    THE SOCIALIST REPUBLIC OF VIETNAM

    Independence Freedom Happiness

    -------*****________

    CONTRACT OF SUPPLY AND INSTALLATION OF AIR CONDITIONER

    No: 10/2012/ HDLD/DM

    (regarding: supply and installation of Air Conditioner)

    In accordance with:

    (1) The Commercial Law of S.R.Vietnam dated in 2005 and instructive documents on enforcement .

    (2) The Civil Law of S.R Vietnam dated in 2005 and instructive documents on enforcement.

    (3) Functions, missions, authorities, capacity and needs of both parties

    Today, 30th August, 2012, in Ha Noi, we include

    BUYER :

    Representative :Mr. KIM DEOK KI Position:Tel : no.8 block, Thuy Van Industrial zone, Viet Tri, Phu Tho

    Bank account : opened by: .

    Tax code :

    Hereinafter as A party for short

    SELLER : DUC MINH Trades and technological service Co,ltd

    Representative : Mr. Le Son Position: Director

    Address : #23 Ngo Thi Nham, Hai Ba Trung, Ha Noi

    Tel : 043.971.9341

    Bank account : 102010000523857 opened by: Vietin Bank, Hoan Kiem Branch, Hanoi

    Tax code : 0101966375

    Hereinafter as B party for short

    Upon discussion, both parties agreed to ink contract postulating the following articles

    ARTICLE 1: CONTENT OF CONTRACTB party provide A party with supply and installation of air conditioners and their detailed prices as inAppendix No.01-08/2012/ HDLD/DM

    The total contract value: 528.000.000 VND

  • 7/31/2019 Contract No.8

    2/13

    In which:

    1. The value of devices: 490.000.000 VND

    In capital: four hundred and ninety million Vietnam Dong

    2. Materials, workforce for installation: 38.000.000 VND

    In capital: thirty eight million Vietnam Dong

    - Lead time of the contract is 65 days (+- 5 days) counting from the days ofB partys receipt ofdeposit.

    - Type of contract: constant contract value

    ARTICLE 2: SPECIFICATION, QUALITY OF COMMODITIESCommodities provided and installed by B party as listed in the Appendix is completely new, sealed, strictlfollowed the specification of manufacturer.

    ARTICLE 3: CONTRACT VALUE, MEANS AND TERM OF PAYMENT3.1. Total contract value: 528.000.000 VND(in capital: five hundred and twenty eight million VietnamDong)

    3.2. VAT is included in the above contract value, detailed unit price in the Appendix is constant andunchangeable in any case, except written adjustment of price of both parties. In case of governmentaladjustment, both parties is subjected to renegotiation.

    3.3 Freight paid till destination regulated in point 4.1 of article 4 is included in above price.

    3.4 Mean of payment: bank remittance or in cash

    3.5 Term of payment: A party makes payment to B party in accordance with regulation and followed theschedule as below:

    a) A party honors 50% of contract value, which is 264.000.000 VND( in capital: two hundred and sixtyfour million Vietnam dong) upon signing this contract.

    b) Upon B partys notification of delivery 05 working days in advance, A party must honor 30% ofcontract value to B party: 158.400.000 VND ( in capital: one hundred and fifty eight million and fourhundred thousand Vietnam Dong).

    c) A party must honor the remainder of 20% of contract value to B party, which is 105.600.000 VND ( incapital: one hundred and five million and six hundred thousand VND) as long as B party acquits theirinstallation and complete hand-over forA partys use, the Acceptance report and Contract liquidation areavailable within less than 07 (seven) days. After 07 days, ifA party do not honor the remainder of contracvalue to B party, B party disassemble all installed air conditioners and move them back without any refunof paid installments.

    3.6. The contract starts its effectiveness since the B partys receipt ofA partys deposit ( Bill attached)

  • 7/31/2019 Contract No.8

    3/13

    ARTICLE 4: PLACE, SCHEDULE, AND DOCUMENTS FOR PAYMENT CLEARANCE4.1 Place of delivery and installation:

    4.2 The collection and hand-over of air conditioners is documented, clarifying current condition, quantitiesand quality of commodities along with both parties confirmation.

    ARTICLE 5: WARRANTY

    5.1 Term of warranty: B party offers free-of-charge warranty for devices within 12 months, 48 months forcompressor in accordance with manufacturers condition of warranty

    5.2 Warranty conditions: the warranty is invalid in any case as followed:

    (a) Electricity supply is not stable, which is higher or lower than the verified using condition of devices( 220V +/- 5%, single phase, 50 Hz, 380 V+/-5%, triple phases, 50 Hz).

