Disclaimer: The above photographs have been taken in March 2011. Actual status of this project as on date may be at variance from these photographs. Dear Customer, Greetings! We would like to bring you up-to-date with what’s happening in and around your privileged Unitech property. UPDATES WILL BE AVAILABLE ONLINE AT: www.unitechgroup.com/cr-construction-updates.asp March, 2011 STRUCTURE • Possession commenced in Tower 3 & 4 STRUCTURE • External façade painting work in progress in Tower 1 & 2 STRUCTURE • External plaster and painting work is in progress in Tower 6, 7 & 8 TRELLIS • Enhancement done with trellis along with sitting arrangement complete in central landscape area WATER BODY • Water body is ready along with bamboo forest as background AMPHITHEATRE • Amphitheatre work is in final stages of completion

description

Unitech Escape, located in Nirvana Country, sector 50, offers 2-3-4 bedroom ready to move apartments with modular kitchen and air conditioning.

Transcript of Construction Update Unitech Escape Gurgaon | 9999189999

Page 1: Construction Update Unitech Escape Gurgaon | 9999189999

Disc

laim

er: T

he a

bove

pho

togr

aphs

hav

e be

en ta

ken

in M

arch

201

1. A

ctua

l sta

tus

of th

is pr

ojec

t as

on d

ate

may

be

at v

aria

nce

from

thes

e ph

otog

raph

s.

Dear Customer,

Greetings!We would like to bring you up-to-date with what’s happening in and around your privileged Unitech property.

UPDATES WILL BE AVAILABLE ONLINE AT: www.unitechgroup.com/cr-construction-updates.asp

March, 2011

STRUCTURE• PossessioncommencedinTower

3 & 4

STRUCTURE• Externalfaçadepaintingworkin

progress in Tower 1 & 2

STRUCTURE• Externalplasterandpainting

work is in progress in Tower 6, 7 & 8

TRELLIS• Enhancementdonewithtrellis

along with sitting arrangement complete in central landscape area

WATER BODY• Waterbodyisreadyalongwithbambooforestasbackground

AMPHITHEATRE• Amphitheatreworkisinfinalstagesofcompletion

Page 2: Construction Update Unitech Escape Gurgaon | 9999189999

S. No. PARTICULARS

TOWER REMARKS

1 2 3 4 5 6 7 8

STRUCTURAL COMPLETION 1(G+18) 3(G+15)* 2(G+17) 1(G+17) 3(G+15)* 2(G+17) 1(G+18) 3(G+15)* 2(G+17) 1(G+17) 3(G+15)* 2(G+17) 1(G+17) 3(G+15)* 2(G+18) 1(G+18) 3(G+15)* 2(G+17) 1(G+17) 3(G+15)* 2(G+17) 1(G+17) 3(G+15)* 2(G+18) *Tail Flat

1 Structure C C C C C C C C C C C C C C C C C C C C C C C C

2 Completion of masonry work within flat C C C C C C C C C C C C C C C C C C C C C C C C

3 Completion of internal plaster within flat C C C C C C C C C C C C C C C 16th C C C C C 14th 14th 14th

4 Completion of plumbing work within flat 17th 17th 17th 17th C 17th C C C C C C C C C 7th 6th 6th 5th 6th 5th 4th 4th 4th

5 Aluminum work (frames) 15th 17th C C C – – –

6 Aluminum work (Shutters) – – C C C – – –

7 Completion of electrical wiring within flat – 7th 8th 8th C C C C C C C C C – – –

8 Completion of flooring within flat 16th C 16th C C 17th C C C C C C C C C C C C 16th C 16th 14th 14th 14th

ROAD• PeripheryroadiscompletefromMain

gate to Tower 5 along with signage, lighting and surrounding landscape

For information on new launches, E-mail: [email protected] Call: Gurgaon 0124 - 4552000, Noida 0120 - 3985100

www.unitechgroup.com

SECTOR - 117, NOIDA

•Partof70+acresUnitechdevelopment

•2,3&4bedroomapartments

•Sizesfrom1140-1980sq.ft.

•SplitACsinliving&masterbedroom

•Securedandgatedcommunity

•Modernclubhousewith

large swimming pool

FOR MORE DETAILS ON THIS PROJECT, PLEASE CALL: 0124 - 4552103

BASEMENT RAMP• Basemententryandexitramp

ready

•Spaciousluxuryvillas

•Newagefeatureslikehome

automation system, intruder

alarmsystemandcentralized

VRV air - conditioning system

•Partyterracewithduplexvilla,

clubhouse with spa and more