GSPublisherVersion 0.0.100.100 Drawing Scale As Shown Layout ID General Notes 1. ALL DIMENSIONS ARE IN METER UNLESS STATED. 2. DO NOT SCALED DRAWINGS 3.COORDINATE ALL WORKS WITH ARTCHITECTURE DRAWINGS AND SPECIFICATION 4. CONTRACTOR AND SUB- CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS, LOCATIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITING A BID. 5. CONTRACTOR AND SUB- CONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS AND FAMILIARIZE THEMSELVES WTH PROJECT REQUIREMENTS PRIOR TO COMMENCING WITH THE WORK. CONTRACTOR SHALL REPORT ANY DESCRIPANCIES TO ENGINEER. Cilent Implemented by: IOM Project title: CONSTRUCTION OF GOGOL SCHOOL Drawing title: Cover Design by: Eng Awil Drawing by: Eng Awil Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY DISTRICT NOVEMBER,2018, FINANCED BY IOM_RDS_MIDNIMO. Client: Jubaland State of Somalia.

Transcript of CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location:...

Page 1: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: Cover

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

Client: Jubaland State of Somalia.

Page 2: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: Drawing index.

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

DRAWING INDEX.

Page No Description Remarks01/19

Drawing index

Site location

Existing plan

Proposed site layout

Foundation plan

Floor plan and section

Elevation ViewPublic toilet floor plan and section

Public toilet Elevation View

Staff toilet floor and section

Staff toilet elevation view.

3D-01

3D-02

3D-03

3D-04

3D-05

3D-06

3D-07

02/19

03/19

04/19

05/19

06/19

07/19

08/19

09/19

10/19

11/1912/19

13/19

14/19

15/1916/19

17/19

18/19

19/19

Cover

Page 3: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: Site location

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

Client:Jubaland State of Somalia.

Page 4: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

4.600

19.5

00

23.100

46.7

50

Proposedwashrooms

Septic tank WC

Existing classrooms(to remain)

Existingoffice

Exis

ting

iron

shee

t cla

ssro

oms

(to b

e do

mili

shed

)

Existingground

water tank

Existingdestroyed

toilets

Existing Boundarywall to remain

Access Road

Drawing Scale

As ShownLayout ID

cc.1:2.64 d.d1:5.02

aa. 1:4.58

0. Ground Floor 1:269.59

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: Existing Plan

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

Page 5: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

5.55

05.

450

5.00

05.

450

5.55

0

0.60

00.

900

2.25

01.

500

1.45

00.

600

0.90

02.

250

1.50

01.

450

0.60

00.

900

2.25

01.

500

1.45

00.60

00.

900

2.25

01.

500

1.65

0

1.20

06.

700

6.70

06.

700

6.90

05.400 1.400

5.05

06.

000

1.80

03.

700

46.7

50

23.1005.400 1.400

3.000 6.600 2.300 4.000 2.200 2.200 2.400

Wes

t Ele

vatio

n

South Elevation

Eas

t Ele

vatio

n

North Elevation

Class

Class

Class

Class

Existing Classes

Septic tank WC

LadiesGents.

Drawing Scale

As ShownLayout ID

cc.1:2.64 d.d1:5.02

aa. 1:4.58

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: Site Layout

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

Page 6: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

E E

D D

C C

B B

A A

1

1

2

2

3

3

1

1

2

2

3

3

A A

B B

C C

1

1

2

2

AA

BB

27.8

00

5.910 1.290

7.36

96.

747

6.69

76.

988

6.50

00.

600

6.10

00.

600

6.10

00.

600

6.10

0

5.002 0.600 0.598 0.400

7.36

96.

747

6.69

76.

988

0.60

0

0.600

7.200

5.002

6.5000.600

6.1000.600

6.1000.600

6.100

0.60

00.

600

2.0002.500

1.500

2.40

0

2.90

13.

400

0.5000.500

3.40

02.

901

2.40

0

1.5000.500 0.500

2.0002.500

7.200

0.5003.000

0.5002.700

0.500

3.522 3.190

0.50

01.

200

0.50

01.

600

0.50

0

3.522 3.1907.200

0.5001.400

0.5001.100

0.5001.100

0.5001.100

0.500

0.50

01.

200

0.50

01.

