Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
Control configulation for S1G module operation H. Hayano 07102009 version 1.
-
Upload
berniece-richard -
Category
Documents
-
view
220 -
download
5
Transcript of Control configulation for S1G module operation H. Hayano 07102009 version 1.
Control configulation for S1G module operation
H. Hayano 07102009
version 1
STF main component assignment and function
Klystron #1 station
S 1 G operation Quantum-beam / phase2
Klystron #2 station
Klystron #3 station
TL5MW(max:3MW)
TL5MW(max:5MW)
MBK10MW(max:10MW)
coupler process/RFgun process
S1G cryomodule(8 cavities)
start-up/stand-alone
coupler process/RFgun operation
capture cryomodule(2 cavities)
phase2 cryomodules(26 cavities)
2009.04-2010.12 2011.01-2014.12
Cryogenic station
Vertical test station
EP station
main component
S1Gcryomodule cooling capture cryomodule coolingthen, phase2 cryomodule cooling
1 or 2 cryostat operation 2 cryostat operation
1 or 2 EP-bed operation 2 EP-bed operation
overall configulation of S1Global module
RF signal generationtiming generation
Modulator
cavity
PIEZO HV driver
Tuner motor driver
Vacuum, Temp, RF monitors
Digital LLRF
klystron
klystrondriver amp
RF-SW on/off control(RFamplitude reference)(RFphase reference)
scopes
STF-net
cryomodule Temp monitors
cryomodule
cavity
PIEZO HV driver
Tuner motor driver
Vacuum, Temp, RF monitors
cryomodule Temp monitors
cryomodule
digital LLRF
LAN (STF-net)
Klystron#2 stationsurface building
S1G cryomoduletunnel
Temp
Feedthroughfor Temp Feedthrough Feedthrough
T-tube extention
RF power meter
RF monitors
tuner motor
tuner piezo
RF cables
piezo signalgeneration
vector sumcontrol
pulse motor drive wire
HV coaxial cableRF cables
Which Lab covers which component?control racks in surface
control racks in tunnel
pulse motor drive wire
HV coaxial cable
KEK-network
STF building inside STF-net
console terminal 1
STF-gate
STF-control Main(EPICS)
STF-data logger
control room
near local device
#1 RF station LLRF
#1 RF station modulator
storage
#1 RF station RFcontrol, monitor
#1 RF station scopes
#2 RF station LLRF
#2 RF station modulator
#2 RF station RFcontrol, monitor
#2 RF station scopes
#3 RF station LLRF
#3 RF station modulator
#3 RF station RFcontrol, monitor
#3 RF station scopes
#1 RF station
#2 RF station
#3 RF station
cryomodule T-monitors
cryogenics control/monitor
timing, beam control/monitor
Vertical test data logger
EP data logger
STF-net connection from outside;password controled log-in
radiation safty
Vacuum monitors
stf-nt1.kek.jp
stfco3
stfcob1
stfcob2
stfco2
stfsv1
console terminal 2
console terminal N
Control software configulationSoftware Control (1) Write a control and read back it (2) Data logging, trend plot, display and analysis of logged data Fast logging : second interval logging into 1day circular buffer. Dump and storage function by command. Long-term data storage: minute interval data storage from the fast logger.
STF Main Menu
#1 RF station
Beam control
#2 RF station
#3 RF station
Cryogenics monitor
Cryomodule monitor
VT monitor
Vacuum monitor
EP monitor
safety
Laser control
Timing control
Magnet control
beam monitor
modulator control
RF control Timing control digital LLRF control
waveform monitor
Data logging controlBUttons for popup window
Control console window structure
Example of trend plot window
example of selection menu windowfor trend data plot