Construction Project[1]
-
Upload
layton-hutchinson -
Category
Documents
-
view
221 -
download
0
Transcript of Construction Project[1]
-
8/2/2019 Construction Project[1]
1/39
4/15/12
Construction Project
Management andContract Procedures
Module 2
April 12,2012.Mr. B. Leahing
Keian Walker
-
8/2/2019 Construction Project[1]
2/39
4/15/12
Question
The administration of construction contracts are consideredsignificant to the outcome or effective of any construction
project. It is therefore essential that the contractadministrator or project coordinator has a significantappreciation for the different types of contracts available tohim.n If the money being spent by the Jamaican government
was secured through negotiating with an internationallending agency, select the most effective contract typethat can be used to achieve an effective capitalconstruction project in Jamaica.
n The FIDIC engineering and construction document setsout the necessary guidelines as to the responsibilities ofvarious stakeholders to a contract.
Explain in detail the responsibilities of the client in the FIDICengineering and construction document.
Explain the responsibilities of the Engineer in the FIDICEngineering and construction document.
-
8/2/2019 Construction Project[1]
3/39
4/15/12
Introduction
n Construction
n Contracts
n Administration
n Which one will we use?
n The FIDIC
-
8/2/2019 Construction Project[1]
4/39
4/15/12
Contracts
n Contracts we have not used.
n
Why are they not effective to beused?
-
8/2/2019 Construction Project[1]
5/39
4/15/12
What is BOOT?
nB- BuildnO- Ownn
O- OperatenT- Transfer
-
8/2/2019 Construction Project[1]
6/39
4/15/12
BOOT, Project DeliveryMethod
n Design and construction
n Finance
n Operations and maintenance
n
Marketing and customerinterface
n
Concession period
-
8/2/2019 Construction Project[1]
7/39
4/15/12
Cost and Benefits ofthe BOOT
Procurement Method
n Enhanced efficiency
n
Access to broader fundingn Risk sharing
n Whole of life approach
n Access to latest technology
n Economically sound decision-
making
-
8/2/2019 Construction Project[1]
8/39
4/15/12
To Reduce Costn Sufficient work by government prior to
approaching the marketn Large amount ofcertainty that the project
will go ahead
n Engage experienced advisers
n Short, sharp process
n High degree ofintegrity
n Reasonable (real) short-listsn Few negotiable items post bid
-
8/2/2019 Construction Project[1]
9/39
4/15/12
The Client (Employer)
n
As per the FIDIC the employer isdefined as the person named asemployer in the Contract Data and
the legal successors in title to thisperson.
n This person is the initiator of the
project. The Employer can be anindividual, an organization or as in
the case of the scenario given agovernment.
-
8/2/2019 Construction Project[1]
10/39
4/15/12
Client:
Right of Access to the Site
n The Employer shall give the Contractor
right of access to, and possession of all
parts of the Site within the time stated inthe Appendix to Tender.
n However, the Employer may withhold
such right of possession until thePerformance Security has been received.
-
8/2/2019 Construction Project[1]
11/39
4/15/12
Right of Access to the Site
n If no such time is stated in the Appendix
to Tender, the Employer shall give the
Contractor right of access to, and
possession of, the Site within such timesas may be required to enable the
Contractor to proceed in accordance with
the programme submitted.
-
8/2/2019 Construction Project[1]
12/39
4/15/12
Right of Access to the Site
n If the Contractor suffers any delay as aresult of a failure by the Employer to giveany such right or possession within such
time, the Contractor shall give notice tothe Engineer and shall be entitled to:
Extension of time for any delay ifcompletion is or will be delayed and
Payment of any such Cost plus reasonableprofit which shall be included in the ContractPrice.
-
8/2/2019 Construction Project[1]
13/39
4/15/12
Right of Access to the Site
n After receiving this notice theEngineer shall proceed in accordancewith the clause on determinations to
determine these matters.n However, if the Employers failure was
caused by an error or delay by theContractor including an error in, or
delay in the submission of any of theContractors Documents, theContractor shall not be entitled of
time, Cost or profit.
