1 CONSTRUCTION & PROFESSIONAL SERVICES CONTRACT PROCESS OVERVIEW Presented by Nathan Jones Contract Procurement Manager June 5, 2014

Transcript of CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into...

Page 1: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

1

CONSTRUCTION & PROFESSIONAL SERVICES CONTRACT PROCESS OVERVIEW

Presented by Nathan Jones Contract Procurement Manager June 5, 2014

Page 2: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Contract Process

Design of project and development of Scope of Work by Project Manager and Designer

Prepare Bid documents including plans and specifications or Request for Proposal (RFP) documents

Advertise for three consecutive business days in the Daily Journal and post all documents on website (all contract information on website)

Email notice to email list Pre-Bid / Pre-Proposal Conference (and site visit) normally

7 to 10 days following first day of advertisement Pre-Bid / Pre-Proposal Conference and Bid Opening held in

the South Campus, Trailer #2 (unless otherwise noted) 2

Page 3: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Contract Process - Continued

Written questions due ten calendar days prior to Bid Opening date (Construction) or approximately 7 to 10 days following Pre-Proposal Conference (RFP)

Public Bid Opening / Proposals Due approximately 30 days after first day of advertising

Bid Bond required in the amount of 5% of your bid Review period for budget and DSBO requirements Selection Committee reviews and scores proposals (RFP) Shortlist of firms and formal presentations (RFP) Award of contract (Construction) Contractor has five consecutive business days to return

signed contract with Performance & Payment Bond and Insurance

Page 4: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Contract Process - Continued

Selection of Consultant (RFP) and negotiation period Contract signing period (after contract returned by

Contractor) approximately 30 days for under $500,000 and 60 days for over $500,000 (Council approval required)

Contract signing period for CONSTRUCTION contracts (after contract returned by Contractor) approximately 30 days for under $5,000,000 and 60 days for over $5,000,000 (Council approval required)

Executed contract delivered with Notice To Proceed

Page 5: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

DIA‘s Web site—On Line Business Resources

5

Page 6: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

DIA Business Center Web page

– The Web site has been reorganized and will be consistently refreshed with current updates to align with the DIA Commerce Hub mission.

– Click on:

www.flydenver.com Business Opportunities

6

Page 7: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Defined Selection Pool

7

Page 8: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

DIA Web site—”Future Opportunities” Link Professional Services

8

Page 9: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

DIA Web site—”Future Opportunities” Link Construction

9

Page 10: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

DIA Web site—”Future Opportunities” Link Revenue Development

10

Page 11: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

DIA Business Center Web page

11

Page 12: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Project Notification Form—Construction and Professional Services

12

Page 13: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Current Contract (Procurement) Opportunities and Planholders List

13

Page 14: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Planholders List--Example

14

Page 15: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Contact Information

Nathan Jones 303-342-2137

[email protected]

Contract Procurement General Email: [email protected]

15

Page 16: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

16

DIVISION OF SMALL BUSINESS OPPORTUNITY (DSBO)

Page 17: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Ordinance 760 and Federal Code

– Division 1, Article III, Chapter 28, D.R.M.C. – “M/WBE” program – “SBE” program

– 49 CFR, Part 23 and Part 26 – “ACDBE” program – “DBE” program

– City Ordinance 1121 – Prompt Pay

17

Page 18: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

ACDBE Certification

Airport Concessions Disadvantaged Business Enterprise 49CFR Part 23 | Effective April 25, 2005

Its purpose is to help firms compete and participate in

concession opportunities by: – Helping remove barriers to the participation of ACDBEs in

opportunities for concessions at DIA;

– Creating a level playing field on which ACDBEs can compete fairly for opportunities for concessions;

– Avoiding discrimination in the award and administration of opportunities for concessions by airports receiving DOT financial assistance.

18

Page 19: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

ACDBE Certification

Who Should Apply? - Restaurant owners, concessionaires, retailers;

- Firms that provide goods or services or firms that can provide

a particular service to an existing concessionaire are encouraged to apply.

- Examples of ACDBE certified firms include; retail food & beverage, news & gifts, janitorial and maintenance services, consulting services, parking & transportation management, etc.

