© 2009 Bentley Systems, Incorporated Tim O’Leary Construction Solutions Europe & Africa Construction Simulation An Introduction

Transcript of Construction Simulation An Introduction - Forside · PDF fileConstruction Simulation An...

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

Tim O’LearyConstruction Solutions Europe & Africa

Construction SimulationAn Introduction

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

2 | WWW.BENTLEY.COM

Solutions

COMMUNICATIONS

COMMUNICATIONCOMMUNICATIONSS

BRIDGESBRIDGESBRIDGES BUILDINGSBUILDINGSBUILDINGS CAMPUSESCAMPUSESCAMPUSESCADASTRE AND LAND

DEVELOPMENT CADASTRE AND LAND CADASTRE AND LAND

DEVELOPMENT DEVELOPMENT

OIL AND GASOIL AND GASOIL AND GASELECTRIC AND GAS UTILITIESELECTRIC AND ELECTRIC AND GAS UTILITIESGAS UTILITIES

FACTORIESFACTORIESFACTORIESMETALS AND

MININGMETALS AND METALS AND

MININGMININGPOWER

GENERATIONPOWER POWER

GENERATIONGENERATION

ROADSROADSROADSWATER AND

WASTEWATERWATER AND WATER AND

WASTEWATERWASTEWATERRAIL AND TRANSITRAIL AND TRANSITRAIL AND TRANSIT

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

3 | WWW.BENTLEY.COM

Construction Simulation

USING

CONSTRUCTSIM

CONSTRUCTION

TODAY

BENTLEY’S

CONSTRUCTSIM

OVERVIEW

BENEFITS

Best practices and the challengesin applying them

Proven solution to plan, process and status construction

• VPM

• Data Reorganisation

• 4D playback

• Status tracking

• Work Packs

• Look ahead planning

• Greater workforce productivity

• Shorter project time

• Substantial cost savings

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

4 | WWW.BENTLEY.COM

Overview

Construction Best Practices

Software Technology ConstructSimConstructSim

Virtual PlantModel

Virtual PlantModel

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

5 | WWW.BENTLEY.COM

Current Major Issues

Installation

Testing

Systems Turnover

Engineering

Delivery + Fabrication

7

1, 23, 4, 56, 8

71, 2

3, 4, 56, 8

1, 23, 4, 56, 8

9

1, 23, 4, 56, 8

9

1.Poor communications betweendisciplines and functions

2.Concurrent engineering

3.Fast-track projects

4.Limited resources

5.Ageing skilled workforce

6.Schedule / install by area –test and turnover by systems

7.Short time betweenAFC/IFC and construction

8.Many revisions

9.Operate in “scramble” mode and work with whatever is available

a) Engineering deliverables

b) Materials availability

c) Allocation of materials

d) Fabrication deliverables

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

6 | WWW.BENTLEY.COM

Common Questions

What is the exact progress to date?

Is the planned schedule

achievable?

What effort is needed to complete?

How will theschedule be kept

given the changing circumstances?

How will engineering changes affect work

content, cost and schedule?

What will bethe project impact be if materials are delayed?

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

7 | WWW.BENTLEY.COM

Workflow Planning

Validate Constraints

Validate Constraints

Issue work to the field that can be

done

Issue work to the field that can be

done

Create WorkPacks

Create WorkPacks

Automate MTOsAutomate MTOs

IFCDrawings

IFCDrawings ConstructorConstructorSuppliers /

Fabricators

Suppliers / Fabricators

EngineeringEngineeringDefine Priority Areas Early on in

Design

Define Priority Areas Early on in

Design

Lean ConstructionLean Construction

Last PlannerLast Planner

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

8 | WWW.BENTLEY.COM

Ideal Construction SequenceBased on Turnover Systems

Linear Definition of Priorities

Construction

SystemsTurnover

TestingInstallationDeliveryEngineering

CompletionDate

Definition of Priorities

TestingComplete

InstallationComplete

MaterialsDelivery

DrawingsIssued

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

9 | WWW.BENTLEY.COM

Managing Work Buffers to Speed Projects

Systems Turnover

Testing

Installation

Delivery + Fabrication

Engineering

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

10 | WWW.BENTLEY.COM

BENEFITS

USING

CONSTRUCTSIM

Construction Simulation

CONSTRUCTION

TODAY

BENTLEY’S

CONSTRUCTSIM

OVERVIEW

Best practices and the challengesin applying them

Proven solution to plan, process and status construction

• Greater workforce productivity

• Shorter project time

• Substantial cost savings

• VPM

• Data Reorganisation

• 4D playback

• Status tracking

• Work Packs

• Look ahead planning

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

11 | WWW.BENTLEY.COM

ConstructSim Approach

• Drive priorities based on “ideal” construction sequence basedon turnover systems

