i

CONTENTS

COMPOSITION OF THE REPORT

SUMMARY REPORT (English Version, Japanese Version)

MAIN REPORT (English Version, Japanese Version)

APPENDIXES (English Version)

GUIDELINE FOR LAND CONSOLIDATION (English Version, Myanmar Version)

APPENDIX I IMPLEMENTATION ARRANGEMENT OF THE SURVEY .............. I

I.1 JICA Team Members and Counterpart Personnel. ........................................................... I-1-1

I.2 Person-Month Input for the Study. ................................................................................... I-2-1

I.3 Record of Discussions for the Project .............................................................................. I-3-1

I.4 Minutes of Meetings Concluded in the Process of the Project ......................................... I-4-1

APPENDIX II IRRIGATION AND DRAINAGE ........................................................... II

II.1 Location Map of Irrigation Systems ............................................................................... II-1-1

II.1.1 Location Map of North Nawin Irrigation System .......................................................... II-1-1

II.1.2 Location Map of South Nawin Irrigation System .......................................................... II-1-2

II.1.3 Location Map of Wegyi Irrigation System ..................................................................... II-1-3

II.1.4 Location Map of Taung Nyo Irrigation System .............................................................. II-1-4

II.2 Examination on Irrigation Water Requirement for Paddy .............................................. II-2-1

II.2.1 Crop Water Requirement and Irrigation Demand in General ......................................... II-2-1

II.2.2 Review of Irrigation Demand ......................................................................................... II-2-2

II.2.3 Irrigation Demand for Irrigation System Rehabilitation ................................................ II-2-4

II.3 Schematic Diagram of Irrigation Systems ...................................................................... II-3-1

II.3.1 Link Canal Network between North and South Nwin Irrigation Systems ..................... II-3-1

II.3.2 Schematic Diagram of North Nawin Irrigation System ................................................. II-3-2

II.3.3 Schematic Diagram of South Nawin Irrigation System ................................................. II-3-3

II.3.4 Schematic Diagram of Wegyi Irrigation System ............................................................ II-3-4

II.3.5 Schematic Diagram of Taung Nyo Irrigation System..................................................... II-3-5

II.4 Discharge Capacity of Canals ........................................................................................ II-4-1

II.4.1 Discharge Capacity of North Nawin Irrigation System .................................................. II-4-1

II.4.2 Discharge Capacity of South Nawin Irrigation System .................................................. II-4-4

II.5 Rehabilitation Plan for Canals ........................................................................................ II-5-1

II.5.1 Rehabilitation Plan for Canals of North Nawin Irrigation System ................................. II-5-1

II.5.2 Rehabilitation Plan for Canals of South Nawin Irrigation System ................................. II-5-7

II.5.3 Location Map of Rehabilitation Canals .......................................................................... II-5-8

II.6 Discharge Capacity of Link Canal ................................................................................. II-6-1

II.6.1 Rink Canal Network ....................................................................................................... II-6-1

II.6.2 Result of Site Survey for DO-9(B) Canal ....................................................................... II-6-1

II.6.3 Hydraulic Calculation for DO-9(B) Canal ..................................................................... II-6-3

APPENDIX-I

IMPLEMENTATION ARRANGEMENT OF THE SURVEY

APPENDIX I: IMPLEMENTATION ARRANGEMENT OF THE SURVEY

TABLE OF CONTENTS

I.1 JICA Team Members and Counterpart Personnel. ........................................................... I-1-1 I.2 Person-Month Input for the Study. ................................................................................... I-2-1 I.3 Record of Discussions for the Project .............................................................................. I-3-1 I.4 Minutes of Meetings Concluded in the Process of the Project ......................................... I-4-1

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-1-1 ID

I.1 JICA TEAM MEMBERS AND COUNTERPART PERSONNEL

I.1.1 JICA TEAM MEMBERS

Mr. Kosei HASHIGUCHI Team Leader / Irrigation Project Planning

Mr. Motoyoshi HIKASA Co-leader / Irrigation Facilities Design1

Mr. Tsutomu SENDA Irrigation Facilities Design2

Mr. Yoji SAWADA Irrigation Facilities Design3

Mr. Itsuo KIHARA Irrigation Facilities Design4

Mr. Yoji SAWADA Construction Planning / Procurement

Mr. Mamoru SASA Small Hydroelectric Generation

Mr. Shin-ichi ARAI Equipment

Mr. Hironori TAKAHASHI Farmland Consolidation (Design)

