1. Company overview

2. Company background

3. Geography of key current projects

4. Human resources

5. Technical resources

6. Quality control department

7. Pipe shell section

8. Heat treatment

9. Responsibility to the Customer

10. Significant projects over the last five years

11. Projects portfolio

12. Main Facilities of SU-6 Neftegazmontazh, JSC

13. Company card

3

4

5

6

7

8

10

11

12

13

18

27

39 2

Company overview

Company’s resources:

Over 125 large-scale projects for oil and gas industry;

Own production and repair base with a set of tools for the fabrication of pipe spools of large diameter (200÷1400 mm) metal structures;

Modern laboratory exercising quality control of materials and works performed;

Over 400 highly qualified and certified specialists, including 70 welders;

Own training centre of continuing professional education for workers;

Own construction equipment fleet in order to perform a wide range of works.

SU-6 Neftegazmontazh, JSC is a construction and installation company of the South region with wide experience specialized in the following: Installation of industrial pipelines and tanks Welded joints examination by non-destructive method Fabrication of non-standard equipment, pipe spools and metal structures Procurement

3

Company background

•SU-6 was transferred from Welding and Installation Trust to Soyuzmontazhgaz trust and relocated from the city of Bryansk to the city of Stavropol at the end of 1964. •In 60-s and 70-s they performed installation works in the course of the construction of oil and gas complex in the Stavropol Territory. These years the staff of SU-6 was involved in works for facilities of national economic significance in different region of the USSR.

•On June 23, 1980 SU-6 of Soyuzgazmontazh trust integrated into Tsentrkomplektmontazh trust. •Assemblers of SU-6 were the first to develop the largest gas filed “Shatlykskoye” in Turkmenistan and gas condensate facilities in Novy Urengoy and Astrakhan, where large installation organizations were established on the basis of SU-6. They performed the construction of gas pipelines and compressor stations in Azerbaijan, Uzbekistan and the Baltic States, and abroad in collaboration with Germany, Italy, the Chez Republic, the USA, England, Japan, Canada and France.

•On June 21, 1990 Tsentrkomplektmontazh trust was dissolved and SU-6 was renamed in SU-6 Construction and Welding Union “Neftegazmontazh”. •On October 1, 1993 SU-6 became branch of Open JSC Neftegazmontazh SU-6 that was dissolved completely on July 31, 1998. •On August 1, 1998 Subsidiary SU-6 Neftegazmontazh, JSC was established. During the time of drastic reduction in oil and gas construction SU-6 underwent a period of stagnation, was on the verge of bankruptcy, but it was able to keep its main staff and equipment.

•From February 2004 Subsidiary SU-6 Neftegazmontazh, JSC was reorganized into SU-6 Neftegazmontazh, JSC. •From 2001 to 2006 the Company’s staff performed the following large-scale oil and gas industry facilities:

1) Komsomolskaya, Kropotkinskaya and Astrakhanskaya pump stations;

2) Salskaya, Volgogradskaya, Olkhovskaya, Kotelnikovskaya, Zhirnovskaya, Novopetrovskaya, Stavropolskaya and Smolenskaya compressor station.

•In 2007 SU-6 Neftegazmontazh, JSC integrated into Promstroi Group of Companies and began the execution of the following significant projects: 1) Expansion of South Balyk Gas Treatment Plant (the Khanty Mansiysk Autonomous District);

2) ESPO 1 Skovorodino – the PRC’s Border Pipeline; 3) Sakhalin – Khabarovsk – Vladivostok Main Gas Pipeline. Sakhalin gas compressor station. Received certificate ISO 9000.

• In 2009 became member of NPO Self-Regulatory Organization “Builders Alliance” and received Certificate “For Hazardous, Highly Technical and Unique Sub-Facilities”.

•On March 6, 2012 SU-6 Neftegazmontazh, JSC received certificate of conformity to quality management system requirements of GOST R ISO 9001-2008, what is proved by the status of a reliable partner. •On March 20, 2012 being a member of NPO Self-Regulatory Organization “Builders Alliance”, SU-6 Neftegazmontazh, JSC received Work Permit to specific works influencing the security of capital construction facilities. •In 2015 it became a member of SRO “Association of gas and oil complex builders”.

4

Reconstruction of Astrakhan OPS andA-OPS-4A within the project «Expansion of CPC on the

territory of the RF»

Production of butadiene styrene thermoplastic elastomers with the

capacity of 50 000 tons per year Location: Voronezh

Client: SIBUR Holding, JSC

Isomerization complex of pentane hexane fraction

Construction of Kuibyshev-Unecha-Mozyr-1 pipeline section

circumventing Penza

Location: Penza region Client: Transneft, JSC

Pokrovskaya gas treatment plant

Location: the Orenburg region Client : ТNК-ВР, JSC

Increase in natural gas liquids production in South Balyk GTP

in Pyt-Yakh

Location: Pyt-Yakh Client: SIBUR Holding, JSC

Sakhalin-Khabarovsk-Vladivostok main gas pipeline. Sakhalin gas

compressor station

Location: Sakhalin island Client: Gazprom, JSC

ESPO 1 Specialized Oil Loading Seaport

«Kozmino»

Location: the Primorsk Territory Client: Transneft, JSC

Geography of key current projects

- Current projects

Expansion of natural gas liquids processing production No.3 and 6 in

Astrakhan Gas Processing Plant.

