Contractors Performance Evaluation · CPE Administration Note: Users must complete the following...

16
Contractors Performance Evaluation User Guide Version 2

Transcript of Contractors Performance Evaluation · CPE Administration Note: Users must complete the following...

Page 1: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

Contractors Performance Evaluation

User Guide

Version 2

Page 2: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

1

Table of Contents

Chapter Page

Purpose 1

CPE Login via Site Manger 2

CPE Administration 2-4

Entering VDOT Contacts (2)

Entering Contractor Contacts (3)

Selecting Categories and Questions (4)

Interim Scoring 5-7

Add Interim (5)

Print Interim Evaluation (6)

Email Interim Evaluation (6)

Update Interim Scores (7)

Notate Status of Contractor Signatures (7)

Enter Appeal Date (7)

Annual Scoring 8-10

Add Annual (8)

Print Annual Evaluation (9)

Email Annual Evaluation (9)

Update Annual Scores (10)

Notate Status of Contractor Signatures (10)

Enter Appeal Date (10)

Key Tips & FAQ 11-12

Helpful Hints 14-15

The Contractors Performance Evaluation’s Purpose:

The Contractors Performance Evaluation (CPE) is used to evaluate the contractor’s efficiency and

effectiveness in performing tasks on a per contract basis, as outlined by the state of Virginia. The

WebCPE application is a web-based application that is accessed via Site Manager. User permissions and

access to contracts are based on security roles assigned in Site Manager.

Page 3: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

2

Site Manager Login & CPE Launch

1. Log-in to Site Manager (Note: Users must login to Site Manager in order to launch the CPE

application.)

2. Select Contract

a. Click on: Contract Administration - Contract Records -Contracts - select Contract and

click OK

3. Launch CPE Plug-in

a. Click on Plug-in (Yellow Attachment) Icon –

b. Click CPE

c. Browser opens CPE application the following information auto-populates:

i. Contract details: Contract ID, Contract Description, District Name and

Number, Project ID, Prime/Sub Designation, Dates include, WKBG (c-5 start)

and work end date (c-5 Complete)

ii. Note: Work Start and End dates may not populate for subcontractor

CPE Administration

Note: Users must complete the following areas under

CPE Administration before attempting to perform an evaluation.

1. VDOT Contacts

a. Select VDOT Contacts

b. Select: Add Contacts for Inspector, ACE, Construction Manager and DCE

Note: Information must be entered for each role – roles will be used to email

reports and for system notifications.

i. Enter name and use search button to locate staff

ii. Manually enter or change information as needed

iii. Click Save

1. Contact is saved and defaults to Active.

c. Change VDOT Contact

i. Follow instructions in 1a-b

ii. The contact added will default to Active

d. Change Active Status

i. Click on the Active button to activate a previous contact

1. Old contact will be deactivated.

Page 4: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

3

CPE Administration (continued)

Note: Users must complete the following areas under

CPE Administration before attempting to perform an evaluation.

2. Contractor Contacts

a. Select Contractor Contacts

b. Select contractor using vendor drop down (Setup prime first –then repeat process

outlined in Contractor Contacts for each subcontractor.)

c. Select: Add Contractor Contacts for both onsite and home office

Note: Information must be entered for each role – roles will be used to email

reports.

i. Manually enter or change information as needed

ii. Click Save

1. Contact is saved and defaults to Active.

d. Change Contractor Contact

i. Follow instructions in 2a-b

ii. The contact added will default to Active

e. Change Active Status

i. Click on the Active button to activate a previous contact

1. Old contact will be deactivated.

f. Subcontractor Work Start Date – if not auto-populated:

i. Enter work start date using calendar

ii. Click Save.

Note: Work start date is used to determine when interims and annuals are due.

Scoring cannot occur if work start date is not populated. No Interim Evaluations Due:

• Users cannot enter an evaluation before the work start date.

• Evaluation dates are produced by the system; based on work start date and cannot be changed.

• Evaluation dates occur 90 days after work start date and continue every 90 days thereafter.

• No interim evaluation due - The application will not allow an interim to be completed before

the evaluation date.

g. Subcontractor Work End Date – if not auto-populated:

i. Once all subcontract work is completed and the project is ready for a final

evaluation, inspector populates work end date field

ii. Enter work end date using calendar

iii. Click Save.

Page 5: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

4

The user can make a change to a work end date if the new work end date is prior to

today’s date. Users cannot pick a date prior to the last locked interim evaluation

date.

Note: Once contract is accepted in Site Manager, the prime and any subcontracts that

don't have a work complete date will be auto populated with C-5 complete date from Site

Manager; which will trigger final notifications.

