Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532 PAGE 1 Construction News Project: UIUC EPC 3 College of Engineering ESCO Project Date: October 30, 2017 – November 17, 2017 Items completed to date 0066 MRL 0067 LLP 0095 SC 0174 ESB 0237 MNTL ECM 5 Occupancy Sensors ECM 10 Pipe Insulation ECM 13 Duct Cleaning ECM 2 Alt 2A DDC Controls Upgrade for AHU-1 VAVs ECM 5 Occupancy Sensors ECM 7.1 Steam Traps (Non Radiation Only) ECM 2 Alt 2A DDC Controls Upgrade for Tower VAVs ECM 5 Occupancy Sensors ECM 7/7.1 Steam Traps ECM 10 Pipe Insulation ECM 2 HVAC Energy Savings and Deferred Maintenance ECM 5 Occupancy Sensors ECM 7.1 Steam Traps (Non Radiation Only) ECM 19 Process Water ECM 26 Everitt Cleanroom Areas to be affected in near term 0066 Seitz Materials Research Lab (MRL) Basement Southwest Quadrant: Replacing existing vent and temperature controls Installing occupancy sensors in accordance with design drawings Roughing in process water mains and installing chilled beams in accordance with design drawings First Floor Northwest Quadrant (beginning 11/13): Replacing existing vent, temperature controls, perimeter control valves and perimeter steam traps Installing occupancy sensors in accordance with design drawings Roughing in process water mains and installing chilled beams in accordance with design drawings Second Floor No construction activities at this time. Third Floor Southeast Quadrant: Replacing existing vent, temperature controls, perimeter control valves and perimeter steam traps Installing occupancy sensors in accordance with design drawings Roughing in process water mains and installing chilled beams in accordance with design drawings

Transcript of Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ......

Page 1: Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ... Making final connections to relocated toilet exhaust EF-16. Demoing existing supply

Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532

PAGE 1

Construction News

Project: UIUC EPC 3 College of Engineering ESCO Project

Date: October 30, 2017 – November 17, 2017

Items completed to date

0066 MRL 0067 LLP 0095 SC 0174 ESB 0237 MNTL

ECM 5 Occupancy Sensors

ECM 10 Pipe Insulation

ECM 13 Duct Cleaning

ECM 2 Alt 2A DDC Controls Upgrade for AHU-1 VAVs

ECM 5 Occupancy Sensors

ECM 7.1 Steam Traps (Non Radiation Only)

ECM 2 Alt 2A DDC Controls Upgrade for Tower VAVs

ECM 5 Occupancy Sensors

ECM 7/7.1 Steam Traps

ECM 10 Pipe Insulation

ECM 2 HVAC Energy Savings and Deferred Maintenance

ECM 5 Occupancy Sensors

ECM 7.1 Steam Traps (Non Radiation Only)

ECM 19 Process Water

ECM 26 Everitt Cleanroom

Areas to be affected in near term

0066 Seitz Materials Research Lab (MRL)

Basement

Southwest Quadrant: Replacing existing vent and temperature controls Installing occupancy sensors in accordance with design drawings Roughing in process water mains and installing chilled beams in accordance with design drawings

First Floor

Northwest Quadrant (beginning 11/13): Replacing existing vent, temperature controls, perimeter control valves and perimeter steam traps Installing occupancy sensors in accordance with design drawings Roughing in process water mains and installing chilled beams in accordance with design drawings

Second Floor

No construction activities at this time.

Third Floor

Southeast Quadrant: Replacing existing vent, temperature controls, perimeter control valves and perimeter steam traps Installing occupancy sensors in accordance with design drawings Roughing in process water mains and installing chilled beams in accordance with design drawings

Page 2: Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ... Making final connections to relocated toilet exhaust EF-16. Demoing existing supply

Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532

PAGE 2

Fourth Floor

Laying in corridor ceiling tiles

Penthouse

Demolishing abandoned HVAC equipment Installing permanent fume hood exhaust duct Installing freeze stats and starting up heating hot water system for DOAS heating coils Roofing over east side of fourth floor

0067 Loomis Laboratory

Basement

Starting up reheat hot water system.