19

Page 20: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

COMP-MAP-100 R3

M/WBE Goal Setting Process

AGENCY

AGENCY

Is Form

Filled Out Correctly

?

Prepare Committee Agenda & Distribute

Assign to Appropriate

Goals Comm

Receive

Committee Project Info Form

(DBE/MWBE)

N

Prepare Recommendation

Conduct Goals Committee

Mtg

Forward Recommendation

To Project Mgr

Post Goal Recommendation

Obtain Director

Signature

Y

Page 21: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

M/WBE Goal Setting

– Goals Committee: Heavy/Highway; Construction; and Professional Services.

– Goals Committee made up of citizen/contractors. Industry experts.

– Evaluate project scope and available M/WBE in marketplace to establish M/WBE project goal.

– Once goal established, project is bid.

21

Page 22: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Responsive Bid/Proposal

– Letter of Intent (LoI) or Good Faith Effort (GFE) determines Responsiveness.

– Bid Projects: LoI due three (3) days after bid due date.

– Proposal Projects: LoI due at time of bid due date.

– GFE is ten (10) step process. Failure to meet all 10 steps will result in non-responsiveness.

– Goals apply to all Change Order work! 22

Page 23: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Subcontractor Payment Reporting

– The Prime Contractor is responsible for reporting payments made to the subcontractor/consultant in the city’s contract management system, B2G.

– Payments are uploaded into B2G monthly.

– The Prime Contractor will receive an email, which begins the process.

– Once the Prime Contractor submits the payment information, it is also the subcontract’s responsibility to confirm the payment.

23

Page 24: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Network and Ask Questions

– Get to know the M/WBE firms in the city’s directory. Start early.

– Ask DSBO for assistance when submitting LoI.

Key Contacts Payment Reporting: Cristina Lopez, 303.342.2191 [email protected] ACDBE Certification: Alicia Sewell, 303.342.2185 [email protected] Project Requirements: Emmanuel Hangar, 303.342.2191 [email protected]

24

Page 25: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

25

AIRPORT SECURITY

Page 26: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Airport Security

– Denver Municipal Airport System Rules and Regulations – Rule 20.01 Participant Status

– Each Air Carrier, Tenant, Vendor, Ground Transportation (GT) Vendor, Contractor requiring access to the Restricted Area, Sterile Area, and/or Secured Area shall become a “Participant” in the Airport Security Program, and remain in good standing in order to retain Airport Security privileges.

26

Page 27: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Airport Security

– Three key items to Airport Security New Company Setup 1. Participant Sponsorship Form 2. Participant Meeting 3. Obtaining Unescorted Access

27

Page 28: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Airport Security

1. Participant Sponsorship Form: – Any vendor, ground transportation vendor, or contractor requiring

access to the Restricted Area, Sterile Area, or Secured Area must be sponsored by the City and County of Denver Department of Aviation, an air carrier, or a tenant. The sponsorship establishes that a vendor, ground transportation vendor, or contractor has legitimate business at the airport. All construction contractors must submit the Participant Sponsorship Form with their sponsor’s signature, along with a signature from the Maintenance or Engineering divisions to validate non-city projects.

28

Page 29: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Airport Security

2. Participant Meeting: – Attend a Participant Meeting with the Assistant Director of Security or

their designee. All pertinent information will be covered in this meeting. The following information and documents are required at the Participant Meeting:

– Sponsorship Form from each company you are servicing or working for

– Contact information for your company (e-mail address, phone number, etc.)

– List of areas, doors, and gates that you will require access through. Please contact your sponsor to determine necessary access.

– An Insurance Policy of $10 million for driving unescorted on the airfield. If driving is required only in the tunnels you will need an Insurance Policy of $1 million.

– Fees for fingerprinting. Cash or check only. Check made payable to "Airport Revenue Fund."

– Authorizing Agent Class: the person that attends the Participant Meeting will be the Authorizing Agent and the security contact for your company

29

Page 30: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Airport Security

3. Obtaining Unescorted Access: – Any person requesting or requiring a badge that would permit

unescorted access to the sterile or restricted areas must be fingerprinted, pass a Criminal History Background Check, and a Security Threat Assessment. If your company requests unescorted driving privileges on the AOA, every badged individual requesting a driving endorsement will be required to receive the AOA driver training on an annual basis through Computer Based Training (CBT).

