$ ky1 emryo~aeahw No.: D. I MENaJOfnarLaboratorY Revision. 21 It NUCLEAR WASTE MANAGEMENT PROGRAM Date. April 11, 1988 CONTROLLED COPY NO. Page: of 1 8 Subject: Approved: No Approval TABLE OF CONTENTS Required Please note that not all participants hold every procedure listed in this Table of Contents. TAB/CONTENTS A. Title Page Control Sheet B. Preface C. Terms and Definitions D. Table of Contents 033-NWMP-P 1.0 033-NWMP-P 2.0 033-NWMP-P 2.1 TITLE Title Page Control Sheet Preface Terms and Definitions Table of Contents Organization Assurance Review & Approval of QA Requirements and Procedures Peer Review Scientific Investigation & Design Control Design Control Drawing Control DATE 3/29/85 12/24/86 7/28/87 4/11/88 10/15/87 12/24/86 2/3/87 11/19/87 6/27/86 12/24/86 STATUS APPROVED APPROVED APPROVED REVISION 1 1 6 21 1 0 0 033-NWMP-P 033-NWMP-P 033-NWMP-P 033-NWMP-P 2.2 3A.0 3B.0 3B. 1 1 Interim Procedure APPROVED 0 In Preparation 88O4190350 880411 PDR WASTE WM- 11 DCD LL 5497 {Rev. 11/86) /z-, #

Transcript of CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for...

Page 1: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

$ ky1 emryo~aeahw No.: D.

I MENaJOfnarLaboratorY Revision. 21

It NUCLEAR WASTE MANAGEMENT PROGRAM Date. April 11, 1988

CONTROLLED COPY NO. Page: of1 8

Subject: Approved:No Approval

TABLE OF CONTENTS Required

Please note that not all participantshold every procedure listed in this Table of Contents.

TAB/CONTENTS

A. Title Page Control Sheet

B. Preface

C. Terms and Definitions

D. Table of Contents

033-NWMP-P 1.0

033-NWMP-P 2.0

033-NWMP-P 2.1

TITLE

Title Page ControlSheet

Preface

Terms and Definitions

Table of Contents

Organization

Assurance

Review & Approval ofQA Requirements andProcedures

Peer Review

Scientific Investigation& Design Control

Design Control

Drawing Control

DATE

3/29/85

12/24/86

7/28/87

4/11/88

10/15/87

12/24/86

2/3/87

11/19/87

6/27/86

12/24/86

STATUS

APPROVED

APPROVED

APPROVED

REVISION

1

1

6

21

1

0

0

033-NWMP-P

033-NWMP-P

033-NWMP-P

033-NWMP-P

2.2

3A.0

3B.0

3B. 1

1

Interim Procedure

APPROVED 0

In Preparation

88O4190350 880411PDR WASTEWM- 11 DCD

LL 5497 {Rev. 11/86)

/z�-, #

Page 2: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

I INo.: Revision: Date

21 April 11, 1988

Page

2D. of 8

2Please note that not all participants

hold every procedure listed in this Table of Contents.

TAB/CONTENTS TITLE DATE STATUS REVISION

033-NWMP-P 4.0

033-NWMP-P 4.1

033-NWMP-P 4.2

033-NWMP-P 5.0

033-NWMP-P 5.1

033-NWMP-P 5.2

033-NWMP-R 6.0

033-NWMP-P 6.1

033-NWMP-P 7.0

033-NWMP-R 8.0

ProcurementDocument Control

Use of FabricationAccounts & LaboratoryFabrication Services

Use of LaboratoryTechnical SupportServices

Instructions,Procedures & Drawings

Preparation ofTechnical Procedures

Review and Approval ofTechnical Procedures

Document Control

Issue of ControlledDocuments

Control of PurchasedMaterials, Equipmentand Services

Identification and Controlof Materials, Parts andComponents

12/24/86

3/25/88

3/25/88

6/24/86

6/24/86

6/24/86

6/24/86

6/24/86

12/24/86

12/24/86

APPROVED 0

ISSUED 0

ISSUED a

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

I

0

a

I

I

0

0

033-NNWSI-P 8.1

033-NNWSI-P 8.2

033-NNWSI-P 8.3

Procedure forPreparing Crushed RockSamples

Sample Catalog Procedure

Procedure forPreparing Core WaferSamples

In Preparation

In Preparation

In Preparation

033-NNWSI-P 8.4 Sample Labeling & TrackingGlass Waste Form Testing

In Preparation

I I CA0o7l

Page 3: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

Revision Date

21 April 11, 1988

Page:

3I D.of 8

Please note that not all participantshold every procedure listed in this Table of Contents.

TAB/CONTENTS TITLE DATE STATUS REVISION

033-NNWSI-P 8.5

033-NNWSI-P 8.6

033-NNWSI-P 8.7

033-NNWSI-P 8.8

033-NNWSI-P 8.9

Procedure forRock Sample Collection

Procedure forPreparation of SolidPowder Samples Suspendedin Pressed KBr Disks

Preparation of Sawn GlassMonoliths

Procedure forPreparing Rock Samples

Procedure forMineral Cataloging

In Preparation

In Preparation

In Preparation

In Preparation

In Preparation

033-NNWSI-P 8.10 Identification and Control ofMill Finish Materials, Parts,and Components

12/18/87 ISSUED 0

033-NNWSI-P 8.11 Procedure for Identification,Tagging, Storage, andDocumentation of Treatments forMetal Barriers Test Specimens

In Preparation

033-NWMP-P 8.12

033-NWMP-R 9.0

033-NWMP-R 10.0

033-NWMP-R 11.0

Qualification of Equipment andMaterial for use on Level ofQuality Assurance I and IIActivities

Control of Processes

Inspection

Test Control

3/25/88

12/24/86

12/24/86

5/22/87

ISSUED 0

APPROVED

APPROVED

APPROVED

0

0

0

033-NWMP-R 11.1

033-NNWSI-P 11.2

Requirements for Proceduresfor Analysis or forInstrumentation

Procedure forCarbonate Analysis Usingthe OIC Model 524D CarbonAnalyzer

In Preparation

In Preparation

033-NNWSI-P 11.3 Testing Rock-Water InteractionsUsing a Rocking Autoclave

5/22/87 ISSUED 0

Page 4: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision: Date

April 11, 1988

-- Page:

40. 21 of 8

Please note that not all participantshold every procedure listed in this Table of Contents.

