Consumer Help Manual - OREDA
Transcript of Consumer Help Manual - OREDA
OREDA RTS WEB TOOL
Consumer Help Manual
OREDA RTS Web tool Help Manual
Contents
1 Introduction ........................................................................................................ 2
2 Consumer Registration/Login ................................................................................ 3
2.1 Consumer Registration: ................................................................................. 3
2.2 Consumer Dashboard after login: .................................................................... 4 3 Application for Net Metering Only .......................................................................... 5
4 Application for Subsidy Only ................................................................................. 6
5 Application for both Net Metering and Subsidy ........................................................ 8
6 Annexure .......................................................................................................... 10
1
OREDA RTS Web tool Help Manual
1 Introduction
The OREDA RTS Web Tool is designed for Net-Metering and both Subsidy & Net-Metering
applications for Roof Top Solar for all consumer categories.
For detailed description please follow the steps in the subsequent sections along with the
screenshots given in this help manual.
2
OREDA RTS Web tool Help Manual
2 Consumer Registration/Login
Visit www.rts.odisha.gov.in for creating a new consumer ID or login for existing users.
Click on Register if applicant is a new consumer. Existing consumers should fill in the
Username and Password along with the captcha to login.
2.1 Consumer Registration:
Fill the required details in the new consumer registration form (sample given below) and
click Submit. Upon successful completion of form, applicant will receive a confirmation
email with password for login. The password can be later changed as per convenience after
login.
3
OREDA RTS Web tool Help Manual
2.2 Consumer Dashboard after login:
Click on Apply for Solar Rooftop to submit an application for the following:
a. Apply for both Subsidy and Net Metering b. Apply for Net Metering only
Click on the applicable option to gain access to the application form.
4
OREDA RTS Web tool Help Manual
3 Application for Net Metering Only
Step 1. Click on the tab Add new Net Metering Application to open the Net Metering
Application form.
After successful submission of application form, applicant can track the status of
the progress of application under the tab Status for the corresponding Activity
Step 2. Fill all the applicable details in the form and click on Submit to complete the
application for Net Metering. Applicant will receive a confirmation email on the
registered email ID upon successful submission of application.
5
OREDA RTS Web tool Help Manual
5 Application for both Net Metering and Subsidy
Step 1. Click on Add New Application Form to open the Net Metering and Subsidy
application form.
After successful submission of application form, applicant can track the status of the
progress of application under the tab Status for the corresponding Activity. Library of
uploaded documents can be seen under Annexure and More documents can be uploaded as
and when required (intimated via email) under My Action.
Step 2. Fill all the details under each part of the form. Click on Important Particulars
to expand that section and fill in the details. The last section of the form named Grid
Connectivity (Shown below) is for Net Metering application.
Step 2. Fill all the entries and upload relevant documents which are a part of Important
Particulars. The sections following Important Particulars contains Technical Details which can
be filled in two ways by selecting one of the following options in the dropdown of the tab
Please specify, who is filling the application (shown below) :
8
OREDA RTS Web tool Help Manual
a. Self – All the following sections will be filled by consumer b. Vendor – All the following sections except the last section of Bank Details will
be filled by vendor selected by the consumer. The selected vendor will be
intimated via email and will contact the applicant to coordinate for application
submission.
For detailed description of all the tabs in the subsidy application form, please refer to
the sample MNRE form for reference purpose given in the annexure.
Step 3. A confirmation email will be sent to consumer after successful submission
of subsidy application form. Details of additional documents/information required for
processing of application shall be intimated to consumer via email.
The details of Empaneled Vendors can be accessed under the tab List of Agencies on the
Home page of the website.
9
OREDA RTS Web tool Help Manual
6 Annexure
Form B
Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B
for Project Proposals for
Grid Connected Rooftop and Small SPV Power Plants
(For the project above 5 kWp & upto 50 kWp)
PART- I : Project Details
[A] General Details
Sl. Description Remarks
No.
