    CONSTRUCTION MEASUREMENT III: SBQ 3314

    AIR CONDITIONING INSTALLATIONS : PACKAGE/CENTRALSYSTEM

    DR. SARAJUL FIKRI MOHAMEDDEPARTMENT OF QUANTITY SURVEYING

    UNIVERSITI TEKNOLOGI MALAYSIA

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    2/131

    Pre-cast and Pre-stressed ConcreteCIVIL WORKS

    Electrical Installations

    Fire Fighting Installations

    Air Conditioning Installations

    Window/Split Package/Central

    Landscape Works

    Single Phase Three Phase

    Gas Installations

    ELECTRICAL WORKS

    MECHANICAL WORKS

    LANDSCAPE WORKS

    Hard Landscape Soft Landscape

    MAIN COURSE COMPONENTS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    3/131

    1. Air conditioning installations: main components of package & central system

    2. SMM2 measurement rules for air conditioning installations

    3. Taking off list for air conditioning installations

    4. Heading and description.

    5. Case study: WATER COOLED CHILLER SYSTEM

    6. Studio work: AIR CONDITIONING SYSTEM: CENTRAL SYSTEM FORCADANGAN MEMBINA DAN MENYIAPKAN KOMPLEKS PERNIAGAANLARKIN MALL.

    TABLE OF CONTENTS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    4/131

    Main components

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    5/131

    PREAMBLES

    EQUIPMENT: CONDENSING UNIT & FAN COIL UNIT ETC

    DUCTING: SUPPLY DUCT & RETURN DUCT

    DUCTING FITTING

    INSULATION TO DUCTWORK/PIPE

    DUCT WORK SUPPORT

    PIPEWORK

    EQUIPMENT/DIFFUSER/GRILLE/DAMPER

    BUILDERS WORK

    ELECTRICAL SYSTEM

    TESTING

    AIR CONDITIONING SYSTEM

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    6/131

    AIR CONDITIONING SYSTEM

    UNIT SYSTEM PACKAGE SYSTEM CENTRAL SYSTEM

    WINDOW UNITSPLIT UNIT

    UNIT KEMAS SIAPPENYEJUKAN

    UDARA

    UNIT KEMAS SIAPKESELURUHAN

    UNIT KEMAS SIAPKESELURUHAN

    UNIT KEMAS SIAPPENYEJUKAN

    UDARA

    SISTEM AIRDISEJUKKAN

    SISTEM LOGIPUSAT

    AIR CONDITIONING SYSTEM

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    7/131

    7

    PACKAGE SYSTEM

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    8/131

    8

    COOLING TOWER Menara penyejuk

    CENTRAL SYSTEM

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    9/131

    9

    Sistem ini digunakan untuk sistem pendinginan bangunan yangmelibatkan beban penyejukan 15 TR atau keupayaan kendalian udarasebanyak 6000 CFM ke atas. Memerlukan ruang-ruang khas di dalambangunan untuk menempatkan peralatannya

    Dibahagikan kepada 2 jenis iaitu:

    a) Sistem Logi Pengendalian Pusat

    b) Sistem Logi Pengendalian Air Sejuk/Water Chilled System

    SISTEM LOGI

    CENTRAL SYSTEM

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    10/131

    DUCTING SYSTEM

    AIR HANDLING UNIT

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    11/131

    A/C CHILLED WATER EXPANSION TANK

    CHILLED WATER PUMP

    AIR COOLED CHILLERS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    12/131

    12

    Komponen-komponen asas diletak dalam satu ruang logi mekanikalpenyaman udara yang mengendalikan sebahagian besar Saikel Refrigerationdan penyejukan udara.

    Selain itu ia memerlukan satu Unit Pengental penyejukan udara dan Menara

    Penyejuk di mana ia boleh mendapat pengudaraan yang baik. Kedua-dua unitini disambung melalui paip ulang-alik refrigerant atau air ikut sistem yangdigunakan.

    Udara bekal didatangkan dari Logi Pusat dan diagihkan melalui saluran danbaur ke ruang-ruang yang didinginkan. Udara boleh diagihkan secara

    mendatar melalui salur dalam ruang siling gantung/ bawah lantai ditinggikan.

    Agihan mendatar boleh dibuat melalui liang-liang pugak kemudahan.

    SISTEM LOGI PENGENDALIAN PUSAT

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    13/131

    13

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    14/131

    14

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    15/131

    15

    COOLING TOWER AND CONCRETE PLINTH

    RETURN AND SUPPLY REFRGERATION PIPE

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    16/131

    16

    WATER CHILLER UNIT

    SUPPLY & RETURN CHILLED WATER PIPE

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    17/131

    17

    AIR HANDLING UNIT AND DIFFUSER

    REGISTER AND DIFFUSER

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    18/131

    18

    COOLING TOWER

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    19/131

    19

    CAPACITY

    COOLING TOWER

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    20/131

    20

    Ciri utama sistem ini adalah penggunaan air yang disejukkan dari SaikelRefrigerant untuk menyejukkan udara dalam Saikel Udara.