– For further information regarding fees and deposits, please contact the Airport Security Office at (303) 342-4307. Review the Denver Municipal Airport System Rules and Regulations for further guidelines for conducting business at Denver International Airport.

30

Page 31: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

31

INSURANCE

Page 32: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Basic Insurance Requirements

– Any company or individual doing business of any type with DIA must carry insurance which, at a minimum, includes:

– General Liability – Workers’ Compensation – Auto Liability

32

Page 33: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Additional Requirements

– Depending on the type of work that you are performing for DIA, you may be required to carry additional insurance such as: – Umbrella Liability – Professional Liability – Environmental Liability – Builders’ Risk

33

Page 34: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Steps of the Process

– Insurance requirements are issued with the RFP/Bid or are in the draft contract.

– Please be sure that you know what the requirements are-once you sign the contract, you will be legally responsible for meeting these basic requirements, even if you have to go out and purchase the coverage before beginning work.

34

Page 35: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Steps of the Process

– The uniform insurance language in the contract states that the Consultant: – agrees to buy and keep in force the required insurance

during the entire term of the contract, – will provide proof of that insurance to DIA upon

execution of the contract and prior to any work beginning, and

– will ensure that all subcontractors will comply with all of the insurance requirements.

35

Page 36: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Summary

– All businesses must have insurance to work at DIA. – Once you receive a RFP or bid packet, take the insurance

section to your insurance agent. – Once you are awarded the contract, have your insurance

agent send a certificate of insurance to DIA. Submit the certificate with the signed contract.

– Do not start work until your insurance has been approved. Invoices will not be processed until the insurance is complete.

36

Page 37: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

37

Rolling Owner Controlled Insurance Program

Administrator: Arthur J Gallagher Risk Management Services, Inc.

Insurance Carrier: The Hartford

In recent years, the airport has elected to include some CIP projects in the ROCIP, the rolling owner controlled insurance program so you want to know a little about this program as well.

Page 38: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Rolling Owner Controlled Insurance Program (ROCIP) Definition

• A ROCIP is a technique for consolidating the insurance

coverage for participants in a large construction project.

• DIA purchases the insurance coverage and then recovers from the contractors the amount each would have spent on insurance absent the ROCIP.

• There is one insurer and one insurance broker instead of a patchwork program of coverage, indemnities, policies, brokers and insurers.

38

Page 39: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Rolling Owner Controlled Insurance Program (ROCIP) Benefits

3

•DBE/WBE/MBE inclusion

•Certainty of better insurance coverage Broader terms and higher limits

•Centralized focus All parties interests are aligned financially and legally.

•Proactive Safety and Claims Management

•Cost savings Economies of scale

Page 40: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

40

PREQUALIFICATION

Page 41: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prequalification

- Prequalification is a status that allows a contractor to bid on City & County of Denver work.

- Prequalification is granted as to categories of work and financial levels, based on contractor’s experience, qualifications and financial capability

- Generally any contract estimated to be over $1,000,000 requires prequalification

41

Page 42: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prequalification

There are 9 categories of work: 1. Excavation and Grading 2. Landscape (a & b) 3. Utilities (a & b) 4. Sewer (a, b & c) 5. Roadway and Paving (a, b, c & d) 6. Structures (other than buildings) (a, b, c & d) 7. Buildings (a, b, c, d, e, f & g) 8. Environmental Remediation (a, b & c) 9. Specialty

42

Page 43: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prequalification

Financial Limits:

43

Contracts Not Exceeding : Financial Statement Required

$1,500,000 Reviewed or Certified Audited

$3,000,000 Reviewed or Certified Audited

$5,000,000 Certified Audited

$7,500,000 Certified Audited

$10,000,000 Certified Audited

$15,000,000 Certified Audited

$20,000,000 Certified Audited

$25,000,000 Certified Audited

Page 44: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prequalification

– All contractors performing Environmental work are required to be prequalified regardless of the dollar amount

What is Special Permission: - A process allowing a contractor to be prequalified at a

higher level than what they are prequalified at for a specific project.