Mr. Nobutoshi EGUCHI Farmland Consolidation (Monitoring)

Mr. Yoshinao ADACHI Farming System

Mr. Ken KOZAI Project Economic Analysis

Mr. Hideki ISHIKAWA Environment and Social Consideration1

Mr. Yoji SAWADA Project Cost Estimation

Mr. Nobutoshi EGUCHI Farmers’ Organization / Env. and Social Consideration2

I.1.2 COUNTERPART PERSONNEL

Irrigation Department (Head Office –Nay Pyi Taw-)

Mr. Kyaw Myint Hlaing Director General

Mr. Tint Zaw Deputy Director General

Mr. Tint Lwin Director of Procurement Branch

Mr..Tun Kyaw Soe Director of Mechanical Section

Mr. Soe Naing Deputy Director of Mechanical Section

Irrigation Department (Nay Pyi Taw Office)

Mr. Soe Tint Director

Mr. Saw Thet Khine Win Assistant Director

Irrigation Department (Yangon Office)

Mr. Zaw Win Chit Director of Inspection Branch

Mr. Minn Aung Than Director of Design Branch (1)

Mr. Hla Phone Maw Staff Officer of Design Branch (1)

Irrigation Department (Pyay Office)

Mr. Myint Htun Latt Director of Construction (2)

Mr. Ko Ko Htay Deputy Director of Construction (2)

Mr. Hla Win Myint Assistant Director (1) of Construction (2)

Mr. Aung Moe Win Assistant Director (3) of Construction (2)

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-1-2 JICA

Mr. Soe Aung Deputy Director of Maintenance Division

Mr. Myint Thaung Assistant Director (Pyay District) of Maintenance Division

Mr. Tin Maung Wai Staff Officer of Construction (2)

Mr. Aung Kyaw Oo Staff Officer of Construction (2)

AMD (Head Office -Nay Pyi Taw-)

Mr. Soe Hlaing Director General

Mr. Aung Win Deputy Director of Research and Technology Section ion

(Project Manager)

Mr. Way Phyo Assistant Director of Director General Office

Mr. Zaw Zaw Htet Project Officer for PRIS

Ms. Ei Ei Khin Project Officer for 2KR Project

AMD (Bago West Region Office -Pyay-)

Mr. Wan Maung Deputy Director

Mr. Khin Mg Kyaw Assistance Director (Pyay District)

Mr. Aung Myo Lwin Oo Township Officer (Pyay Township),

Manager of No.30 Agricultural Mechanization Station)

Mr. Tin Ko Township Officer (Paukkhaung Township),

Manager of No. 58 Agricultural Mechanization Station)

Mr. Win Shwe Township Officer ( Nattalin Township),

Manager of No. 45 Agricultural Mechanization Station)

Mr. Kyaw Kyaw Soe Township Officer (Thegone Township)

Manager of No. 94 Agricultural Mechanization Station)

AMD (Nay Pyi Taw Office)

Mr. Kyaw Soe Deputy Director

Mr. Than Tun Aung Assistant Director

SLRD (Nay Pyi Taw Office)

Mr. Zaw Min Aung Deputy Director

Mr. Win Myint Oo Assistant Director

DOA (Nay Pyi Taw Office)

Mr. Saw Sein Win Deputy Director

Mr. Win Oo Assistant Director

Cooperative Department

Mr. Khin Mg Win Deputy Director

Nay Pyi Taw Council

Mr. Thein Nyunt Chairman (Minister)

Mr. Myint Swe Member (Deputer Minister)

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-1-3 ID

Irrigation Technology Center (ITC) (Head Office –Bago-)

Mr. Zaw Min Htut Director

Mr. Maung Maung Naing Assistant Director

Irrigation Technology Center (ITC) (Pyay Office)

Ms. Myint Myint Sein Staff Officer of Laboratory

Myanm

ar

P

roject for Rehabilitation of Irrigation System

s

JICA

I-2-1

ID

I.2 P

ER

SO

N-M

ON

TH

INP

UT

FO

R T

HE

PR

OJE

CT

Person-month Schedule: The Project for Rehabilitation of Irrigation Systems (PRIS)