    (b) A party do not fully follow the guidance and mode of operation of commodities, do not implement orimproperly implement the periodical warranty formalities postulated by manufacturer.

    (c) Any damage caused by externalities ( users omission, third party, intentional damage or naturalcalamities such as thunder strike, rain leakage, fusty etc)

    (d) A party do not make complete payment or undue payment in any installment or violate any obligationregulated in this contract.

    (e) The damage is not recognized to be caused by manufacturer.

    (f) The damage and repair of any part relating to the warrantied devices is disassembled and repaired by anthird party, which is not processed by or commissioned to do by B party.

    5.3 Limitation of warranty: B party guarantee ( repair or replace) any damaged part caused bymanufacturer forA party. In case warranty turns invalid as regulated in point 5.2, yet B party commencesrepair damages forA party, nevertheless A party must bear arisen expenditures on repair, replacement ancost of delivery and traffic eventually.

    5.4 In case of any breakdown relating to warranty, A party must keep the scene intact and report to B partin written documents as B party dispatch personnel to inspect and identify the occurrence of damage aswell as plan countermeasures. Nonetheless, upon inspection without recognizing the occurrence ofdamaging factors not to be within Limitation of warranty, A party must bear the entire expenditure onrepair, cost of traffic forB partys personnel as regulated in point 5.3.

    5.5 B party will process the damage within the limitation of warranty in 02 days ( weekly day off, holidayand other day off due to States postulation) since the day of receipt A partys written report.

    ARTICLE 6: TERMINATION, UNILATERAL TERMINATION, VIOLATION OF CONTRACTAND CONTRACT TERMINATION6.1. One party is considered to violate contract as breach over any rights and obligation regulated by thiscontract and the violated party do dispatch second reminds but no correction of entire violation is processe

    6.2 Penalty for violation of contract

    - IfB partys hand-over is belated in reference to overall progress schedule and is caused by B party( except for irresistible cases such as: strike fire fold natural calamities earthquake or local authoritys

  • 7/31/2019 Contract No.8

    4/13

    legislation and stipulation), B party must bear the penalty on violation of contract at 1% per week ofcontract value at most, but less than 08% of contract value.

    - IfB party acquit their work, but A party do not make remainder of payment due to contract, A partymust be penalized with violation of contract at 1% per week of contract value at most, but less than 08% ofcontract value.

    6.3 B party is eligible to terminate the contract unilaterally and A party lose their deposit regulated at poin(a0 3.5 article 3 in any of following case:

    - Upon A partys deposit followed by unilateral termination of contract, A party is penalized with theentire deposit.

    - A party finalize their first installment but refuse hand-over, which is not subject to B partys fault.

    6.4 This contract is terminated as

    6.4.1. Both parties accomplish obligations of this contract and confirm termination of contract.

    6.4.2 Both parties agreed on termination of contract prior to its due date.

    6.4.3. Other case in accordance with Law

    6.5 As both parties accomplish hand-over and A party make complete, due payment to B party, thecontract is deemed to be terminated without any further discrete written termination of contract. As forarticles of warranty, they remain effective till the due date of warranty.

    ARTICLE 7: CORRECTION, AMENDMENT AND APPENDIX OF CONTRACT7.1. During the time of honoring, both parties can make correction and amendment to several articles of thi

    contract, but they must be subject to written form with authoritative persons signatures of both parties to beffective.

    7.2 Other documents, namely appendix of contract, acceptance record of using project is indispensible tothis contract.

    ARTICLE 8: OBLIGATION OF EACH PARTY:8.1. A party:

    - Obligated to make payment to B party due to the Article 3 of this contract.

    - Hand-over construction site forB party to process their work.

    - Facilitate B party to be supplied with electricity source for construction.

    - Supply B party with electricity source forB partys trial on devices.

    8.2 B party:

    - Fulfill their commitment of working duration, commodities quality, guarantee of technology and aesthetic

    - Work with other contractor to avoid overlapping.

    - Guarantee labor safety, construction site hygienic.

  • 7/31/2019 Contract No.8

    5/13

    8.3. Obligation of both parties:

    - Sign to confirm the blueprint before construction, ifA party change place of installation, it must subjectto bilateral agreement, A party must bear entire cost of modification.

