Gipe Associates, Inc.CONSULTING ENGINEERS
Geothermal Heating and Cooling FundamentalsGeothermal Heating and Cooling FundamentalsASHRAE – Philadelphia Chapter
By: David R. Hoffman, P.E., Geothermal Heating and Cooling –Is It Right for your Building or House?
By: David R. Hoffman, P.E., LEED AP, Cert. Geo. DesignerGipe Associates, Inc.
![Page 2: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/2.jpg)
Today’s Agenda
Introduction
Commercial Geothermal Systems
Lessons Learned
Residential Geothermal SystemsResidential Geothermal Systems
Typical Costs
Rules of Thumb
E i T h l iEmerging Technologies
![Page 3: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/3.jpg)
Need to Thank:
Dr Steve KavanaughDr. Steve Kavanaugh
The Well DrillersThe Well Drillers
![Page 4: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/4.jpg)
Geothermal and Commercial Applications
Gipe Associates has been involved in over 120Gipe Associates has been involved in over 120Geothermal Projects
![Page 5: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/5.jpg)
Basic FundamentalsThe Refrigeration Cycle
![Page 6: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/6.jpg)
Insulation Panels The Refrigeration Cycle
Typical Residential
Warmed Room Air Carries Away Heat From Interior
Cooled Air Returns To Inside Of Refrigerator
Refrigerator
Condenser Coil
Evaporator Coil
Refrigerant Hot ZoneCirculating Fan
Refrigerant Cold Zone
Room Air Is Drawn
Air Inside Refrigerator Flows Over Very Cold Refrigerant Coils, Giving Up Heat
Circulating Fan
Room Air Is Drawn Over Hot Refrigerant Coils
Compressor Pumps Refrigerant Through System
![Page 7: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/7.jpg)
( )BtugetyouWhat
ePerformanc oft CoefficienCOP =
( )( )HrBtuyou cost it What
Hrget you What =COP
![Page 8: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/8.jpg)
Geothermal Piping Headers
![Page 9: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/9.jpg)
Geothermal Hydronic PumpsGeothermal Hydronic Pumps
![Page 10: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/10.jpg)
HeatpumpsHeatpumps
![Page 11: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/11.jpg)
Vertical U-tube Fundamentals & ApplicationsVertical U tube Fundamentals & ApplicationsWARNING TAPE WITH METALLIC TRACER
FINISHED GRADE
MINIMUM 20 FT SEPARATION BETWEEN CENTER LINE OF EACH BORE HOLE (TYP.)
TO BUILDING
MINIMUM HORIZONTAL BURY DEPTH 4 FT
GROUT ENTIRE ANNULAR SPACE AND VERITCALU-TUBE WITH BENTANITE GROUT.
TYPICALBORE DEPTH
200 500 FT
TYPICAL VERTICAL U-TUBE1” DIAMETER
200-500 FT
![Page 12: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/12.jpg)
COMMERCIAL SYSTEM
Pump(s)Fill Line
Geothermal System Flow DiagramFill Line
Expansion Tank
Air Separator
Boreholes
Supply HeaderReturn Header
Boreholes
![Page 13: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/13.jpg)
Judy Center in Cambridge, MDB fBefore
![Page 14: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/14.jpg)
Judy Center in Cambridge, MDAftAfter
![Page 15: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/15.jpg)
Washington College in Chestertown, MDB fBefore
![Page 16: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/16.jpg)
Washington College in Chestertown, MD AftAfter
![Page 17: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/17.jpg)
Washington College in Chestertown, MD N R id H llNew Residence Halls
![Page 18: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/18.jpg)
Salisbury University• Pocomoke Hall: Existing Air Cooled Chiller w/
new fuel fired boiler to supply dual temp system• Manokin Hall: Ground Source Heat Pump system p y
with Water-to-Water Heat pumps to supply dual temp system.
Pocomoke Hall(Bid Spring of ‘09)
Manokin Hall(Bid Fall of ‘09)
HVAC/Pl bi $1 681 800 00 $1 579 500 00HVAC/Plumbing $1,681,800.00 $1,579,500.00Electrical $687,948.00 $820,000.00Total MEP Cost $2,369,748.00 $2,399,500.00Total Construction Cost
$6,175,440.00 $5,175,000.00
• Both Projects Similar in Size (21,400 sq.ft.)