TAB/CONTENTS

033-NNWSI-P 11.4

033-NNWSI-P 11.5

033-NNWSI-P 11.6

033-NNWSI-P

033-NNWSI-P

033-NNWSI-P

033-NNWSI-P

11.7

11.8

11.9

11.10

033-NNWSI-P 11.11

033-NNWSI-P 11.12

033-NNWSI-P 11.13

033-NNWSI-P 11.14

TITLE DATE

X-Ray DiffractionCharacterization

Determination of Anions inWater by Ion Chromatography

ICP-AES Analysis for TraceElements in Solutions

Static Leach Test

Pu-Np Separation, PuRepurification, and PlatingPreparation

SEM and Microprobe Analysis

Nuclear Waste Management Program 8/14/87Nevada Nuclear Waste StorageInvestigations Project Test Plan:Prototype Engineered BarrierDesign Testing

Borescope Surveys to Map 11/20/87Fractures InterceptingBoreholes

Neutron and Gamma (Density) 11/24/87Logging in Welded Tuff

Borehole Television Surveys To 11/30/87Map Fractures Along Horizontalor Subhorizontal Boreholes

Determination of Trace Elementsin J-13 Well Water by InductivelyCoupled Plasma Optical EmissionSpectroscopy (ICP-OES)

Grouting a Measurement Borehole

Installation and Operation ofthe Electromagnetic MeasurementSystem

Procedure for Microprobe Analysis

Measurement of Suction Potential ViaRelative Humidity in Unsaturated Rock

In

In

Preparation

Preparation

In Preparation

ISSUED 0

STATUS REVISION

In Preparation

In Preparation

In Preparation

ISSUED a

ISSUED 0

ISSUED 0

033-NNWSI-P

033-NNWSI-P

033-NNWSI-P

033-NNWSI-P

11.15

11.16

11.17

11.18

In Preparation

In Preparation

In Preparation

In Preparation

In Preparation

Page 5: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision: IDate;.

IlPage:

5D. 21 _Ii

Please note that not ary procedure listed in

April 11, 1988

11 participant-this Table of Contents.

of 8

hold eve:

TAB/CONTENTS033-NNWSI-P 11.19

033-NWMP-R 12.0

033-NNWSI-P 12.1

033-NNWSI-P

033-NNWSI-P

12.2

12.3

033-NNWSI-P 12.4

033-NNWSI-P

033-NNWSI-P

12.5

12.6

033-NNWSI-P 12.7

033-NNWSI-P 12.8

TITLEAir Permeability Measurements

Control of Measuringand Test Equipment

Laboratory Calibration ofthe Goodman Borehole Jack

Calibrating Balances

Calibrating Data Log Systems,Temperature Controllers, andDigital Displays

Calibrating PressureTransducers

Calibration of Thermocouples

Measurement of the pH of AqueousSolutions with the Class Electrode

Calibration of Length MeasuringInstruments

Procedure for Measurement,Accuracy, Calibration andRecords for Metal BarriersSamples

Temperature Measurements

Calibration, Installation andOperation of the MicrowaveResonator Humidity MeasurementSystem

Handling, Storageand Shipping

Collection, Storage &Distribution of J-13 Water

Handling, Storage, and Shippingof Mill Finish Metals

Inspection, Testand Operating Status

12/17/84 ISSUED

DATE STATUS REVISIONIn Preparation

12/24/86 APPROVED 0

0

In

In

Preparation

Preparation

In Preparation

In Preparation

2/18/87 ISSUED 0

In Preparation

In Preparation

033-NNWSI-P

033-NNWSI-P

12.9

12.10

In

In

Preparation

Preparation

033-NWMP-R 13.0

033-NNWSI-P 13.1

033-NNWSI-P 13.2

033-NWMP-R 14.0

12/24/86 APPROVED

4/21/87 ISSUED

12/18/87 ISSUED

12/24/86 APPROVED

a

0

0

0

Page 6: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision: Date.

April 11, 1988

.

P~age:

6D. 21 of 8

Please note that not all partfcipantshold every procedure listed in this Table of Contents.

TAB/CONTENTS

033-NWMP-P 15.0

TITLE

Nonconformances

DATE

1/15/87

STATUS

APPROVED

REVISION

0

033-NWMP-P 16.0

033-NWMP-P 17.0

__ 033-NWMP-P 17.1

033-NNWSI-P 17.2

033-NWMP-P 17.3

Corrective Action

Quality Assurance Records

Receipt and Review ofQuality Assurance Records

Identification and Indexing ofQuality Assurance Records

Storage of QualityAssurance Records

12/24/86 APPROVED

6/24/86

10/12/87

APPROVED

APPROVED

0

1

I

1

1

10/12/87 ISSUED

10/12/87 APPROVED

033-NNWSI-P 17.4

033-NNWSI-P 17.5

033-NWMP-P 17.6

033-NNWSI-P 17.7

Transmittal of 10/12/8Quality Assurance Records

Receipt and Verification 10/12/8of Film Received

Retrieval of Quality 12/24/8Assurance Records

Acceptance of Data Generated 12/24/8Before 1980 & Non-NNWSI Data

Storage of One-of-a-Kind Items

Transmittal of Quality Assurance 11/9/87Records to the Local RecordsCenter

7 ISSUED

7 ISSUED

6 APPROVED

I

0

66 APPROVED 0

In Preparation

ISSUED a

033-NWMP-P

033-NWMP-P

17.8

17.9

033-NWMP-P

033-NW'MP-P

033-NWMP-P

18.0

18.1

18.2

Audits

Surveillance

Qualification of QualityAssurance Audit Personnel

Software QualityAssurance

Appendix 1

Appendix 2

6/24/86

12/24/86

6/24/86

APPROVED

RESCINDED

APPROVED

2

0

0

0

0

0

033-NWMP-R 19.0 12/24/86 APPROVED

033-NWMP-R

033-NWMP-R

19.1

19.1

(EQ3/6)

(EQ3/6)

10/25/86

10/25/86

ISSUED

ISSUED

Page 7: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

Ddte: 'S

April 11, 1988

. P~age:

7 of 8

Please note that not all participantsry procedure listed in this Table of Chold eve: ontents.

TAB/CONTENTS

033-NWMP-R 19.1 (EQ3/6)

033-NWMP-R

033-NWMP-P

033-NWMP-P

033-NWMP-P

03 3-NWMP-P

033-NWMP-P

'- 033-NWMP-P

033-NWMP-P

033NWP-

033-NWMP-P

19.2 (EQ3/6)

19.3 (EQ3/6)

19.4 (EQ3/6)

19.5 (EQ3/6)

19.6 (EQ3/6)

19.7 (EQ3/6)

19.8 (EQ3/6)

19.9 (EQ3/6)

19.10 (EQ3/6)

19.11 (EQ3/6)

TITLE

Requirements for Developmentand use of Scientific andEngineering Software

Coding Standards for FortranComputer Codes

Acquisition and Evaluationof Computer Codes

Development of Computer Codes

Verification and Validationof Computer Codes

Documentation of Scientificand Engineering Software

Peer Review of Scientificand Engineering Software

Transfer of Computer Codes

Application of Scientificand Engineering Software

Error Reporting and Resolution

Working Environment forStorage, Development, andApplication of Computer Codes

Backup and Archiving ofComputer Codes

DATE

10/25/86

10/25/86

10/25/86

10/25/86

10/26/86

10/25/86

10/25/86

10/25/86

10/25/86

10/25/86

10/25/86

STATUS

ISSUED

ISSUED

ISSUED

ISSUED

ISSUED

ISSUED

ISSUED

ISSUED

ISSUED

ISSUED

ISSUED

REVISION

0

0

0

0

0

0

0

0

0

0

0

0033-NWMP-P 19.12 (EQ3/6) 10/25/86 ISSUED

033-NWMP-P

033-NWMP-P

O33-N WMP-R

033-~NWMP-R

20.0

20.1

21A.0

21B.0

Assigning Levels ofQuality Assurance

Numbering of Activities

Training

Qualification of Personnel

12/24/86

12/24/86

12/24/86

12/24/86

APPROVED

APPROVED

APPROVED

APPROVED

0

0

0

0

L.L 54971

Page 8: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision:

D. 21A

Date.