600

0.50

0

1.74

32.

051

4.30

0

1.74

32.

051

4.30

0

Class

Class

Class

Class

STUDENTS TOILETS

STAFF TOILET

Drawing Scale

As ShownLayout ID

cc.1:2.64 d.d1:5.02

aa. 1:4.58

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: Foundation Plan

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

CONSTRUCTION OF GOGOLPRIMARY SCHOOL AT

GARBAHAREY DISTRICT-NOVEMEBER-2018, Funded by

IOM_RDS_MIDNIMO.

Date 20-Nov-2018

Page 7: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

E E

D D

C C

B B

A A

1

1

2

2

3

3

6.50

06.

500

6.50

0

5.45

5.45

05.

005.

455.

45

5.40 1.70

6.800

5.400 1.400

2.70

1.50

2.60

2.60

1.50

2.60

2.60

1.50

2.60

2.60

1.50

2.70

6.80

6.70

6.70

6.80

0.60

00.

900

2.25

01.

500

1.54

70.

503 0.

900

2.25

01.

500

1.55

10.

500.

900

2.25

01.

500

1.55

90.

491 0.

900

2.25

01.

500

1.65

0

5.45

5.45

5.00

05.

450

5.45

A A

E-01

E-02 E-

03E-04

Class

Class

Class

Class

1 2 3

5.400 1.400

0.80

0 0.45

01.

000

1.20

00.

800

FOUNDATION SPECIFICATION- Floor tiling works should be 300X300mm.

-A42 BRC mesh.-100mm thick slab concrete

- 1000 guage polythene sheeting as DampProof membrance.

- 200mm thick ground beam laid on rublestone.

- Compacted hardoce fill.-400mm thick rubble stone.

-50mm thick palin concrete under the rubblestone.

-Excavation depth should be 800mm.

ROOF SPECIFICATION.- Pitch 20 degree five profile 28 guage

roofing with blue color.- 100X75mm wall plate.

-100X50mm rafter at 600mm c/c 50X50m.-200mm with fascia board.

-All timber to be cured and painted with 2paint coats of painted.

12mm thick clipboard celling.-300mm thick concrete ring beam.

-200mm thick lintel beam.-1500X1200mm Aluminium windows

with grill mesh.-1500X250mm Ventilation blocks.

Classroom200X200 veranda columns

Section View.

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title:Floor plan andsection.

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

Page 8: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

E D C B A

6.791 6.708 6.704 6.796

0.45

02.

956

1.14

2

1.00

01.

200

0.20

00.

250

BACK ELEVATION

A B C D E

6.796 6.704 6.708 6.791

3.00

41.

243

2.13

9

0.998

0.25

0

1.500

6.796 6.704 6.708 6.791

1 2 3

5.400 1.400

0.45

03.

000

0.45

03.

952

0.45

03.

247

0.30

03.

048

3 2 1

1.400 5.400

Drawing Scale

As ShownLayout IDaa. 1:4.78cc. 1:2.50d.d 1:4.58

E-02

E-03E-04

E-01

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title:Elevation View.

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

200mm width fascia boardalong the premeter roof

- Guage 28 iron sheet with red color- 1500X1200mmm high Aluminium

window with grill mesh.- Decorative plastering blocks shouldbe consist cement and fine aggregate

then paint to the indicated color.-250mm thick ventilaltion block above

the windows.

- External wall color should bewhite stuco paint.

-900X2100mm high steel doors.

- Front steps construction should beconcrete with 1:2:4 cement ratio.

-200X200mm dimention concrete column.

Page 9: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

11

22

33

44

55

AA

BB

CC

1.6071.611

1.5971.618

6.600

0.2000.400

0.600 0.4000.200

0.4000.600 0.4000.200

0.4000.600 0.4000.200

0.4000.6000.400

0.4000.700

0.9000.700

0.500 0.2000.2000.700

0.9000.700

0.700

1.4001.400

1.4001.400

0.2003.000

0.1993.001

0.200

6.600

0.700 1.000 2.000

3.700

0.700 1.000 2.000

3.700

AAAA

E-06

E-07

E-05

E-08

LadiesG

ents.

1 2 3 4 5

1.607 1.611 1.597 1.618

0.80

0

1.607 1.611 1.597 1.618

0.45

02.