- Completed projects 5

Location: Krasnodar krai Client: Chernomortransneft, JSC

Changing of the section of TLUP «Tikhoretsk-Tuapse», Dn500, km. 34, stand-

by line, across the Beisug river. KDOPA.

Location: the Astrakhan Region Client: Transneft, JSC; CPC-R, JSC

Location: Astrakhan Client: GAZPROMSTROIINVEST, LLC

Location: the Saratov region Client: ТNК-ВР, JSC

ESPO 1 Skovorodino – the PRC’s Border

oil pipeline

Location: the Amur Region Client: Transneft, JSC

Location: Tobolsk Client: SIBUR Holding, JSC, Linde Engineering

Polypropylene production plant

Human resources

Number of personnel by categories

Total 332

53 50

155

74 Office and management personnel

Engineering staff

Workers support production

41

39

55 24

143

Number of personnel by subdivisions

SABU"Astrakhan" (Maliy Aral village – Astrakhan region)

Administration

Mechanical Department

Welding Department

Production department No. 1

Pipe Shells and Structural Engineering Department

6

Main staff

3 2

33 3 SABU "Novomalorossiyskaya" (Novomalorossiyskaya village, Krasnodar krai)

SABU "Tyumen", Tyumen city

Power and Energy Utilities Department

Technical resources

7

Type of equipment No. оf units

Excavation and road-building equipment

15

Lifting equipment 29

Mobile personnel facilities 20

Transport facilities 92

Welding equipment 161

Other 34

Total 351

Non-destructive testing laboratory applies the following control methods: - radiographic test - ultrasonic test - dye penetrant inspection method - leak detection method - visual inspection control - electrical control - thickness test

Destructive testing laboratory applies the following mechanical

control methods: - stretching test - static bending test - impact bending test - flattening test - macrosection - metal hardness test - metal spectral analysis

Quality control department Quality Control Department is a structural subdivision of SU-6 Neftegazmontazh, JSC that exposes defects at different stages of work performance.

8

Quality Control

Department

Quality Control Department Quality Control Department has most-up-to-date equipment:

• test machine UMM-50; • pendulum testing machine 2010KM; • visual and measuring testing equipment; • hardness testing machines; • ultrasonic flaw detectors; • steel quality device; • quality control device for insulating covering of

Korona type; • ultrasonic thickness tools;

• surface thermometer of TK-5.60 type; • hesiometer of AMT2-20 type; • X-ray pulse devices “Arina”, “Shmel”; • constant potential X-ray devices “Mart-200”, “RPD-

200”, “RPD-250SP”; • X-ray device of BNDT 10-60 type; • autoprocessor “Agfa”; • image quality indicators; • quality control samples, etc.

X-ray device «SHMEL»

VMT equipment

X-ray device “ARINA”

Steel quality device

Ultrasonic flaw detector

Contact thermometer ТК-5.06

9

Quality control department

Specialists of SU-6 has developed, fabricated and introduced an uncommercial and unique in the territory of the Russian Federation set of tools and devices for pipe spool fabrication of large diameter for compressor and pump stations (diameter 0f 500÷1400 mm) in the shop and in the field

SU-6 Neftegazmontazh, JSC has its own production and repair base with pipe spool and metal structure fabrication workshop. They use advanced methods for submerged arc and gas-shielded welding.

10

Heat treatment

SU-6 Neftegazmontazh, JSC established a subdivision carrying out heat treatment of welded joints and equipment. There are 12 Heat Treatment Operators in the subdivision who are certified on an annual basis.

Works are carried out by means of the heat treatment plant for

welded joints that can be operated both manually and in automatic mode. At least 6 welded joints up to 377 mm each can be processed by means of this plant simultaneously. All devices meant for recording and in-process monitoring have certificates for measuring means.

Total amount of heat-treated joints of different diameters (from 32

mm to 377 mm) at the facility “Saratov Oil Refinery” was about 2000 joints. About 800 joints were heat-treated at “Astrakhan Gas Processing Plant”.

11

Responsibility to the Customer

From February 2015 the Quality Management System of SU-6 Neftegazmontazh, JSC relating to construction reconstruction and overhaul works, that have an impact to safety of capital construction projects corresponds to the international requirements ISO 9001:2008 that is confirmed by the certificate of Intertek Certification Limited, Great Britain

From 2014 SU-6 Neftegazmontazh, JSC is a member of Self-Regulating Organization "Association of gas and oil complex builders" (The Certificate of clearance for a specific type or types of works that influence safety of capital construction projects including highly dangerous and technically challenging facilities" No.0645.01-2014-2635043064-С-084 dated 14.11.2014.

Non-Destructive Testing Laboratory: SU-6 Neftegazmontazh, JSC has testimonial of competence issued by Independent Certification Agency for Non-Destructive Testing Laboratories LLC Firm “Stroiexpert” in Krasnodar certifying that a non-destructive testing laboratory of SU-6 complies with the requirements of non-destructive control system.

