Contracts and Grants Accounting C&G Training Presentation May 21, 2014 Cost Share: Budgeting, Spending and Reporting Procedures Effective July 1, 2014

description

Contracts and Grants Accounting. Cost Share: Budgeting, Spending and Reporting Procedures Effective July 1, 2014. C&G Training Presentation May 21, 2014. Cost Share Commitment. Cost sharing committed on a award means designated costs are covered by the University, not by the sponsor. - PowerPoint PPT Presentation

Transcript of Contracts and Grants Accounting

Page 1: Contracts and Grants Accounting

Contracts and Grants Accounting

C&G Training PresentationMay 21, 2014

Cost Share: Budgeting, Spending and Reporting

Procedures Effective July 1, 2014

Page 2: Contracts and Grants Accounting

2

Cost Share Commitment• Cost sharing committed on a award means designated costs are

covered by the University, not by the sponsor. – Commitment may include salaries, equipment/supply purchases, waived

F&A, etc., as defined in the award documentation and allowable– Cost sharing can be funded by donations/gifts, in-kind contributions, start-

up or retention funds, or non-federally sponsored funding source (provided it has been approved)

• Once a cost sharing commitment is made, cost share becomes mandatory and the University is required to measure, track, report on, and meet that commitment. – UCOP requires a centralized tracking system to capture committed cost

sharing amounts– New C&G functionality facilitates the identification of cost share

transactions throughout the life of the award

Page 3: Contracts and Grants Accounting

3

Current Challenges System and Process to Address Challenges

Inconsistent processes across campus for meeting, reporting on cost share commitments

New procedures for budget set up, coding and monitoring spending, and closeout/final report

CGA knows only the $ amount of the commitment, not how the department plans to fund that commitment

PI’s plan when committing cost sharing $ in the proposal will be used by the RA to create a cost share budget; provide budget to CGA at set-up

Lack of consistent tracking method (which can result in a single expense being used to meet cost sharing commitments on multiple awards)

Each award has a unique cost share CF1 value that is used on all transactions, including salary and F&A (overhead rate auto-calculated, applied)

Lack of a consistent recording methodology means there is no way to produce a cross-campus cost share report

Project Costing module in BFS captures all cost sharing transactions (including those not in BAIRS reports) using analysis type and PC ChartFields

Cost sharing treated as an afterthought at the end of the award -- no method to ensure commitment is monitored/met during award

Initial budget establishes how commitment will be met, coding expenses as they are incurred identifies cost sharing transactions in GL

Effective July 1, 2014

Page 4: Contracts and Grants Accounting

4

Cost Sharing Process SummaryAWARD SET UP • Define budget allocations, amounts based on commitments made in award docs• Submit budget to CGA using new CF1 in ChartStrings (within 48 hours of NOA)• Transfer budgeted allocations via 7xxxx transfer, use the CF1• Request ongoing payroll costs (or percentage of payroll costs) be coded with the cost

share CF1 ChartString

MANAGING TRANSACTIONS THROUGHOUT AWARD• Code cost shared expenses, purchases using CF1• Throughout the life of the award, department monitors spending against the budget• If budget revision required, submit one to CGA using budget submission process

CLOSE OUT REPORT• Submit Cost Share Contribution Report and supporting documentation to C&G along

with Closeout Certification (within 70 days of award expiration)• CGA analyst does a final review to ensure that cost share commitments have been

met, prepares final report for Sponsor as required, CGA certifies the final report

Page 5: Contracts and Grants Accounting

5

Award Setup Timeline

Notice of Award Email

from SPO

Submit Complete

Budget

Day 0 Day 2

Award Setup Process

Day 3

Spending Authorized(email from

CGA)

Day 4

Validate Budget, setup award

2 Days 2 Days

At NOA, the CSS-RA/Department has 2 days to submit complete budget information, including

cost sharing, to CGA.

When the budget is received, CGA has 2 days to verify accuracy and completeness, setup the award in BFS,

then notify CSS-RA/Department.

If the submitted budget is inaccurate or noncompliant, the award setup will be delayed.

Page 6: Contracts and Grants Accounting

6

Budget at Award Set up• NOA alerts CGA that a new award has cost sharing, and the total

committed amount. CGA will create a specific CF1 value in BFS to use on cost share transactions (CF1 associates these transactions with the award).– A CF1 value in the 20000-29999 range identifies transactions as cost share when

used in a ChartString with a non-grant fund* • RA/Department creates the award budget, determining BUDSUM categories

(for personnel effort, equipment, travel, unrecovered IDC, etc.) as well as specific $ amounts that meet the cost share commitment defined in NOA – Look up the new CF1 in BFS (use the SPO award number) to use in Cost Share

rows in award budget, due to CGA within 48 hours of the NOA– Each Cost Share row has a F&A row in the budget

• Once the award is activated, unit providing the cost share transfers designated budget in BFS using 7xxxx– Unit providing the cost share requests recharge units and payroll use cost share

ChartString with CF1

*When the fund source for cost sharing is a faculty start-up or retention fund, using a CF1 from the 2 range in combination with that fund “trumps” the Management Code 3 series CF1 requirement.