3. Contract Categories

a. Select: Contract Categories

b. Select contractor using vendor drop down (Setup prime first –then repeat process

outlined in Contract Categories for each subcontractor.)

c. Select category and questions

i. Click on Category and select questions by placing checkmarks in appropriate

boxes

ii. Add additional question for each category

1. Type question in associated field and activate by clicking checkbox.

iii. Click Save: Category title defaults to green indicating changes have been

saved.

Note: Informative/Warning Message -When category/questions are not saved, a

red icon appears on right side of category title bar.

d. Select additional categories and questions

i. Repeat steps 3a-c for each category

e. Add Special Provisions - [if applicable - max. questions (10)]

i. Click on Special Provisions Category

ii. Manually add questions

iii. Activate by clicking checkbox for each question

iv. click Save

f. Copy Prime Categories and Questions to subcontractor - [if applicable]

This feature will copy the prime’s categories and questions to the selected subcontractor.

i. Click "Copy to Prime" - blue icon on the right of screen above categories – all

questions are copied

ii. Modify categories and questions as needed - repeating steps 3a-e

iii. Any questions added using the “Additional Question” and “Special Provision”

Sections will not be copied from the PRIME and must be added separately.

Page 6: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

5

Interim Scoring

Interim Scoring

Interims are based on the work start date. Each interim evaluation date will prepopulate and cannot be

changed. The evaluation date will auto-populate every ninety days from the work start date, when “add

interim score” is selected and continue every 90 days thereafter. Only categories and questions

previously selected under CPE Administration -Contract Categories will appear. Prime and

subcontractors are scored using the process outlined below.

No Interim Evaluations Due:

• Users cannot enter an evaluation before the work start date.

• Evaluation dates are produced by the system; based on work start date and cannot be changed.

• Evaluation dates occur 90 days after work start date and continue every 90 days thereafter.

• No interim evaluation due - The application will not allow an interim to be completed before

the evaluation date.

1. Add Interim Scores

a. Select contractor using vendor drop down

i. Enter review date by clicking on calendar

ii. Click Save

b. No Work Performed

(If no work has been performed during the evaluation period)

i. Select No Work Performed - click to activate checkbox

(Checkbox is a toggle and can be deactivated by clicking)

ii. Click Save - categories will disappear

c. Quick Scroll Comments – link

i. Click on link: VDOT Representative Comments and Contractor Comments boxes appear

when needed for manually entering comments.

d. Default scoring icon

i. Click icon to default all questions with a score of 3 – individual questions can be

modified as needed.

e. Information icon – click to show rating system

f. Select Category

i. Click on category to be scored - accordion opens to reveal questions

g. Score questions within category

i. Use dropdowns to score each question with a score of 1-4;

ii. Scores default to 0 which indicates question is not applicable

iii. Category and total score will update dynamically as questions are answered

h. Category comments (if applicable)

i. Click on comments box

ii. Manually enter comments as needed.

i. Score additional categories and questions as needed: Repeat steps 1a-h

Page 7: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

6

Interim Scoring

Add Interim Scores (continued)

j. Add VDOT and Contractor Comments

i. Click comments field

ii. Manually enter comments

k. Click Save

i. Print and email icons appear at top of screen

2. Print Interim Evaluation Report (Print and email icons appear at top of screen after saving)

a. Click print icon –

i. File is saved to database and popup displays at bottom of screen as CPE

generates a pdf report

b. Preview interim evaluation Click Open, Save or Save As

i. Open feature - Interim Evaluation Opens in Adobe for review or printing to user’s

default print location.

ii. Save feature -File is saved to the user's download folder and can be opened for

review or printing (File name consist of Contract-Id, Vendor-Id, and date)

iii. Save As feature allows file to be saved to a location of user's choosing

3. Email Interim Evaluation Report

a. Click email icon –

i. Any changes are saved to database and the report is emailed to the Inspector,

ACE, CM, the contractor’s home office and onsite contacts as defined in CPE

Administration page. A copy of the interim is also emailed to the person who

has triggered the email button; even if he/she is not in the VDOT contacts for

that contract.

Page 8: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

7

Interim Scoring

Update Interim Score

The update interim scores button allows users to make changes to a previously entered evaluation.

Note: Interim evaluations lock sixty days after creation and cannot be changed.

1. Update Interim Scores

a. Select contractor using vendor drop down

i. Previously entered evaluations will auto-populate in descending order – use arrow keys

or numbers in the middle of the screen to select the desired evaluation

b. Make changes to scores or comments as needed. (repeating steps shown on pages 5 and 6)

c. Add VDOT and Contractor Comments - Click comments field and manually enter

comments

d. Notate Status of Contractor Signature

i. Click in checkbox to denote status for

i. Contractor Refused to Sign

ii. Contractor Signature on File

iii. Contractor Comments on File

e. Enter Appeal Date

i. Enter review date by clicking on calendar

ii. Click Save

iii. Adjust scores as needed

Page 9: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

8

Annual Scoring

1. Add Annual Score

a. Select contractor using vendor drop down

Note: Informative/Warning Message "No Annual records found for evaluation"

If the appropriate interims have not been completed for the contractor, the above message will

appear. An interim needs to be completed (or No Work Performed selected) for each quarter

prior to the annual or final being completed. Click “Add Interim” to see any interims that may

need to be completed before an annual can be done.