April 11, 1988

Page:

8 of 8

.. . . ._ . :: o _ _ _. f _ W _ __s

Please note that not all participantshold every procedure listed in this Table of Contents.

TAB/CONTENTS TITLE DATE STATUS REVISION

033-NWMP-P 22.0

033-NWMP-P 22.0

Technical Reviewof Publications

Instructional Memorandum #22-1

3/13/87 APPROVED

10/4/87 ISSUED

a

0

Page 9: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

Lkvvr&,, of a~, omaNo.: 03N M - .lL LawmeveLhen mEFFECTIVE DATE IS I033-NWMP-P 4-1MF4NationalLaboratory I Revision.

v APR.08 1988 De. 0

AUCLEAR WASTE MIANAGEM1ENT PROGRA Date.

CONTROLLEDgCOPYMarch 25, 'o 1988CONTROLLED COPY NO. ~Pg:o

1 8Subject: Appro d:

USE OF FABRICATION ACCOUNTS AND aL AORRATORY FABRTCAIITN SERVICES nIwrpnrp f Rsmspntt

NWMP Leader

Reviewed by & M . d '/qko Reviewed by:David W. Short n J. 'onkersDeputy Project Leader eputy Program Leaderfor NNWSI for Quality Assurance

Reviewed by: L. 42i*. A s- 4W- F;esse L. Ycd, Jr.t7

Other Projects Leader

4.1.1 PURPOSE

This procedure specifies the Nuclear Waste Management Program's (NWMP) controland documentation requirements for use of fabrication accounts and use of theLaboratory's fabrication services. The intent of this procedure is to bringthe control, review, and documentation of fabrications in conformance with thepertinent requirements established for procurement actions.

4.1.2 SCOPE

The Deputy for QA reviews documentation pertaining to each use of afabrication account to assure each action is associated with an activity. Forfabrications supporting Level of Quality Assurance I and II activities theDeputy for QA reviews the original documents. For fabrications supportingLevel of Quality Assurance III activities a review by the Deputy for QA of aninformational copy of the fabrication request form is sufficient.

Disagreements concerning the activity with which a fabrication should beidentified are resolved between the Deputy for QA, the Task Leader, and theresponsible Project Leader. In instances where the matter cannot be resolvedbetween these parties, the NWMP Leader's decision is final.

The steps described in the remainder of this procedure apply to uses offabrication accounts and fabrication services supporting Level of QualityAssurance I and II activities with the exception of fabrications not affectingthe quality of scientific investigations.

The steps described in the remainder of this procedure do not apply to uses offabrication accounts in support of Level of Quality Assurance III activitiesexcept in instances where the Task Leader deems it appropriate.

LL 5497 (Rev. 11/86)

Page 10: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision Date. Page:

033'-NWMP-P 4.1 0 March 25, 1988 2 of 8

4.1.3 RESPONSIBILITIES

This procedure prescribes specific responsibilities for the requestor ofLaboratory fabrication services, the technical representative, the appropriateTask Leader, the Program Administrator, and the Deputy for QA.

The NWMP Project Leaders are responsible for the implementation of thisprocedure. The Deputy for QA is responsible for assuring that this procedureis implemented and remains effective.

4.1.4 TERMS AND DEFINITIONS

Fabrication Account: A 7800 series capital account within the LLNL accountingstructure. These accounts are part of the General Plant and Capital Equipmentaccount series.

Requestor: The individual originating the fabrication request. If therequestor is a Task Leader or above, that same individual has responsibilityfor fulfilling the responsibilities assigned to the Task Leader by thisprocedure.

Technical Representative: The individual assigned responsibility by the TaskLeader for technical decisions related to the fabrication request. Thetechnical representative is likely to be the requester, but need not be. TheTask Leader can serve as the Technical Representative.

4.1.5 PROCEDURES

Starting the Process

4.1.5.1 Identify the Activity (or Activities) Being Supported

Responsible Individual: Requestor

The requestor identifies the activity or activities the fabrication serviceswill support. If the item to be fabricated supports more than one activity,the most stringent Level of Quality Assurance is applicable.

4.1.5.2 Prepare the Fabrication Document Package

Responsible Individual: Requestor

All uses of fabrication accounts require completion of a Fabrication RequestForm (LL 4970) or preparation of a memorandum specifying the account andservice to be utilized. The requestor includes the following information onthe memorandum or as an attachment to LL 4970:

A. Scope of Work -- The scope of work defines the work to be accomplished andincludes a statement and schedule of deliverables.

I�I �aq7.IL- 1 5^Q7- l

Page 11: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision: Date. Page:

0335NWMW-P 4.1 0 March 25, 1988 3 of 8

B. Technical Requirements -- Specifications, drawings, standards, codes, andprocedures to be followed are specified. In-process reviews and acceptancetests necessary to evaluate conformance of an item or service to the technicalrequirements are specified.

C. Quality Assurance Requirements -- A fabrication shop must follow thepertinent provisions of the NWMP QAPP when doing work for the NWMP. Thequality assurance program requirements, including provisions for collection ofpersonnel qualification records, are specified in a statement attached to theprocurement document (see Form 4.1.1).

D. Right of Access -- Facilities and relevant records must be accessible toNWMP personnel and its authorized representatives for the purposes ofconducting inspections, audits, and surveillances. The responsible individualwho has assured right of access is specified by title and name.

The requester forwards the memorandum (or LL 4970 and attachment) to the TaskLeader of the activity (or activities) the fabrication will support.

Reviewing the Fabrication Document Package

4.1.5.3 Task Leader's Review

The Task Leader reviews the memorandum to assure that the use of thefabrication account is appropriate and that the document contains all requiredinformation.

After completing his review, the Task Leader prepares and signs theFabrication Document Review Form (see Form 4.1.2) and attaches the form to thefabrication documents.

The Task Leader forwards the memorandum and review form (the fabricationdocument package) to the Program Administrator.

4.1.5.4 Program Administrator's Review

The Program Administrator reviews the Fabrication Document Review Form toverify that all appropriate information has been entered by the Task Leader.Questions concerning this information are resolved with the Task Leader. TheProgram Administrator completes and signs the Fabrication Document ReviewForm.

The Program Administrator forwards the fabrication document package to theDeputy for QA. For fabrications supporting Level of Quality Assurance IIIactivities and fabrications not affecting the quality of a scientificinvestigation, the Program Administrator need only forward an informationalcopy of the Fabrication Request Form with the activity number and QALA notedat the bottom.