Page 7: Contracts and Grants Accounting

7

Page 8: Contracts and Grants Accounting

8

Example Budget at Award Set up

Transaction Type Account Account Description Fund Dept Prg Cd CF1 CF2 Amount PC BU Project Activity Analysis Type

Budget - COE 55000 BUDSUM General Supplies COE fund Dept providing

cost share 44 200241 -50,000 GM100 1000004 01 CBU

Budget 57900 BUDSUM Indirect Cost Recovery COE fund Dept providing

cost share 80 200241 -25,000 GM100 1000004 01 CBU

Budget - VCRA 55000 BUDSUM General Supplies VCRA: 69749 Dept providing

cost share 44 200241 -50,000 GM100 1000004 01 CBU

Budget 57900 BUDSUM Indirect Cost Recovery VCRA: 69749 Dept providing

cost share 80 200241 -25,000 GM100 1000004 01 CBU

Budget -University 55000 BUDSUM General Supplies U Fund - EECS Dept providing

cost share 44 200241 EHSIS -15,000 GM100 1000005 01 CBU

Budget 57900 BUDSUM Indirect Cost Recovery U Fund - EECS Dept providing

cost share 80 200241 EHSIS -7,500 GM100 1000005 01 CBU

Budget -University 55000 BUDSUM General Supplies U Fund – Chem E Dept providing

cost share 44 200241 EEXXX -15,000 GM100 1000006 01 CBU

Budget 57900 BUDSUM Indirect Cost Recovery U Fund – Chem E Dept providing

cost share 80 200241 EEXXX -7,500 GM100 1000006 01 CBU

• The NOA from SPO includes this Cost Sharing Commitment for one fiscal year:– College of Engineering $75,000– VC Research $75,000– Other University funds $45,000 ($22.5 from EECS + $22.5 from

Chem E) $195,000 total cost share commitment (DIR+IDC)

• The budget has a row for each direct cost and associated indirect cost. Using the CF1 provided by CGA in each ChartString identifies the row as Cost sharing.

Here, “Prof. X” from Chem E plans to use his endowment funds for Cost Sharing. Using Prof. X’s CF2 in the ChartString means he will see this in PI Portfolio.

Select the expense category that reflects the award’s spending plan (salary, supplies, etc.)CGA will create the PC ChartFields for each ChartString during the award set up process.

Page 9: Contracts and Grants Accounting

9

Coding Direct Costsalong with related indirect costs

Transaction Type Account Account Description Fund Dept Prg Cd CF1 CF2 Amount PC BU Project Activity Analysis Type

Budget 55000 BUDSUM General Supplies Gift Fund Dept providing

cost share 44 200241 EHSIS -10,000 GM100 1000004 01 CBU

Budget 57900 BUDSUM Indirect Cost Recovery Gift Fund Dept providing

cost share 80 200241 EHSIS -5,000 GM100 1000004 01 CBU

Actual Spending 55040 General Supplies Gift Fund Dept providing cost share 44 200241 EHSIS 6,000 GM100 1000004 01 CAC

Actual Spending 57990 Indirect Cost Recover-C&G Gift Fund Dept providing

cost share 80 200241 EHSIS 3,000 GM100 1000004 01 CFA

Actual Spending 55040 General Supplies Gift Fund Dept Providing cost share 44 200241 EHSIS 4,000 GM100 1000004 01 CAC

Actual Spending 57990 Indirect Cost Recovery – C&G Gift Fund Dept Providing

cost share 80 200241 EHSIS 2,000 GM100 1000004 01 CFA

• When budgeting, create a cost share line for each expense category of direct costs (faculty and staff salary and related fringe benefits, equipment, travel, etc.) as well as a line for related indirect costs

• When spending, use the award’s cost share CF1 in the chartstring. Indirect costs will be automatically calculated at the appropriate rate for each cost- shared direct expense as it is incurred (shaded rows above)

Use a non-grant fund

Use the cost-share CF1 created for this award

IF the fund used is a faculty-managed fund, use that person’s CF2

Page 10: Contracts and Grants Accounting

10

Coding Cost Shared Effort

Transaction Type Account Account Description Fund Dept Prg Cd CF1 CF2 Amount PC BU Project Activity Analysis Type

Budget 50000 BUDSUM Academic Salaries 19900 Dept providing

cost share 44 200241 EHSIS -10,000 GM100 1000004 01 CBU

Budget 57900 BUDSUM Indirect Cost Recovery 19900 Dept providing

cost share 80 200241 EHSIS -5,000 GM100 1000004 01 CBU

Actual Spending 50210 Faculty 19900 Dept providing cost share 44 200241 EHSIS 10,000 GM100 1000004 01 CPY

Actual Spending 57990 Indirect Cost Recover-C&G 19900 Dept providing

cost share 80 200241 EHSIS 5,000 GM100 1000004 01 CFA

• Cost shared effort (even if included without a dollar value in the award docs) needs to be tracked in BFS. At award set up, request HR allocate the appropriate % of salary* to the cost-share chartstring/ CF1 – Indirect costs will be automatically calculated at the

appropriate rate as salary expense is incurred (shaded row below)

• In ERS, cost-sharing salary transactions (coded with a CF1) are NOT automatically shown “above the line” in the cost share column.– RA/Effort Coordinator must manually adjust Effort Report to

reflect appropriate percentage of cost share effort on an award, i.e., move the % above the line

*Note: if the employee whose salary will be cost shared is NOT already in the ERS system (i.e., not paid from a federal fund) Payroll will need to add that person to the ERS system.