First Floor

No construction activities at this time.

Second Floor

No construction activities at this time.

Third Floor

Demoing existing and installing new air terminals, ductwork, grilles and room controls in south and west perimeter rooms.

Fourth Floor

Demoing existing and installing new air terminals, ductwork, grilles and room controls in west interior.

Penthouse

Installing freeze stats in new air handlers. Making final connections to relocated toilet exhaust EF-16. Demoing existing supply fan S-9. Installing new pipe and duct for AHU-3.

If you have any comments, questions or concerns regarding this information or the UIUC EPC 3 College of Engineering ESCO Project in general, please contact:

Josh Whitson, LEED AP Facilities & Services – Energy Services Administration Phone: (217) 333-9073 Cell: (217) 841-5788 Email: [email protected] In construction areas, please note any postings regarding safety precautions and/or access restrictions. On behalf of F&S and Energy Systems Group (ESG), thank you for your cooperation during construction.

Page 3: Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ... Making final connections to relocated toilet exhaust EF-16. Demoing existing supply

Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532

PAGE 3

MRL 4TH FLOOR April 20, 2017 - August 25, 2017

Substantially Complete Substantially Complete

Substantially Complete Substantially Complete

Page 4: Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ... Making final connections to relocated toilet exhaust EF-16. Demoing existing supply

Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532

PAGE 4

MRL 3RD FLOOR August 28, 2017 – January 12, 2018

Nov 20th – Dec 15th

Dec 18th – Jan 12th

Nov 20th – Jan 12th

Substantially Complete

Oct 11th – Nov 17th

Substantially Complete

Page 5: Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ... Making final connections to relocated toilet exhaust EF-16. Demoing existing supply

Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532

PAGE 5

MRL 2ND FLOOR January 15, 2018 – April 27, 2018

Jan 15th – Feb 9th Feb 12th – Mar 9th

Mar 12th – Mar 23rd Mar 26th – Apr 27th

Substantially Complete

Page 6: Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ... Making final connections to relocated toilet exhaust EF-16. Demoing existing supply

Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532

PAGE 6

MRL 1ST FLOOR November 13, 2018 – March 9, 2018

Feb 12th – Mar 9th Nov 13th – Dec 8th

Dec 11th – Jan 5th Jan 15th – Feb 9th

Jan 8th— Jan 12th

Page 7: Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ... Making final connections to relocated toilet exhaust EF-16. Demoing existing supply

Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532

PAGE 7

MRL BASEMENT September 25, 2017 - May 15, 2018

Mar 19th – May 15th

Sept 25th – Jan 1st

Jan 1st – Feb 9th

Feb 12th – Mar 16th

Page 8: Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ... Making final connections to relocated toilet exhaust EF-16. Demoing existing supply

Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532

PAGE 8

LOOMIS 4TH FLOOR September 18, 2017 – November 3, 2017

Page 9: Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ... Making final connections to relocated toilet exhaust EF-16. Demoing existing supply

Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532

PAGE 9

LOOMIS 3RD FLOOR November 6, 2017 – January 3, 2018

Page 10: Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ... Making final connections to relocated toilet exhaust EF-16. Demoing existing supply

Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532

PAGE 10

LOOMIS 2ND FLOOR January 4, 2018 – February 2, 2018

Page 11: Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ... Making final connections to relocated toilet exhaust EF-16. Demoing existing supply

Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532

PAGE 11

LOOMIS 1ST FLOOR June 12, 2017 – September 15, 2017

Page 12: Construction News - Frederick Seitz Materials Research ......Steam Traps (Non Radiation Only) ... Making final connections to relocated toilet exhaust EF-16. Demoing existing supply

Energy Systems Group 2443 Warrenville Road Suite 620 | Lisle, IL 60532

PAGE 12

LOOMIS BASEMENT February 5, 2018 – February 14, 2018