С In 2009 Zapadno-Sibirskiy Bank of Sberbank of Russia in the city of Tyumen became a reliable partner of Promstroi Group of Companies that during the cooperation period issued several dozens of its products (credit lines, bank guarantees, payroll programmes) for the Group.

Gazprom’s Certificate confirms the Company’s organizational and technical readiness in order to carry out preparatory, earth, welding and installation, and insulation works, as well as works concerning ballasting and allocation of gas pipelines, void pigging and testing of pipelines and equipment, quality control of welded and insulation coating in the course of capital repairs and reconstruction of gas transport facilities.

In 2007 SU-6 Neftegazmontazh, JSC integrated into Promstroi Group of Companies, a construction and installation Holding Company performing design and construction of large-scale industrial projects of power-producing industry (oil and gas production, transportation and processing), power industry and metallurgy industry. Ten specialized companies of the Russian Federation, the Republic of Kazakhstan and the Republic of Belarus are integrated into Promstroi Group of Companies, which carry out EPC and EPCM projects).

Materials Testing Laboratory: SU-6 Neftegazmontazh, JSC has certificate issued by the Federal Budget Institution “State Regional Centre of Standardization, Metrology and Testing in the Stavropol Territory” that gives the laboratory the right to carry out physical testing of joint welds and their certain parts, weld deposits and their alloy, and measure of hardness of metals.

12

Significant projects over the last five years

Project

Client

Function

Types of works Perfomance period

Booster station

"Volokamskaya" at the gas pipeline

"Yamal – Europe"

Yamalgazinvest, JSC Subcontractor 100 % Installation of technical equipment - 670 t, process pipelines Ø 22-1420 mm – 18.3 km, Valves - 814 pcs.

2007

Process pipelines for depot and between the sites (from PS

No.41 to metering skids No.4) (Primorsk city)

Trest No.68, JSC Subcontractor 100 % Installation of technical equipment - 285 t, process pipelines Ø 32-1020 mm – 9.2 km, Valves - 318 pcs.

2007

Construction of VSTP-10000 No.8 OPS-3 Almetyevsk

PPMR, LLC Subcontractor 100 % Installation of technical equipment, Process

pipelines 2007

Booster station

"Novogryazovetskaya" at the gas pipeline SRTO - Torzhok

SGM, LLC Subcontractor 100 %

Installation of technical equipment – 816 t, Process pipelines Ø 22-1420 mm – 19.5 km,

Valves –914 pcs. 2007

Replacement of sections of toil pipeline

"Zhirnovsk-Volgograd" Dn-500 (section "Efimovka-VNPZ" 84-107 km with

backing rings"

Stroynovatsiya, LLC Subcontractor 100 %

Earthworks, installation and welding, insulation works for pipelines Ø 530

– 23 km

2007

Expansions of Yuzhno – Balykskiy GTP Yuzhno – Balykskiy GTP,

JSC Subcontractor 100 %

Installation of technical equipment – 520 t,

Process pipelines Ø 32-1220– 28.2 km, Valves - 425

pcs.

2008

Reconstruction of VST – 20000 m3 No.14 at

OGS Proteks NPO

Subcontractor

100%

Installation of technical equipment - 520 t, process

pipelines Ø 32-1220– 28.2 km, Valves - 425 pcs. 2008

Construction of oil field named after

Yu.Korchagin

(1 line) New construction of LPS-1"

StroiTransGazEngineerin

g, LLC Subcontractor 100 %

Installation of technical equipment – 170 t,

Process pipelines Ø 32-720 mm – 1.8 km, Valves -

458 pcs. metal piers – 164 t

2008

GTP BS Algay

JSC

Gazpromstroiengineerin

g

Subcontractor 100 % Erection of metal structures of vessel V=20000v3

– 445 t 2008

13

Significant projects for the last five years

Project Client Function Types of works Performance

period

The first line of pipeline

system "VSTO".

Specialized oil seaport "Kozmino".

Utility line area (Big and little).

Onshore facilities site. Offshore

facilities"

TsUP VSTO, LLC Subcontractor 85%

Installation of technical equipment –

1500 t, Process pipelines Ø 32-820

mm – 30 km, PE pipelines Ø 110, 315

mm– 2.6 km Valves - 300 pcs.

2008- 2009

Oil pipeline "Skovorodino – Board with

PRC" TSUP VSTO, LLC Subcontractor 100 %

Installation of technical equipment -

502 t, process pipelines Ø 32-820

mm – 5.88 km, Valves - 214 pcs.

