Content Bus Systems ENDR - European...

36
CONTEN MODULE The PLC-M their curric programmi is needed. industrial b also fault f industrial b there. In the last demonstrat NT OF MO E BUS SY Module is d culum. Stud ing. In the m During the bus system’ finding and bus systems week there tion test. OVET MO STEMS designed for dents that tak module stud e three week s and how s diagnostic l s are used in e is written t DULE BU r students w ke part in th dent must w k training th some of tho lessons. D n local indu test which s US SYSTE which have a he module s work mostly he students w ose are conf During the tr strial compa student mus MS automation t should have in pair’s or will learn ba igured and b raining the s anies and th t past befor technology e basic know r groups, so asic’s of wh build up. In students can hey also hav re he can tak as an essen wledge of PL good teamw hat is the ma n the modul n also see ho ve some wo ke part of sk ntial part of LC- work skills ain idea of le there is ow ork to do kills

Transcript of Content Bus Systems ENDR - European...

CONTEN

MODULE The PLC-Mtheir curricprogrammiis needed. industrial balso fault findustrial bthere. In the last demonstrat

NT OF MO

E BUS SY

Module is dculum. Studing. In the m During thebus system’finding and bus systems

week theretion test.

OVET MO

STEMS 

designed fordents that takmodule stude three weeks and how sdiagnostic l

s are used in

e is written t

 

DULE BU

r students wke part in thdent must wk training thsome of tholessons. Dn local indu

test which s

US SYSTE

which have ahe module s

work mostly he students wose are conf

During the trstrial compa

student mus

MS 

automation tshould havein pair’s or

will learn bafigured and braining the sanies and th

t past befor

technology e basic knowr groups, so asic’s of whbuild up. Instudents canhey also hav

re he can tak

as an essenwledge of PL good teamwhat is the man the moduln also see hove some wo

ke part of sk

ntial part of LC-work skills ain idea of le there is ow

ork to do

kills

Compete

MODULE

Competenarea

1.

2.

3.

4.

5.

6.

7.

8.

9.

ence deve

E  BUS SY

nce Ste

1.

7.

9.

elopment 

YSTEMS 

eps of com

1

2.1

3.1

4.1 4.2

5.1

6.1

1

8.1

1

 (VQTS) 

 

mpetence de

1.2

2

3

2 4.3

5.2

6.2

7.2

8

9.2

evelopmen

1.3

.2

.2

4.4

5.3

6.3

7.3

.2

9.3

nt

3

4.5

5.4

6.4

3 7.

3

1.4

2.3

3.3

4.6

5.5

6.5

35 7.4

8.3

9.4

Subject: AAim: Studsystem Required Performandemonstrat Time hours

Co

4 ReThins

BUS SYST

2 Difsys

2 StaEth Fac

4 Cab Difpla

2 Pro Difetc

Automation dents will lea

skills: Studnce: Three tion test wh

ontent

eply: he studentsstructions w

TEMS

fference bestem

andard Bushernet

ctory level,

beling and

fferences bacement in

ofibus netw

fferent protc). Building

with PLC –arn how mo

dent has to hweek traini

here student

s will makewith PLC c

etween wir

s systems:

, cell level,

connectio

between bucabelways

5. Pwork

tocols, cabg a profibu

6

–logic and bodern autom

have basic king, Includits will show

1. Ge

e some bascontrol

2. Basicsred I/O and

3. CommProfibus, A

field I/O

4.ons

us systemss etc.

ProfibusDP

beling distaus network

6. Profibus

bus systemsmation proje

knowledge ing visits to

w their comp

LeaWh

etting start

sic S isPLClea

s of Bus Syd bus S is

busthe S isexpwire

mon Bus SyAS-I, S is

the S islevewor

Cabeling

s,

S isthreProf S isandcab

P Building N

ance’s k

S isconof P(Sla S iscab

Configura

s ect is carried

of electric scompanies

petences abo

arning Outchat can theted s able to exC program,rned items

ystems s able to cos system coadvantage

s able to diplain6 the ded I/O andystems s able to ex

standard b

s able to exel’s of Bus rk together

s able to exee differenfibus, AS-i)

s able to cad explain thbles Network s able to cannections inPLC (Masteave)

s able to exbeling proctions

d out with P

systems, rel. In the endout the subj

come e Student (

xplain1 and, and recals of PLC co

ompare4 woncerning tes of a Bus

fferentiatedifferences d Bus

xplain7 the bus system

xplain8 the systems ar.

xplain9 difft bus syste).

arry out10 che principe

arry out11 cn a networer) and a I/

xplain12 thecedures

PLC and fiel

lay and PLCd of trainingect.