![Page 19: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/19.jpg)
Water to Water Heat-Pumps
![Page 20: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/20.jpg)
Energy Recovery Units
![Page 21: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/21.jpg)
Energy Recovery Technology
• Variable speed control on Variable speed control on Supply & Exhaust Fan
• CO2 Monitoringg• Dedicated Outside Air
Tempering Controlp g• Heat Pipe Technology• Outdoor Air ResetOutdoo eset• Airflow Monitoring
![Page 22: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/22.jpg)
Domestic Hot Water
![Page 23: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/23.jpg)
Fuel Cost Comparisons
$Fuel True Cost in $ per 100,000 BTU(corrected for efficiency)
No 2 Fuel Oil $2 00No. 2 Fuel Oil $2.00Natural Gas $1.88Propane Gas $3.22Electric $3.52Air Side Heat Pump $1.56Water Cooled Heat Pump $0.70 (Geothermal)ate Coo ed eat u p $0 0 (Geot e a )
![Page 24: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/24.jpg)
Matapeake Elementary School -Mechanical RoomMechanical Room
![Page 25: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/25.jpg)
Washington College – 3 Dorm ProjectGeothermal Main pipe layoutGeothermal Main pipe layout
![Page 26: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/26.jpg)
Tudor Farms – Main HouseGeothermal Heat ExchangersGeothermal Heat Exchangers
![Page 27: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/27.jpg)
Chesapeake College – Higher Education CenterProject Specifications:
Building Size - 26,700 sq. ft.
System Type – Closed Loop Vertical U-Tube
Borehole Data –
60 Total Boreholes60 Total Boreholes255’ Total depth below grade4-3/4” Bore Diameter3/4” U-Tube Piping
Treatment of Outside Air – Energy Recovery Unit utilizing dual temperature coils for conditioning of air and wrap around heat pump technology
Unique Design Features-Indoor Energy Recovery Units
![Page 28: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/28.jpg)
Chesapeake College Dorchester Administration BuildingDorchester Administration Building
Project Specifications:
B ilding Si e 23 500 sq ftBuilding Size - 23,500 sq. ft.System Type – Closed Loop Vertical U-TubeBorehole Data –
45 Total Boreholes279’ Total depth below grade4” Bore Diameter1” U Tube Piping1 U-Tube Piping
Treatment of Outside Air – 100% Outside Air Water Source Heat Pump Units with hot gas re-heat for dehumidification
Unique Design Features-100% Outside Air Water S H t P U itdehumidification Source Heat Pump Units
![Page 29: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/29.jpg)
Talbot County Community CenterProject Specifications:
Building Size – 30,000 sq. ft.System Type – Closed Loop
Vertical U-TubeBorehole Data –
190 Total Boreholes310’ Total depth below grade5” Bore Diameter1” U-Tube Piping
Treatment of Outside Air – 100% Outside Air Units utilizing Geothermal Loop temperature for conditioning of code required amount of Ventilation Aircode required amount of Ventilation Air.
Unique Design Features- Ice Rink De-humidifier
S M lt Pit- Snow Melt Pit- Ice Rink Water Treatment
![Page 30: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/30.jpg)
Lessons Learned - CommercialWell FieldWhat are some of the “GOTCHA’s”?• Borehole Diameter• U tube pipe diameters• U-tube pipe diameters• Pump / Piping Size• Pipe Schedule
(SDR-11 vs. SDR-13.5)• Reynold’s Number
(maintain min. 2 ft/sec (maintain min. 2 ft/sec velocity in piping)
• Expansion Tank Sizing• Vaults (When to use?)• Vaults (When to use?)
![Page 31: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/31.jpg)
Lessons Learned - CommercialOutside Air – Dual Temperature SystemWhat are some of the “GOTCHA’s”?• Multiple, small, Water-to-
W H PWater Heat Pumps
• Variable Speed Pumping of p p gWater-to-Water Heat Pumps in lieu of Individual In-Line PumpsPumps.