44

Page 45: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prequalification

Prequalification Criteria Reviewed:

Financial Capability-

-Amount of Quick Assets or Working Capital (must be positive) -Ratio of Debt to Net Worth <4.0 -Type and size of projects completed in past 5 years (top 50) -Bonding capacity -Is audited statement subject to any qualifications 45

Page 46: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prequalification

-Has contractor’s performance been satisfactory -Contractor’s safety record (Experience Modification Rate

Factor-EMRF) - >1.5 automatic ineligibility - 1.2-1.49 consideration for denial or lower

prequalification level

-In arrears or default may be considered for denial

-History of debarment or suspension may be considered for denial

-History of criminal conviction may be considered for denial

46

Page 47: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prequalification

– Prequalification status is good for one year. You must reapply annually.

– Apply today don’t wait until you need it.

– The Rules and application are available at

www.denvergov.org/prequalification

47

Page 48: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

48

PREVAILING WAGE

Page 49: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prevailing Wage

WHAT IS PREVAILING WAGE? – Prevailing Wage is the law. It is mandated under

Section 20-76 of the Revised Municipal Code of the City and County of Denver.

– Prevailing Wage applies to all DIA contracts with a

value of $2,000.00 or more – the value being the total cost of all labor and materials on the project, whether individually or in the aggregate.

– Prevailing Wages are the hourly wages (including fringe benefits) based on the Federal Davis-Bacon rates which the City of Denver’s Career Service Authority periodically adjusts for our local market.

49

Page 50: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prevailing Wage

TYPES OF WORK COVERED BY PREVAILING WAGE:

Construction Demolition Alterations Improvements Repairs Maintenance/Janitorial Hauling

50

Page 51: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prevailing Wage

– WHAT PREVAILING WAGE RATES APPLY AT DIA? Career Service issues four groups of wages: Building: everything inside the foundation of the building. Highway: covers construction, alteration or repair of roads,

highways, airport apron areas, runways, taxiways, and parking areas.

Heavy: covers everything outside the building foundation: non-habitable structures, such as toll booths, kiosks, parking

garages and car washes. Also used for building demolition. CSA: finishers, floor grinders, transit technicians, baggage

system technicians, custodial rates.

51

Page 52: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prevailing Wage

THE PROCESS – The general/prime and subcontractors at all tiers submit

weekly certified payrolls in a timely manner via LCPTracker, the City’s on-line reporting system in which the applicable Prevailing Wage rates have been locked in.

– Contractors report their employees, work classifications, straight time and overtime hours (after 40 hours in a given work week), as well as any apprentices used.

– Apprentices must be currently registered in a BAT Program (Bureau of Apprenticeship and Training, US DOL). We enforce a 1:1 journeyman/apprentice ratio at all times.

– Employees are required to be paid weekly for the hours worked. Only janitorial and window washing contracts are exempt from this requirement.

52

Page 53: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prevailing Wage

THE PROCESS (continued) – Employees working on a DIA project must have been E-

verified after September 1, 2010. – The general/prime contractor ensures that all

subcontractors are informed about the Prevailing Wage requirements of a DIA project prior to commencing work.

– Fringe benefits need to be approved by the Auditor’s Office prior to the start of the project. Approval is good for one year.

– The Prevailing Wage posters in English and Spanish, together with the applicable wage rates, need to be displayed on site where they are accessible to all employees.

53

Page 54: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prevailing Wage

THE PROCESS (continued) – Working owners who personally perform work on a DIA

project may be exempt from paying themselves Prevailing Wages, but still must submit in LCPTracker the weekly certified payrolls reporting their hours worked.

– Contractors who are non-compliant will have their payments withheld until the Auditor’s Office is fully satisfied that they have met the project’s Prevailing Wage requirements.

– Please note that the Auditor’s Office no longer accepts

certified payrolls in a paper format. For further information about the electronic payroll reporting system referenced earlier, please visit www.LCPTracker.com.