S) do

d carry outl3 previous

ontrols

ired I/O anthe idea ans System

e5 and between

function oms.

different nd how th

ferents in em (Ethern

connectiones of placin

cabeling anrk consistin/O –station

e limits of

ldbus

C controls g is skill

t2 a sly

nd nd

of

ey

net,

s ng

nd ng n

2 Con

Ma Usi

4 Tak TakProfro

4 Ma Addeximacon

4 Postoo Havwit

4 Bui ConPro

4 Tak Stunetbui

nfigurationster-Slave

ing a confi

king over t

ke over tesofibus Netwm substati

king the n

ding a newsting netw

ake the whnfiguring a

ssible faultol’s

ving a faulth using dia

ilding an A

nnecting thofibus netw

ke over the

udents will twork and ilt-up Profi

n of a Profinetwork

guration to7

the Profibu

st’s for PLCwork. Findion and us

etwork larg

w Profibus work. Stude

ole thing (nd take ov

9. t situations

lt situationagnostic to

AS-I networ

he AS-I nework

e AS-I netw

make a litconnect it bus Netwo

bus DP –

ool (softwa7. ProfibuusDP netwo

C-system wding out I/Oing them

8. Netwoger.

–module toents will no(cabeling, ver) againProfibusDP

s and diagn

and findinool’s

10. ASrk

etwork to

11. AS-I work

ttle AS-I to previou

ork

are)

S isconcon S is

s_ Taking ork

with O

S isableadd

ork expansi

o ow

S isthe proove

P Fault situnosis

ng it

S isdiag S isof f

-I NetworkS isconof P(Sla

Taking ov

usly

S isableadd S isdiffeProf

s able to exnfiguration nfiguration

s able to caover

s able to cae to explaindressing in

ion s able to re

the netwocedures of

er

uations s able to chgnostic too

s able to orfinding out

k s able to cannections inPLC (Masteave)

ver s able to cae to explaindressing in

s able to coerences befibus

xplain the iand carry procedure

arry out14 c

arry out15 In16 the sysProfibus N

ecognise17 ork propertf cabeling a

heck19 situaol’s.

rganize20 tht and solvi

arry out21 cn a networer) and a I/

arry out22 In23 the sysAS-i Netw

ompare24 thetween AS-

idea of out13

e

configuring

I/O –test. Sstem of Network

and recall1ties and and taking

ations with

he procedung faults

cabeling anrk consistin/O –station

I/O –test. Sstem of

work

he -I and

g

S is

18

h

ure

nd ng n

S is

8 Bui Bui

4 Writemnet

8 Stuto s

ilding an E

ilding a litt

ritten test oms Profibutwork

udent is masome mac

Ethernet ne

tle Etherne

of central tus, AS-I and

aking a nethine or con

12. Etheretwork

et network

13. Wtheoretical d Ethernet

14. Pratwork cabenveyor.

rnet Netwo

S iscabmai S isEthe

Written test

t

actical testeling S is

cabout2chein taown

ork s able to exbeling. S is in features

s able to caernet netw

t s able to orbeling work

29 connecteck30 I/O:s aking overn work.

xplain 25 prable to ex

s of Ethern

arry out27 cwork

rganise28 nk. S is able ions and isand netwo

r. S is able

rincipes of xplain26 theet network

cabeling of

etwork to carry

s able to ork functioe to critic31

e k

f

ns his

MOVET 

GETTING

 MOVET TGETTINGGetting sta

Task 1 GTask 2 CTask 3 CTask 4 HTask 5 TTask 6 p

 

 TRAININ

G START

TRAINING G STARTEDarted with SGetting startCreate projeClear/Reset Hardware coTesting I/O programmin

NG MODU

TED –MAT

MODULE D –MATER7 programmted .............ect ................................onfiguration..................

ng practice .

 

ULE “BUS 

TERIAL 

“BUS SYSRIAL ...........ming and PL.........................................................n .......................................................

 SYSTEMS

STEMS” ........................LC –setup ....................................................................................................................

