Constructor

13
April 2014

description

Team Finland: Luoteis-Venäjän teollisuuspuistojen esittelytilaisuus Pietarissa 23.4.2014 Team Finland: презентация индустриальных парков в Санкт-Петербурге 23.4.2014

Transcript of Constructor

Page 1: Constructor

April 2014

Page 2: Constructor

Part of the CONSTRUCTOR GROUP - one of the largest sales and technical

support organization in Europe, which has factory in Finland.

CONSTRUCTOR RUS is today a full scale supplier of storage and logistic

solutions for the industry and trade – stationary, mobile archive , machines and

many other variety of storage solutions.

Page 3: Constructor

• 2008 – Setting up a company CONSTRUCTOR RUS; Acquisition

of the premises in Kirovsk (Leningradskaya obl.)

• 2009 – Launch of the Factory; Pallet racking P90 production started: uprights, painted beams

• 2010 – Shelves profiling line put into operation

• 2011 – Brace profiling line put into operation

• 2012 – Combi uprights profiling line put into operation

• 2013 – Opening of a branch office in Moscow, Krasnodar and Nigniy Novgorod

• 2014-nowadays – Investment development -New powder painting system implementation

Page 4: Constructor

Factory was put into operation within 1 year after the purchase. This was achieved due to parallel and timely provisions for:

Construction (modernization project), requires approval from authorities, Building work, Project for production (requires approval from authorities), Import of machinery, Recruitment, Assembly and installation of equipment.

Page 5: Constructor

Location – Kirovsk, L.O. Despite of remoteness from Saint-Petersburg, there is an opportunity to gain to the Factory by public transport (bus 565). It takes up over 25-30 minutes to be there from metro station “Ulitsa Dybenko”.

Today CORU is a high developing manufacturing company with its own production, logistics, sales department and etc. Labour supply – over 100 workers

Page 6: Constructor

Raw

Materi

als

ware-

house

Beams prof. line

Uprights prof. line

Degreasing zone

Factory floor space – 12 000 m²

Inner Yard – 3 000 m²

Painting zone Welding stations Painting:

loading

Drying tunnel

Curing oven

Painting:

unloading &

packing

Finished products

& goods warehouse

Shelving line warehouse

Braces line

Office

INNER

YARD

A90-uprights line

Page 7: Constructor

Resource utilities (average)

Resource

1 Electricity Electric power consumption 86 262 kWhe/month

Price 3,25 RUR per kWhe

2 Water Water consumption 68,66 cum/month

Price 115 RUR per cum

3 Sewage Discharge 58,2 cum/month

Price 282 RUR per cum

4 Gas Gas consumption 19 925 cum/month

Price 5 044,73 RUR per cum

5 Heat power Heat power consumption 344,37 Gcal/month

Price 1 547,52 RUR per Gcal

Nowadays, the Factory is provided by all necessary resources to operate on maximum capacity.

Page 8: Constructor

PRODUCTS &

SERVICES

Page 9: Constructor
Page 10: Constructor
Page 11: Constructor

STEEL

STORAGE STORAGE STORAGE

BANKING

Page 12: Constructor

We are stronger together! Unavailability of

information

Cult

ura

l dif

fere

nces

Politi

cal

restr

icti

ons

Competition

Page 13: Constructor