. .. .V_

Page 12: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No: Revision Date. Page:

033-NWMP-P 4.1 0 March 25, 1988 4 of 8

4.1.5.5 Deputy for QA's Review

The Deputy for QA reviews all fabrication document packages to assure each isidentified with the appropriate activity and the attendant Level of QualityAssurance. This review is conducted within two working days of receipt.

The Deputy for QA assures that the required information as prescribed by thisprocedure is contained in the document package.

When the document package satisfies the requirements of this procedure theDeputy for QA signs the Fabrication Document Review Form.

The Deputy for QA creates and maintains a separate folder (the task actionfolder) for each task. The Deputy for QA makes a copy of the fabricationdocument package and places it in the appropriate folder. The Deputy for QAretains the original Fabrication Document Review Form in the appropriatefolder.

The fabrication document package is returned to the requestor for transmittalto the appropriate fabrication shop.

The Deputy for QA maintains a Fabrication Log (see Form 4.1.3). The Deputyfor QA enters the applicable information on the log.

4.1.5.6 Changes to Fabrication Documents

Changes to fabrication documents are brought to the attention of the Deputyfor QA by the requester. The Deputy for QA makes a copy of any changeddocument and places the revised document in the appropriate task actionfolder. The Deputy for QA sends a copy of the revised package to therequester, Task Leader, and Program Administrator.

Fabrication Phase

4.1.5.7 In Process Evaluations

Responsible Individuals: Technical Representative and the Deputy for QA

As specified in the fabrication document package, the technical representativeand the Deputy for QA conduct in-process evaluations of the fabrication toassure technical and quality assurance requirements are satisfied.

The technical representative and the Deputy for QA prepare documentation ofin-process monitoring activities. The technical representative sends a copyof this documentation to the Deputy for QA for inclusion in the task actionfolder.

4.1.5.8 Nonconformances

Nonconformances are reported and controlled in accordance with 033-NWMP-P15.0, "Nonconforming Items, Procedural Nonconformances, and Conditions Adverseto Quality."

.I A T-

Page 13: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision: Date.' age

033-NWMP-P 4.1 0 March 25, 1988 5 of 8

A fabricated item cannot be accepted and/or the fabrication action closed ifthere is an open nonconformance pertaining to the fabrication.

Close-out Phase

4.1.5.9 Acceptance

Responsible Individual: Technical Representative

The technical representative is responsible for acceptance of the fabricateditem in accordance with the criteria specified in the fabrication documentpackage.

The technical representative documents the grounds for acceptance of thefabricated item. The technical representative sends a copy of thisdocumentation to the Deputy for QA for inclusion in the task action folder.

Upon receipt of this documentation by Quality Assurance the fabrication actionis considered closed for quality assurance related purposes.

4.1.6 QUALITY ASSURANCE RECORDS

Documents contained in the task action folder become quality assurance recordswhen the fabrication action is closed. The Fabrication Log is also a qualityassurance record. These records are collected, stored, and maintained inaccordance with 033-NWMP-P 17.0, "Quality Assurance Records."

Li S497-1

Page 14: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

w - T

No.: _ Revision: Date.

March 25, 1988

Page:

6 of 8033.-NWMP-P 4.1

FORM 4.1.1

QUALITY ASSURANCE REQUIREMENTS

Met by:______________________________________

Requirement/Procedure NWMP Requirement/Procedure Other(Specify)

________________________________________________________________________________

lI- . .. ,-,,- -. > -,

Page 15: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.:_ , . \

,

. _

Revision: 1-1

.0

Date

March 25, 1988 7 of 8033'-NWMP-P 4.1

FORM 4.1.2

FABRICATION DOCUMENT REVIEW FORM

Technical Contact -Ext.

Activity Number_ QA Level_

Estimated Cost

~'~' Fabrication Objective:

I *N

11-~ I have reviewed the attached documents and concur that they aretechnically adequate to meet the stated fabrication objective.

Task Leader Date

* * ** * * * * * * * * * *

I have reviewed the attached fabrication documents and concur thatthey are complete and accurate.

NWMP Program Administrator Date

** * * * * * * * * * * * *

I have reviewed the attached fabrication documents and concur that theycontain the necessary quality assurance requirements to meet the statedobjective.

NWMP Deputy Leader for Quality Assurance Date

Logged by QA

I i ILAO.-

Page 16: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.:_ . __

Revision: \_>

0

Date. <Page:

March 25, 1988 8033-NWMP-P 4.1 of 8

FORM 4.1.3

FABRICATION LOG

ACCOUNT NUMBER COST REQUESTOR SHOP LEVEL FOLLOW-UPDATE

CLOSED

LL 5497-1

Page 17: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

iLtrvefofCakaEFFECTV DE No.: 033-NWMP-P 8.12

OlNtbna Leaboratory APR-08 1988 Revision:PROGRAIF~~~ 8 1988 Date.

JUCLEAR WASTE MIANAGEMENT PROGR March 25, 1988

CONTROLLED COPY NO. "A Page: of

1 7

Subject. prvQUALIFICATION OF EQUIPMENT AND MATERIAL FOR USE 0 X i//eLEVEL OF QUALITY ASSURANCE I AND II ACTIVITIES Lawrence ott

NWMP Leader

Reviewed by. I& X W /iX Reviewed by:David W. Short n mDeputy Project Leader eputy ogram Leaderfor NNWSI for Quality Assurance

Reviewed by: f e s-

Other Projects Leader

8.12.1. PURPOSE

This procedure specifies the Nuclear Waste Management Program's (NWMP)requirements for qualifying equipment and material originally obtained atLevel of Quality Assurance III or outside the NWMP for use on a Level ofQuality Assurance I or II activity. The intent of this procedure is tocontrol, review, and document material and equipment used in support of Levelof Quality Assurance I and II activities.

8.12.2 SCOPE

This procedure applies to material and equipment that will be used in supportof a Level of Quality Assurance I or II activity. Material and equipment notaffecting the quality of a scientific investigation are exempt from theprovisions of this procedure.

Material and equipment procured for Level of Quality Assurance I and IIactivities in accordance with the provisions of 033-NWMP-P 4.0 and P 7.0 areexempt from this procedure.

Disagreements concerning whether this procedure is applicable to a specificitem are resolved between the Deputy for QA, the Task Leader, and theresponsible Project Leader. In instances where the matter cannot be resolvedbetween these parties, the NWMP Leader's decision is final.

LL 5497 (Rev. 11/86)

Page 18: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision: Date Page:

OD33-NWMP-P 8.12 0 March 25, 1988 2 of 7

8.12.3 RESPONSIBILITIES

This procedure prescribes specific responsibilities to the technicalrepresentative, the Task Leader, and the Deputy for QA.

The NWMP Project Leaders are responsible for the implementation of thisprocedure. The Deputy for QA is responsible for assuring that this procedureis implemented and remains effective.

8.12.4 TERMS AND DEFINITIONS

Technical Representative: The individual making the request to qualify an itemfor use on a Level of Quality Assurance I or II activity. The Task Leader canfulfill this role.