S” 

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

..................

..................

..................

..................

..................

..................

..................

..................

..................

................ 9

................ 9

.............. 10

.............. 11

.............. 11

.............. 11

.............. 12

.............. 14

.............. 16

0

4 6

Getting s Rememberhardware –

Look the c

• S7-• Dig• A s• A c

Next we stproject in S

 started w

r what you h–configurati

configuratio

-300 systemgital input asimulator wconveyor un

tart to find oS7-Manager

 with S7 p

have previoion in the pr

n of the dev

m and output u

with digital anit

out the hw-cr.

rogramm

ously learn iractice-devi

vices. It sho

units, analogand analog d

configuratio

ming and

in S7 prograices.

ould look lik

g input –unidevices (sw

on of the S7

d PLC –set

amming. Fi

ke next pictu

it itches etc)

7 system wit

tup 

irst we start

ure:

th practises

t to deal wit

and how to

th the

o create a

Task 1 G Fill in the n

SLOT 1 2 3 4 5 6 7 8

Task 2 Cr Start SIMA

1. Crepro

2. Ins

Task 3 ClCheck thatsystem. It program un

etting sta

next table o

ExplanPower s

reate pro

ATIC Man

eate a new poject “MOVert a new S

lear/Reset there is pocan be don

nits and def

arted 

of the S7 un

nation supply 24V/

oject 

nager –prog

project, namVET”

7 -300 stati

et wer on the

ne with keysfinitions.

its you have

/5A

gram.

me it someho

on to the pr

S7 –devicesswitch or S7

e

ow that you

roject

s. Then mak7 –program.

u can recogn

ke the “CLE. RESULT:

Code (fro1EA00-0A

nize it. Use

EAR / RES: The CPU

om the unitAA0

e your name

SET” to theis empty fr

t)

e and/or the

e S7 rom the

Task 4 H Open the Hyou…

Save and c QUESTIOWhat is th___________________________ In HW-Conumbers m____________________________________

Hardware 

Hardware co

compile the

ONS: e difference______________________________

onfig you camean (etc. 0________________________________________

 configura

onfiguration

configurati

es between ______________________________

an see the c0..3)? ________________________________________

ation 

n. Make the

ion, then do

configurati______________________________

columns of I

________________________________________

e configurat

wnload. Ho

tion and par______________________________

I and Q (E

________________________________________

tion as it is

opefully no

rametrizatio______________________________

and A) –ad

________________________________________

on the S7 –

o problem oc

on? ______________________________

ddresses. W

________________________________________

–system in fr

ccurs…!

______________________________

What does th

________________________________________

front of

___________________________

hose

____________________________________

Next pictur

QUESTIOInput’s ?

 Extratask: flashing by

re is telling

ON: What is

Make the pyte

how the ad

s the addres

parametrizat

ddressing is

ss of last inp

tion for the

made in S7

put if the I/

CPU –unit.

7-300 system

/O –card is

Parametriz

m:

in SLOT 5,

ze it so that

, if there is

marker MB

16 digital

B10 is the

Task 5 Tes Situation: Next you wConveyor

1. InsNam

2. Insthe

3. Ins

-Above: Te Extratask:

sting I/O

You have n

want to knowsystem. Do

ert a VAT –me the VATert the Inpum ert a VAT t

esting the in

Test the MB

new S7 –pro

w how the Iit like this:

–table to theT –table likut -variables

table for out

nputs…

B10 (if you

oject, with S

I/O is wired

e program ine “CNV1_I

s from the c

tputs “CNV

u have param

S7-300 syst

d to the “fiel

n S7-managInput” onveyor an

V1_Output”

metrisized th

tem and HW

ld”. You w

ger (go to “B

d use monit

and test the

he CPU…),

W-configura

want to make

Blocks” and

tor and mod

e outputs of

, eg M10.0…

ation.

e an I/O –te

d right click

dify –functio

f the convey

…M10.7

est to the

k etc…).

ons to test

yor

RESULT: The structu

Is this righ Fill the tabAddress E8.0 E8.1 E8.2 E8.3 E8.4 E8.5 E8.6 E8.7 Fill the tabAddress A8.0 A8.1 A8.2 A8.3 A8.4 A8.5 A8.6 A8.7

ure of the co

ht?

