    TENDERING AND BIDDINGPROCEDURE

    BY:-- Karnail Singh

    1. The quotation for a tender should be valid for a minimum period daysfrom the date of openings a tender

    a. 30 b.45 c.60 d.90

    2. Payment should be made within .. days of receipt and acceptance of materials

    a. 15 b. 30 c.45 d.60

    3. Bid security should remain valid for _______________ days

    a. 15 b. 30 c.45 d.60

    4. Time interval between invitation and submission of bid in case of large projects

    a. 17 b. 30 c.50 d.90

    5. For limited tendering minimum number of parties required are

    a. 1 b. 2 c.3 d.4

    6. Bid opening statement is prepared by corporate contract and

    a. project engineering b. Core engineering c. finance d.Contract/consultancy

    7. Standard format with package Specific details required to be filled in is known as

    a . invitation for bid b. Instruction to bidders c. Bid data sheet d. Specialconditions to contract

    8. Standard Section not required to be changed on Package to Package basis is

    known as

    a. invitation for bid b. Instruction to bidders c. Bid data sheet d.Special conditions to contract

    9. Which one of the following Provides package specific details to correspondingclauses in ITB

  • 8/7/2019 Contract Questions[1]

    2/4

  • 8/7/2019 Contract Questions[1]

    3/4

    19. In which one of the following ease of preparing specification is very good

    a. single stage single envelope b. single stage double envelope c. two stage . d.none of these

    20. Ability to exploit all market conditions are very high in case of

    a. single stage single envelope b. single stage double envelope c. two stage . d.none of these

    21. Finalization of volume entitled technical data requirement is done by

    a. contract deptt b. engineering deptt. C. project engineering goroup d. noneof these

    22. Approval of the estimated cost and release of bid documents is done by

    a. contract deptt b. core engineering deptt c. corporate planning group d.none of these

    23. In case of single stage, double envelope which envelope is opened firstly

    a. Price bid b. Technical bid

  • 8/7/2019 Contract Questions[1]

    4/4