2009-2010

Construction of two vessels VSTP 20

000 m3 No.7, 8 at LODS

"Konda", Uraysk Oil Trunk Line

Division

Sibnefteprovod, JSC Subcontractor 100 %

Erection of metal structures of

vessel V=20000v3 (2 pcs)– 900 t,

Process pipelines Ø 22-720 – 2.1 km

2009-2010

VST-20000m3 No.1.5 LDSP

"Samotlor" reconstruction Sibnefteprovod, JSC Subcontractor

Erection of metal structures of

vessel V=20000v3 (2 pcs)

Installation of equipment and

fitting, pipelines

2011

Construction of Pokrovskaya GTP JSC

Orenburgneftestroi Subcontractor

Erection of metal structures,

equipment, fitting, pipelines 2011-2012

Main gas pipeline

Sakhalin-Khabarovsk-Vladivostok.

GCS Sakhalin

Gazprom, JSC Subcontractor

Installation of technical equipment –

127 pcs/147.7 t Pipe spool – 71 t

Process pipelines Ø 16x1420 – 2.7km

Non-destructive testing of welded

joints.

2011-2012

14

Significant projects for the last five years

Project Client Function Types of works Performance

period

Construction of oil pipeline section

"Kuibyshev-Unecha-Mozyr-1". Bypassing

Penza city

AK Transneft, JSC Subcontractor

Installation of process pipelines Ø 1020 mm –

16776 km. Installation of valves.

Soil remediation. Testing.

Installation of cathodic protection.

2012-2012

Production of styrene-butadiene

thermoelastoplasts, capacity of 50000

tons per year

Voronezh city

SIBUR Holding, JSC Subcontractor Process pipelines Ø 18-530 mm – 2100 m, Valves –

475 pcs. NDT of welded joints. 2012-2013

Saratov Oil Refinery

Expansion of isomerization

of pentane-hexane fraction

Saratov Oil Refinery, JSC Subcontractor

Installation of technical equipment – 110 t,

Metal structures – 101 t,

Installation of pipeline structures – 36 t, process

pipelines Ø 18-325 mm – 14850, Valves –2565 pcs.

2012-2013

Trunk pipeline "Mozdok-Kazi-Magomed"

Chechnya, Gas-measuring station,

capacity of 50-55 mln.m3 per 24hrs at 836

km Dn 1200

Chechengazprom, JSC EPC Contractor

Installation of technical equipment – 130 t,

Process pipelines Ø 22-1220 mm – 1526 m,

Valves –362 pcs.

2012-2013

Section Gas Fractionation Plant 2 of the

project "Expansion of WSLH Processing

Plant no less than 5.8 million tons per

year".

GFP-2. Title 1201

Tobolsk-Neftekhim, LLC Subcontractor

Installation of technical equipment - 600 t,

process pipelines Ø 24 – 1020 – 14 km, Valves -

1299 pcs.

2012-2014

15

Significant projects for the last five years

Project Client Function Types of works Performance

period

Expansion of productions No. 3, 6 on

gas condensate processing at Astrakhan

Gas Processing Plant. Isomerization plant

of pentane-hexane fraction in Astrakhan

city

LLC

Gazpromstroiinvest Subcontractor

Installation of technical equipment and metal

structures. Installation of pipelines Ø 21.3-711mm -

10415 m.

Installation of valves.

2013-2014

Reconstruction of OPS "Astrakhan" and

A-OPS-4A in terms of the project

"Expansion of the Caspian Pipeline in the

Territory of the RF" Astrakhan region.

AK Transneft, JSC, Caspian

Pipeline Consortium – R, JSC Subcontractor

Installation of equipment and pipeline nodes.

Non-destructive testing of welded joints.

Isolation of welded joints.

Installation of valves. Installation of vessels.

2012-2015

"Reconstruction of production of

ethylene oxide and glycol with the use of

highly selective catalysts" Dzerzhinsk city

Sibur-Neftekhim, JSC Subcontractor Installation of equipment and pipeline nodes.

Non-destructive testing of welded joints. 2014

Major overhaul of the facility: "Trunk

pipeline 14.0 from 0 to 14 km

Rozhdestvenskaya-Izobilniy"

Gazprom transgaz Stavropol,

LLC Subcontractor

Installation, dismantling, reisolation of pipeline

Ø1020 mm 2014

Junction point to BS-7, km 98.6.

Gas pipeline "BS Izobilniy-Nevinnomyssk"

I launch complex km 98.6 - km 43.4

Nevinnomyssk city

Gazprom transgaz

Stavropol, LLC Subcontractor

Installation of above-ground and under-ground

pipelines Ø57 – 1220 mm, installation of

equipment. Non-destructive testing of welded

joints.

2014

16

Significant projects for the last five years

Project Client Function Types of works Performance

period

Covered parking for machinery with

administration and amenity rooms and heated

warehouse for storage of centrifugal

adjustable separator; Open air parking for

machinery with shed. OPS "Palkino". Regional

Oil Pipeline Management. construction

Transneft- Baltika, LLC Epc contractor

Erection of precast concrete and reinforced

concrete structures. Erection of metal structures.

Arrangement of external heat supply networks.

Installation works.

2014

"Replacement of section of trunk line

underwater passage "Tikhoretsk - Tuapse",

Dn500, km.34, stand-by line, over Beisug river.

KDORA."

JSC

Chernomortransneft" Subcontractor

Erection of precast concrete and reinforced

concrete structures. Erection of metal structures.

Arrangement of external heat supply networks.