ble for CNV

ble for CNV

onveyor sho

V inputs

V outputs

ould be like

Variable Photocell

Variable H1

this

Note Sensor

Note NotInUse Lamp

Task 6 pro Now we ne

To control The progra

1. Cre2. E0.3. Wh

4. Crebe cWhit ispho

5. If y

Rememberbe downlo Test that th FILL THE

ogramming p

eed to make

the convey

am is workineate FC 15 f.0 devicehen device i

a. ManuaE0.5

b. AutomE0.5 (Q

c. BOTHchange

d. The lameate FC 16 fcontrolled v

hen there inds in the phootocell you have tim

a. made ito end

b. Make t

r that after caded to the

he program

E I/O TABL

practice

e a program

yor we need

ng so: for automate on and A4is “ON” theal mode is se

matic mode iQuitted O of the “mo

ed (needs alwmp connectfor controllivia E0.2 andductive sento sensor (E

me left you it so that if photocell etthe symbol

creating FCPLC.

is working

LE’S NEXT

m. Next pict

d to use the s

tic/manual s4.1 goes “one user can seelected whe

is selected wOperator giv

odes” is reseways the aced to A4.2 sing the convd E0.3, whesor E8.5 = “

E8.0). The

can: the part is itc… table for the

15 and FC1

!

PAGE (Ca

ture is show

switches on

selection n”. E0.1 elect two difen E0.4 = “0

when E0.4 =ves an accepetting if the cceptance wshows the Mveyor. Wheen the AUTO“1” and opeconveyor i

in inductive

e project an

16 you must

an be done b

wing the stru

n the left.

Device to Offerent mod0” and the s

= “1” and thptance to thdevice goes

with E0.5 whMan mode aen manual mO is selecteerator is puss not runnin

sensor E8.6

nd give symb

t call them i

before progr

ucture of the

OFF des Auto or selection is q

he selection his “choice”s to OFF or hen changinand A4.3 shmode is seleed the conveshing the S1ng when the

6 and S2 is

bolic names

in OB1. Eve

ramming, it

e simulator

Man: quitted with

is quitted w”). r the switch ng the modehows Automcted the coneyor works 1 the part mere is part in

pushed the

s for the var

ery block ha

t may help!)

h input

with input

E0.4 is e) mode nveyor can like this:

moves until n the last

part goes

riables

as also to

)

TABLE 1 TABLE 2 Symbolic N Picture of e

,

Symbolic N

INPUTS U

OUTPUTS

Name

example op

Name

SED IN TH

USED IN T

perator pane

HE PROGRA

THE PROG

Address

el for this co

Address

RAM

GRAM

onveyor…LLT = light, P

Note (if ne

PB = PushB

Note (if ne

eeded)

utton SW =

eeded)

= Switch

Wha

• Fielda wa

• Advshor

• Fieldinsta

• Topo• Lot o

••••

Field lev

ActuatoSensor-level

at is field

dbus is an inday to connect antages: Lessrter installation

dbusses are aall new etc..)ologies (meanof standards, ProfibusAS-IInterbusDevieceNet

vel

r/-

dbus?

ustrial networinstruments in

s cabels in then time, less “p

Länsirann

also flexsible: T

ns “how statione.g

Länsirann

rk system for rn a manufactue process fieldproblem causin

nikon koulutus Oy WinNNurArt

They can be c

ns are installe

nikon koulutus Oy WinNNurArt

C

real-time distriuring plant.d and less conng” connection

Nova /

changed (take

d”): Star, ring,

Nova /

CAN

buted control.

nections Lons

e away stations

, tree, branch

. It is

ot

s,

Que

• How

• For we n

• Can

• Do w

13.12.6

A pracanswe

stions:

w many cables

10 pcs 32 bitneed those for

n we save spac

we have less c

.2010

ctise: looer questi

Länsirann

If bus sy

s for digital I/O

digital Input pr the process

ce in +C1 ?

connections (h

ok the syions:

nikon koulutus Oy WinNNurArt

ystems

O:s we need?

lc-card we canI/O:s?

hand made)?