    - Dispatch personnel to resolve concerns in construction site.

    ARTICLE 9: GENERAL ARTICLES9.1. If any non-agreed articles in this contract, in case of any dispute arisen, other relevant legislativedocuments of S.R. Vietnam is references for adjustment.

    9.2. During the honor of this contract, if any new concerns or difficulties arisen, both parties will discuss osettlement.

    9.3. This contract is five-page in length, and is made to four copies in Vietnamese, each party holdconfinement of two copies, which has the same legal effectiveness, it comes in to effect since the day ofsigning till both parties acquit their obligations in this contract.

    THE REPRESENTATIVE OF A PARTY THE REPRESENTATIVE OF B PARTY

  • 7/31/2019 Contract No.8

    6/13

    SCHEDULE CONTRACT

    No: 01-09/2012/HL/M

    A DESCRIPTION SPECIFICATION UNIT Q'tyUnit price

    (VND)Amount(VND)

    1

    Air condition cooling

    Brand: MIDEA (China)Type: Splitduct.Cooling/haeting

    Model: MHA 192-HRLiquid pipe: 2 x 12.7

    Gas : 2 x 28.6

    Capacity: 192.000 btu/h

    Voltage:3 phase - 380 v/50 hz

    Air volume:11,200 m3/h

    Refrigerant: R22

    set 10 130,000,000 1,300,000,0

    2 Copper pipe 28.6 M 220 250,000 55,000,00

    3 Copper pipe 12.7 M 220 150,000 33,000,00

    4 Insulation supelon 28-T19 M 220 80,000 17,600,00

    5 Insulation supelon 13-13T M 220 50,000 11,000,00

    6Pipe PVC and insulation

    supelon 32-13T M 150 40,700 6,100,000

    7 Steel frame for outdoor V50 x 50 x 4L6000 set 10 1,500,000 15,000,00

    8 Steel frame for indoor V50 x 50 x 4L6000 set 10 1,500,000 15,000,00

    9 Wire for indoor units 4 x 2.5 M 260 40,000 10,400,00

    1

    0

    Wire controls temperature 7 x 0.7 M 150 18,000 2,700,000

    11

    Wire controls 4 x 1.5 M 260 35,000 9,100,000

    12

    Supplies and accessories Lot 10 600,000 6,000,000

    13

    Labor,transport Lot 10 500,000 5,000,000

    14

    Scaffolding hire Lot 20 250,000 5,000,000

    15

    Pylons truss tube Lot 14 650,000 9,100,000

    Total 1,500,000,0

    Note:

    1. Does not include wires supplied from the main panel to control panel

    2. Power Supply by the investor to the installation location conditioner.

    3. Price include VAT 10%

  • 7/31/2019 Contract No.8

    7/13

    CNG HA X HI CH NGHA VIT NAM

    c lp - T do - Hnh phc

    -----------*****------------

    HP NG

    CUNG CP V LP T IU HA KHNG KH

    S: 08/2012/HL/M-

    (V/v: cung cp lp t h thng iu ha)

    Cn c:

    (1)Lut thng mi nc Cng ho X hi Ch ngha Vit Nam nm 2005 v cc vn bn hng dn thi hnh;

    (2)B lut dn s nc Cng ho X hi Ch ngha Vit Nam nm 2005 v cc vn bn hng dn thi hnh;

    (3) Chc nng, nhim v, quyn hn, kh nng v nhu cu ca hai bn.

    Hm nay, ngy thng nm 2012, ti H Ni, chng ti gm:

    BN MUA:

    Ngi i din: Chc v:

    a ch :

    in thoi :

    S ti khon : .. Ti ngn hng:

    M s thu :

    Sau y gi tt l Bn A.

    BN BN: CNG TY TNHH DCH V K THUT V XNK C MINH

    Ngi i din: NGL SN Chc v: Gim c

    a ch : S 23 Ng Th Nhm, Hai B Trng, TP. H Ni.

    in thoi : 043.971.9341 Fax: 043.933.0789

    M s thu : 0101966375

    Ti khon s : 102010000523857

    Ti Ngn hng TMCP Cng Thng Vit Nam CN Hon Kim, H Ni.

    Sau y gi tt l Bn B.

    Sau khi tho lun, hai bn thng nht k kt hp ng theo cc iu khon sau.