54

Page 55: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prevailing Wage

Wage Changes During The Project The Prevailing Wage rates can change if the

project goes beyond 1 year from the date the Mayor signed the contract – known as the anniversary date.

The wages in effect on the anniversary date

apply to all work done during the following calendar year. This cycle repeats itself until the project is completed. 55

Page 56: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prevailing Wage

DIA Tenant Finish Projects All of these requirements also apply to Tenant Finish projects

at DIA. These are projects for which the tenant directly engages a general contractor. They can be for food and beverage concessions, car rentals, airlines, freight/custom services, SkyChef, etc.

Since the work is not awarded through the City’s formal bidding

process, the general contractor completes a Pre-NTP Form that I have sent him once notified about the upcoming project. The information provided on the completed Pre-NTP Form allows me to set up the project in LCPTracker.

56

Page 57: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Prevailing Wage

Contact Information Stan Cuba Prevailing Wage Investigator c/o Auditor’s Office-AOB Denver International Airport 8500 Peña Blvd. Denver, CO 80249-6340 Email: [email protected] Phone: (303) 342-2710 57

Page 58: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

58

TREASURY

Page 59: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Contact Information

Douglas W. Schellinger, CPA

Tax Audit Supervisor

201 West Colfax Avenue, MC 1001

Dept. 1009

Denver, CO 80202

Phone: 720-913-9393

Fax: 720-913-9460

Email: [email protected]

59

Page 60: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Resources

– www.denvergov.org/treasury – Colorado Dept of Revenue – Current Tax Rates, by

Jurisdiction. Website address: www.colorado.gov/revenue/tax

60

Page 61: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Sales to Construction Contractors

Contractors are considered to be the end user of all construction materials and should be charged sales tax (unless use tax has been paid to another jurisdiction on a building permit) .

Contractors could also make retail sales but must have a valid resale license to do so.

Denver’s tax rate is 3.62%.

61

Page 62: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Consumer Use Tax

Use tax is due on all taxable purchases (including purchases made over the Internet) on which sufficient sales or use tax has not been paid.

Accrue and remit use tax directly to Denver. Use tax rate = sales tax rate that a licensed vendor would

have charged on the invoice. If you have a sales tax license, remit use tax on line 8 of

your sales tax return. If no sales tax license, apply for a Use Tax account.

62

Page 63: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Occupational Privilege Tax

OPT has 2 parts: EOPT – Employee OPT imposed on

taxable employees $5.75 per taxable employee, withheld

from employees’ paychecks. BOPT – Business OPT imposed on the

business/employer. $4.00 per taxable employee, owner,

partner and/or business with no employees.

63

Page 64: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Duty to Keep Records

DETAILED GENERAL LEDGER DEPRECIATION SCHEDULE PURCHASE INVOICES AND RECEIPTS SALES INVOICES AND RECEIPTS BANK STATEMENTS AND CANCELLED CHECKS BUSINESS CREDIT CARD STATEMENT DETAIL DELIVERY DOCUMENTS PAYROLL RECORDS DENVER TAX RETURNS Job Cost Records Other records as required.

64

Page 65: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

65

PROJECT CONTROLS

Page 66: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

PROJECT MANAGEMENT - Project Controls

– Project Management and Coordination – 013100 Oracle Unifier EPPM® Project Management systems are being utilized by Project Controls to manage system content, schedules, and project cost ● Primavera P6 – Scheduling system ● Unifier – Project & Cost Management system ● Negotiation Requirements – Title 11 GCC ●

66

Page 67: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

67

Primavera P6

– Scheduling The construction schedule shall be a computerized Critical Path Method

(CPM) schedule with the following requirements:

● Work Breakdown Structure (WBS) format that corresponds with the Schedule of Values.

● Required to be Cost & Resource loaded at $500k (Project Manager’s choice below $500k)

● Cost loaded – to include Total Contract Cost (i.e. material, non direct costs)

● Man Hours loaded – direct man hours only, including work by subcontractors (no overhead hours)

● Include submittals and subcontractor work in the schedule.

● A narrative explaining means, methods, and assumptions utilized to develop the schedule logic.

