Construction Methods & Management CIEG 486-010
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    255
  • download

    0

Transcript of Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business...

Page 1: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Page 2: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Construction Managers must be both…

…business and technically oriented

Page 3: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Education Options

Education Format

• Traditional

• CEM

• BC

• CM

Page 4: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

• Engineering (civil or architectural)

–Specialization/area of concentration

–Curriculum Elective

Construction Education Options

Page 5: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction-FocusedEducation

CEM CM BCM

CivilEngineering

Applied Technologyor

Professional Studies

Architecture

School of Construction

Page 6: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Management Education

• National CEM Programs– Stanford University– University of Michigan– Virginia Tech– Purdue University– University of Illinois-UC– Oregon State University– University of Colorado– NC State

Page 7: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Management Education

• National BCM Programs– Georgia Tech– University of Florida– Purdue University– Virginia Tech– Auburn University– Georgia Southern University– University of North Florida

Page 8: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Education Options

• National CM Programs– Arizona State University– Florida International University– Colorado State– Clemson– University of Washington– Michigan State University– Brigham Young – Wentworth Institute of Technology

Page 9: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Education Options

• Graduate Construction Programs– Stanford University– University of Colorado– University of Michigan– Virginia Tech– University of Southern California– Arizona State University– Florida International University– Texas A&M

Page 10: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Management

• Interdisciplinary Education

• Practice rather than theory based

• Foundation of Business and Science Courses

• Architectural & Engineering Coursework

• Core of Construction Management Courses

Construction Education Options

Page 11: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

B.S.C.M. Coursework

Engineering subjects

• Strength of Materials• Statics and Structures• Soil Mechanics• Steel and Concrete Design• Surveying

Construction Methods & ManagementCIEG 486-010

Page 12: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

B.S.C.M. Coursework

Business Management

• Accounting• Economics• Statistics• Financial Mgt.• Contract Law

Page 13: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

B.S.C.M. Curriculum Course DistributionEngineering(incl math &

science)34%

Construction Mgt.30%

Liberal Arts13%

Business 15%

Architecture8%

Page 14: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Licensing/Certifications

• Professional Engineer’s License issued by state or local governing board.

• Certified Constructor issued by the American Institute of Constructors (AIC).

• Certified Construction Manager issued by Construction Management Association of America (CMAA)

• Project Management Professional (PMP) by the Project Management Institute (PMI)

Page 15: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Basic Skills needed by Construction Managers

– Estimating– Computer– Leadership/supervisory– Communication = writing and oral skills– Negotiating

– Team Building

Construction Methods & ManagementCIEG 486-010

Page 16: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Construction Management Functions

• Coordination

• Planning & Scheduling

• Purchasing & Expediting

• Supervision

• Cost Control

• Documentation and Reporting

Page 17: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Construction Management Functions

• Quality Control/Quality Assurance

• Estimating

• Safety and Risk Management

• Contract Administration

• Claims Analysis/Avoidance

Page 18: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Additional Skills & Knowledge needed by Construction Engineers

• Surveying (GPS, GIS, Hydrographic)

• Structural Design

• CADD/Drafting

• Specialization in Mechanical, Electrical,

Chemical, or Environmental disciplines

Page 19: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Construction Engineering Functions

• Preparation and Review of Shop Drawings

• Constructibility & Sequencing Studies

• Value Engineering

• Erection Diagrams and Procedures

• Survey & Layout

Page 20: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Executive Functions

• Corporate Management

• Strategic Planning

• Marketing & Business Development

• Public Relations

• Labor Relations

Page 21: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Executive Functions

• Ultimately responsible for quality, safety, production, and general financial health.

Page 22: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Construction training can be valuable to design professionals……

• To enable them to produce practical and efficient designs

• Develop needed management skills

• Learn scheduling techniques that can be applied to the preconstruction process

Page 23: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Project Life Cycle

Page 24: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Life Cycle of a Constructed Facility

1. Concept and Feasibility

2. Engineering and Design

3. Procurement

4. Construction

5. Startup and Implementation

6. Operation or Utilization

Page 25: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

What is Construction?

Application of art and science

Inherently dangerous

Organized chaos

Mankind using creativity, knowledge, strength, determination, and persistence to control his environment

Page 26: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Construction differs from manufacturing in that:

• Not performed in controlled conditions, therefore highly impacted by weather and other environmental conditions

• Seasonality

• Each project is unique

• Remotes sites with various access problems

Page 27: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Construction differs from manufacturing in that:

• Process is not as predictable

• Difficulty in applying automation

• High potential for encountering unforeseen conditions

• Costs can vary according to conditions

Page 28: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction differs from manufacturing in that:

• Difficult to manage and supply utilities and other resources.