Installation works.

2014-2015

"Installation of diesel hydrotreater" at

Antipinsky oil refinery

YUNIKS, LLC, SD

Tyumen Subcontractor

Erection of precast concrete and reinforced

concrete structures. Erection of metal structures.

Arrangement of external heat supply networks.

Installation works.

2014-2015

LACT unit 433 at LODS "Yaroslavl". Regional Oil

Pipeline Management. Modernization Transneft- Baltika, LLC Epc contractor

Erection of precast concrete and reinforced

concrete structures. Erection of metal structures.

Arrangement of external heat supply networks.

Installation works. Earthworks. installation of

process pipelines

2015

LACT unit at OPS "Yaroslavl-3" "Surgut-

Polotsk. Regional Oil Pipeline Management.

Construction"

Transneft- Baltika, LLC Epc contractor

Erection of precast concrete and reinforced

concrete structures. Erection of metal structures.

Arrangement of external heat supply networks.

Installation works. Earthworks. Installation of

process pipelines

2015

17

CS-2 «Babayevskaya» 2004 – 2005

18

Volokolamskaya Compressor Station for Yamal –

Europe gas pipeline, 2006 -2007

19

VSTP-50000 OPS «Kaleikino», Automatic Subsurface

Firefighting System of Tank Farm «Druzhba 1»,

2006 -2007

20

Industrial pipelines at and between the sites (from

Pump Station No.41 to Metering Unit No.4) Primorsk,

2006 -2007

21

GTP, Algay Compressor Station, 2008

22

First stage of ESPO pipeline system.