1. Title of the Project Applicant has to provide title of the project
(eg. Solar Rooftop of 45 kWp)
Applicant has to fill the capacity of the plant in
2. Capacity of the plant (kWp) numeric
(eg. 45)
3. Category of the Applicant/Project Applicant has to select appropriate category from the
Proponent dropdown list. For example:
Government Organization/ PSU/ State
Nodal State Nodal Agency
Agency/ SECI/ Channel Partner/
RESCO/ System
Integrator/ Finance Integrator/
Manufacture/Supplier of Solar
equipment’s/ Developer/
NGO/Financial Institutions/Financial
Integrator/ Any other (please specify)
4. Details of the Applicant/
Representative/ Project Applicant has to provide his/her personal details For
Proponent example:
Name Manik Rawat
Designation Consultant
Mailing Address 5 J/35, NIT, Balasore, Odisha 121212
10
OREDA RTS Web tool Help Manual
Telephone, Fax & Email (Web site, if
99999999999,[email protected]
any)
5. Executive Summary of the Executive summary (.pdf / .jpg / .png / .doc / .xls) of
the proposal has to be uploaded on the portal while
Proposal (Please attach a
applying for subsidy
separate sheet)
6. Objective for implementing the Applicant has to select the objective for implementing Plant the plant from the dropdown list. For example:
(a) Sale of electricity to the Sale of Electricity to third party distribution licensee at feed-in
tariff or competitively
discovered rate
(b) Sale of electricity to the distribution licensee at Average
Pooled Price Cost (APPC) and
participation in REC Mechanism
(c) Sale of electricity to third party
(d) Self-consumption total or partial generation
(e) Diesel saving
(f) Combination of above (please mention)
(g) Any other, please specify
7. Any Other detail relevant for Applicant can upload (.pdf / .jpg / .png / .doc / .xls) consideration of support under the of any other details (if required)
scheme by the evaluation
committee
[B] Details of the plant site/location
Sl. Description Remark
No.
1. Is the plant located at the address Applicant has to confirm if the plant is located
mentioned in [A] 4 above; if No, at the address mentioned in [A]-4. If NO,
Address of the location of the plant(s) then applicant has to provide the address of
the plant. For example:
Name Manik Rawat
H. No. 5 J/35
11
OREDA RTS Web tool Help Manual
Street/Locality/Road NIT
District Balasore
State Odisha
Pin code 121212
2. Is the beneficiary same as [B] 1. If No, Applicant has to confirm whether the
Details of Project Beneficiary/ beneficiary of the subsidy is same as
Organization mentioned above by selecting Yes/No from
dropdown. If NO, then provide the details
manually
Head of the organization Alpha Go
Name of the contact person Manik Rawat
full address, phone, mobile and e-mail 5 J/35, NIT, Odisha, 121212
99999999999
99999999999
3. Details of Proposed Power Plant Applicant has to provide technical details of the
proposed power plant.
(a) Proposed capacity of the SPV Power Applicant has to enter capacity of proposed
Plant (kWp) power plant in numeric. (e.g. 45)
(b) Plant proposed at single site/multiple sites Applicant has to select from the dropdown
whether the plant is to be installed at single or
multiple site
(c) Interconnection with the electricity Applicant has to select the applicable option
network at single point or multiple point from the dropdown
(d) Availability of shadow free south facing Applicant has to provide shadow free area
rooftop/ land area for the power plant available in numeric (e.g. 540 )
with photograph
(e) Total loads to be energized by
SPV Power Plant (kW)
(f) Calculations and justification for the Applicant has to provide brief justification of
proposed capacity (Please elaborate) capacity proposed above (e.g. 12 square meter equals 1kWp)
(g) Expected annual energy generation Applicant has to provide expected MWh of
annual generation in numeric (e.g. 50)
12
OREDA RTS Web tool Help Manual
(h) Space for housing the plant control
Applicant has to provide the details in numeric
systems and battery bank (if any) (e.g. 20)
4. Details of electrical load where the plant Applicant has to provide details of electrical
is to be installed load where the plant is installed. For example:
(i) Total connected electrical load in kW (as per Applicant has to provide total connected
electricity bill) electrical load in numeric (e.g. 5)
(ii) Applicable consumer category Applicant has to select applicable consumer (domestic/commercial/individual/others, category from the dropdown (e.g. Domestic)
please specify)
(iii) Total electrical load to be met by the Applicant has to provide the value of electrical SPV power plant (kW) load that can be met by SPV power plant in
numeric (e.g. 2)
5. Technology Description & System Design Applicant has to provide Technology /Specification Description & System Design/Specification
i.Sketch/Line diagram of the complete SPV
Applicant has to upload (.pdf / .jpg) of Single Line Diagram of complete SPV System on the System with details (please attach
web portal
drawing)
ii. Capacity/ Power of each PV Module
Applicant has to specify capacity in kWp of
each module in numeric (e.g. 0.3)
(kWp)
iii. Number of modules and total array Applicant has to specify number of modules to capacity (nos. & kWp) be installed and array capacity in numeric (e.g.