Commercial Grade Item: An item that can be ordered from a manufacturer orsupplier on the basis of specifications in a manufacturer's published productcatalog.

8.12.5 PROCEDURES

8.12.5.1 Commercial Grade Items

To qualify a commercial grade item for use on a Level of Quality Assurance Ior II activity, the technical representative completes Form 8.12.1,"Qualification of a Commercial Grade Item for Use on a Level of QualityAssurance I or II Activity."

In completing this form the manufacturer's published product description,catalog number, and, if available, the item's serial number are cited.

If appropriate, qualification tests are stipulated for the item.Qualification testing is documented and appended to Form 8.12.1. Thetechnical representative consults with the Task Leader to assure that theproposed qualification tests are appropriate and sufficient. Qualificationtest documentation includes the names of the individuals conducting thetest(s), the test criteria, and the test results.

The technical representative forwards a copy of Form 8.12.1 and anyaccompanying documentation to the Task Leader prior to use of the item in aLevel of Quality Assurance I or II activity.

8.12.5.2 All Other Items

To qualify a non-commercial grade item for use on a Level of Quality AssuranceI or II activity, the technical representative completes Form 8.12.2,"Qualification of an Item for Use on a Level of Quality Assurance I or IIActivity."

a I S 07.11

Page 19: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision: Date. Page:

053-NWMP-P 8.12 0 March 25, 1988 3 of 7

In completing this form the item and the proposed use are described. Theitem's serial number, if available, is cited. The technical requirements forthe item are specified.

If appropriate, qualification tests are stipulated to demonstrate the itemmeets the technical requirements. The technical representative consults withthe Task Leader to assure that the proposed qualification tests areappropriate and sufficient. Qualification tests are documented and thedocumentation appended to Form 8.12.2. Qualification test documentationincludes the names of the individuals conducting the test(s), the testcriteria, and the test results.

The technical representative forwards a copy of Form 8.12.2 and the attacheddocumentation to the Task Leader prior to use of the item on a Level ofQuality Assurance I or II activity.

8.12.5.3 Task Leader's Review

The Task Leader reviews the documents (either Form 8.12.1 or 8.12.2 and theaccompanying documentation) to assure that use of the item on a Level ofQuality Assurance I or II activity is appropriate and the documents containall the required information.

The Task Leader signs Form 8.12.1 or 8.12.2 (whichever is applicable) andforwards the form and documentation to the Deputy for QA.

8.12.5.4 Deputy for QA's Review

The Deputy for QA assures that the information prescribed by this procedure iscontained on the form and the accompanying documentation. The Deputy for QAverifies that qualified personnel conducted all qualification tests.

Disagreements concerning whether an item is qualified for use on a Level ofQuality Assurance I or II activity are resolved among the Deputy for QA, theTask Leader, and the responsible Project Leader. In instances where thematter cannot be resolved among these parties, the NWIMP Leader's decision isfinal.

When the documentation satisfies the requirements of this procedure, theDeputy for QA signs Form 8.12.1 or 8.12.2 (whichever is applicable) and sendsa copy to the Task Leader and technical representative.

Once Form 8.12.1 or 8.12.2 (whichever is applicable) has been signed by thetechnical representative, Task Leader, and the Deputy for QA the subject itemis qualified for use on a Level of Quality Assurance I or II activity.

The Deputy for QA maintains a file folder for each task where the documentsproduced in response to this procedure are placed.

The Deputy for QA maintains a "Qualified Items Log" (see Form 8.12.3) withapplicable information on each item qualified for use on a Level of QualityAssurance I or II activity by means of this procedure.

E1 5691-2

Page 20: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision: Date: Page:

033-NWMP-P 8.12 0 March 25, 1988 4 of 7

8.12.6 QUALITY ASSURANCE RECORDS

Qualification documents and the Qualified Items Log are quality assurancerecords. Once the Deputy for QA approves an item as qualified for use on a

Level of Quality Assurance I or II activity a copy of the documentation is

submitted to the Records Management System in accordance with 033-NWMP-P 17.0,

"Quality Assurance Records."

. ~A7..I-- -17-^

Page 21: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision: 1

033-f4WMP-P 8.12 0

Date.

March 25, 1988

I Page

5 of 7

FORM 8.12.1

QUALIFICATION OF A COMMERCIAL GRADE ITEMFOR USE ON A LEVEL OF QUALITY ASSURANCE I OR II ACTIVITY

Technical Contact_ _ _ _ _ __ _ _ _Ext

Activity Number_ QA Level_

Item Description:

Item Catalog Number:

Item Serial Number:

Intended Use:

Qualification Testing Required? (Y/N)_If yes, append qualification test documentation.

'~s~ Technical Representative's Signature

Date

*t * *t *t *t *t *t *t * * * * * *

I have reviewed the documentation and concur that this itemuse on a Level of Quality Assurance I or II activity. -

is qualified for

Task Leader Date

I have reviewed the documentation and concur that they contain the necessaryquality assurance requirements to qualify this item for use on a Level ofQuality Assurance I or II activity.

NWMP Deputy for QA Date

\- ~Logged by QA QA ITEM NO.

* L U-WI-1

Page 22: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision: \,

033-NWMP-P 8.12 0

Date.

March 25, 19&E

- rage1

3 6 of 7

FORM 8.12.2

QUALIFICATION OF AN ITEM FOR USEON A LEVEL OF QUALITY ASSURANCE I OR II ACTIVITY

Technical Contact_ Ext

Activity Number_ QA Level_

Item Description:

Item Serial Number:

Intended Use of the Item:

Technical Requirements for the Item:

Qualification Testing Required? (YIN)_If yes, append qualification test documentation.

Technical Representative's Signature_

Date

* N N N N * N N * * * N * N

I have reviewed the documentation and concur that this itemuse on a Level of Quality Assurance I or II activity.

is qualified for

Task Leader Date

* N * * * * N * * * N * *

I have reviewed the documentation and concur that they contain the necessaryquality assurance requirements to qualify this item for use on a Level ofQuality Assurance I or II activity.

NWMP Deputy for QA Date

*

Logged by QA_ QA ITEM NUMBER

LL 5497-1

Page 23: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

FORM 8.12.3

QUALIFIED ITEMS LOG

ITEM NO ITEM REQUESTOR ACTIVITY LEVEL DATEAPPROVED

I . KA07-1

Page 24: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

'�J334J�iP..P 4.2t*vwySryofa1Jdr<r> P. _o--33-NWMP-P 4-2

Aa ikoni1tben oratry DATE IS Rcvision 0

IAPR .08 1988 1)ate.NUCLEAR WASTE NMANAGEN1ENT PROGRA awll March 25, 1988

CONTROLLED COPY NO. Zs Page: of1 8

Subject: Approed 7/&

USE OF LABORATORY TECHNICAL SUPPORT SERVICES awrence D. Rams~ottNWMP Leader

Reviewed by:t £ S* Reviewed by:David W. Short hn J. onkersDeputy Project Leader eputy Wogram Leaderfor NNWSI for Quality Assurance

Reviewed by: 64 4 4 - 4- *Ji~sse L. Yost Jr'. °Other Projects Leader

4.2.1 PURPOSE

This procedure specifies the Nuclear Waste Management Program's (NWMP) controland documentation requirements for use of the Lawrence Livermore NationalLaboratory's technical support services. The intent of this procedure is tobring the control, review, and documentation of these services in conformancewith the pertinent requirements established for procurement actions. Use offabrication accounts and Laboratory fabrication services are coveredseparately under 033-NWMP-P 4.1.

