Offshore Construction in South Korea
![Page 2: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/2.jpg)
LOCATION OF CONSTRUCTION TO LOCATION OF OPERATIONS
![Page 3: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/3.jpg)
The Goal for 2011 onward; 6th generation Drill ships ready for operations in Brazil
![Page 4: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/4.jpg)
The Goal only a few hundred years ago a 6th Generation Sail Ship to reach Brazil
![Page 5: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/5.jpg)
Differences then and now:
• Same Goals
• Different technology
• Different dreams
• Different needs
![Page 6: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/6.jpg)
Then it started out with Manual Labor
![Page 7: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/7.jpg)
And more manual labor to build ships
![Page 8: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/8.jpg)
Early 20th century the Mass Production
![Page 9: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/9.jpg)
Only since the last 30 years: Little Manual Labor / Fully Automated cutting Machines.
![Page 10: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/10.jpg)
Erection Block / Section
![Page 11: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/11.jpg)
Pre Outfitting for Block Sections
![Page 12: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/12.jpg)
Blasting & Painting & Coating
• Blasting will take in block stage in controlled environments (blast shops) with grid.
• Painting & Coating will take place in block stage will take place mainly in controlled environment.
• The Hull and Superstructure• The underwater part of the Hull• The Individual Tanks• The Equipment and it’s systems
![Page 13: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/13.jpg)
The good old days
![Page 14: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/14.jpg)
Block Construction / Use Sections
![Page 15: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/15.jpg)
YARD Overall Project Plan Construction Facilities
• YARD will use 5 mayor location for construction of Block Sections & Modules
• Main yard: Majority of blocks and the Hull• Shin Han Yard: Living Quarters & Heli deck• Sung Jin: Certain curved blocks (bow & stern)• Posh: Mud module Roof sections• Hochang: Derrick and Flap & small sections
![Page 16: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/16.jpg)
YARD planningBlock erection diagram
![Page 17: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/17.jpg)
YARD reality – to Planning
![Page 18: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/18.jpg)
YARD reality to Planning
![Page 19: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/19.jpg)
YARD overall construction facilities for pre outfitting and piping spools
• YARD will use over 70 different vendors and subcontractors to assist with the production and fabrication of spools and outfitting materials:
• The biggest contributors (and mostly mentioned in the office)
• HARVARD, DEOK SU, TAECHANG, GANA, SAM NOK.
• KANG RIM, SUNG IL, SAM KUN, SHIN WOO, SUNG WANG
![Page 20: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/20.jpg)
Process Piping well fabricated and inspected and installed
![Page 21: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/21.jpg)
Welding Accepted, installation rejected
![Page 22: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/22.jpg)
Failed After re-inspection
![Page 23: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/23.jpg)
INSPECTIONS as there are thousands of inspections these are being catagorized
• YARD Witness Inspections; Owner and Class are invited for the inspection.
• YARD Monitor Inspection; YARD will perform the inspection Owner and Class could witness
• OWNER Patrol Inspection: Owner will inform YARD that a visit will take to a fabrication shop and a random inspection will take place
![Page 24: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/24.jpg)
DOCUMENTATION for INSPECTIONS
• YARD Witness Inspection Sheet: To receive at each witness inspection for owner, YARD and Class
• OFR sheet: Owner performs a patrol inspection and finds a discrepancy. Owner will issue to YARD
• YARD NCR: A failure occurred, YARD will issue a NCR
• OWNER NCR: In case an OFR will not be resolved within a certain time Owner will change to a NCR
• Class discrepancy: Class will issue to YARD
• In any case of failure or rejection these items will become “punch items”
![Page 25: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/25.jpg)
WEB SITES for inspections planning & tracking of results and punchitems
• YARD has 2 websites available to track the inspections and the punch items
• PCS: This website is for all inspections on and off site, excluding paint inspections; Also for the Punch items.
• E-QISS: This website is for all inspections on and offsite, including paint inspections AND the NDE reports.
See website: http://www.dsme.co.kr/eng/company/ceo/ceo01.jsp
![Page 26: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/26.jpg)
Daily Activities and Inspection reviews in the site office, with Korean Inspectors
![Page 27: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/27.jpg)
Present status in site office
• Every morning: we review the websites to review the inspection planning and locations
• Every Morning: we have a pre inspection meeting with all inspectors to review the daily schedule
• Every end of the day: we have a short summary on inspections; failures and owner findings
• Every Friday afternoon: we have an evaluation QA/QC meeting with YARD, Owner and Class on the results and the next week look ahead
![Page 28: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/28.jpg)
Present Status for Site Inspection Team
• For construction Owner has hired and will further hire local inspectors specialized in construction for drill ships in various disciplines.
• Additionally part of the Engineering team will slowly grow into the construction and mechanical completion of the construction phase.
• Following Mayor Disciplines:
• HSE (safety first!)• Hull, Structure & Welding • Piping & Mechanical & Installation• Painting & Coating• Later: Outfitting, Electrical, Marine, Drilling, Subsea.
• All the inspectors will be lead by the construction and QA/QC department and for each discipline the leader will get involved in the failures, corrections, improvements and changes.
![Page 29: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/29.jpg)
Construction Phase, Block Stage
• Total amount of small, block is 238
• Total amount of erection block is 14
• Separate are the Accommodation Block, the mud module, The Funnel Casing, The Derrick, The BOP, and the Deck Cranes
![Page 30: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/30.jpg)
Block Stage on yard
Funnel Casing; Weight approx 500mT Accommodation: Weight approx 1800mT
![Page 31: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/31.jpg)
Hull Block stage Program
![Page 32: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/32.jpg)
Block Stage; Big Blocks on the Slipway
![Page 33: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/33.jpg)
Load Out (Horizontal Launching) of Complete Hull
![Page 34: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/34.jpg)
Lifting on large blocks
Lifting of Mud module: Weight 1400mT And Lifting of the Drill tower (Derrick) Weight 1200mT.
![Page 35: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/35.jpg)
THE NEXT PHASES
• The Construction Phase is normally completed with the launching of the vessel.
• Then the Mechanical Completion Phase will start
• Followed by the pre commissioning phase• The commissioning and the integration
commissioning phase• And finally the Sea Trials• Closing with the delivery.
![Page 36: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/36.jpg)
A completed drill ship
![Page 37: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/37.jpg)
Let’s try to avoid Shipwrecking
![Page 38: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/38.jpg)
And let’s make sure we will avoid a Blow Out.
![Page 39: Construction Presentation Slideshow](https://reader031.fdocuments.in/reader031/viewer/2022020207/55556a59b4c9055f5f8b4607/html5/thumbnails/39.jpg)
Make sure we will be ready for our Company and Client in Brazil in 2011 ONWARD