-
8/2/2019 Construction Project[1]
14/39
4/15/12
Right of Access to the Site
n The possession does not necessarilymean exclusive possession, butshared possession needs clarification
in the Particular Conditions.n When the Contractor takes possessionof the Site, he is responsible forsafety, security and insurance. If the
Contractor does not have full controlof the Site and the activities on theSite, or the site will be shared, thenthe extent of the Contractorsresponsibilities must be clearly stated.
-
8/2/2019 Construction Project[1]
15/39
4/15/12
Right of Access to the Site
n If the Employer fails to give right of
access to and possession of the Sitewithin the stated period then the
Contractor will be entitled to anextension of time plus his costs anda reasonable profit.
-
8/2/2019 Construction Project[1]
16/39
4/15/12
Permits, Licenses or Approvals
n The Employer shall provide reasonableassistance to the Contractor at the requestof the Contractor:
n By obtaining copies of the Laws of theCountry which are relevant to the Contract
n For the Contractors applications for anypermits, licenses or approvals required bythe Laws of the Country
-
8/2/2019 Construction Project[1]
17/39
4/15/12
Employers Personnel
n The Employer shall be responsible forensuring that the employersPersonnel and the Employers otherContractors on the Site:
Cooperate with the Contractorsefforts and
Take actions similar to those which the
Contractor is required to take in relationto the clauses relevant for SafetyProcedures and Protection of theEnvironment.
-
8/2/2019 Construction Project[1]
18/39
4/15/12
Employers Personnel
n When two or more Contractors areworking on the same Site the possibilitiesof delays and costs from failures ofcooperation can lead to serious problems.
n The FIDIC Clauses may be adequate whenone Contractor is carrying out a highpercentage of the total work on the Site.
n
If the work is more evenly dividedbetween two or more Contractors, theprovision of the Contract need to bereviewed.
-
8/2/2019 Construction Project[1]
19/39
4/15/12
Employers Claims
n If the Employer considers himselfentitled to any payment the Employer orthe Engineer shall give notice andparticulars to the Contractor.
n
The notice shall be given as soon aspracticable after the employer becameaware of the event or circumstancesgiving rise to the claim.
n
The particulars shall specify the Clauseor other basis of the claim, and shallinclude substantiation of the amountand/or extension to which the Employerconsiders himself to be entitled for theclaim.
-
8/2/2019 Construction Project[1]
20/39
4/15/12
Employers Claims
n The Engineer shall then proceed in
accordance with theDetermination clause to agree or
determine:
The amount that the employershall be paid by the Contractor
n This amount can be deducted
from the Contract Price and
Payment Certificates.
-
8/2/2019 Construction Project[1]
21/39
4/15/12
Employers Claims
n If the Employer deducts money from theContractor which he (the Employer) is notentitled to do, will enable the Contractor to
claim for all consequences of thedeductions.
n This could involve a substantial claim bythe Contractor. In such case, the Employer
would be advised to reserve his rights butnot to deduct any money until the finalresolution of this matter.
-
8/2/2019 Construction Project[1]
22/39
4/15/12
Who is the Engineer?
n The Engineer is defined as the
person appointed by the Employerand named in the Appendix to
Tender. The word person can meana company, so the Engineer may benamed as a firm of Consulting
Engineers rather than an individual.
-
8/2/2019 Construction Project[1]
23/39
4/15/12
Who is the Engineer?
n If the Engineer is a company, then
the company should designate anindividual to carry out the role of the
Engineer.
-
8/2/2019 Construction Project[1]
24/39
4/15/12
Who is the Engineer?
n The Engineer has an extremely
important role in the administrationof the Contract and the way in which
he carries out his duties will have amajor impact on the work of theContractor and the success of the
project.
-
8/2/2019 Construction Project[1]
25/39
4/15/12
Engineers Responsibilities
n (a) The Engineer shall carry out the
duties specified in the Contract.
n (b) Except as expressly stated in the
Contract, the Engineer shall have
no authority to relieve the
Contractor of any of hisobligations under the Contract.