For the purpose of this procedure, Laboratory technical support services aredefined as scientific and engineering personnel utilized to support the NWMPon an occasional or one-time only basis.

4.2.2 SCOPE

To assure that each use of a Laboratory technical support service isassociated with an activity, the Deputy for QA reviews documentationpertaining to use of such services. For services supporting Level of QualityAssurance I and II activities, the Deputy for QA reviews the originaldocuments. For services supporting Level of Quality Assurance III activities,a review by the Deputy for QA of an informational copy of a technical supportservice request memo is sufficient.

Disagreements concerning the activity with which the use of a technicalsupport service should be identified are resolved between the Deputy for QA,the Task Leader, and the responsible Project Leader. In instances where thematter cannot be resolved between these parties, the NWMP Leader's decision isfinal.

LL 5497 (Rev. 11/86)

Page 25: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.. Revision: Date. Page:

033-NWMP-P 4.2 0 March 25, 1988 2 of 8

The steps described in the remainder of this procedure apply to uses ofLaboratory scientific and engineering services in support of Level of QualityAssurance I and II activities. This procedure does not apply to use of theTechnical Information Department or other support services not affecting thequality of a scientific investigation.

The steps described in the remainder of this procedure do not apply to uses ofLaboratory technical services in support of Level of Quality Assurance IIIactivities except in instances where the Task Leader deems it appropriate.

4.2.3 RESPONSIBILITIES

This procedure prescribes specific responsibilities for the requester ofLaboratory technical support services, the technical representative, theappropriate Task Leader, the Program Administrator, and the Deputy for QA.

The NWMP Project Leaders are responsible for the implementation of thisprocedure. The Deputy for QA is responsible for assuring that this procedureis implemented and remains effective.

4.2.4 TERMS AND DEFINITIONS

Requestor: The individual originating the technical support service request.If the requestor is a Task Leader or above, that same individual hasresponsibility for fulfilling the responsibilities assigned to the Task Leaderby this procedure.

Technical Representative: The individual assigned responsibility by the Task~' Leader for technical decisions related to a technical support service

request. The technical representative is likely to be the requester, but neednot be. The Task Leader can serve as the Technical Representative.

Technical Support Service: LLNL scientific or engineering personnel utilizedto support the NWMP on an occasional or one-time only basis.

4.2.5 PROCEDURES

Starting the Process

4.2.5.1 Identify the Activity (or Activities) Being Supported

Responsible Individual: Requestor

The requestor identifies the activity or activities the technical supportservice will support. If the technical support service supports more than oneactivity, the most stringent Level of Quality Assurance is applicable.

LL 5497-1

Page 26: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision. Date: Page

033-NWMP-P 4.2 0 March 25, 1988 3 of 8

4.2.5.2 Prepare the Technical Support Service Document Package

Responsible Individual: Requestor

Prior to use of a technical support service, the requestor prepares amemorandum specifying the support service to be utilized. The memorandumincludes the following information:

A. Scope of Work -- The scope of work defines the work to be accomplished andincludes a statement and schedule of deliverables.

B. Technical Requirements -- Specifications, drawings, standards, codes, andprocedures to be followed are specified. In-process reviews and acceptancetests necessary to evaluate conformance of the service to the technicalrequirements are specified.

C. Quality Assurance Requirements -- The Laboratory personnel or organizationproviding the service must follow the pertinent provisions of the NWMP QAPPwhen doing work for the NWMP. The quality assurance program requirements,including provisions for collection of personnel qualification records, arespecified in a statement attached to the procurement document (see Form4.2.1).

D. Right of Access -- Facilities and relevant records must be accessible toNWMP personnel and its authorized representatives for the purposes ofconducting inspections, audits, and surveillances. The responsible individualwho has assured right of access is specified by title and name.

The requester forwards the memorandum to the Task Leader of the activity (oractivities) the service will support.

Reviewing the Technical Support Service Document Package

4.2.5.3 Task Leader's Review

The Task Leader reviews the memorandum to assure that the use of the serviceis appropriate and that the document contains all required information.

After completing his review, the Task Leader prepares and signs the TechnicalSupport Service Document Review Form (see Form 4.2.2) and attaches the form tothe memorandum.

The Task Leader forwards the memorandum and review form (the technical supportservice document package) to the Program Administrator.

4.2.5.4 Proaram Administrator's Review

The Program Administrator reviews the Technical Support Service DocumentReview Form to verify that all appropriate information has been entered by theTask Leader. Questions concerning this information are resolved with the TaskLeader. The Program Administrator completes and signs the Technical SupportService Document Review Form.

LL 5497-1

Page 27: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision: Date. Page

033-NWMP-P 4.2 0 March 25, 1988 4 oi 6

The Program Administrator forwards the technical support service documentpackage to the Deputy for QA. For services supporting Level of QualityAssurance III activities and services not affecting the quality of ascientific investigation, the Program Administrator need only forward aninformational copy of the service request memo with the activity number andLevel of Quality Assurance noted at the bottom.

4.2.5.5 Deputy for QA's Review

The Deputy for QA reviews all technical support service document packages toassure each is identified with the appropriate activity and the attendantLevel of Quality Assurance. This review is conducted within two working daysof receipt.

The Deputy for QA assures that the required information as prescribed by thisprocedure is contained in the document package.

When the document package satisfies the requirements of this procedure, theDeputy for QA signs the Technical Support Service Document Review Form.

The Deputy for QA creates and maintains a separate folder (the task actionfolder) for each task. The Deputy for QA makes a copy of the document packageand places it in the appropriate folder. The Deputy for QA retains theoriginal Technical Support Service Document Review Form in the appropriatefolder.

The technical support service document package is returned to the requestorfor transmittal to the appropriate personnel or Laboratory organization.

The Deputy for QA maintains a Technical Support Service Log (see Form 4.2.3).The Deputy for QA enters the applicable information on the log.

4.2.5.6 Changes to Technical Support Service Documents

Changes to technical support service documents are brought to the attention ofthe Deputy for QA by the requester. The Deputy for QA makes a copy of anychanged document and places the revised document in the appropriate taskaction folder. The Deputy for QA sends a copy of the revised package to therequester, Task Leader, and the Program Administrator.

Service Execution Phase

4.2.5.7 In Process Evaluations

Responsible Individuals: Technical Representative and the Deputy for QA

As specified in the technical support service document package, the technicalrepresentative and the Deputy for QA conduct in-process evaluations of theservice to assure technical and quality assurance requirements are satisfied.

The technical representative and the Deputy for QA prepare documentation ofin-process monitoring activities. The technical representative sends a copyof this documentation to the Deputy for QA for inclusion in the task actionfolder.