    IU 1: NI DUNG HP NG

    Bn B cung cp lp t h thng iu ha nhit cho Bn A vi s lng v gi c chi tit the

    ph lc s 01-08/2012/HL/M

    Tng gi tr ca hp ng l : 528.000.000 (VN)

    Bng ch: Nm trm hai mi tm triu ng chn /

  • 7/31/2019 Contract No.8

    8/13

    Trong :

    1. Gi tr phn thit b l: 490.000.000 VN

    Bng ch: Bn trm chn mi triu ng chn./.

    2. Gi tr phn vt t, nhn cng lp t: 38.000.000 VN

    Bng ch: Ba mi tm triu ng chn./.

    -Thi gian thc hin hp ng 65 ngy ( 5 ngy) k t ngy bn B nhn c tin t cc.

    -Hnh thc hp ng: Gi tr hp ng l khng i.

    IU 2: QUY CCH, CHT LNG HNG HA.

    Ton b hng ha Bn B cung cp v lp t cho Bn A lit k ti ph lc hp ng l hng m

    100%, nguyn ai, nguyn kin, ng theo tiu chun ca nh sn xut.

    IU 3: GI TR HP NG, PHNG THC V TIN THANH TON.

    3.1 Tng gi tr hp ng l: 528.000.000VN (Vit bng ch: Nm trm hai mi tm triu nchn./.).

    3.2 Tng gi tr trn bao gm thu VAT, n gi chi tit trong ph lc hp ng l c nh khng tha

    i trong mi trng hp, ngoi tr c s thay i bng vn bn gia hai bn v iu chnh gi. Tron

    trng hp nh nc i tin th hai bn s bn bc li gii quyt.

    3.3. Gi trn bao gm chi ph vn chuyn hng ha n a im theo quy nh ti Khon 4.1 iu 4 c

    Hp ng.

    3.4. Phng thc thanh ton: Chuyn khon hoc tin mt.3.5. Tin thanh ton: Bn A thanh ton ton b s tin trn cho Bn B theo quy nh v tin sau:

    a) Bn A thanh ton 50% tng gi tr hp ng l 264.000.000 VN (Bng ch: Hai trm s

    mi t triu ng chn./.) ngay sau khi k hp ng.

    b) Sau khi Bn B hon thnh phn thi cng cc ng ng, sn sng lp t thit b, Bn A ph

    thanh ton 30% gi tr phn vt t v nhn cng cho Bn B l: 11.400.000 VN (Bng ch: Mi m

    triu bn trm nghn ng chn).

    c) Ngay khi nhn c thng bo giao my (thit b) ca Bn B, Bn A thanh ton ht 50% gi tthit b cn li cho Bn B l 245.000.000 VN (Bng ch: Hai trm bn mi nm triu ng chn)

    d) Bn A thanh ton ton b gi tr hp ng cn li l 7.600.000 VN (Bng ch: By triu s

    trm nghn ng chn)cho bn B khi bn B thc hin xong vic thi cng lp t, bn giao ton b

    bn A a vo s dng, c bin bn nghim thu khi lng, bin bn thanh quyt ton hp ng.

    3.6. Hp ng c gi tr khi Bn B nhn c s tin t cc t Bn A.(C phiu thu km theo).

    IU 4: A IM, THI GIAN, CC GIY T LM CN C THANH QUYT TON.

    4.1. a im giao hng v lp t ti:4.2. Vic nghim thu bn giao h thng iu ha c lp thnh vn bn ghi r tnh trng, s lng v ch

  • 7/31/2019 Contract No.8

    9/13

    IU 5. BO HNH

    5.1. Thi hn bo hnh: Bn B bo hnh min ph phn thit b trong thi gian 12 thng, my nn l 4

    thng theo quy nh bo hnh ca nh sn xut.

    5.2. iu kin bo hnh: Vic bo hnh s khng c gi tr khi c mt trong cc trng hp sau:

    (a) in th cung cp khng n nh v cao hn hoc thp hn qu gii hn cho php s dng c

    hng ha (chi tit: 220V+/-5%, 01 pha, 50Hz, 380V+/-5%, 03 pha, 50Hz).