• Technical innovations are adopted slower.• Success is dependent upon the quality of its

people.• Very custom-oriented

• Product can be of mind-boggling size, cost, and complexity

Page 29: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Problems Facing Construction Industry:

• Highly traditional and fragmented; slow to embrace new technology

• Restrictive/outdated building codes

• Labor agreements and craft jurisdictional issues

• Liability and legal considerations

• Lack of profit motive or other incentive

Page 30: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Problems Facing the Construction Industry:

• Government regulation

• Environmental constraints

• NIMBY syndrome

• Global competition

Page 31: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

“The Blame Game”

Page 32: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Overview of the Construction Industry

• 10% of GNP

• Employs over 10,000,000 workers

• Annual Volume exceeds $800 billion

• Vital to the Nation’s economic health and quality of life

Page 33: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Industry Divisions

1. Residential Construction

2. (Institutional & Commercial) Building Construction

3. Heavy Construction

4. Industrial Construction

Page 34: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Overview of the Construction Industry

Industry Divisions

1. Residential Construction

2. (Institutional & Commercial) Building Construction

3. Heavy Construction

4. Industrial Construction

Page 35: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Overview of the Construction Industry

Residential • Types

– Single family houses

– Multi family dwellings

– High-rise apartments & condominiums

• 30-35 % of the industry

• Low capital and technology requirements

Page 36: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Overview of the Construction Industry

Residential (continued)

• Largely private

• Often speculative

• Developers = surrogate owners

• Designed by architects, builders/developers

Page 37: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Building Construction

• Institutional and Commercial Construction

– Schools and universities

– Medical clinics and hospitals

– Recreational facilities and sports stadiums

Overview of the Construction Industry

Page 38: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Overview of the Construction Industry

Building Construction

– Retail stores and shopping centers

– Warehouses and light manufacturing

– Office buildings (single story to sky scrappers)

– Hotels, convention centers, and theaters

Page 39: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Overview of the Construction Industry

Building Construction• Institutional and

Commercial Construction– Churches and

Synagogues– Prisons– Courthouses and other

government buildings

Page 40: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Building Construction

• 35-40 % of construction market• Larger and more complex than

residential • Various owners (mostly private)• Designed by architects and engineers

Overview of the Construction Industry

Page 41: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Heavy Construction

• Horizontal Construction

• 20-25% of the construction industry

• Mostly public financing or large consortium

Overview of the Construction Industry

Page 42: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Heavy Construction

• Highway & Bridges• Railroads & Urban Transit

Systems• Tunnels and Dams• Airports• Canals• Port & harbor structures

Overview of the Construction Industry

Page 43: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Heavy Construction

• Pipelines• Sewer Systems• Water treatment & distribution

systems• Power & communication

networks• Landfills

Overview of the Construction Industry

Page 44: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Overview of the Construction Industry

Heavy Construction

• Mass quantities of basic materials: earth, rock, steel, timber, and concrete

• Constructors need knowledge of engineering and geology

• Engineers and builders are often specialized

Page 45: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Overview of the Construction Industry

Heavy Construction

• Greatest impact on land and water

• High degree of mechanization

• Contracts awarded through competitive bidding

Page 46: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Industrial Construction

• Very large scale projects

• High degree of technological complexity

• Designed and built by the largest firms with the highest level of technical sophistication

• Represent 5-10% of the market

Overview of the Construction Industry

Page 47: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Industrial Construction

• Petroleum refineries

• Steel mills & aluminum plants

• Chemical processing plants

Overview of the Construction Industry

Page 48: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Industrial Construction

• Fossil fuel & nuclear power plants

• Other heavy manufacturing facilities

Overview of the Construction Industry

Page 49: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Industrial Construction

• Complex mechanical systems, process piping, and instrumentation

• Civil, but also mechanical, chemical, and electrical engineering disciplines involved

• Mostly private ownership (in western countries)

Overview of the Construction Industry

Page 50: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Industrial Construction

• Negotiated contracts are typical

• “Turnkey” contract arrangements are common

• Design-constructor must be intimately familiar with the technology and operations of the facility

Overview of the Construction Industry

Page 51: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Industry is further subdivided into sectors or segments by:

• Public vs. private ownership/funding• Union labor vs. open shop• Organization and method of project delivery• Type of work: new vs. rehab/retrofit/restoration• Contract type

Overview of the Construction Industry

Page 52: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Participants in the Construction Process

1. Owner

• Private or public• Conceives the construction project• Increasing level of sophistication

Page 53: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Participants in the Construction Process

2. Designer• Architects

• Size of firms ranging form single practitioner to large integrated firms

• Mostly building and residential construction• Engineers

• Civil, mechanical, structural, electrical,chemical, environmental, geotechechnical, and multidiscipline