L. L.L a -L

Page 28: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No. Revision: Date. Page

03?-NWMP-P 4.2 0 March 25, 1988 5 of 8

4.2.5.8 Nonconformances

Nonconformances are reported and controlled in accordance with 033-NWMP-P15.0, "Nonconforming Items, Procedural Nonconformances, and Conditions Adverseto Quality."

The deliverable(s) of the technical support service cannot be accepted and/orthe technical support service action closed if there is an open nonconformancepertaining to the service.

Close-out Phase

4.2.5.9 Acceptance

Responsible Individual: Technical Representative

The technical representative is responsible for acceptance of thedeliverable(s) of the technical support service in accordance with thecriteria specified in the technical support service document package.

The technical representative documents the grounds for acceptance of thedeliverable(s). The technical representative sends a copy of thisdocumentation to the Deputy for QA for inclusion in the task action folder.

Upon receipt of this documentation by Quality Assurance the technical supportservice action is considered closed for quality assurance related purposes.

4.2.6 QUALITY ASSURANCE RECORDS

Documents contained in the task action folder become quality assurance recordswhen the technical support service action is closed. The Technical SupportService Log is also a quality assurance record. These records are collected,stored, and maintained in accordance with 033-NWMP-P 17.0, "Quality AssuranceRecords."

LL 5497-1

Page 29: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

-f X - ffi @ - . -

No.: Revision:

0

Date: Page:

March 25, 1988 | 6033;NWMP-P 4.2 of 8

FORM 4.2.1

QUALITY ASSURANCE REQUIREMENTS

Met by:______________________________________

Requirement/Procedure NWMP Requirement/Procedure Other(Specify)

- - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

LL 5497-1

Page 30: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

No.: Revision:

0

Date; Page:

March 25, 1988 70331-NWMP-P 4.2 of 8

FORM 4.2.2

TECHNICAL SUPPORT SERVICE

DOCUMENT REVIEW FORM

Technical Contact

Activity Number_

Ext.

QA Level

Estimated Cost_

Support Service Objective:

I have reviewed the attached documents and concur that they are technicallyadequate to meet the stated objective.

Task Leader Date

* * * * * * * * * * * * *

I have reviewed the attached documents and concur that they are complete andaccurate.

*

NWMP Program Administrator Date

* * * * * * * * * * * * * *

I have reviewed the attached documents and concur that they contain thenecessary quality assurance requirements to meet the stated objective.

NWMP Deputy Leader for Quality Assurance Date

Logged by QA

LL 5497-1

Page 31: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

FORM 4.2.3

TECHNICAL SUPPORT SERVICE LOG

ACCOUNT NUMBER COST REQUESTOR DEPT_USED

LEVEL FOLLOW-UPDATE

CLOSED

Page 32: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

-1�- -/

Lsrvw ecyLCaIhfornba EFFECTIVE DATE IS No.: 033-NNWSI-P 11.11

~. NatkionalLabofatory IAPR 0 8 198B RvisionnteIini Change Notice

_IUCLEAR WASTE IVIANAGEM ET PROGRAM Date. March 25, 1988

CONTROLLED COPY NO. _ Page: ofAddition

Subject: "Interim Change Notice" Approved:Borescope Surveys To Map Fractures I 0w ) i. 80 1i / /Mf1Intercepting Boreholes David W. Short

NWMP Deputy Project Leaderfor NNWSI

Reviewed by:4 n J onkerseputy rogram Leader for

Quality Assurance

11.11.5 RECORDS

(The following paragraphs replace the second paragraph of this section.)

The process to change a procedure is dependent upon the section of theprocedure which has to be changed. Changes to procedure sections titled:"PURPOSE", "SCOPE", "RESPONSIBILITIES", "RECORDS", "PERSONNELQUALIFICATIONS", and "SAFETY" are described using carbon copy memorandumforms. The review and approval process for these changes begins when theinitiator of the changes writes the proposed changes on the memorandumform. The memorandum identifies the initiator of the proposed changes.The Principal Investigator responsible for the activity will review theproposed change and authorize it by signing the memorandum. The originalsheet of the form will be attached to the field copy of the technicalprocedure and a notation made on the margin of the procedure referring thereader to the memorandum. One of the carbon copies will be pasted in thescientific notebooks and the third copy will be returned to the SubtaskLeader and filed.

Documentation of the methods or procedures used to perform thetest/activity will be provided by the Scientific Notebook approach. Incontrast to the requirement for documentation of changes to other sectionsof this procedure, there is no requirement to note deviations from thetypical approach outlined in those sections of this procedure that addressmethods or procedures only. Rather, the method or approach used will bedetermined by the Principal Investigator or the person assigned by thePrincipal Investigator to do the work, and the documentation will beprovided in the Scientific Notebook in accordance with 033-NWMP-R 11.0,Revision 1 (approval pending.) As such, deviations from the suggested ortypical approaches outlined in this procedure are allowed based on thetechnical judgement of the scientist responsible for this activity.Revised procedures will then be prepared upon completion of the test usingthe original technical procedures, changes specified in the scientificnotebooks in accordance with revision procedures outlined in Section 8.2.

LL 5497 Utev. 11/86)

Page 33: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

I-- _1/ur.tvs.,ofCa Ad-ba No.. 033-NNWSI-P 11.12JIL Lawervce LivemoIFNatir csna/Laxborntory RevisionInterim Change Notice

NUCLEAR WASTE IMIANAGEMENT PROGRAMi Date. March 25, 1988Page: of

CONTROLLED COPY NO. Addition

"Interim Change Notice" Approve W 4 ., f@ /G8NEUTRON AND GAMMA (DENSITY) LOGGING IN WELDED TUFF David W. Short

NWMP Deputy Project LeaderTfor NNWSI

Reviewed by:,49n J. Ynkers

W puty Pfogram Leader forQuality Assurance

11.12.6 RECORDS

(The following paragraphs replace the second paragraph of this section.)

The process to change a procedure is dependent upon the section of theprocedure which has to be changed. Changes to procedure sections titled:"PURPOSE", "SCOPE", "RESPONSIBILITIES", "RECORDS", "PERSONNELQUALIFICATIONS", and "SAFETY" are described using carbon copy memorandumforms. The review and approval process for these changes begins when theinitiator of the changes writes the proposed changes on the memorandumform. The memorandum identifies the initiator of the proposed changes.The Principal Investigator responsible for the activity will review theproposed change and authorize it by signing the memorandum. The originalsheet of the form will be attached to the field copy of the technicalprocedure and a notation made on the margin of the procedure referring thereader to the memorandum. One of the carbon copies will be pasted in thescientific notebooks and the third copy will be returned to the SubtaskLeader and filed.