• Dead-band on Dual Temp LLoop
![Page 32: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/32.jpg)
Lessons Learned - CommercialMiscellaneousWhat are some of the “GOTCHA’s”?• Filter Racks on Heat
PPumps
• Relief Valve
• Anti-Freeze: Glycol vs. MethanolMethanol
• Design Flow Rate -Di itDiversity
![Page 33: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/33.jpg)
Applications Fan Coil unitspp
Domestic Hot WaterDedicated Outdoor Air Systems
Domestic Hot Water Pre-Heating
Fume Hood Make up Air
Kitchen Hood Make-up AirChilled Water
Fume Hood Make-up Air
Chilled Water w/ Storageg
Hot WaterRadiant Heat
Hot Water w/ Storage
![Page 34: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/34.jpg)
BuildingsgCommercial Kitchens
Dormitories
Office BuildingsScience Buidlings
Vocational Schools
Dining Hallsg
Vocational Schools
Historic BuildingsElem./Middle/High Schools
Historic Buildings
“Anything done conventionally can be Anything done conventionally can be done with Geothermal”
![Page 35: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/35.jpg)
Geothermal in Residential ApplicationsGeothermal in Residential Applications
![Page 36: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/36.jpg)
THE HOFFMAN HOUSEGeothermal System Flow Diagram
Pump(s)Fill Line
Air Separator
Fill Line
Expansion Tank
Heat Pump(s)
Supply Header Return Header
BoreholesBoreholes
![Page 37: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/37.jpg)
THE HOFFMAN HOUSE
Geothermal Split System Heat Pumps
![Page 38: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/38.jpg)
THE HOFFMAN HOUSEDomestic Make-up Water Valve Train
![Page 39: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/39.jpg)
THE HOFFMAN HOUSEExpansion Tank
![Page 40: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/40.jpg)
THE HOFFMAN HOUSEGeothermal Water Pumps
![Page 41: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/41.jpg)
THE HOFFMAN HOUSEFinished Site
![Page 42: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/42.jpg)
THE HOFFMAN HOUSEDe-Superheater Capability
M
H t P #1 H t P #2Heat Pump #1 Heat Pump #2
DomesticDomesticWater Heater
![Page 43: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/43.jpg)
THE HOFFMAN HOUSE
De-Superheater Capability
![Page 44: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/44.jpg)
Lessons LearnedResidentialWhat are some of the “GOTCHA’s”?• De-Superheaters are great!
(C I l C ld W )(Connect Inlet to Coldest Water)• Heating Dominated Borefield• Hydronic Specialties• Hydronic Specialties• Pump Noise (Avoid high RPM pumps)• Variable Speed Pumping in Large SystemsVariable Speed Pumping in Large Systems
(Wilo / Grundfos)
![Page 45: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/45.jpg)
Typical CostsTypical Costs
First Costs:Commercial: $23 - $45 per sq.ft.Residential : $10 - $14 per sq.ft.(Does not include Tax Incentives or Rebates)( )
Energy Costs:Commercial: $0.80 - $1.10 per sq.ft, per year$ $ p q , p yResidential: $0.80 - $1.25 per day
Maintenance Costs:Maintenance Costs:Commercial: $0.10 per sq.ft, per yearResidential: $0.03 per sq.ft, per year
![Page 46: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/46.jpg)
Design Rules of ThumbV ti l B h lVertical BoreholesMud Drilling: 250 – 400 ft. borehole per TonRock Drilling: 200 – 300 ft. borehole per Ton
Equipment CapacitiesCommercial Projects: Average = 300 sq.ft./Ton
00 f /Residential Projects: Average = 500 sq.ft./Ton
Pumping Flow Rates:All Projects: 3 Gallons per Minute/Ton1 Ton = 12,000 BTU/Hr
Pump Horsepower – GoalGrade Horsepower/100 TonsA 5.0B 7.5C 10 - 15
![Page 47: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/47.jpg)
Design Rules of Thumb
Equipment EffeciencesHeating - COP Cooling - EER(C ffi i t f P f ) (E Effi i t R ti )(Coefficient of Perf.) (Energy Efficient Ratio)
Commercial: 3.5 17.0Residential: 4.5 20.0
Where:COP = What you get (BTU/Hr)
What it cost you (Electric Energy in BTU/Hr)
EER = What you get in (BTU/Hr)Power Input (in Watts)
![Page 48: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/48.jpg)
Emerging Technologies / Improvementsg g g pECM for Motors
Why?• Ultra High Efficiency (Energy savings
up to 67% average compared to PSC up to 67% average compared to PSC motors)
• Uses DC motors which are significantly more energy efficient significantly more energy efficient that AC motors and are easier to control
• Soft starts and stops• Fan Laws can be utilized to reduce
Energy ConsumptionEnergy Consumption• 10% Reduction in Airflow results in
27% energy reduction.
