Coquitlam Transfer Station Replacement CONSULTATION PRESENTATION June 2017 Web version

Transcript of Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and...

Page 1: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

Coquitlam Transfer Station Replacement

CONSULTATION PRESENTATION

June 2017 – Web version

Page 2: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

2

• Lease of Coquitlam Transfer Station expires at end of 2019

• New transfer station on former Coquitlam Landfill by 2020

• Board approved detailed design and construction in 2016

• Capital Budget = $45M

• Studies completed: Traffic, Noise, Odour, Geotechnical

• Detailed design in progress

2

Overview

Page 3: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

2017: Detailed Design and Consultation

• Stakeholder Consultation

• Permitting

• Geotechnical

• LFG modelling

2018: Tender Award and

Construction

• Issuing tender package

• Selecting contractor(s)

• Equipment orders

• Construction

2019: Construction

and Commissioning

• Construction (cont.)

• Systems testing

• Commissioning at end of 2019.

3

Project Timeline

Page 4: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

4

Replacement of CTS on Coquitlam Landfill

Page 5: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

5

Proposed Project Site

Page 6: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

6

Sustainability Features

• High efficiency/natural lighting

• Stormwater management

• Rainwater recovery

• Management of landfill gas

• Landscaping

Page 7: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

7

Facility Features for Commercial

• ~50,000 sq ft transfer building

• Flat tipping floor layout

• Segregated traffic flows

• Driver amenities

Page 8: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

8

Flat Tipping Floor

Examples of flat tipping floor

Page 9: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

9

Flat Tipping Floor

• Provides operational flexibility

• Flexibility for waste pile

management and expansion for

future operations/materials

• Faster unloading for self haul

customers

• Safety

• Disposal Ban inspections/

hazardous material recovery

Page 10: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

10

Segregated Traffic Flow

• Dedicated inbound lane and scale

• Dedicated outbound lane for scale or bypass

DRAFT

Updated June 16

Residential / Small Vehicles

Commercial / Account holders

Transfer Vehicles

Page 11: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

11

Segregated Traffic Flow

Example

only

Example commercial vehicle tipping area.

This proposed CTS design will have a flexible

tipping floor to accommodate separate areas

for large and small vehicles

Page 12: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

12

Driver Amenities

• Bin turnaround areas

• Tarping pull-out area

• Driver washrooms

Page 13: Coquitlam Transfer Station Replacement presentation · • Consider stakeholder feedback and finalize design • Engagement on neighbourhood construction and operational issues –Fall

13

Next Steps

• Consider stakeholder feedback and finalize design

• Engagement on neighbourhood construction and

operational issues – Fall 2017

• Updates through development permit process and Metro

Vancouver website

• Construction starts in 2018