Kozmino Specialized Oil Loading Seaport, 2008 – 2009

23

Skovorodino – the PRC’s Border Oil

Pipeline, 2009 – 2010

24

Sakhalin Gas Compressor Station, 2011

25

"Section Gas Fractionation Plant 2» of the project

"Expansion of WSLH Processing Plant no less than 5.8

million tons per year», 2012

26

Main facilities "SU-6 Neftegazmontazh", JSC

Item No. Facilities Location Year of construction

1 Winter Rate Stavropol krai 1965

2 Ozek-Saut Stavropol krai 1966

3 Yuzhno-Sukhokumskaya Dagestan 1967

4 Velichayevskaya Stavropol krai 1967

5 Kamysh-Burunskaya Stavropol krai 1967-1968

6 Zhuravskaya Stavropol krai 1969

7 BS of high pressure Stavropol krai 1969

8 Rozhdestvenskaya Stavropol krai 1968

9 Izobilnoye Stavropol krai 1969

10 Kazakh Azerbaijan 1971

11 Agdamskaya Azerbaijan 1971

12 Kazi-Magomed Azerbaijan 1971

13 Ternopolskaya Ukraine 1972-1973

14 Dolinskaya MK-8 Ukraine 1973

15 BCS in Mirny Stavropol krai 1974-1975

16 Dolinskaya Kuper-Bessemer Ukraine 1974

17 Pugachevskaya Saratov region 1975

18 Dolinskaya GTK-10 Ukraine 1975

19 Pallasovka electric motor Volgograd region 1975

20 Pallasovka GTK-10 Volgograd region 1977

21 Sovkhoznaya Orenburg region 1977

22 Alkseyevskaya Orenburg region 1977

23 Georgiyevskaya Stavropol krai 1978

24 Nevinnomysskaya DR-12 Stavropol krai 1977

25 Ostrogozhskaya Voronezh region 1977-1980

26 Gas booster station in Neftekumsk Stavropol krai 1980

27 Arkaulovskaya Bashkiria 1980

28 Polyanskaya Bashkiria 1980

29 Storozhovskaya Saratov region 1980

Booster stations

27

Main facilities "SU-6 Neftegazmontazh", JSC

Item No. Facilities Location Year of construction

30 Smolenskaya Krasnodar krai 1980

31 Sindorskaya Komi Autonomous Soviet Socialist Republic 1981

32 Nevinnomysskaya MK-8 Stavropol krai 1981-1982

33 Meshcherskaya Penza region 1981-1982

34 GPU Dolina Ukraine 1981

35 Toliattinskaya Samara region 1982

36 DGS (Urengoi) Urengoi 1982

37 Egorlykskaya Rostov region 1983

38 Privolnaya Stavropol krai 1983

39 Komsomolskaya Ekaterinburg 1984

40 Reshetilovskaya Ukraine 1986

41 Ananyevskaya Ukraine 1987

42 Ekaterinovskaya Saratov region 1983

43 Siozan Azerbaijan 1983-1984

44 Aksay (Oktyabrskaya) Rostov region 1984

45 Stavropolskaya Stavropol krai 2003

46 Salskaya Rostov region 2003

47 Volgogradskaya Volgograd region 2003

48 Smolenskaya Smolensk region 2003

49 Zamyany Astrakhan region 2004

50 Kotelnikovskaya Rostov region 2004

51 Olkhovskaya Volgograd region 2004

52 Babaevskaya Vologda region 2004

53 Kholm-Zhirkovskaya Smolensk region 2005

54 Novopetrovskaya Stavropol krai 2006

55 Zhirnovskaya Volgograd region 2006

56 Volokolamskaya Moscow region 2007

57 Novogryazovetskaya Vologda region 2007

58 Izobilnyi-Nevinnomyssk Stavropol krai 2014

Booster stations

28

Main facilities "SU-6 Neftegazmontazh", JSC

Gas mains and gas metering stations Item

No. Facilities Location Diameter Length Year of construction

1 Bryansk-Smolensk Bryansk region / Smolensk region 530 84 1964-1965

2 Yuzhniy Sukhokumsk-Kamysh Burun Dagestan 530 40 1965

3 Rozhdestvenskaya-Nevinnomyssk Stavropol krai 720 35 1966

4 Gas pipeline "Bratstvo" Western Ukraine 820 30 1967

5 Approach to Inchukalinskiy UGSF Latvia 720 49.5 1967

6 Mozdok-Nevinnomyssk Stavropol krai 1020 32 1968

7 Mirnyy-Izobilniy Stavropol krai 1020 78 1969

8 Astara-Kazakh Azerbaijan 1020 45 1970-1971

9 Rozhdestvenskaya-Izobilniy Stavropol krai 1020 22 1970

10 Ishcherskaya-Mozdok North Ossetia 530-325 45 1970

11 Valdai-Pskov-Riga Latvia 720 154 1971-1972

12 Mayskoye-Bezmein-Bayram-Ali Turkmenia 530 31.5 1972-1973

13 Georgiyevsk- Mozdok-Luping Stavropol krai 1020 28 1972

14 Ermolinskaya-Kamysh Burun Stavropol krai 1020 31 1972

15 Branch line to Stavropol Stavropol krai 530 24 1972

16 Naip-Khiva Uzbekistan 1020 92 1973

17 Perm-Kazan-Gorkiy Mari AR 1220 73 1973-1974

18 Orenburg-Novopskoy Volgograd region 1220 54 1975-1976

19 Nevinnomyssk-Izobilnoye Stavropol krai 1020 48 1977-1978

20 Kiev-state border Western Ukraine 1420 8 1976

21 Kazi-Magomed-Kazakh Azerbaijan 1020 48 1976-1977

22 Elets-Petrovsk Penza region 1220 36 1979-1980

23 Elets-Kursk Kursk region 1220 43 1981

24 Gryazevets-Mok Kostroma region. 1220 26 1983

25 Ananyev-Ternopol-Izmail Ukraine 1220 16 1987

26 Ananyev-Kremenchug Ukraine 1420 12 1987

27 Urengoy-Novopskov Saratov region 1220 25 1983

28 Branch line to Aktyubinsk TPS Kazakhstan 720 36.8 1990

29 Aktyubinsk-Alga-Oktyabrsk Kazakhstan 530 96.7 1989-1990 29

Main facilities "SU-6 Neftegazmontazh", JSC

Gas mains and gas metering stations

Item No. Facilities Location Diameter Length Year of construction

30 GMS "Stavropolskaya" of gas pipeline

Russia-Turkey Stavropol krai 1420 18,7 2002 – 2003

31 Gas pipeline "Blue Stream" Stavropol krai 1420 7 2002 - 2003

32

Reconstruction of lineal part of main gas

pipeline Orenburg-Novopskov with

installation of launching station of LU at

942 km

Orenburg region 1220 4,6 2002 - 2003

33

Reconstruction of lineal part of main gas

pipeline Petrovsk-Novopskov with

installation of launching station of LU at

475 km

Volgograd region 1420 4,3 2004 - 2005

34

Reconstruction of gas pipeline systems the

North Caucasus - Center in the area of 127

km - BS Izobilnoye. Lineal part Dn1200,

length 21 km

Stavropol krai 1220 21 2005 - 2005

35

Gas pipeline from village Dzuarikau

(Republic of North Ossetia-Alania) to

Tskhinval (Republic of South Ossetia)

Republic of North Ossetia - Alania

Republic of South Ossetia

426 43,3 2007 - 2007

36

Main Gas pipeline Sakhalin-Khabarovsk-

Vladivostok GCH

Sakhalin

Sakhalin region 1420 2,7 2011 - 2012

37

GMS capacity of 50-55 mln. m3 per day at

836 km of main gas pipeline "Mozdok-Kazi-

Magomed"

Republic of Chechnya 1220 1,6 2012 - 2013

38

Major overhaul of the facility: "Trunk

pipeline 14.0 from 0 to 14 km

Rozhdestvenskaya-Izobilniy"

Stavropol krai 1020 8,94 2014

30

Main facilities "SU-6 Neftegazmontazh", JSC

item no.