![Page 49: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/49.jpg)
Emerging Technologies / Improvementsg g g pVariable Speed Compressors
Why?• Reduction in compressor energy and
water flow rateswater flow rates
• Improved part load performanceImproved part load performance
• Enhanced Humidity Control (Lowers the Equipment sensible heat ratio without re-heat.
![Page 50: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/50.jpg)
Emerging Technologies / Improvementsg g g pSolarWhy?• Electrical Utility Distribution
losses are in excess of 70%!losses are in excess of 70%!
• Local Solar can eliminate the j it f El t i l Utilit majority of Electrical Utility
Distribution losses and reduce cost of energy per KWh.
• Thermal Solar can be utilized to supplement Geothermal loop supplement Geothermal loop temperatures in heating mode.
![Page 51: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/51.jpg)
TS THE HOFFMAN HOUSESolar Collector Array
Solar Supply High
PanelTemperature Sensor
Solar Thermal Heating System
Fill LinePumps
Solar Supply
HeatSolar
H L
HighTemperature
LimitTemperature
Sensor
Heat Exchanger
PumpTS
Expansion Tank
Heat Pump(s)
Solar Storage
3‐WayValve
TS
Supply Header
Return Header
gTank
Solar Return
Tank TemperatureSensor
Boreholes
![Page 52: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/52.jpg)
SOLAR HOT WATER HEATING SYSTEMSOLAR HOT WATER HEATING SYSTEMNotice all pipes/panels are sloped ¼ inch per foot
Solar Thermal Flat Plate CollectorsSolar Thermal Flat Plate Collectors
Solar Thermal Drain Back Tank & Piping
• Completely amazed at Performance• First Cost including estimate for Labor = $6,250• Simple Payback = 5 years
52
Tank & Piping S p e aybac 5 yea s• Return on Investment = 20% Tax Free• Where to Purchase: Solar Heat Exchange Manuf.
![Page 53: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/53.jpg)
Emerging Technologies / Improvementsg g g pDuctless / GeothermalWhy?• Extremely Efficient
• No Duct losses due to conduction or leakage
• Simultaneous Heating / Cooling
• Variable Refrigerant Volume (VRV) Systems
![Page 54: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/54.jpg)
Finally….yA Combination Solar/Wind Powered Clothes Dryer
![Page 55: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/55.jpg)
How Can You Learn More?How Can You Learn More?
![Page 56: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/56.jpg)
Consult the Experts• Contact
• Gipe Associates Inc – Easton (410) 822-8688Gipe Associates, Inc. Easton (410) 822-8688• Gipe Associates, Inc. – Baltimore (410)-832-2420
• Websites• Geothermal Heat Pump Consortium
• www.gphc.org• University of Alabama – Geocool
www bama ua edu/ geocool• www.bama.ua.edu/~geocool• Intl. Ground Source Heat Pump Assoc.– IGSHPA
• www.igshpa.okstate.edu• Geo-Heat CenterGeo Heat Center
• www.oit.edu/~geoheat• Phillips Drisco
• www.driscopipe.comp p
![Page 57: CONSULTING ENGINEERS Geothermal Heating and Cooling … · 2014-03-24 · Salisbury University • Pocomoke Hall: Existing Air Cooled Chiller w/ new fuel fired boiler to supply dual](https://reader035.fdocuments.in/reader035/viewer/2022070806/5f051b5c7e708231d4114c28/html5/thumbnails/57.jpg)
Gi A i t IGipe Associates, Inc.CONSULTING ENGINEERS
Questions and Answers