• Expedite both engineering and fabrication to deliver against ideal plan

• Allocate materials based on priorities

• Accurately track effort for completion

• Manage work-fronts effectively as constraints change on site

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

12 | WWW.BENTLEY.COM

Client Feedback

Piping

2x faster

Welding

1.8x faster

–Streamline sequencing

–Reduced rework

–Automated productionof work packages

–Work packages are executable

–TIC $50M – Savings $1M

–Completed 1 month aheadof schedule

Increase field productivity 7 – 25%

Save time and cost on Brownfield projects

ConstructSim

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

13 | WWW.BENTLEY.COM

Diesel Refinery: $2M Savings in Mechanical Sub Change Orders

– New Refinery Unit - TIC $320M

– Lump Sum Contract with Mechanical Sub

– ConstructSim Pipe purchased by Owner and

utilized by Construction Management firm

– Excessive change order submitted by

Mechanical Sub

– Actual progress not in alignment with

progress reported

– ConstructSim used to analyze change order

and update progress reporting system

“ ConstructSim enabled

us to recover project

schedule losses, and

complete on time -

without paying for

unwarranted change

orders.”

Claim: $2.5M

Settled: $0.5M

Background

ConstructSim Use Case

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

14 | WWW.BENTLEY.COM

– Deepwater Offshore Platform - $150M

– Time and materials contract with Fab Yard

– ConstructSim Pipe purchased by Owner and

utilized by module Fab Yard contractor

– ConstructSim used to re-baseline

project schedule

– Development of crew-level work face

plans with ConstructSim

– Project completes on time, under budget,

and sails away with only 7 punch list items

(compared to 1000’s for other projects)

Background

ConstructSim Use Case

Offshore Platform: Saved $17M, Reduced Schedule 3 Mon ths

“ The labour efficiency

we obtained using

ConstructSim enabled

us to save 3 months

and U.S.$17M, as well

as reduce the punch list

items by over 99%.”

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

15 | WWW.BENTLEY.COM

ConstructSim Provides Measureable Savings

Reduce Impact of Change

Reduce Wasted Time

MinimizeRework

ReduceLengthy

Planning Process

StreamlineMaterials

Management

1% to 5% TIC

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

16 | WWW.BENTLEY.COM

Who Uses ConstructSim?

Engineers and Constructors, Ltd.

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

17 | WWW.BENTLEY.COM

ConstructSim Solves Complex Planning and Execution Problems

• Owners

• Construction Managers

• Constructors

Materials Management System

CAD Databases Project Schedule

Project Controls Database

VirtualPlant Model

ConstructSim

Reporting & Simulation

Work the Plan

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

18 | WWW.BENTLEY.COM

CONSTRUCTION

TODAY

BENTLEY’S

CONSTRUCTSIM

OVERVIEW

BENEFITS

Construction Simulation

USING

CONSTRUCTSIM

Best practices and the challengesin applying them

Proven solution to plan, process and status construction

• Greater workforce productivity

• Shorter project time

• Substantial cost savings

• VPM

• Data Reorganisation

• 4D playback

• Status tracking

• Work Packs

• Look ahead planning

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

19 | WWW.BENTLEY.COM

Using Bentley’s ConstructSim

VirtualPlant Model

LookAheadPlanning

WorkPacks

AutomaticData

Organization

4DPlayback

StatusTracking

ConstructSim

Week 1

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

20 | WWW.BENTLEY.COM

Project Schedule Integration

MTOFrom CAD +

Production Information

Work StepsTask Templates &Standard Norms

ConstructSimSchedule

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

21 | WWW.BENTLEY.COM

Project Milestones

ProjectMilestone 1

RulesOf

Progress

ProjectMilestone 2

RulesOf

Progress

ProjectMilestone 3

RulesOf

Progress

ProjectMilestone N

ProjectMilestone N

RulesOf

Progress

RulesOf

Progress

EngineeringInitial DesignFinal DesignCheck 1Check 2Check 3Approval

FabricationDrawings ReceivedIn ProductionShipped

InstallationInstallTestHand over

TestingCompletionsCommissioningEtc. Etc.