10 and 3)
iv. Solar cell technology and Module Applicant has to select Solar cell technology efficiency proposed to be used (mono- being used from dropdown and specify module
crystalline/ polycrystalline/ thin film/ efficiency in numeric (e.g. Poly-crystalline and
any other) 85)
v. Details of Tracking of PV Array, if Applicant has to select applicable technology proposed (single axis/ double axis used for tracking of PV array from dropdown
tracking etc.)
vi. PCU/inverter capacity with detailed Applicant has to specify inverter capacity in specifications (kVA) (Details of quality numeric and upload .pdf / .jpg of inverter
of output power, standards) specifications on the web portal (e.g. 40)
vii. Type of inverter (central/ string/ multi Applicant has to select applicable inverter type string/any other), inverter efficiency from dropdown and specify inverter efficiency
in % numeric (e.g. String ,85)
13
OREDA RTS Web tool Help Manual
viii. Number of PCU/inverters proposed to Applicant has to specify number of
be used PCU/inverters proposed (e.g. 2)
ix. DC Bus voltage Applicant has to specify DC Bus Voltage in
numeric (e.g. 230)
x. Capacity of battery bank (Current, Applicant has to specify capacity of battery
Voltage and AH), if used, any bank used in numeric (e.g. 10)
xi. Type of battery proposed (lead acid Applicant has to select type of battery proposed
tubular/ lithium ion/ NaS/ any other) from the dropdown (e.g. NaS)
xii. Details of protections to be deployed Applicant has to specify and upload details of
on PV array and AC output side protections to be deployed on PV array and AC
output side in .pdf / .jpg format
xiii. Details of Metering, Indication, Data Applicant has to specify and upload details of
logging operation Metering, Indication, Data logging operation in
.pdf / .jpg format
xiv. Schematic diagram of the system Applicant has to specify and upload schematic
including protecting interlocking diagram of the system including protecting
devices, monitoring and data logging interlocking devices, monitoring and data
points to be provided. logging points in .pdf / .jpg format
xv. Details of training of manpower to be Applicant has to specify and upload details of
provided for successful operation of training of manpower to be provided for
the plant. (Compliance to BIS/IEC successful operation of the plant in .pdf / .jpg
Standards is mandatory). format
xvi. Details of Mounting system: Applicant has to select details of mounting
- Roof mounted system system from dropdown and upload the details
- Ground mounted system in .pdf / .jpg format (e.g. Ground Mounted)
6. Details of Building to install the Applicant has to provide Details of Building to
Electronics install the Electronics Control Panel and Battery
Control Panel and Battery Bank (if any) Bank for the proposed power plant. For example:
i. Whether any existing building is to be Applicant has to specify details of any existing
used as control room, if so, details to building is to be used as control room, if any. be provided.
ii. If a new building is to be constructed, Applicant has to specify the details of a new
area, estimated cost and layout, etc. building is to be constructed, area, estimated
to be provided and time frame to cost and layout, etc. and time frame to
construct the building. construct the building, if any.
Notes: • It is mandatory to provide technical performance specifications of each component of
the power plant proposed to be installed under the project as applicable and for which the performance will be warranted.
14
OREDA RTS Web tool Help Manual
• All technical parameters and warranty requirements must meet or exceed the requirements mentioned in the guidelines issued by the Ministry.
[C] Operation and Maintenance Arrangements
Applicant has to provide Operation and maintenance arrangements for the
proposed power plant. For example:
Sl. Description Remark
No.
- Details of Operation and Applicant has to specify briefly the details of
Operation and Maintenance Arrangements
Maintenance Arrangements
- Arrangements for Generation Applicant has to specify briefly arrangements for
Generation Data Collection through remote
Data Collection through remote monitoring
monitoring
- Is dedicated staff being trained
Applicant has to select Yes/No from the
dropdown, whether dedicated staff is being
for O&M of the plant? trained for O&M of the plant.