Facilities Location Year of erection

1 Krasnoarmeyskaya Saratov region 1974

2 Lisichanskaya Ukraine 1975

3 Kastornenskaya Kursk region 1976

4 Sakhranovskaya Volgograd region 1977

5 Armavirskaya Krasnodar krai 1987

6 Sukhodolnenskaya Rostov region 1978

7 Grachevskaya Saratov region 1978

8 Platina Sverdlovsk region 1980

9 Podkumok Stavropol krai 1981

10 Klinskaya Penza region 1988

11 Velikotskaya Ukraine 1981

12 Melovoye Ukraine 1982

13 Astrakhanskaya Astrakhan region 2002

14 Kropotkinskaya Krasnodar krai 2002

15 Komsomolskaya Kalmykiya 2002

16 Primorsk Phase I (Spetsmornefteport) Leningrad region 2004

17 Nevskaya Leningrad region 2006

18 PS No.14 – metering stations No.4 Leningrad region 2007

19 Phase I TS "ESPO pipeline". Spetsmornefteport

"Kozmino". Primorsky krai 2008 - 2009

20 BPS-2 depot Ust Luga Leningrad region 2011 - 2012

21 Zamyany Astrakhan region 2012

Pumping stations and refineries

31

Main facilities "SU-6 Neftegazmontazh", JSC

item no.

Facilities Location Year of erection

1 Neftekumsk gasoline plant No.2 Stavropol krai 1966-1970

2 Stepnoye Dagestan 1969-1970

3 Solonchakovoye Dagestan 1969-1970

4 Russkiy Khutor Stavropol krai 1970-1971

5 GTP BS Algay Saratov region 2008 - 2008

6 Expansion of Yuzhno-Balykskiy GTP Khanty-Mansiisk autonomous district - Yugra 2008 - 2008

7 Increased production of natural gas liquids in the Yuzhno-

Balykskiy GTP, Pyt-Yah city Khanty-Mansiisk autonomous district - Yugra 2011 - 2012

8 Complex of isomerization of pentane-hexane

fraction, Saratov Oil Refinery, JSC Saratov region 2011 - 2012

9 GTU "Pokrovskaya" Orenburg region 2011 - 2012

10 Production of butadiene building

thermoplastic elastomers of Voronezhsintezkauchuk, JSC Voronezh region 2012 - 2013