Note: The system will auto-populate the last 4 interim evaluations or all interims available

between work start date and work end date (for contracts less than 12 months); or interims

between last annual and work end date – if a work end date has been entered and a final is due.

b. Enter review date - Enter date in review date field using calendar

c. Select Annual or Final Designation - click to activate checkbox for annual or final

d. Add Description of Work - Click in field and manually enter description of work

e. Select Quick Scroll Comments

i. Click on Quick Scroll Comments link - VDOT Representative Comments and

Contractor Comments boxes appear when needed for manually entering

comments

f. Information icon - click to show rating system

g. Select category –

i. Click on category to be scored - accordion opens to reveal questions

h. Score questions within category

i. Use dropdowns to score each question with a score of 1-5;

ii. scores default to 0 which indicates question is not applicable

iii. Category score and total score updates dynamically as questions are answered

i. Category Comments (if applicable)

i. Click on comments box

ii. Manually enter comments as needed.

j. Score additional categories and questions as needed: Repeat steps 1a-i

k. Add VDOT and Contractor Comments

i. Click comments field

ii. Manually enter comments

Page 10: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

9

Annual Scoring

Add Annual Score (continued)

l. Click Save

i. Print and email icons appear at top of screen

2. Print Annual Evaluation Report

a. Click print icon –

i. File is saved to database and popup displays at bottom of screen as CPE

generates a pdf report

b. Preview annual evaluation Click Open, Save or Save As

i. Open feature - annual Evaluation Opens in Adobe for review or printing to

user’s default print location.

ii. Save feature -File is saved to the user's download folder and can be opened

for review or printing (File name consist of Contract-Id, Vendor-Id, and date)

iii. Save As feature allows file to be saved to a location of user's choosing

3. Email Annual Evaluation Report

a. Click email icon –

i. The annual evaluation saves to the database and is emailed to the CM, ACE,

DCE and the contractor’s home office as defined in CPE Administration page.

A copy of the annual is also emailed to the person who has triggered the

email button; even if he/she is not in the VDOT contacts for that contract.

Page 11: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

10

Annual Scoring

Update Annual Score

The update annual scores button allows users to make changes to a previously entered evaluation.

Note: Annual evaluations lock ninety days after creation and cannot be changed.

2. Update Annual Scores

a. Select contractor using vendor drop down

i. Previously entered evaluations will auto-populate in descending order – use arrow keys

or numbers in the middle of the screen to select the desired evaluation

b. Make changes to scores or comments as needed. (repeating steps shown on pages 8 and 9)

c. Add VDOT and Contractor Comments - Click comments field and manually enter

comments

d. Notate Status of Contractor Signature

i. Click in checkbox to denote status for

1. Contractor Refused to Sign

2. Contractor Signature on File

3. Contractor Comments on File

4. Contractor did not return form within 10 days

e. Enter Appeal Date

i. Enter review date by clicking on calendar

ii. Click Save

iii. Adjust scores as needed

Page 12: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

11

Key Tips & FAQ

1. I cannot change the evaluation date.

a. Evaluation dates are produced by the system; based on work start date and

cannot be changed.

b. The evaluation date is selected by the system and occurs every ninety days from

the work start date for each interim evaluation that is due for the project.

• Users cannot enter an evaluation before the work start date.

• Evaluation dates occur 90 days after work start date and continue every

90 days thereafter.

• No interim evaluation due - The application will not allow an interim to

be completed before the evaluation date.

c. The review date can be selected by the user.

d. The system will not allow an annual or final to be performed if an interim is

missing. An interim evaluation must be completed for each quarter the contract

is active; for the 12 month period preceding the annual or final. The only

exception is if the contract is active for less than 12 months.

2. System notifications are sent on a weekly basis via email. These emails are contract

specific. Emails notify users when an annual, final or interim evaluation is due or

delinquent.

a. Notifications cannot be deactivated. The intent is to ensure evaluations are

completed.

b. You can change who will receive notifications by changing or adding an active

VDOT contact using the CPE Administration tab.

3. I cannot perform an interim.

a. Has a work start date been entered?

b. Are you attempting to perform an interim before the evaluation date?

c. Are the VDOT contacts completed?

d. Have questions been selected in the contract categories?