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Myanmar Japan

Team Leader/Irrigation Project Planning

Kosei HASHIGUCHI Sanyu Consultants Inc.(15) (30) (9) (9)

2.10

Co-leader/Irrigation Facilities Design 1

Motoyoshi HIKASA Sanyu Consultants Inc.(97) (30) (38) (9)

5.80

Irrigation Facilities Design 2 Tsutomu SENDA Sanyu Consultants Inc.(30) (15) (30) (15)

3.00

Irrigation Facilities Design 3 Yoji SAWADA Sanyu Consultants Inc.(27) (33)

2.00

Irrigation Facilities Design 4 Itsuo KIHARA Sanyu Consultants Inc.(27) (15)

1.40

Construction Planning/Procurement

Yoji SAWADA Sanyu Consultants Inc.(60)

2.00

Small HydroelectricGeneration

Mamoru SASA Sanyu Consultants Inc.*1

(27) (33)2.00

Equipment Shin-ichi ARAI Sanyu Consultants Inc.(60) (30) (30)

4.00

Farmland Consolidation(Design)

Hironori TAKAHASHI Sanyu Consultants Inc.(45) (36)

2.70

Farmland Consolidation(Monitoring)

Nobutoshi EGUCHI Sanyu Consultants Inc.(30) (29)

1.97

Farming System Yoshinao ADACHI Sanyu Consultants Inc.(45)

1.50

Project Economic Analysis Ken KOZAI Sanyu Consultants Inc.(45)

1.50

Environment and SocialConsideration 1

Hideki ISHIKAWA Sanyu Consultants Inc.(60)

2.00

Project Cost Estimation Yoji SAWADA Sanyu Consultants Inc.(30) (45)

2.50

Farmers' Organization / Env.and Social Consideration 2

Nobutoshi EGUCHI Sanyu Consultants Inc.(30) (45) (46)

4.03

38.50

Team Leader/ IrrigationProject Planning

Kosei HASHIGUCHI Sanyu Consultants Inc.(3) (9)

0.40

Irrigation Facilities Design 1 Motoyoshi HIKASA Sanyu Consultants Inc.(6) (6) (18) (9)

1.30

Irrigation Facilities Design 2 Tsutomu SENDA Sanyu Consultants Inc.(15) (15) (30)

2.00

Equipment Shin-ichi ARAI Sanyu Consultants Inc.(15) (15)

1.00

Total 4.70

Total 38.50 4.70

Grand Total

in Myanmar *1: Associate (J-power)

in Japan

43.20

in M

yanm

arin

Jap

an

Reports

Major Activities

Expertise Name OrganizationPerson-month20142013

ICR

Preparatory WorkFirst Field Investigation

First Home Work in JapanDraft Project Plan & Implementation

Arrangement

Second Field InvestigationSecond Home Work in Japan

Draft Final Report Preparation & Presentation

Final Project Plan & Implementation Arrangement

PR DFRDraft Land

Consolidation Manual FR

Third Field InvestigationImplementation of Farmland Consolidation Preparation of Procurement for Machineries

Review of Design of NN and SN Irrigation Facilities

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-3-1 ID

I.3 RECORD OF DISCUSSIONS FOR THE PROJECT

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-3-2 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-3-3 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-3-4 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-3-5 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-3-6 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-3-7 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-3-8 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-4-1 ID

I.4 MINUTES OF MEETINGS CONCLUDED IN THE PROCESS OF THE PROJECT

No. Title Page

1 Minutes of Meeting on Inception Report I-4-2

2 Minutes of Meeting on Progress Report I-4-9

3 Minutes of Meeting on Draft Final Report I-4-15

4 Minutes of Meeting on Draft Guidelines for Land Consolidation I-4-19

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-4-2 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-4-3 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-4-4 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-4-5 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-4-6 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-4-7 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-4-8 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-4-9 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-4-10 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-4-11 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-4-12 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-4-13 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-4-14 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-4-15 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-4-16 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-4-17 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-4-18 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-4-19 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-4-20 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-4-21 ID

Project for Rehabilitation of Irrigation Systems Myanmar

ID I-4-22 JICA

Myanmar Project for Rehabilitation of Irrigation Systems

JICA I-4-23 ID