Construction Noise Mitigation Construction Noise Mitigation Options Associated with the Options Associated with the Upgrading of Doyle Drive (US Upgrading of Doyle Drive (US 101) in San Francisco County, 101) in San Francisco County, California California Win Lindeman Win Lindeman Senior Project Manager Senior Project Manager Environmental Science Associates Environmental Science Associates Tampa, Florida Tampa, Florida [email protected] [email protected] TRB Annual Meeting TRB Annual Meeting January 2008 January 2008

Transcript of Construction Noise Mitigation Options Associated with … · Construction Noise Mitigation Options...

Construction Noise Mitigation Construction Noise Mitigation Options Associated with the Options Associated with the

Upgrading of Doyle Drive (US Upgrading of Doyle Drive (US 101) in San Francisco County,101) in San Francisco County,

CaliforniaCalifornia

Win LindemanWin LindemanSenior Project ManagerSenior Project Manager

Environmental Science AssociatesEnvironmental Science AssociatesTampa, FloridaTampa, Florida

[email protected]@esassoc.com

TRB Annual MeetingTRB Annual MeetingJanuary 2008January 2008

PROJECT LOCATION

Cooperating Agencies

• San Francisco County Transportation Authority

• Federal Highway Administration

• California Department of Transportation

Other Cooperating Agencies

• National Park Service

• Presidio Trust

• U.S. Department of Veteran Affairs

Crissy Field Center

Main Post

Palace of Fine Arts

Richardson Ave.

Crissy Field Marsh

Presidio

Doyle Drive

Crissy Field Marsh

Battery Area

Stillwell Hall

Cavalry Stables

National Cemetery

Doyle D

rive

Toll Plaza

Highw

ay 1

Log Cabin

Final Noise and Vibration Study

Draft EIS/R

PROJECT ALTERNATIVES

1. No Build

2. Replace and Widen (Eliminated)

3. Presidio Parkway (Preferred)

No Build Alternative

No Build Alternative

No Build Alternative

No Build Alternative

Presidio Parkway Alternative

Presidio Parkway Alternative

Presidio Parkway Alternative - Refined

Crissy Field Center

Stillwell Hall

San Francisco National Cemetery

Cavalry Stables

Crissy Field

2004 Noise Study Construction Noise Control Options

1. Operational noise limits for construction equipment

2. Approved exhaust mufflers

3. Acoustic shields/shrouds on pavement breakers and jackhammers

4. Prohibiting construction from 8 PM to 7 AM if 5 dBA over background

5. Contractor to coordinate with facility users to reduce conflicts

6. Demolition near Stillwell Hall and Cavalry Stables to use quieter methods

7. Reduce the amount of pile driving

8. Use rubber-tired equipment rather than tracked vehicles

9. Storage and equipment located away from noise-sensitive sites

Construction Noise Concerns Focus Point

Additional Construction Noise Options

1. Construct a temporary noise barrier between the Crissy Field Centerand Doyle Drive

2. Conduct a building noise reduction analysis for the Center

CURRENT CONSTRUCTION NOISE CONTROL PLANFOR THE CRISSY FIELD CENTER

Temporarily relocate the activities of the Crissy Field Center to another location within the area until noisy construction activities within the areaare completed.

Benefits of the Crissy Field Center Relocation

1. Reduce potential for disruption of activities

2. Eliminate disruption from building insulation study

3. Eliminate the costs associated with a temporary barrier

4. Improve safety of Crissy Field Center users

CONCLUSIONS

• Construction noise control planning is an iterative process

• A general construction noise mitigation plan is a good starting point.

• Coordination and cooperation with interested parties aids in theidentification of concerns and leads to workable solutions.

• Keep the issues in perspective and keep the solutions simple!

QUESTIONS?

Contact:

Win LindemanEnvironmental Science Associates1715 N. Westshore Blvd., Suite 780

Tampa, FL 33607813.207.7200

[email protected]