- No. of personnel to be trained in O&M Applicant has to specify the no. of personnel to be trained in O&M in numeric (e.g. 8)
[D] Project Duration and Implementation Schedule
Applicant has to upload completion schedule and milestone in .pdf / .jpg format. PERT
chart is preferable.
Completion schedule with milestones (Please attach PERT
CHART preferably)
[E] Monitoring Mechanism
Applicant has to provide monitoring mechanism details for the proposed power plant. For example:
Details of Data Monitoring on Daily, Monthly and Annual energy generation Third
Party (Data logging and compilation and sharing with MNRE)
Please provide details in the following format
15
OREDA RTS Web tool Help Manual
Applicant has to select mode of data
Own Mechanism (up to 5 kWp)
monitoring of energy generation from the
dropdown list in the web tool (e.g. Third
Party)
Third Party Applicant has to provide details of option
selected above
Remote Monitoring (for SPV power plants of 10kWp
and above)
[F] Costing of Project
Applicant as to provide detailed cost breakup for installing the proposed power plant to
avail subsidy. For example:
Sl. Systems Unit Cost Quantity Total Cost
No. (Rs. (Rs.
in lakh) in Lakh)
1. Cost of Systems Hardware - SPV modules
10 1 10
- Inverters 1 1 1
- Installation structure 1 1 1
- Electrical Wires 5 2 10
- Battery Bank (if any) 1 1 1
- Meter 2 1 2
- Any other 3 2 6
2. Cost of transportation and insurance 1 2 2
3. Cost of civil works and electrical works 2 1 2
4. Cost of installation and commissioning 1 1 1
5. Cost of Annual Maintenance for 5 years 2 1 2
6. Cost of Battery replacement 1 1 1
16
OREDA RTS Web tool Help Manual
7. Any other related costs 2 1 2
Total Cost 41
Note: Figures used in the table are for illustration purpose only. Project specific figures
Sl. Description
Remark
No.
have to be filled in the application form. [G] Means of Finance (Rs. in lakh)
Applicant has to provide detailed breakup of means of finance as per the tabs in numeric in
the web tool. For
1. Envisaged Central Financial Assistance from MNRE Rs. 8
2. Contribution of Beneficiaries Rs. 8
3. Contribution of Project Proponent Rs. 8
4. Other Source (s) of Funding Rs. 8
5. Envisaged Soft Loan assistance, if any Rs. 8
Details of Revenue to be collected with payback period 8
[H] ANY OTHER INFORMATION
PART – II. Details of Grid Connectivity of the Project
(The developer shall submit “Single line diagram elaborating Interconnection of the Solar
Photovoltaic Plant to the
Grid”)
Applicant has to provide details of the Grid Connectivity of the proposed power plant
as follows:
17
OREDA RTS Web tool Help Manual
A. Grid Connectivity Level Applicant has to select Grid
Connectivity Level from the dropdown
• Low Voltage single phase supply (Up to 10 list in the web tool. For example:
kW SPV system)
• Three phases low voltage supply (Up to 100 kW SPV system)
Low Voltage single phase supply • Connected at 11kV level. (100 kW to 1.5 MW
SPV systems)
• Connected at 11kV/33 kV/66kV level (1.5 MW to 5.0 MW SPV systems)
• Any Other level
1. Distance of interfacing point of the SPV Plant with Applicant has to specify distance of
the Grid interfacing point of the SPV Plant
with the Grid in meters
(e.g. 2)
2. Type of Grid available Applicant has to select Type of Grid
available at project site from the
dropdown list. For example:
Three phases low voltage supply
3. Letter of Consent for Synchronization of SPV Plant Applicant has to confirm whether
with the Network of Distribution Licensee/NOC he/she has the letter for
(enclose letter) Synchronization of SPV Plant with the
Network of Distribution Licensee by
selecting Yes/No from dropdown.
If Yes then applicant has to upload
the same.