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

22 | WWW.BENTLEY.COM

Automatic DataOrganization

LookAheadPlanning

WorkPacks

AutomaticData

Organization

4DPlayback

StatusTracking

ConstructSim

Week 1

VirtualPlant Model

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

23 | WWW.BENTLEY.COM

ConstructSim Automatic Data Reorganization for Construction Tasks

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

24 | WWW.BENTLEY.COM

4D Playback

LookAheadPlanning

WorkPacks

AutomaticData

Organization

4DPlayback

StatusTracking

ConstructSim

Week 1

VirtualPlant Model

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

25 | WWW.BENTLEY.COM

4D Playback to Optimize and Communicate the Construction Sequence

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

26 | WWW.BENTLEY.COM

Status Tracking

LookAheadPlanning

WorkPacks

AutomaticData

Organization

4DPlayback

StatusTracking

ConstructSim

Week 1

VirtualPlant Model

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

27 | WWW.BENTLEY.COM

On-Demand Status Tracking and Visualisation

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

28 | WWW.BENTLEY.COM

Tracking Equipment Delivery

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

29 | WWW.BENTLEY.COM

Pipe Delivery Status Visualization

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

30 | WWW.BENTLEY.COM

Pipe Delivery Status Visualization

Area 08(Mod and

Non-Mod Pipe)

Area 11

Pipe Delivery Status Visualization

Area 15

Pipe Delivery Status Visualization

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

33 | WWW.BENTLEY.COM

Area 02

Pipe Hydro Test Status Visualization

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

34 | WWW.BENTLEY.COM

Area 06

Pipe Hydro Test Status Visualization

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

35 | WWW.BENTLEY.COM

Area 16

Pipe Hydro Test Status Visualization

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

36 | WWW.BENTLEY.COM

Work Packs

LookAheadPlanning

WorkPacks

AutomaticData

Organization

4DPlayback

StatusTracking

ConstructSim

Week 1

VirtualPlant Model

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

37 | WWW.BENTLEY.COM

Fast, Easy Work Pack Creation

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

38 | WWW.BENTLEY.COM

Look Ahead Planning

LookAheadPlanning

WorkPacks

AutomaticData

Organization

4DPlayback

StatusTracking

ConstructSim

Week 1

VirtualPlant Model

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

39 | WWW.BENTLEY.COM

Work Pack Reports and Look Ahead Planning to Streamline Scheduling

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

40 | WWW.BENTLEY.COM

Construction Simulation

USING

CONSTRUCTSIM

CONSTRUCTION

TODAY

BENTLEY’S

CONSTRUCTSIM

OVERVIEW

BENEFITS

Best practices and the challengesin applying them

Proven solution to plan, process and status construction

• Greater workforce productivity

• Shorter project time

• Substantial cost savings

• VPM

• Data Reorganisation

• 4D playback

• Status tracking

• Work Packs

• Look ahead planning

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

41 | WWW.BENTLEY.COM

ConstructSim Benefits for Owner Operator

• Enables schedule date to be met

• Reduces costs

• Provides an insight to project progress

• Potential to shorten schedule and achieve additional production

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

42 | WWW.BENTLEY.COM

ConstructSim Benefits for Construction Managers

• Saves 1-5% TIC or 7 – 25% of field man-hours

• Reduced claims litigation

• Greater control and visibility of project

• Start up date controlled / compressed

• Know where you are at and what needs to be completed

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

43 | WWW.BENTLEY.COM

ConstructSim Benefits for Direct Hire Contractors

• Reduces wasted time on-site

• Improves field productivity by 7 -25%

• Reduces rework and out ofsequence work

• Maximises productivity of on-site equipment e.g. cranes / scaffold

• Improves co-ordination between disciplines

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

44 | WWW.BENTLEY.COM

Cost SavingsCo-ordination between disciplines to maximise effectiveness of resources such as scaffolding / cranes

REDUCE

Work pack planning man-hours

Wasted field man-hours

Rework

“Punch list” items

SAVE

ACHIEVE

REMOVE “Out of sequence” work

On-time project completion

Between 1% - 5% of TIC

© 2009 Bentley Systems, Incorporated

Thank you

Sustaining Infrastructure

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

46 | WWW.BENTLEY.COM

Additional Information

• Streamlining Materials

• Planning Levels

• Additional Details

• Electrical / Instrumentation