    Sistem ini mengadakan media air sejuk di satu Logi Pendinginan dengan tujuanuntuk diagihkan kebeberapa Unit Pengendalian Udara ( A.H.U ).

    Sistem ini mempunyai 4 pusingan berasingan untuk mengalih haba dari dalamruang didinginkan ke udara luar bangunan.

    Pertama- Saikel Udara mengalih haba dari ruang didinginkan ke A.H.U melalui mediaudara.Kedua- Pusingan Air mengalih haba dari alat A.H.U ke Lingkaran Pengental di LogiPendinginan melalui media air.Ketiga- Saikel Refrigerant mengalih haba dari Lingkaran Pengental ke LingkaranPengental dalam alat Chiller di Logi Pendinginan.Keempat- Pusingan Air mengalih haba dari Lingkaran Pengental ke Menara Penyejukmelalui media air

    SISTEM LOGI AIR SEJUK

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    21/131

    21

    AIR HANDLING UNIT

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    22/131

    22

    AIR CHILLED SYSTEM

    AIR HANDLING UNIT

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    23/131

    23

    DUCTWORK, DUCT FITTING ANDCOMPONENTS

    SISTEM PERALATAN PENGAGIHAN UDARA

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    24/131

    24

    DUCTWORK COMPONENTS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    25/131

    25

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    26/131

    26

    ALL ROUND METAL DUCT WITH ROUND METAL BRANCH DUCTS

    DUCTWORK TYPES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    27/131

    27

    METAL TRUNK LINES WITH ROUND FIBERGLASS BRANCH DUCT

    DUCTWORK TYPES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    28/131

    28

    DUCTING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    29/131

    29

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    30/131

    30

    Pre-insulated aluminium sandwich panels with an extra aluminium foil covering

    and internal closed-cell insulation

    DUCTING INSULATION

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    31/131

    31

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    32/131

    32

    MAIN DUCT

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    33/131

    33

    BRANCH DUCT

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    34/131

    34

    DUCT COMPONENT: ELBOW

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    35/131

    35

    INSPECTION HOLE

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    36/131

    36

    DIFFUSER

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    37/131

    37

    REGISTER

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    38/131

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    39/131

    39

    FABRICATION METHOD

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    40/131

    40

    DUCTWORK SUPPORT

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    41/131

    SMM2 measurement

    rules

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    42/131

    42

    AIR CONDITIONING ANDVENTILATION SYSTEM

    MEASUREMENT RULES

    SECTION QPLUMBING AND MECHANICALENGINEERING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    43/131

    43

    DUCTWORKQ.14 DUCTING AND FITTING

    1. Ducting (measured over all pipe fittings, short running lengths andbranches) shall be given in metres stating the type and the normalsize. Joints in the running length shall be given in the descriptionstating the method of jointing.

    2. Lining ducting internally meter separately stating the typeand the thickness of the lining material and internal size ofducting.

    3. Flexible ducting and extensible ducting (measured as fullyextended)- described and enumerated.

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    44/131

    44

    DUCTWORKQ.14 DUCTING AND FITTING

    4. Curved ducting - described and enumerated-stating mean radius.Curved rectangular ducting stated whether shaped to curved onthe wider or narrow side.

    5. Duct fitting in numbers extra over the duct in which they occur.Cutting and forming openings and jointing ducting to fitting shallbe deemed to be included. Fitting involving a change of directionof ducting- shall be described.

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    45/131

    45

    Elbow, Reducer And Branch

    Shall be described and enumerated as extra over in which theyoccur. (Q.14.5)

    6. Providing materials, heat, bolts, nuts, washers and everything elsenecessary for making joints in ducting shall be deemed to beincluded with the items. (Q.14.6)

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    46/131

    46

    DUCTWORKQ.15 SPECIAL CONNECTION, ETC

    1. Special connection and special joints in ducting shall beenumerated separately (except where given in the description ofother enumerated item) stating size and kind of ducting concernedand method of jointing.

    2. Classification :a. Connection between ducting of differing materials.b. Connection between ducting and equipment stating the nature

    of the equipment.c. Isolated joints which differ from those given in the description of

    the ducting.d. Flexible connection between ducting and plant.

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    47/131

    47

    DUCTWORKQ.15 SPECIAL CONNECTION, ETC

    3. Ducting turn and splittershall be enumeratedseparately statingthe type and internal size of ducting.

    4. Nozzle outlets, test holes and covers and access door shall beenumeratedseparately stating the size and method of jointing andmaterial and thickness or gauge of the ducting and lining.

    5. Cowls, terminals, intake louvres and like shall beenumeratedseparately stating the size and type, the size of ducting.

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    48/131

    48

    Q.16 DUCTWORK SUPPORTS1. Components for supporting ductworks shall beenumerated- size

    and type of the components and size of ducting.

    Stating the:- Size,type of the components

    Size of the ducting

    Classification shall be as follows:- Components for supporting single runs of ducting

    Ditto multiple runs of ducting

    Combined components for supporting ducting and pipework.