4. Applicable Fee & Charges made for the Grant of Connectivity if any
B. Details of Distribution Licensee providing Applicant has to provide details of
Grid Distribution Licensee providing grid
Interconnection interconnection. For example:
Name and complete address of Distribution CESU Licensee
CESU
Details of Contact Person Chetan
E-mail [email protected]
Phone Number 98989898989
Mobile 98989898989
18
OREDA RTS Web tool Help Manual
Fax 6742317831371
C. Metering Arrangement for the Project Applicant has to provide Metering (Along with the application for the consideration Arrangement for the proposed power of Central Financial Assistance, the developer plant. For example:
shall submit “Single line diagram elaborating type
and location of Meter(s))
I Export Import meters/
Applicant has to select type of meter
from dropdown list (e.g. Bi-
Directional)
II Two way meters
III Three Meter system
IV Any other (Pl specify) Applicant has to specify price of
V Price of meter
meter in INR up to 1 decimal value (e.g. 2050.5)
Applicant has to specify whether
meter is approved by DISCOM by
VI Whether meter is approved by Distribution selecting Yes/No from the dropdown
Licensee: list (e.g. Yes)
VII Class of Energy Meter Applicant has to specify class of
energy meter
D. Power Purchase Agreement Applicant has to confirm whether
(A copy of agreement made with distribution they have a power purchase
licensee and/or third party shall be enclosed) agreement by selecting Yes/No from
the dropdown. If yes, then upload
the document for the same
E. Business Model Proposed for the project Applicant has to tick on one of the 4
business model given on the web
tool and select the corresponding
sub category from the dropdown in
front of the above selected model.
i. Solar installations owned by consumer
For example:
YES
Owned operated and maintained by
the consumer(s)
19
OREDA RTS Web tool Help Manual
- Solar Rooftop facility owned, operated and
maintained by the consumer(s).
- Solar Rooftop facility owned by consumer but operated and maintained by the 3rd
party ii. Solar installations owned, operated NO
and maintained by 3rd Party Solar Lease Model
- Arrangement as a captive generating plant for the roof owners
- Solar Lease Model, Sale to Grid NO
iii. Solar Installations Owned by the Utility 2
- Solar installations owned operated and maintained by the DISCOM
- Distribution licensee provides appropriate
viability gap funds iv. Any Other Model (Pl specify) NO
F. Commercial Arrangement Applicant has to tick one of the 3
commercial arrangements given on
Sale to Distribution Licensee
the web tool and select the corresponding sub category for the
same from the dropdown
NO
Sale at rate discovered under
competitive bidding
- Sale at Feed-in-Tariff determined by
SERC - Sale at rate discovered under
competitive
bidding and adopted by SERC - Sale at
Average power purchase cost determined by
SERC and participation in REC Mechanism or YES
Self or Captive Consumption Sale of Surplus Power to Grid
20
OREDA RTS Web tool Help Manual
- Participation in Net Metering Mechanism
- Sale of Surplus Power to Grid or 3rd
party o Sale to 3rd Party
- Rate committed for sale of electricity
- Sale of Power on Short Term (Negotiation of rate at Regular Intervals) or
- Sale of Power on Long Term Basis
- Participation in REC Mechanism o Any Other system, please specify
NO Sale of Power on Long term
G. Undertakings from Involved Parties Applicant has to select Yes/No from
the dropdown as per the
arrangement of undertakings from
Involved parties for the proposed
I. Undertaking from the consumer/ beneficiary
power plant. If Yes, then upload the documents for the same
regarding the acceptability and cost
sharing of the project
Applicant has to select Yes/No from
the dropdown list whichever is
applicable (e.g. Yes)
II. Undertaking from the third party/project Applicant has to select Yes/No from
developer regarding Quality assurance, the dropdown list whichever is
installation, operation and maintenance of applicable (e.g. No)
the system
H. Any other relevant information Applicant has to select Yes/No from
the dropdown list for the details
asked in this section. If Yes, then Upload document for the same.
I. Incentives availed from any other Agency
(National/International) Applicant has to select Yes/No from
the dropdown list whichever is
applicable (e.g. No)
II. Likely Capacity Utilization Factor Applicant has to select Yes/No from
the dropdown list whichever is
applicable (e.g. Yes)
21
OREDA RTS Web tool Help Manual
Applicant has to select Yes/No from III. Any other. the dropdown list whichever is applicable (e.g. No)
22