Etunimi Sukunimi

ystem b

Nova /

is used

n have 320 dig

below an

instead

gital inputs. D

nd

d:

Do

Que

• HowDepcabcalb

• For we nFor any

• CanDefe”ter

• Do w13.12.7

Prof

• PRO• First• First

(Dec• DP i• PA is

stions:

w many cablespends on a bule. (Rememb

bes)

10 pcs 32 bitneed those I/Othose inputs

ymore I/O car

n we save spacfenetly. We dorminal block”

we have less c.2010

fibus

Ocess FIeld Bt promotion 19t FMS (Fieldbcentralized Peis most comms good for EX

If bus sy

s for digital I/Ous system. Inber, that some

digital Input pO -cars for thes and outputsrd needed

ce in +C1 ?o not need sp” connections

connections (h

US989us Message S

eripherals, PromonX-areas (low cu

Länsirann

ystems

O:s we need?n some systeme of field dev

lc-card we can process I/O:s

s what we con

pace for so ms to field I/O

hand made)? Etunimi Sukunimi

Spesification),ocess Automat

urrent)

nikon koulutus Oy WinNNurArt

is used

ms we need ovices still nee

n have 320 digs if we use busnnect to the f

many I/O cards

A lot less

Then DP andtion)

Nova /

instead

only one netwd power supp

gital inputs. Ds?fieldbus is no

s, no space f

d PA

d:

workply

Do

ot

for

Elec

• Bas• Bau• Shie• 32 s

Broa• Leng

Type

• Type• Type• Mor

Inte

ctrical ne

ed on RS 485drate 9,6 kBit/

elded cable (pstations in oneadcast)ght depends oMax lenght wi

e A and

e A is never ane B is older ane preferencesrnet..)

etwork p

5 technology/s to 12 Mbit/sair)

e bus segment

on baudrate: 9ith Repeaters

Länsirann

Type B C

nd supports thnd supports ms of cables can

Länsirann

propertie

s

t (total max 12

9,6 kBit/s 1200is 10km

nikon koulutus Oy WinNNurArt

Cables

he baudrate ofmax 1.5 Mbit/sn be found fro

nikon koulutus Oy WinNNurArt

es

26, addres 127

0m / 12Mbit/s

Nova /

f 12 Mbit/s

m cable comp

Nova /

7 is reserved f

100m (segme

panies (Check

for

ent)

k

Devi

• Norm• Pins

”dat• Sign• Opti

Term

• The segm

• Norminteg(Vac

ice Conn

maly with 9-pis 3 and 8 is coa line B” and 8

nal ground in pion for pin 6 ”V

mination

Profibus netwmentmaly with the grated in the scon)

nections

n D-connectoonnected to th8 is connectedpin 5VP”, Power for

Länsirann

n

work must be t

termination reslave, e.g Freq

Länsirann

s

re cable wires d to green wire

r bus terminat

nikon koulutus Oy WinNNurArt

terminated in t

esistors in D9 cquency conve

nikon koulutus Oy WinNNurArt

( 3 is connecte ”data line A”

tion

Nova /

the start and i

connectors. Itrters Profibus

Nova /

ted to red wire”)

n the end of e

t can be connection ca

e

each

ard

Topo

• Prof• A ”b

Opti

• Fibeelec

• Use

ologies

fibus supportsus” –topologi

cal netw

er optic systemctical interferenes Optical Link

s all common tis recommend

Länsirann

work

ms is good for nce

k Modules (OL

Länsirann

topologiesded

nikon koulutus Oy WinNNurArt

long distance

LM) between e

nikon koulutus Oy WinNNurArt

Nova /

es and for plac

electrical netw

Nova /

ces where is lo

ork

ot of

Written  STUDENT Points:___ Passed

 

Answer t Next quest

1) How

2) How

3) Wh

4) Wh

5) Situ

wan

 test for f

T NAME AN

__________

 the questi

tions is abou

w many sig

w many sta

hich one of t 9,6kb

hich one of t 9,6kb

uation: We nt to put 5 m

 fieldbus 

ND COUN

_____/

ions: 

ut “building

gnal wires w

ations it can

the next baubit/s 12

the next baubit/s 12

have Profibmore slaves

 systems 

NTRY:_____

g up” PROF

we need in P

be in one s

udrates has 2Mbit/s

udrates can 2Mbit/s

bus networks, so do we n

  

__________

FIBUS –syst

Profibus –ca

segment of b

more capac

have longe

k with Masteneed any ot

__________

tems

able (electri

bus network

city for tran

er (electrical

er device anther compon

__________

cal network

k?

nsferring dat

l) network?

nd 30 slavesnent?