Page 54: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Participants in the Construction Process

3. General Contractor• General contractor also called “Prime” contractor• Specialty contractors working as subcontractors• Organization ranges from small, one-person

company to large, integrated A/E/C firms• Part of a design-build team

Construction Methods & ManagementCIEG 486-010

Page 55: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Participants in the Construction Process

4. Construction Manager Two principle divisions of CM

• CM for Fee (management services only)

• CM At Risk – Operates similarly to a GC or DB with no labor or

capital equipment• Can encompass the management of the design

process as well as construction• CM services including inspection and overall project or

program management

Page 56: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Participants in the Construction Process

5. Suppliers Manufactures, distributors, research, promotions Materials and equipment sales Equipment Rental

6. Fabricators Structural steel, pre-castors, wood products

7. Labor/Trade Unions

Page 57: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Participants in the Construction Process

8. Government Federal, State, local, and quasi-government Owner/client

GSA, DOT’s, School Districts, USACOE Non-ownership functions

Taxation and regulation Federal: IRS, OSHA, USACOE, DOL, NLRB, HUD (FHA),

FHWA, FAA, EPA, and several others State: DOL, DEP/DNREC, historic preservation (SHPO) Local: County/City/Township Building Officials, Planning

Boards, and Zoning Commissions Quasi-government agencies: development authorities,

bridge and turnpike commissions

Page 58: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Participants in the Construction Process

9. Utility Companies Electric, communications, water, gas,sanitary

sewer Private petroleum pipelines Owner or service provider Integral part of the process Existing facilities in conflict with new

construction Interruption of service can be very costly

Page 59: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Participants in the Construction Process

10. Industry Associations Organizations of construction contractors Organizations of the design and management

professions Construction material and equipment suppliers

and product research Construction labor organizations Coordination and arbitration Inspection, specifications, and costs

Page 60: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

10. Industry Associations

Functions and services• Industry information and communication• Development and maintenance of standards• Interindustry coordination• Collective bargaining• Statistics (market & industry)• Meetings and conventions

Page 61: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

10. Industry Associations

Functions and services• Public relations• Joint industry promotions• Management education• Market development• Apprenticeship training• Legislative• Government relations• Product research

Page 62: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Participants in the Construction Process

11. Professional Services Business/management consultants Legal council CPA firms Surety Companies Financial Institutions/Lenders Insurance agents

Page 63: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Participants in the Construction Process

12. Adjacent Owners and the Public At-Large Existing businesses, institutions, and

residences adjacent to the constructed facility

Civic organizations and community groups

Railroads and public lands

Page 64: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Project Delivery Organization

• Construction by owners forces

• Owner-managed construction

• Construction by general contractor

• Design-build team

• CM Contract

Page 65: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Construction employing owner forces– Usually small in-house construction or

renovations– Industrial projects or institutional (such as

hospitals or schools

Owner-managed construction– Residential/commercial building developers– Industrial or institutional

Page 66: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Construction by General Contractor– Also referred to as “Prime Contractor”– Most common method of delivery– Contractor bears substantial risks and

financial responsibility– Facility designed by in-house

architect/engineer or by design consultants– Often requires specialty subcontractors

Page 67: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Specialty contractors might include those specializing in one of the following:

• Excavation• Steel erection• Concrete

– Cast-in-place– Prestressed/Precast

• Masonry• Timber/wood framing• Piping/plumbing

• Clearing and grubbing• Blasting/demolition• Electrical• Painting• HVAC• Environmental

remediation• Many, many others

Page 68: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

Design-Build (Turnkey)

– Single firm or team responsible for design and construction minimizes coordination problems

– More efficient designs with the interjection of constructibility and innovation

– Often employs fast-track construction– Benefits include reduced overall delivery time and “one-

stop shopping” for the owner– Disadvantages include complexity of evaluating

proposals

Page 69: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

CM Contract -- Fee (management services only) also referred to as “Agency”– Specialized construction skills through all project stages

including preconstruction– Provides close coordination between design and

construction– Eliminates impact of conflicts of interest – Independent and objective evaluation of costs,

schedules, and performance– Potential saving in time and cost– Disadvantages include no risks associated with costs

increase

Page 70: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.

Construction Methods & ManagementCIEG 486-010

CM Contract – “At-Risk”– CM assumes financial risks similar to a GC– CM manages all phases of the work without

performing any actual work tasks– CM’s only resources are management personnel– Contractors/subcontractors have a direct contract

privity with CM– Contract form is often a negotiated guaranteed

maximum price arrangement– Disadvantages includes lack of impartiality

Page 71: Construction Methods & Management CIEG 486-010. Construction Managers must be both… …business and technically oriented.