Documentation of the methods or procedures used to perform thetest/activity will be provided by the Scientific Notebook approach. Incontrast to the requirement for documentation of changes to other sectionsof this procedure, there is no requirement to note deviations from thetypical approach outlined in those sections of this procedure that addressmethods or procedures only. Rather, the method or approach used will bedetermined by the Principal Investigator or the person assigned by thePrincipal Investigator to do the work, and the documentation will beprovided in the Scientific Notebook in accordance with 033-NWMP-R 11.0,Revision 1 (approval pending.) As such, deviations from the suggested ortypical approaches outlined in this procedure are allowed based on thetechnical judgement of the scientist responsible for this activity.Revised procedures will then be prepared upon completion of the test usingthe original technical procedures, changes specified in the scientificnotebooks in accordance with revision procedures outlined in Section 8.2.

LL 5497 (Rev. 11186)

Page 34: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

4 a -

ubwv&:;--fy dt~a aorrw No.. 033-NNWSI-P 11.13fi---Lawrence Liermox

(-Mt",WionULzaIoratory Revision Interim Change Notice

NUCLEAR WASTE IMIANAGEMENT PROGRA Date. March 25, 1988

CONTROLLED COPY NO. Addition

Subject: "Interim Change Notice"ppro, a aBorehole Television Surveys To Map Fractures % 6 Lt V </98Along Horizontal or Subhorizontal Boreholes David W. Short

NWMr Deputy Froject Leaderfor NNWSI

Reviewed by:/bnJ. ~nkersp epty toram Leader for

Quality ssurance

11.13.5 RECORDS

(The following paragraphs replace the second paragraph of this section.)

The process to change a procedure is dependent upon the section of theprocedure which has to be changed. Changes to procedure sections titled:"PURPOSE", "SCOPE", "RESPONSIBILITIES", "RECORDS", "PERSONNELQUALIFICATIONS", and "SAFETY" are described using carbon copy memorandumforms. The review and approval process for these changes begins when theinitiator of the changes writes the proposed changes on the memorandumform. The memorandum identifies the initiator of the proposed changes.The Principal Investigator responsible for the activity will review theproposed change and authorize it by signing the memorandum. The originalsheet of the form will be attached to the field copy of the technicalprocedure and a notation made on the margin of the procedure referring thereader to the memorandum. One of the carbon copies will be pasted in thescientific notebooks and the third copy will be returned to the SubtaskLeader and filed.

Documentation of the methods or procedures used to perform thetest/activity will be provided by the Scientific Notebook approach. Incontrast to the requirement for documentation of changes to other sectionsof this procedure, there is no requirement to note deviations from thetypical approach outlined in those sections of this procedure that addressmethods or procedures only. Rather, the method or approach used will bedetermined by the Principal Investigator or the person assigned by thePrincipal Investigator to do the work, and the documentation will beprovided in the Scientific Notebook in accordance with 033-NWMP-R 11.0,Revision 1 (approval pending.) As such, deviations from the suggested ortypical approaches outlined in this procedure are allowed based on thetechnical judgement of the scientist responsible for this activity.Revised procedures will then be prepared upon completion of the test usingthe original technical procedures, changes specified in the scientificnotebooks in accordance with revision procedures outlined in Section 8.2.

LL 5497 (Rev. 11/86)

Page 35: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

Interdepartmental letterhead

2042-6908[xI

MEMORANDUM---DGW: 88-263/21/88

TO:FROM:SUBJECT:

B. Zucca DuD. WilderInterim Change Notice

As we have discussed, I would like to request an Interim Change Notice beissued for all of the technical procedures that we have already issued (P11.11, P 11.12, & P 11.13) as well as any that have been reviewed-approved and in the process of being released. The wording of the noticeis attached. We intend to use the scientific notebook approach in all ofour procedures but do not want to go through revisions at this time sinceother revisions will be necessary later. We will incorporate thesechanges at that time.

Thanks

Unn'ersityof Califomia

1 E Lawrence Livermore" National Laboratory

Page 36: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

The process to change a procedure is dependent upon the section of theprocedure which has to be changed. Changes to procedure sections titled:"Purpose", "Scope", "Responsibilities", "Records", "Personnel Qualifications",and "Safety" are described using carbon copy memorandum forms. The review andapproval process for these changes begins when the initiator of the changeswrites the proposed changes on the memorandum form. The memorandum identifiesthe initiator of the proposed changes. The Principal Investigator responsiblefor the activity will review the proposed change and authorize it by signingthe memorandum. The original sheet of the form will be attached to the fieldcopy of the technical procedure and a notation made on the margin of theprocedure referring the reader to the memorandum. One of the carbon copieswill be pasted in the scientific notebooks and the third copy will be returnedto the Subtask Leader and filed.

Documentation of the methods or procedures used to perform thetest/activity will be provided by the Scientific Notebook approach. Incontrast to the requirement for documentation of changes to other sections ofthis procedure, there is no requirement to note deviations from the typicalapproach outlined in those sections of this procedure that address methods orprocedures only. Rather, the method or approach used will be determined bythe Principal Investigator or the person assigned by the PrincipalInvestigator to do the work, and the documentation will be provided in theScientific Notebook in accordance with 033-NWMP-Rll.O, Revision 1 (approvalpending.) As such, deviations from the suggested or typical approachesoutlined in this procedure are allowed based on the technical judgment of thescientist responsible for this activity. Revised procedures will then beprepared upon completion of the test using the original technical procedures,changes specified in the scientific notebooks in accordance with revisionprocedures outlined in Section 8.2.

Page 37: CONTROLLED COPY NO. Subject: Approved · 033-NWMP-R 11.1 033-NNWSI-P 11.2 Requirements for Procedures for Analysis or for Instrumentation Procedure for Carbonate Analysis Using the

0 -

LAWRENCE LIVERMORE NATIONAL LABORATORY,MUCLEAR WASTE MANAGEMENT PROJECTP.O. BOX 808, L-202LIVERMORE, CA 94550Ext: 3-7938 CONTROLLED DOCUMENT

TRANSMITTAL RECORD

Page 1 of 1

4/11/88(Transmittal date)

TO: FROM:J. Kennedy John Dronkers(Name) (Name)

NRC LLNL/NWMP(Organization) (Organization)

SUBJECT: NO. OF COPYCOPIES NO.

NNWSI Quality Assurance Program Plan

ITEM ITEM REV. DATEN.

D. Table of Contents 21 4/11/88033-NWMP-P 4.1 Use of Fabrication Accounts and Laboratory 0 3/25/88

Fahrication Services

033-NWMP-P 4.2 Use of Laboratory Technical Support Service 0 3/25/88Qualification of Equipment & Material for 0 3/25/88

033-NWMP-P 8.12 use on Level of Quality Assurance I and IIActivities

Interim Change Notice - Borescope Surveys=_ 033-NNWSI-P 11.11 Tn Map Frartireq TntprrPpting Rnrphnlps (IL A/R5

INSTRUCTIONS/REMARKS ITEM PLEASE SIGN BELOW AND RETURN TO:NO. PAT WALDEN. L-202

(IF YOU HAVE ANY QUESTIONS REGARDINGTHIS MATERIAL, PLEASE CALL: 423-7938) [] Marked previous issues "obsolete",

"superseded", or similar

[] Destroy previous issues

[] I am returning old material with thistransmittal record

l New issue (no previous copies received)

(Signature) (Date)