______

k)?

ta

s in the netw

work. We

6) In ecab

7) Do

8) Wh

9) SitumoPro(tel

10) Is i

electrical neble shield co

es the netw

hat is OLM

uation: In thotors (pump ofibus –cablll also why y

t possible to

etwork it is onnected if w

work need an

(Optical M

he system isstations etc

les totally “myou think w

o use any ot

recommendwe use D9 –

ny terminati

Module Link)

s a profibus c.) The motmixed”. Do

what you thi

ther connec

ded to use tw–fastconnec

ion (if yes th

), where it i

–network itor power cao you think tink)?

ctions to Pro

wisted and ct connector

hen explain

is used?

in a processables is mouthis is a goo

ofibus –cabl

shielded TYr (see pictur

n where)?

where is a unted in samod or bad w

le than D9 –

YPE A cablre)?

lot of electrme cablewa

way to do the

–connector?

e. Is the

rical ays with e cabeling

?

Next que

1) See

estions is 

e the picture

a) What ib) Does thc) How md) Profibue) There i

–outpuf) Is it pog) is it po

with hah) Case: T

i) Can weprogram

 about con

e below:

s the CPU the system h

many slave sus-addresseis used IM1

ut (in this ETossible to adssible to chardware conThe ET200M

e read/writem? Ye

nfiguratio

type in masthave Porfibustations can s for the sla53 (ET200M

T200M)? __dd more slavhange the inpnfiguration pM profibus

e the inputs/es

on 

ter device? us-network?be found in

aves are: ___M) slave un__________ves to this syput-addressprogram? address nee

/outputs conNo

_________? Yesn this system__________

nit. What is______ ystem? Y

ses of the sla Yes

ed to be cha Yes

nnected to E

__________ No

m? _________________s the first ad

Yes ave ET200M

No anged. Is tha

No ET200M –sy

__________

____________________ddress of slo

No M slot 6 (DI

at possible?

ystem in the

__

__ ___ ot 5 DO32

I8/DO8)

e S7-

About fie

1) Des

2) ASdev

j) In this unit, anpropertto think“up” w

eldbus sys

scribe what

-I –fieldbusvices is conn

Hw-config nd think thaties”. Tell wk what chan

with new add

stems 

t is the bene

s belongs tonected to A

we have that you have jwhat you nenges is possdress).

efits to use f

o so called “AS-I bus?

he addressesjust changeed to do to ible needed

fieldbus sys

“Actuator se

s of slaves. Ted the addrehave the ne

d in the S7 -

tem ( vs. tra

ensor level”

Take an exaess of ET200ew address vprogram, ju

aditional wi

”. Can you d

ample of ET0M by usingvalid (you dust have the

ired I/O):

describe wh

T200M –g “object

do not need network

hat kind of

Practica STUDENT

TASK 1  Situation dThere has bbeen damaSiemens PLrepaired it replaced w WORK ORYour job isneeded andconveyor s(they have NOTE! Boconveyors used to con Pic1: Conv

In the new output byte

al test / S

T NAME AN

description: been a fire i

aged. The sLC units (Cwill be mod

with CPU 31

RDER: s to change d to build upsystem. It hbeen simila

oth conveyodo not know

ntrol each c

veyor system

system thee 10 for the

kills dem

ND COUN

in a conveysystem was

CPU 314). Cdernisized t

15-2DP, and

the CPU - up the Profib

has been a liar in both P

or system is w anything onveyor. Th

m used (in b

conveyor wfield I/O.

monstrati

NTRY:_____

yor system inoriginally m

Company hato use Profibd the other o

units like prbus networkittle bit of luLC)!! Prog

still havingabout this c

he old proc

both old 314

which is con

ion test 

__________

n a productmade with tas made a dbus –netwoone with ET

reviously dek. Then youuck and thergram you ca

g the same ochange of Pcess field in

4 CPU:s):

nnected to p

 

__________

ion line. Thtraditionallydecision: Sark. One of

T200M I/O-

escribed, tou must do thre is a pape

an find in at

operator conPLC:s). Youncluding the

profibus slav

__________

he control sy wired fieldame time ththe 314 CP

-unit.

install all ohe testing tor copy versttachment la

ntrol panel’su must have operator pa

ve unit is us

______

system cabind I/O with te control sy

PU:s is going

of the Profibo “take-overion of the oater on this

s (the peoplthe same sw

anel’s are in

sing input b

net has two ystem is g to be

bus-cable’s r” the old programdocument.

le who uses witches n use.

byte 10 and

m

Pic2: New

Pic3: Old cthan old.

