CONSTRUCTION TIMELINE · work will be conducted at night. Access to the Park will not be...
Transcript of CONSTRUCTION TIMELINE · work will be conducted at night. Access to the Park will not be...
STAGE 2F: Major Deck (Laurel Street) Work.Timeline: April 8, 2014 through April 30, 2014.Areas Impacted: Laurel Street leading into the Park Plaza.Access: Deck to be closed to vehicles but pedestrians can enter Park via both the “outsides or sidewalks” of the bridge.
Instead of entering the park through the bridge an alternative Tram service is available to provide access to the park via the Inspiration Point parking lot at Tram Central, a shady arbor with benches. The tram will transport you into the heart of Balboa Park. (Stages: 2A, 2B, 2C, 2D, 2E and 2F.)
STAGE 1: State Route 163 Closures.Timeline: August 5, 2013 through August 8, 2013.Areas Impacted: State Route 163 main lanes of traffic.Access: One lane will be closed to freeway through traffic and all the work will be conducted at night. Access to the Park will not be restricted.
STAGE 2A: Preliminary Deck (Laurel Street) Work.Timeline: January 2, 2014 through February 2, 2014.Areas Impacted: Laurel Street leading into the Park Plaza.Access: Deck to be closed to vehicles but pedestrians can enter Park via both sidewalks.
STAGE 2B: Major Deck (Laurel Street) Work.Timeline: February 7, 2014 through February 17, 2014.Areas Impacted: Laurel Street leading into the Park Plaza.Access: Deck to be closed to vehicles but pedestrians can enter Park via the “center” of the bridge. Assistance will be provided by traffic flaggers helping pedestrians enter the Park safely.
STAGE 2C: Major Deck (Laurel Street) Work.Timeline: February 18, 2014 through March 3, 2014.Areas Impacted: Laurel Street leading into the Park Plaza.Access: Deck will be closed to vehicles but pedestrians can enter Park via the “left sidewalk” of the bridge. Assistance will be provided by traffic flaggers helping pedestrians enter the Park safely.
STAGE 2D: Major Deck (Laurel Street) Work.Timeline: March 4, 2014 through March 20, 2014.Areas Impacted: Laurel Street leading into the Park Plaza.Access: Deck to be closed to vehicles but pedestrians can enter Park via the “right sidewalk” of the bridge. Assistance will be provided by traffic flaggers helping pedestrians enter the Park safely.
STAGE 2E: Major Deck (Laurel Street) Work.Timeline: March 21, 2014 through April 7, 2014.Areas Impacted: Laurel Street leading into the Park Plaza.Access: Deck to be closed to vehicles but pedestrians can enter Park via the “center” of the bridge. Assistance will be provided by traffic flaggers helping pedestrians enter the Park safely.
CONSTRUCTION TIMELINE
June 2013 July Aug. Sept. Oct. Nov. Dec. Jan. 2014 Feb. March April May June July
MaterialProcurement
Clearing & GrubbingJune-August 2013
Concrete Workon Columns
August 2013-Jan 2014
(DECK WORK)Stage 2A Through
Stage 2FJanuary 2014-April 2014
Interior Bridge WorkApril-July 2014
Begin 06/05/2013 End 07/03/2014
California Department of TransportationDistrict 11 - San Diego, CA.
U.S. NavalHospital
Pepper Grove
San DiegoAutomotiveMuseum
BALBOA PARK
Space Theater Way
5
Balboa Rec. Ctr.
Presidents Way
Veterans Museum& Memorial Ctr.
Park Blvd.
Insp
irat
ion
Po
int W
ay
Wie
ber
Ave
.
TramCentral
TramCentral
El Prado
Cabrillo Bridge(Laurel Street Overcrossing)
No Scale
Pan Am
erican R
d. E
Pan Am
erican P
laza
San DiegoSportCommission
StarlightMusicalTheater