137

1.17

6

FOUNDATION SPECIFICATION- Floor tiling works should be 300X300mm.

-A42 BRC mesh.-100mm thick slab concrete with cement ratio 1:2:4.

-1000 guage polythene sheeting as Damp Proofmembrance.

-200mm thick ground beam laid on ruble stone.-compacted hardoce fill.

-400mm thick rubble stone.-50mm thick palin concrete under the rubble stone.

-Excavation depth should be 800mm.

ROOF SPECIFICATION.- Pitch 20 degree five profile 28 guage

roofing with blue color.- 100X75mm wall plate.

-100X50mm rafter at 600mm c/c 50X50m.-200mm with fascia board.

-All timber to be cured and painted with 2paint coats of painted.

12mm thick clipboard celling.

the doors should besteel doors with anti

rust paint

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title:Public toilet andsection.

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

Section AA--AA

Page 10: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

1 2 3 4 5

1.607 1.611 1.597 1.618

1.607 1.611 1.597 1.618

0.45

01.

800

1.51

3

2.30

0

A B C

1.703 1.795

0.45

02.

800

0.45

01.

800

0.50

01.703 1.795

-200mm widthfascia board.

5 4 3 2 1

1.618 1.597 1.611 1.607

1.618 1.597 1.611 1.607

0.45

03.

313

0.60

0

0.600

C B A

1.795 1.703

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: Public toiletsElevation Views

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

E-05

E-06

E-07

E-08

Page 11: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

A A

B B

2

2

1

1

2.002

2.200

0.800 0.600 0.800

2.80

0

2.59

4

2.59

4

2.80

0

0.4000.700 1.100

2.002

2.200

aaaa

E-09

E-10

E-11

E-12 WC

A B

2.594

0.45

02.

137

1.05

4

0.80

0

FOUNDATION SPECIFICATION- Floor tiling works should be 300X300mm.

-100mm thick slab concete-A42 BRC mesh.

-1000 guage polythene sheeting as Damp Proof membrance.-200mm thick ground beam laid on ruble stone.

-compacted hardoce fill.-400mm thick rubble stone.

-50mm thick palin concrete under the rubble stone.-Excavation depth should be 800mm.

ROOF SPECIFICATION.- Pitch 20 degree five profile 28 guage roofing with

blue color.- 100X75mm wall plate.

-100X50mm rafter at 600mm c/c 50X50m.-200mm with fascia board.

-All timber to be cured and painted with 2 paint coatsof painted.

-12mm thick clipboard celling.

-200mm thick concrete ofring beam

-200mm thick concrete ofring beam

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: Staff toilet floorplan and section

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

SECTION aa--aa

Page 12: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

1 22.002

0.45

03.

324

0.45

02.

137

A B2.594

0.45

03.

324

0.45

02.

874

2 1

2.002

0.45

03.

152 0.

600

0.600

B A2.594

0.45

02.

874

0.45

03.

324

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title:Staff toiletElevation Views

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

E-09

E-10

E-11 E-12

Page 13: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: 3D-01

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY DISTRICTNOVEMBER,2018, FINANCED BY IOM_RDS_MIDNIMO.

Page 14: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: 3D-02

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

Client: Jubaland State of Somalia.

Page 15: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: 3D-03

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

Client:Jubaland State of Somalia.

Page 16: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: 3D-04

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

Client:Jubaland State of Somalia.

Page 17: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: 3D-05

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

Client:Jubaland State of Somalia.

Page 18: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: 3D-06

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

Client:Jubaland State of Somalia.

Page 19: CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT … for Quotation - Construction of...Project Location: Garbaharey District Date 20-Nov-2018 CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY

GSPublisherVersion 0.0.100.100

Drawing Scale

As ShownLayout ID

General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.

2. DO NOT SCALED DRAWINGS

3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION

4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.

5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.

Cilent

Implemented by: IOM

Project title: CONSTRUCTIONOF GOGOL SCHOOL

Drawing title: 3D-07

Design by: Eng Awil

Drawing by: Eng Awil

Project Location:Garbaharey District

Date 20-Nov-2018

CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,

FINANCED BY IOM_RDS_MIDNIMO.

Client:Jubaland State of Somalia.