4. I cannot perform an annual

a. Has the work end date been entered?

b. Have you added the DCE Contact in the “VDOT Contacts” section?

c. Go to “Add interim” and see if an additional interim needs to be completed.

d. The system will not allow an annual or final to be performed if an interim is

missing.

e. An interim evaluation must be completed for each quarter the contract is active

for the 12 month period preceding the annual or final. Also, if the project ended

in the middle of the 90-day period, an interim needs to be completed for those

days. The only exception is if the contract is active for less than 12 months.

Page 13: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

12

f. If no work was performed for a specific quarter “No Work Performed” should be

selected on the “Add Interim” screen.

g. If an interim evaluation has been waived – click “No Work Performed”

5. I need to add new questions to an interim evaluation.

a. New questions will show up on new evaluations.

b. New questions cannot be added once an interim is started.

c. If you need to add questions to an interim that has been started perform the

following:

i. Send an email to [email protected] entitled, “Request to

Delete”

ii. Within the email note the following:

• ProjectID

• ContractID

• VendorID

• Review Date

• Reason for deletion

6. Adding contacts

a. Changing Contacts – The last contacted added will be the active contact. You can

change the active contact by clicking the “Active” box.

b. I Cannot Add A Contact - Intranet settings will need to be changed. See section

titled: “Change Intranet Settings” on the following page: fig.1 - fig.3)

Page 14: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

13

Change Intranet Settings (NOT needed for CITRIX SiteManager):

If anyone is having difficulty in adding VDOT Contacts (+) is missing (Fig 1), the browser configuration

must be modified (Not a problem with Citrix SiteManager).

This can be done by selecting compatibility mode (fig 2) under the tools option and unchecking the

“intranet” setting. (Fig. 2)

Figure 1 Figure 2

Figure 3

Page 15: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

14

Helpful Hints

ADMIN

1. Users can enter data into the CPE administration area before the work start date.

2. Admin info will need to be added for prime and each sub

3. VDOT & Contractor Contacts: Information must be entered for each role – roles will be

used to email reports and for system notifications.

a. If contacts cannot be added, change intranet configuration settings – see pg. 13

of user guide

4. Changing Contacts – The last contacted added will be the active contact. You can change

the active contact by clicking the “Active” box.

5. When selecting categories and questions for a subcontractor, you can use the icon on

the right of screen to copy all questions and categories from prime to sub.

a. Once completed – the user can still add/change/remove questions as needed for

the subcontractor.

6. Work start and work end dates may need to be added for subcontractors.

7. Once contract is accepted in Site Manager, the prime and any subcontracts that don't

have a work complete date will be auto populated with C-5 complete date from Site

Manager; which will trigger final notifications.

SCORING

1. User cannot enter an evaluation before the work start date.

2. No Interim Evaluations Due:

• Users cannot enter an evaluation before the work start date.

• Evaluation dates are produced by the system; based on work start date

and cannot be changed.

• Evaluation dates occur 90 days after work start date and continue every

90 days thereafter.

• No interim evaluation due - The application will not allow an interim to

be completed before the evaluation date.

3. Review dates are mandatory and entered by user.

4. Appeal dates can be entered for interim/annual evaluations using the Update screen.

5. Info icon – displays scoring index

6. Scores will calculate automatically as user enters score

7. A red triangle indicates information entered has not been saved.

a. If not saved before leaving screen, information will be lost.

8. Lettering for each category turns green once the scores/question(s) have been saved.

Page 16: Contractors Performance Evaluation · CPE Administration Note: Users must complete the following areas under CPE Administration before attempting to perform an evaluation. 1. VDOT

15

9. “Default all scores to 3” icon is located above categories on the right of scoring screen.

a. Can be used to give a score of 3 for all questions associated with evaluation.

10. Update Interim Score - update interim scores button allows users to make changes to a

previously entered evaluation.

a. Interim evaluations are locked sixty days after the review date and cannot be

changed.

11. All interims must be performed or (“No Work Performed” selected) before an annual

can be completed.

a. Use “No work performed” - check box if the contractor did not perform work for

any given quarter.

12. No annual records found for evaluation - message will be shown if all interims have not

been completed.

13. Update Annual Score - The update annual scores button allows users to make changes

to a previously entered evaluation.

a. Annual evaluations are locked ninety days after the review date and cannot be

changed.

MISCELLANEOUS

a) User guide can be accessed, using the help icon in the upper right corner of screen.

b) Reports now contain work start and end dates

c) Description of work is a mandatory field

d) All data is immediately available to those who have permissions to access contract data

per Site Manager security roles.

e) If subcontractor appears more than once in the vendor drop down - rare but on

occasion a sub will complete all work (a final will be performed) and then the sub will be

called back to work on the contract again. In these cases the sub will appear twice.