Page 11: Contracts and Grants Accounting

11

Coding Waived F&A

Transaction Type Account Account Description Fund Dept Prg Cd CF1 CF2 Amount PC BU Project Activity Analysis Type

Budget 55000 BUDSUM General Supplies Gift Fund Dept providing

cost share 44 200241 EHSIS -10,000 GM100 1000004 01 CBU

Budget 57900 BUDSUM Indirect Cost Recovery Gift Fund Dept providing

cost share 80 200241 EHSIS -5,000 GM100 1000004 01 CBU

Actual Spending 55040 General Supplies Gift Fund Dept providing cost share 44 200241 EHSIS 10,000 GM100 1000004 01 CAC

Actual Spending 57990 Indirect Cost Recover-C&G Gift Fund Dept providing

cost share 80 200241 EHSIS 3,000 GM100 1000004 01 CFA

Waived F&A on Actual Spending* 57990 Indirect Cost Recover-

C&G Gift Fund Dept providing cost share 80 200241 EHSIS 2,000 GM100 1000004 01 WFA

• Waived Indirect (F&A) cost sharing occurs any time the Sponsor and University agree to recover less than the federally negotiated indirect cost rate. – If the rate is lower than the current negotiated federal rate and the

sponsor has no alternative agreement/policy, approval from UCOP is required

• The overhead rate that CGA sets up in the system automatically “splits” F&A on expense transactions into the cost shared portion and the waived portion.

• At closeout, both the cost shared F&A (pink line) and the waived F&A (green line) are reported to the sponsor, depending on the sponsor’s requirements

* Waived F&A on Actual Spending is only recorded in the BFS project costing module. It is not available in the GL and therefore not currently availably on BAIRS reports.

Page 12: Contracts and Grants Accounting

12

Coding In-Kind Cost Share

Transaction Type Account Account Description Fund Dept Prg Cd CF1 CF2 Amount PC BU Project Activity Analysis Type

Budget 54100 BUDSUM Computer Equip Inventor Donations Dept providing

cost share 44 200241 EHSIS -10,000 GM100 1000004 01 CBU

Actual Spending 54110 Computer Equipment =>5k Donations Dept providing

cost share 44 200241 EHSIS 10,000 GM100 1000004 01 CTP

Actual Spending 57990Indirect Cost

Recovery (per sponsor terms)

DonationsDept providing

cost share 80 200241 EHSIS GM100 1000004 01 CFA

• In-kind contributions represent the value of non-cash contributions (equipment, services) that are a benefit to or are used for award activities. If in-kind contributions are committed as cost share, they must be included in the cost share budget, recorded in BFS, and included on the final report– Sponsor terms determine if F&A is charged on in-kind contributions

• “Spending” in-kind contributions in BFS ensures these assets are used only once and only for one award. Use the award’s specific cost share CF1 in the chartstring to ensure in-kind costs are documented on the Cost Sharing Contribution Report for the sponsor.

Page 13: Contracts and Grants Accounting

13

Spending, Monitoring, and Budget Revisions• Department periodically reviews expenses to see that Cost Share transactions meet award commitment• cost share transactions are identified by having a non-grant fund* and

a cost share CF1 • Department will NOT see cost share F&A or 3rd party on BAIRS report

• Periodic Cost Share reports, when required, are generated by RA and CGA and sent to the sponsor along with the invoice• To revise cost sharing allocations, submit a revised (net 0) budget to CGA

* A very rare exception is Matching Program Income, which allows income earned on a grant to be used for cost sharing.

Page 14: Contracts and Grants Accounting

14

Reporting at Award Close• Continue to use the existing Cost

Sharing Contribution Report (until such time as a new report is available)– Submit a copy of in-kind

contribution documentation

• Submit Contribution Report along with the Closeout Certification form (due within 70 days of award expiration)

Page 15: Contracts and Grants Accounting

15

Contracts & GrantsImplementation Project

http://controller.berkeley.edu/departments/contracts-grants-accounting

[email protected]

Page 16: Contracts and Grants Accounting

16

Cost Share Analysis TypesType Code DescriptionSalaries and Benefits CFR

CPYCost Share FringeCost Share Payroll

Budget CBACBU

Cost Share Budget AdjustmentCost Sharing Budget

Commitments CAJCCOCCR

Commitment AdjustmentCost Sharing CommitmentCommitment Reversal

Other CACCFACGE

Cost Sharing ActualsCost Sharing F&ACost Sharing GL Expense

Waived F&A WFA Waived F&A

(third party cost share)(award to award cost share)

CTPCAA