Page 68: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Unifier

– Project and Cost Management All DIA Development Group projects (without exception) will be managed within the Unifier Project Management system ● Design Review ● Change Management (CRs, CCRs, COs) ● Submittals ● Request for Information (RFIs) ● Invoice & Pay Application management ● Closeout ● Document Management

68

Page 69: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Negotiation Requirements

– General Contract and Conditions Defines the specific requirements and processes for submittal of Contractor change(s) to Project and Contract scope of work ● Contractor Change Requests ● Change Orders ● Claim Submittal

69

Page 70: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Contractor Change Request (CCR)

70

Page 71: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Change Order/Task Change Order

71

Page 72: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Construction Claims

72

Page 74: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

74

PAYING CONTRACTORS

Page 75: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Contract Administration

Areas of Responsibility – Payment Application Audits/Processing – Compliance Monitoring

• Bonds and Bond Riders • Insurance • Executed On-Call Authorizations

– 107 Claims Processing – Records Management and Reporting

75

Page 76: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Contract Administration

Payment Application Submittal Requirements

– CM-18 form (Application for Progress Payment) – Schedule of Values – Partial Lien Release form – Contractor’s Certification of Payment form

76

Page 77: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

77

Textura Information Sessions Textura will work with the DIA project teams, AGC and ASA to schedule on site information sessions

Textura Training Sessions Initial on site training for project teams Subcontractor training webinars 3 days/week

http://www.texturacorp.com/training/webinarschedule.htm Continued Support

866-TEXTURA Monday – Friday / 6AM – 7PM MST

Textura representative in Denver area every 1-2 months Just in Time Training Job Aides for Specific Roles Active Group Training Sessions (optional) One on One Trainings with Textura Representatives Weekly Status / Q&A Calls

Textura

Page 78: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

78

Textura Pricing Per Project – Prime Only

PROJECT SIZE FEE (% OF BID)

< $1,000,000 0.22%

$1,000,001 - $5,000,000 0.17%

$5,000,001 - $20,000,000 0.12%

$20,000,001 - $50,000,000 0.10%

$50,000,001 - $100,000,000 0.08%

$100,000,001 - $500,000,000 0.05%

> $500,000,000 CONTACT TEXTURA FOR PROGRAM PRICING

Page 79: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Contract Administration

79

Page 80: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

+

80

DIA COMMERCE HUB

Page 81: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

DIA Commerce Hub Overview

– The DIA Commerce Hub will increase the opportunity and capacity of the local business community through contracting opportunities, educational programs, prime engagement, and business development.

– The Hub acts as an advocate for small businesses, championing efforts that improve policy, increase access, and position firms to bid on projects across all DIA departments. This includes providing direct assistance to external business customers requiring training, guidance, tactical support, and mentoring to meet DIA, City, and Federal Requirements for gaining ACDEB/DBE certification. 81

Page 82: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

DIA Commerce Hub Core Services

– To serve as a One-Stop Center:

– Outreach and financial capacity guidance – Advocacy – Program development – Referrals and community partnerships

82

Page 83: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

DIA Commerce Hub Operations

- DIA is committed to identifying and working with qualified small and minority firms intending to bid on DIA projects and opportunities

- DIA utilizes the Commerce HUB to:

- Disseminate information about upcoming opportunities (90 day projects list for future opportunities)

- Provide technical assistance and support to our local business community

– Training and financial capacity review 83

Page 84: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

Contact Us

– Hours of Operation Monday – Friday 8 a.m. – 4 p.m.

– Main Phone: 303.342-2351

Email: [email protected]

84

Page 85: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

DIA‘s Website

85

Page 86: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

DIA Connecting Business Website

– The Website has been reorganized and will be consistently refreshed with current updates to align with the DIA Commerce Hub mission.

– Click on:

– www.flydenver.com – Business

Opportunities – DIA Commerce Hub

86

Page 87: CONSTRUCTION & PROFESSIONAL SERVICES ......management system, B2G. – Payments are uploaded into B2G monthly. – The Prime Contractor will receive an email, which begins the process.

DIA Commerce Hub Web Page

87

In the Commerce Hub page you will find contract opportunities. The website has current procurement opportunities listed in the Concessions, Construction, and Professional Services links