    (b) Bn A khng tun th y cc hng dn v cch thc vn hnh ca hng ha, khng th

    hin hoc thc hin khng ng quy trnh vic bo dng nh k theo quy nh ca nh s

    xut;

    (c) Hng ha b h hng l do yu t tc ng bn ngoi (do s sut ca ngi s dng, bn th b

    k c yu t ph hoi hoc do thi tit nh st nh, ma dt, m mc..v..v);

    (d) Bn A khng thanh ton v ng thi hn i vi bt k t thanh ton no hoc vi phm b

    c ngha v no quy nh ti hp ng ny;(e) Chi tit h hng c xc nh khng do li ca nh sn xut;

    (f)Vic h hng v vic tin hnh sa cha bt k mt chi tit no trc lin quan ti thit b

    bo hnh c tho ri v tin hnh sa cha bi mt bn th ba bt k khng do Bn B th

    hin hoc ch nh thc hin.

    5.3. Phm vi bo hnh: Bn B bo hnh( sa cha hoc thay mi) cho Bn A nhng chi tit b h hng d

    lica nh sn xut. Trong trng hp vic bo hnh khng c gi tr nh quy nh ti khon 5.2 i

    ny, Bn B c th vn tin hnh sa cha khc phc h hng v Bn A phi chu ton b chi phpht sinh sacha hoc thay mi, k c chi ph vn chuyn, i li.

    5.4. Trong trng hp xy ra bt k s c no lin quan n vic bo hnh, Bn A phi gi nguyn hi

    trng v thng bo bng vn bn cho Bn B Bn B c nhn vin n kim tra v xc nh nguy

    nhn h hng v c bin php khc phc. Tuy nhin, nu sau khi tin hnh kim tra m pht hin c

    yu t h hng khng thuc phm vi bo hnh th Bn A phi chu ton b chi ph sa cha, k c ch

    ph i li cho nhn vin ca Bn B nh quy nh ti Khon 5.3 iu ny.

    5.5. Bn B s tin hnh x l cc s c lin quan trong phm vi bo hnh trong thi hn 02 ngy (khn

    tnh cc ngy ngh hng tun, ngy l tt, ngy ngh khc...theo quy nh ca nh nc) k t th

    im nhn c vn bn thng bo ca Bn A.

    IU 6 : CHM DT, N PHNG CHM DT, PHT VI PHM HP NG V THANH L HP NG

    6.1. Mt bn c xem l vi phm hp ng khi vi phm bt k quyn v ngha v no theo quy nh c

    hp ng ny v bn b vi phm c thng bo nhc nh n ln th hai m vn khng tin hn

    khc phc hon tt ton b vi phm.

    6.2.Pht vi phm hp ng:+ Nu vic bn giao ca bn B chm so vi tng tin nu trn do nguyn nhn bn B (Ngo

  • 7/31/2019 Contract No.8

    10/13

    iu l lut php, quy nh ca chnh quyn a phng). th bn B phi chu pht vi phm hp n

    vi mc ti a l 1%/tun gi tr vi phm nhng khng vt qu 08% gi tr hp ng.

    + Nu trong trng hp bn B thc hin xong phn vic ca mnh m bn A khng thanh to

    cho bn B s tin cn li theo hp ng th bn A phi chu pht vi phm hp ng vi mc ti a l

    1%/tun gi tr vi phm nhng khng vt qu 08% gi tr hp ng.

    6.3. Bn B c quyn n phng chm dt hp ng v Bn A cn b mt ton b s tin t cc the

    quy nh ti im (a) Khon 3.5 iu 3 hp ng cho Bn B vi mt trong cc trng hp sau:

    - Sau khi Bn A thc hin vic t cc nhng sau t hy hp ng, trng hp ny Bn A ph

    chu pht bng ton b gi tr t cc.

    - Bn A thanh ton t 1 nhng t chi nhn hng m khng do li ca Bn B.

    6.4. Hp ng ny chm dt khi:

    6.4.1. Hai bn hon thnh cc ngha v theo hp ng ny v cng xc lp thanh l hp ng.

    6.4.2. Hai bn tha thun chm dt hp ng trc thi hn.6.4.3. Cc trng hp khc theo quy nh ca php lut.

    6.5. Khi hai bn hon thnh vic giao nhn cng trnh v Bn A thanh ton y , ng hn ton b

    tin hnh cho Bn B, th xem nh hp ng c thanh l xong m hai bn khng cn lp mt v

    bn thanh l ring l. Ring iu khon bo hnh lin quan gia hai bn s tip tc c gi tr cho

    khi ht hn bo hnh.

    IU 7: SA I, B SUNG V PH LC HP NG.

