Programmatic

Environmental Impact Statement for habitat restoration activities implemented throughout the

coastal United States. NOAA Restoration Center, Silver Spring, MD. 298pp.

New Jersey Department of Environmental Protection (NJDEP). 1972. Delineation of flood

hazard areas, Raritan River Basin, North Branch Raritan River. Division of Water Resources

Flood Hazard Report No. 13. 54pp.

New Jersey Department of Environmental Protection (NJDEP). 2008. New Jersey Wildlife

Action Plan. https://www.njfishandwildlife.com/ensp/wap/pdf/wap_draft.pdf. Accessed May

2020.

Page 144: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

136

New Jersey Department of Environmental Protection (NJDEP). 2013. American shad restoration

in the Raritan River. Grant F-48-R. Investigations and Management of New Jersey’s Freshwater

Fisheries Resources. Final Report, Job I-5. NJDEP, Division of Fish and Wildlife, Bureau of

Freshwater Fisheries. Trenton, NJ. 9pp.

New Jersey Department of Environmental Protection (NJDEP). 2019. 2016 New Jersey

Integrated Water Quality Assessment Report. New Jersey Department of Environmental

Protection Division of Water Monitoring and Standards Bureau of Environmental Analysis,

Restoration and Standards. Trenton, New Jersey. 302pp.

New Jersey Department of Labor and Workforce Development (NJDOL). 2020. Population and

Labor Force Projections. https://www.nj.gov/labor/lpa/dmograph/lfproj/lfproj_index.html.

Accessed May 2020.

Northwest Indian Fisheries Commission (NIFC). 2013. Elwha Restoration Roundup: record

chinook return, salmon habitat improving. December 19, 2013. https://nwtreatytribes.org/elwha-

restoration-roundup-record-chinook-return-salmon-habitat-improving/. Accessed May 2020.

Office of the New Jersey State Climatologist at Rutgers University (ONJSC). 2020. NJ Climate

Data Links. https://climate.rutgers.edu/stateclim_v1/njclimdata.html. Accessed May 2020.

Orr, C., S. Kroiss, K. Rogers, and E. Stanley. 2008. Downstream benthic responses to small dam

removal in a coldwater stream. River Research and Applications 24(6):804-822.

Pearson, A.J., N.P. Snyder, and M.J. Collins. 2011. Rates and processes of channel response to

dam removal with a sand-filled impoundment. Water Resources Research 47(8):1-15.

Princeton Hydro, LLC. 2018. Alternatives Analysis: Blackwells Mills Dam on the Millstone

River, Hillsborough and Franklin Townships, Somerset County, NJ. Princeton Hydro LLC,

South Glastonbury, CT. 40pp.

Raabe, J.K., J.E. Hightower, T.A. Ellis, and J.J. Facendola. 2019. Evaluation of fish passage at a

nature-like rock ramp on a large coastal river. Transactions of the American Fisheries Society

148:798-816.

Page 145: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

137

Ravit, B., M. Comi, D. Mans, C. Lynn, F. Steimle, S. Walsh, R. Miskewitz, S. Quierolo. 2012.

Eastern oysters (Crassostrea virginica) in the Hudson-Raritan Estuary: restoration research and

shellfish policy. Environmental Practice 14(2):110-129.

Rutgers Center for Urban Environmental Sustainability (CUES). 2013. NY/NJ Baykeeper

eastern oyster reintroduction feasibility study, 2013 year end report, final Conservation

Resources Inc. project report. https://cues.rutgers.edu/oyster-

restoration/pdfs/Year_7_December_2013_Final%20Report.pdf. Accessed April 2020.

Rutgers University. 2015. Rutgers University Physical Master Plan, Rutgers 2030 Volume I:

New Brunswick. https://masterplan.rutgers.edu/sites/default/files/Rutgers%202030%20-

%20Volume%201%20-%20Rutgers%20University%20-%20New%20Brunswick_r3.pdf.

Accessed April 2020.

Schmadel, N.M., J.W. Harvey, G.E. Schwarz, R.B. Alexander, J.D. Gomez-Velez, D. Scott, and

S.W. Ator. 2019. Small ponds in headwater catchments are a dominant influence on regional

nutrient and sediment budgets. Geophysical Research Letters 46, 9669–9677.

Schneider, J. 2019. History of the Raritan River. https://cdn.knightlab.com/libs/timeline3/

latest/embed/index.html?source=1Ofi5newoFwvho7c-1Yz0YQlwgHkmZkd56F07b4O-

j0M&font=Default&lang=en&initial_zoom=2&height=650. Accessed May 2020.

Smock, L.A. 2006. Macroinvertebrate dispersion. In: Methods in Stream Ecology.pp465-487.

Stanley, E.H. and M.W. Doyle. 2003. Trading off: the ecological effects of dam removal.