11 Expansion of complex processing NGL at

least 5.8 million tons per year". GFP-2. Tyumen region 2012 - 2014

12 Complex of isomerization of pentane-hexane

fraction" Astrakhan region 2012 - 2014

13 Reconstruction of production of ethylene oxide and

glycol with the use of highly selective catalysts Nizhny Novgorod Region

2014

Plants and units

Waterlines Item

No. Facilities Location Length Diameter Year of construction

1 Sulak-Makhachkala Dagestan 148.8 530-1220 1967-1970

2 Hauskhan-Shatlyk Turkmenia 48 377 1972

3 Cherkessk-Mineralnye Vody Stavropol krai 30 1420 1976

4 Water mains Republic of Ingushetia 128 108-820 1996-1998

32

Main facilities "SU-6 Neftegazmontazh", JSC

Oil pipelines and product pipelines

33

item no. Facilities Location Diameter Length Year of construction

1 Gorky-Ryazan Ryazan region 530 52 1970-1971

2 Ozek Suet-Malgobek Stavropol krai 530 25 1971

3 Kuybyshev-Tikhoretsk Saratov region 820 31 1974

4 Samotlor-Kuibyshev Tyumen region 1220 22 1975

5 Kuybyshev-Lisichansk Ukraine 1220 68 1975-1976

6 Branch line to Stavropol depot Stavropol krai 420 56 1976

7 Kholmogory-Klin Ulyanovsk region 1220 78 1984-1985

8 Pavlodar-Chemkent Kazakhstan 820 34 1984

9 Chechnya bypass Stavropol krai 820 28 2000

10 Replacement of sections of oil pipeline

"Almetyevsk-Gorky-2 with backing rings Chuvashia 820 24,6 2006

11 Replacement of sections of oil pipeline "Zhirnovsk-Volgograd" (sec."Efimovka-

VORP"84-107km with backing rings Volgograd region 530 23 2007

12 Oil pipeline "Skovorodino – Board with

PRC" Amur region 820 5,8 2009 - 2010

13 Construction of oil pipeline section

"Kuibyshev-Unecha-Mozyr-1". Bypassing Penza city

Penza region 1020 16,8 2011 - 2013

Main facilities "SU-6 Neftegazmontazh", JSC

Steel tanks Item

No. Facilities Location Capacity of stand-by park Year of construction

1 Construction of Sukhokumsk VST-3000 4 pcs .;

VST-2000 2 pcs. Dagestan 16 000 1967

2 Winter rate VST-3000 2 pcs., VST-2 Stavropol krai 10 000 1967

3 Velichaevskoe field VST-3000 4 pcs .; VST-2000 4

pcs. Stavropol krai 20 000 1968

4 Ozek-Saut field

VST-3000 4 pcs .; VST-2000 2 pcs. Stavropol krai 16 000 1968

5 OPS Kamysh-Burun VST-5000 8 pcs. Stavropol krai 40 000 1969-1970

6 Podkumok depot

VST-3000 4 pcs. Stavropol krai 12 000 1977

7 Armavir VST-5000 12 pcs. Krasnodar krai 60 000 1978-1979

8 Dudinka VST-5000 1 pc.

VST-700 2 pcs .; VST-400 2 pcs. Krasnoyarsk krai 8200 1977-1979

9 OPS Krasnoarmeysk VST-2000 3 pcs. Saratov region 6000 1978

10 OPS Platina VST-20000 2 pcs. Sverdlovsk region 40 000 1979

11 OPS Klin VST-20000 2 pcs. Penza region 40 000 1984

12 Ischerskaya depot 5000 4 pcs. Chechen - Ingush Republic 20 000 1968

13 Water supply VST-3000 1 pc. .; VST-2000 1 pc. Shatlyk Turkmenistan 5000 1981

14

Water supply

VST-5000 2 pcs .; VST-3000 3 pcs .; VST-2000 4

pcs.; VST-1000 2 pcs .; VST-700 1pc .; VST-300 2 pcs;. VST-400 1pc.

Republic of Ingushetia 30 400 1996-1998

15 Sheet assembly "Grushovaya" depot VST 1 pc. Novorossiysk Krasnodar Krai 50 000 2003

16 Construction of Vertical steel tank with floating roof No.58 at transfer tank farm "Grushovaya"

Krasnodar krai

50 000 2003

17 Vertical steel tank with floating roof No.17 for

crude oil in a special sea oil port of Primorsk (1st stage)

Leningrad region 50 000 2004

18 Construction of VST with floating roof 4 pcs. at

"Primorsk" depot. IInd line Leningrad region 50 000 2004 – 2005

34

Main facilities "SU-6 Neftegazmontazh", JSC

Steel tanks Item

No. Facilities Location Capacity of stand-by park Year of construction

19 VSTP OPS "Kaleikino", APTS DP

"Druzhba-1" Tatarstan 50 000 2006

20 OTT "Tikhoretskaya" Krasnodar krai 20 000 2006

21 Construction of VSTP No.8 OPS-3

Almetyevsk Tatarstan 10 000 2007

22 Reconstruction of VST 14at OGS Tyumen region 20 000 2008

23 Construction of two vessels VSTP No.7, 8 at LODS

"Konda", Uraisk OTLD Tyumen region 20 000 2009 - 2010

24 VST No.1,5 LODS "Samotlor" reconstruction Khanty-Mansiisk autonomous district -

Yugra 20 000 2011

25 Armavir VST-5000 12 units Krasnodar krai 60 000 1978-1979

35

Main facilities "SU-6 Neftegazmontazh", JSC

Item

No. Facilities Location Year of construction

1 Rasshevatskoye Stavropol krai 1965

2 Severo-Stavropolskoye Stavropol krai 1965

3 Mirnenskoye Stavropol krai 1966

4 Petrovo-Blagodarnenskoye Stavropol krai 1966

5 Takhtinskoye Stavropol krai 1966

6 Takhta-Kugultinskoye Stavropol krai 1967

7 Gathering of oil and gas Sukhokumsk Dagestan 1967

8 Martovskoye Stavropol krai 1968

9 Shatlykskoye Turkmenia 1971-1975

10 Pravoberezhnoye Stavropol krai 1974

11 Kugultinskoye Stavropol krai 1976

12 Ozek-Suatskoye Stavropol krai 1977

13 Yuzhno-Sukhokumskoye Dagestan 1977

14 Mekhtebskoye Stavropol krai 1978

15 Vladimirskoye Stavropol krai 1982

16 Novo-urengoyskoye Urengoi 1981-1984

17 Astrakhanskoye Astrakhan region 1985-1988

18 Stepnovskoye Saratov region 1981-1985

19 Zelenaya Svita Stavropol krai 1982-1990

20 Hodomsky horizon Stavropol krai 1983-1991

21 Kanchurinsko-Musinskiy complex UGSF Bashkiria 2005 - 2006

22 "Construction of oilfield named after Yu.Korchagin (1st line). New

construction of LPS-1" Astrakhan region 2008

Oil and gas field facilities construction

36

Main facilities "SU-6 Neftegazmontazh", JSC

37

Main facilities "SU-6 Neftegazmontazh", JSC

38

Company card

39

Legal name SU-6 Neftegazmontazh, JSC

Main State Registration Number 1022601949105

Date of registration 18.06.1998

Legal address 355035, the city of Stavropol, Staromaryevskoye shosse, 36

Actual address 355035, the city of Stavropol, Staromaryevskoye shosse, 36

E-mail [email protected]

Taxpayer Identification Number 2635043064

Tax Registration Reason Code 263450001

Russian Classification of Economic Activities 45.21.3 45.21.4 29.12.9 29.13

All-Russian Classifier of Enterprises and Organizations 47782493

Current account (for transactions in RUR)

OJSC ZAPADNO-SIBIRSKIY BANK OF SBERBANK OF RUSSIA,

61, Rizhskaya Street, Tyumen

Current account: 40702810967020000419

Correspondent account Correspondent account № 30101810800000000651

Bank Identification Code 047102651

Director Director General

Motorin Maxim S.

Participants/shareholders JSC Participants/shareholders

Ownership interest (%) 100%

Telephone, fax +7 (8652) 23-00-36; mob. +7 (962) 400-91-30