    7.1.Trong qu trnh thc hin, hai bn c th tin hnh sa i, b sung mt s iu khon trong hp nny nhng vic sa i phi lp thnh vn bn, c ch k xc nhn ca ngi c thm quyn ca h

    bn th mi c gi tr php l.

    7.2.Cc vn bn nh ph lc hp ng, bin bn nghim thu bn giao cng trnh a vo s dng l m

    phn khng tch ri ca hp ng.

    IU 8: NGHA V CA MI BN.

    8.1. Bn A:

    - C ngha v thanh ton cho Bn B theo theo iu 3 ca hp ng.

    - Bn giao mt bng thi cng Bn B thc hin cng vic thi cng.

    - To iu kin cho Bn B c ngun in thi cng ti cng trng.

    - Cp in ngun cho iu ha kp thi Bn B chy th thit b.

    8.2. Bn B:

    -Thc hin ng cam kt thi gian thi cng, cht lng hng ha, m bo k thut, m thut.

    -Lm vic vi cc nh thu khc trnh trng hp thi cng chng cho vo nhau.

    -m bo an ton lao ng, v sinh cng trng.

    -Thi cng ng bn v thi cng c hai bn k.

    8 3 Ngha v ca hai bn

  • 7/31/2019 Contract No.8

    11/13

    -K xc nhn bn v thi cng trc khi i vo thi cng, nu trong trng hp Bn A thay i v t

    lp t phi c bin bn xc nhn ca hai bn v Bn A phi chu mi chi ph do thay i.

    -C cn b gii quyt nhng vng mc trn cng trng.

    IU 9: IU KHON CHUNG.

    9.1.Nhng vn no hai bn cha tha thun trong hp ng ny, khi c pht sinh tranh chp th cc v

    bn php lut tng ng ca nc CHXHCN Vit Nam s c ly lm cn c iu chnh.

    9.2. Trong qu trnh thc hin hp ng, nu c bt k vn g pht sinh mi hoc kh khn, hai bn s

    cng nhau trao i, bn bc tm cch gii quyt. Trng hp xy ra tranh chp, hai bn s chn Ta n kin

    t TP. H Ni gii quyt.

    9.3 Hp ng ny gm 05 trang, c lp thnh 04 bn bng ting Vit, mi bn gi 02 bn thc hi

    v c gi tr php l nh nhau, c hiu lc t ngy k cho n khi hai bn hon thnh trch nhim c

    mnh trong hp ng.

    AI DIN BN A I DIN BN B

  • 7/31/2019 Contract No.8

    12/13

    No: 01-08/2012/HL/M

    A DESCRIPTION SPECIFICATION UNIT Q'tyUnit price

    (VND)Amount(VND) Notes

    1

    Air conditioncooling/ heating

    Brand: MIDEA(VIETNAM)Type: CASSETTEModel: MCC-50HRLiquid pipe: 12.7Gas pipe: 19.05

    Capacity: 50.000 btu/hVoltage:3 phase - 380 v/50 hzAir volume:1650-1412-1264 m3/hRefrigerant: R22

    set 1435,000,0

    00490,000,00

    0

    MCC

    50HRpricesinclud

    VAT 10

    2Copper pipe (Gas

    pipe) 12.7 M 210100,0

    00

    Lp trn g

    38.000.0VN

    3Copper pipe (liquid

    pipe) 19.01 M 210120,0

    00

    4 Insulation supelon 13 M 210

    50,0

    00

    5Insulation supelon 19.08 M 210

    65,000

    6

    Pipe PVC andinsulation supelon(drain) 27-13T M 210

    45,000

    7Steel frame foroutdoor Materials: V50x50x4 set 14

    600,000

    8Steel frame forintdoor Materials: V50x50x4 14

    800,000

    9 Wire for indoor units 3 x 2.0 M 240 40,000

    10Wire control forindoor units 4 x 1.5 M 240

    38,000

    11Wire for outdoorunits (Power supply) 3 x 4 +1 x 2.5 M 200

    50,000

    12Supplies andaccessories

    Tube inserted wire,copper fixtures Lot 14

    430,000

    13Labor, transport 14

    500,000

    14 Scaffolding hire 20 250,000

    15 Pylons truss tube 14650,0

    00

    Total528,000,000

    Note:1. Does not include wires supplied from the main panel to control panel

    2. Power Supply by the investor to the installation location conditioner.3. Price include VAT 10%