Frontiers of Ecology and the Environment 1(1): 15-22.

Sustainable Raritan River Initiative (SRRI). 2016. State of the Raritan Report, Volume 1.

Sustainable Raritan River Initiative, Rutgers, The State University of New Jersey. New

Brunswick, New Jersey. 67pp.

Sustainable Raritan River Initiative (SRRI). 2019. State of the Raritan Report, Volume 2.

Sustainable Raritan River Initiative, Rutgers, The State University of New Jersey. New

Brunswick, New Jersey. 76pp.

Page 146: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

138

The Nature Conservancy (TNC). 2017. Lost Valley Nature Park Recommendations Report. A

report prepared by Elizabeth Schuster, Environmental Economist with The Nature Conservancy,

with support from the Borough of Manville, the Manville Green Team, and Somerset County

Planning Division. December 2017. 21pp.

Tsipoura, N., M. Allen, J. Kelly. 2012. Connecting people to urban wetlands: preserving

biodiversity in the Raritan River watershed, New Jersey.

http://water.rutgers.edu/Projects/EPA_Raritan_River_Project/08_Data/Reports/Tsipoura%20et%

20al%202012.pdf accessed. May 2020.

Turek, J., A. Haro, and B. Towler. 2016. Federal interagency nature-like fishway passage design

guidelines for Atlantic coast diadromous fishes. Interagency Technical Memorandum. 47pp.

U.S. Army Corps of Engineers (USACE). 1981. Rockafellows Mills Dam NJ00568 Phase 1

Inspection Report. National Dam Safety Program, Department of Army, Philadelphia District,

Corps of Engineers, Philadelphia, PA. 73pp.

U.S. Army Corps of Engineers (USACE). 2002. South River, Raritan River Basin Hurricane and

Storm Damage Reduction and Ecosystem Restoration: Integrated Feasibility Report and

Environmental Impact Statement. New York District U.S. Army Corps of Engineers. 175pp.

U.S. Census Bureau. 2018. U.S. Census Bureau quick facts.

https://www.census.gov/quickfacts/fact/table/monmouthcountynewjersey,mercercountynewjerse

y,hunterdoncountynewjersey,morriscountynewjersey,middlesexcountynewjersey,somersetcounty

newjersey/INC110218. Accessed May 2020.

U.S. Environmental Protection Agency (EPA). 2013. Level III ecoregions of the continental

United States: Corvallis, Oregon, U.S. EPA – National Health and Environmental Effects

Research Laboratory, map scale 1:7,500,000, https://www.epa.gov/eco-research/level-iii-and-iv-

ecoregions-continental-united-states. Accessed April 2020.

U.S. Environmental Protection Agency (EPA). 2018. Criteria air pollutants.

https://www.epa.gov/criteria-air-pollutants. Accessed August 2020.

Page 147: CORNELL-DUBILIER ELECTRONICS, I . S S...Map of Cornell-Dubilier Site and environs. ..... 4 Figure 2. Location of Cornell-Dubilier Site (black star) and locations of restoration alternatives

139

U.S. Environmental Protection Agency (EPA). 2020. EJSCREEN: Environmental justice

screening and mapping tool. https://www.epa.gov/ejscreen. Accessed May 2020.

U.S. Environmental Protection Agency (EPA). 2020b. New Jersey nonattainment/maintenance

status for each county be year for all criteria pollutants. https://www3.epa.gov/airquality/

greenbook/anayo_nj.html. Accessed August 2020.

U.S. Fish and Wildlife Service (USFWS). 2019. Fish passage engineering design criteria.

USFWS, Northeast Region 5, Hadley, MA. 142pp.

U.S. Fish and Wildlife Service (USFWS). 2020. IPaC: Information for Planning and

Consultation, powered by ECOS – the Environmental Conservation Online System.

https://ecos.fws.gov/ipac/. Accessed April 2020.

U.S. Geological Survey (USGS). 2019. https://waterdata.usgs.gov/nwis/uv?site_no=01402000.

Accessed March 2020.

Weiss, J. 2019. As climate change erodes U.S. coastlines, an invasive plant could become an

ally. The Conversation. Accessed April 2020. https://theconversation.com/as-climate-change-

erodes-us-coastlines-an-invasive-plant-could-become-an-ally-111162

zu Ermgassen, P.S.E., M.D. Spalding, B.Blake, L.D. Coen, B. Dumbauld, S. Geiger, J.H.

Grabowski, R. Grizzle, M. Luckenbach, K. McGraw, B. Rodney, J.L. Ruesink, S.P. Powers, and

R. Brumbaugh. 2012. Historical ecology with real numbers: past and present extent and biomass

of an imperiled estuarine habitat. Proceedings of the Royal Society of Biological Sciences

279:3393-34.