HW –confi

control pane

figuration

el. Same paanel’s is stilll used, for tthe user (opperator) the new system

m is same

Attachmennt 1 Old connveyor contrrol programm FC10 (Muust be calledd in OB1):

Thursda Today wPhilipp awith a slCPU 315When Beteststandto make AfternooWe had sthe Germdont matBut it wa

ay 21/1 

e startet nd i startave modu-2DP, we

enedict had with the the confi

on: sport on t

men and ttters wheas god jus

 

with the tet as slavule ET 20e was maad made e slave iniguration

the progrthe Finnsen you arest to have

reeson wve for Be

00. and Beking our ohis hardw

n our rack and test

ram, and , i wont se losing. e a few h

we came tnedict, soenedict hown cabeware confk, and afte it on Ben

was lokksay anyth

ours of fu

to Finlando we had ad to rep

el for the figurationer that Ph

nedict sta

king forwaing about

un.

d, the Pro to replacplace his Pconnectin he couldhilipp andnd.

ard to plat the resu

John/Ph

fibus. ce our PLCPLC S7 wng. d control od i got the

y floorbault, becor

ilipp

C S7 ith the

our e chance

ll againstrse result

t

ny we leawitch kinmachine programm The otherdifferencthis them

W

arnd somend of BUSnetworks.m for an C

r Groub lee BUS sys

me.

Wedne

ething abouS systems a. We also

Coveyerbe

earnd also stems and

esday 2

ut roboterare used inprogramm

elt.

somethind do a lot o

27th Ja

rs, Logisticn the diffemed some

ng about thof theorie a

anauar

Today wegroups. TCompany and the sewas at sch In the compacs and erence small

he about

ry 201

e where spThe first Gry called

econd Grohool.

10

plitted in twroup go to

oup

wo o an

Today we

the retail

They had

automatio

After that

skiing.

Many of

we where

The weat

the whole

the sleds.

After that

Danish gr

food, but

The even

Danish guy

e had a co

and priva

d a lot of in

on worked

t we went

us in the g

e very exit

ther was v

e time we

.

t we went

roup wher

the pizza

ning went n

ys in front o

ompany vi

ate compan

nteresting

d, especial

t back to th

group (bot

ted about

very good

had been

t home, an

re so tired

was great

nice and q

of the Fiblon

Tu

sit to Fibl

nies such a

machines

lly with th

he school,

th Danes a

trying it.

for skiing

in Finland

nd we whe

d that they

t.

quiet as alw

n

uesday 2

on witch i

as Airline

s, and it w

here profib

, to get som

and Germ

g, and prob

d, and we

ere all pret

just went

ways.

26.1.10

is a compa

e Company

was very in

bus system

me food, a

ans) had n

bably the b

all had a g

tty tired af

for pizza

The place

any who m

y’s etc.

nteresting t

ms.

and then w

never tried

best weath

good time

fter the ski

instead of

e where we

makes tissu

to see how

we where o

d skiing be

her we hav

e skiing, an

i tour, and

f making t

went skiing

ues both

w there

off to go

efore, so

ve had in

nd riding

d the

there own

g.

Report Tu The secondWe´ve get where we aconnectingIn the roomperson of oas a small tWe got themanager anour stationon Slot 2. Sused by DiSo our firsand to giveThen we hin OB1, ca

uesday the

d school daythe first loo

are going tog, programmm are one coour class. Oteam of two

e first instrund tell the p

n. Normal thSlot 3 is woigital Inputst practice we it in the prad to write

alled FC15 a

19 of Janua

y of our jouok at our PLo learn for thming and woomputer, PL

Only two groo guys on onuction how tprogram whhe power suporkless and ts or Outputs

was to look, rogram. a small proand FC15.

ary 2010

urney beganLC programhe next threorking with LC and convoups of peopne station. to work with

hich componpply is on sthe followins. which com

gram to con

n as the timemming statioee weeks ho

a bus-systeveyer for eaple have to h the simatinents we´veslot 1 and thng Slots are

mponents the

ntrol the con

e 8 o’clock.ons, ow to em. ach work

ic e got as he CPU e being

ere are

nveyor