-
8/2/2019 Construction Project[1]
26/39
4/15/12
Engineers Responsibilities
n
(c) The Engineer may exercise theauthority specified in or necessarily tobe Authority implied from the Contract,provided, however, that if the Engineeris required, under, the terms of his
appointment by the Employer, to obtainthe specific approval of the Employerbefore exercising any such authority,particulars of such requirements shall
be set out in Part II of theseConditions. Provided further that anyrequisite approval shall be deemed tohave been given by the Employer forany such authority exercised by the
Engineer.
-
8/2/2019 Construction Project[1]
27/39
4/15/12
Engineers Representative
n
The Engineers Representativeshall be appointed by and be
responsible to the Engineer andshall carry out such duties and
exercise such authority as may
be delegated to him by theEngineer
E i A th it t D l t
-
8/2/2019 Construction Project[1]
28/39
4/15/12
Engineers Authority to Delegate
n The Engineer may from time to time
delegate to the EngineersRepresentative any of the dutiesand authorities vested in the
Engineer and he may at any timerevoke such delegation.n Any such delegation or revocation
shall be in writing and shall not take
effect until a copy thereof has beendelivered to the Employer and theContractor.
E i A th it t D l t
-
8/2/2019 Construction Project[1]
29/39
4/15/12
Engineers Authority to Delegate
n Any communication given by the
Engineers Representative to theContractor in accordance with
such delegation shall have thesame effect as though it had beengiven by the Engineer. Provided
that:
-
8/2/2019 Construction Project[1]
30/39
4/15/12
EngineersAuthority to Delegate
n Sub-Clause 2-3:
n (a) any failure of the EngineersRepresentative to disapprove any
work, materials or Plant shall not
prejudice the authority of theEngineer to disapprove such work,
materials or Plant and to giveinstructions for the rectification
thereof and,
-
8/2/2019 Construction Project[1]
31/39
4/15/12
EngineersAuthority to Delegate
n Sub-Clause 2-3:
n (b) if the Contractor questionsany communication of the
Engineers Representative he may
refer the matter to the Engineerwho shall confirm, reverse or vary
the contents of suchcommunication
-
8/2/2019 Construction Project[1]
32/39
4/15/12
Instructions of the Engineer
n The Engineer may issue to the
Contractor (at any time) instructionsand additional or modified Drawings
which may be necessary for theexecution of the works and theremedy of any defects, all in
accordance with the Contract
-
8/2/2019 Construction Project[1]
33/39
4/15/12
Instructions of the Engineer
n The Engineer has the power to issueadditional or modified drawings. This
is an important power because manyContracts under the FIDIC Conditionsof Contract rely on a small number of
Drawings in the Tender documents
-
8/2/2019 Construction Project[1]
34/39
I t ti i W iti
-
8/2/2019 Construction Project[1]
35/39
4/15/12
Instructions in Writing
n Instructions given by the Engineer
shall be in writing, provided that iffor any reason the Engineerconsiders it necessary to give any
such instruction orally, theContractor shall comply with suchinstruction. Confirmation in writing
of such oral instruction given bythe Engineer, whether before orafter the carrying out of theinstruction.
-
8/2/2019 Construction Project[1]
36/39
4/15/12
Replacement of the Engineern If the Employer intends to replace the
Engineer, the Employer shall not less than42 days before the intended date ofreplacement, give notice to the
Contractor of the name, address andrelevant experience of the intendedreplacement Engineer.
n The Employer shall not replace the
Engineer with a person against whom theContractor raises reasonable objectionwith supporting particulars.
Replacement of the Engineer
-
8/2/2019 Construction Project[1]
37/39
4/15/12
Replacement of the Engineer
n However a change to the named
individual, when the Engineer is acompany, does not require this
notification.n Reasonable notice and discussion
would assist in efficient
administration.
Determinations
-
8/2/2019 Construction Project[1]
38/39
4/15/12
Determinations
n The Engineer shall consult with each
Party in an endeavour (try) to reachagreement. If agreement is not
achieved, the Engineer shall make afair determination in accordance withthe Contract.
n The determination must express therights and obligations of the Parties
in accordance with the Contract and
the applicable law, regardless of the
-
8/2/2019 Construction Project[1]
39/39
Click to edit Master subtitle style
4/15/12
Conclusion
Questions