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    49/131

    49Hanger

    HANGER

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    50/131

    50

    Q.17 ALTERNATIVE METHOD OF MEASUREMENT

    1. ClauseQ. 18provide alternative method of measurement.

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    51/131

    51

    Q.18 DUCTING AND DUCTING FITTING

    1. Measured in metres (over all ducting fittings,short lengths andbranches) stating the type and size.(Q.18.1)

    2. Joints and method of the jointing shall be given in the description.

    3. Flexible / extensible ducting shall be described andenumerated.(Q.18.3)

    4. Curved ducting shall be so described and enumerated stating themean radius.(Q.18.4)

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    52/131

    52

    EQUIPMENT AND ANCILLARIES

    Q.19 GENERALLY

    1. Unless otherwise stated, equipment such as boiler, generators,cylinder, pumps, cooling, air handling unit, fans, refrigeratorequipment etcin numbers ( Q.19.1)

    Condenser Unit And Fan Coil, etc.

    Measured in nos (Q.19.1)

    2. Packaged item shall be described in conjunction with a

    manufacturers detailed specification (Q.19.2)

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    53/131

    53

    EQUIPMENT AND ANCILLARIES

    Q.19 GENERALLY

    3. Any limiting dimensions on the size shall be given. (Q.19.3)

    4. Electrical connection shall be given in accordance withsection R . (Q.19.4) Section R.

    5. Platework, fuel hoppers dan supporting steelwork -accordance Section P.

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    54/131

    54

    EQUIPMENT

    FIRE DAMPER

    Measured in nos. (Q.19.1)

    The related specification shall be described

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    55/131

    55

    EQUIPMENT

    AIR DIFFUSER & AIR GRILLE

    Measured in nos.

    Stating the type, size and method of fixing.

    Described accordance with the details drawing and specificationgiven.

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    56/131

    56

    AIR DIFFUSER

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    57/131

    57

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    58/131

    58

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    59/131

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    60/131

    60

    GENERALLYQ.1 INFORMATION

    AIR CONDITIONING SYSTEM AND INSTALLATION

    Generally

    Q.1. Information1 Particulars of the following shall be given :

    a) Regulation, etc.b) Kind and quality of material.c) Gauge, thickness or substance of material.d) Any tests, etc.

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    61/131

    61

    Q.1.2 Assembling and jointing together the component parts of compositeunits and providing any necessary connecting flanges and jointingmaterials shall be deemed to be included with the items concerned.Where composite units are supplied by the Employer, particulars shallbe given of the assembly work involved.

    Q.1.3 Patterns, moulds, templets and the like shall be deemed to be includedwith the items.

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    62/131

    62

    WATER COOLED CHILLER UNIT

    Install and complete the water cooled chiller unit (minimumcapacity 186 tonne) c/w microprocessor system, concrete plinth (ifnecessary), vibration isolators and other assecories. (No)

    CHILLED WATER PUMPSET

    Horizontal split casing chilled water pumpset (minimumrequirement 608 igpm, 120 ft) c/w motor, concrete plinth (ifnecessary), vibration isolators and other assecories. (No)

    BILL OF QUANTITIES: EQUIPMENT

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    63/131

    63

    BILL OF QUANTITIES: EQUIPMENT

    WATER EXPANSION TANK

    200 gallons chilled water expansion tank c/w concrete plinth (ifnecessary) and other assecories. (No)

    AIR HANDLING UNITInstall and complete the 366 000 min btu/hr air handling unit c/wthermostat, evaporator blower unit, fan, motor, filters, concreteplinth (if necessary), vibration isolators and other assecories. (No)

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    64/131

    64

    Q.1.4 Priming and painting off-site and proprietary finishes or surfacetreatment applied as part of the production process shall bedescribed stating whether applied before or after fabrication orassembly.

    Q.1.5 Except where otherwise stated the method of fixing and the provisionof nails, bolts, nuts, holes, screws, plugs, shot-fired pins and the likeshall be given in the description of the work.

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    65/131

    65

    Q.1.6 The nature of the background to which work is to be fixed shall begiven in the description. Any necessary drilling of the backgroundsshall be deemed to be included. Backgrounds shall be classified asfollows :

    a) Building-board which shall be deemed to includehardboard, compressed cement sheet, plasterboard, fibreboard andsimilar materials which do not grip woodscrews.

    b) Etc

    MEASUREMENT RULES

    S S

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    66/131

    66

    Q.1.6 The nature of the background.

    b) Timber which shall be deemed to include softwood,hardwood, blockboard, plywood and similar materials which will gripwood-screws when a lead-hole has been drilled.

    c) Brickwork, concrete or stone work

    d) Plain metal

    e) Glass

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    67/131

    67

    Q.1.7. Temporary work shall be so described. Removing temporarywork and making good after shall be deemed to be includedwith the item.

    1.8. Connecting to existing services shall be described

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    68/131

    68

    GENERALLY

    Q.2. CLASSIFICATION OF WORKQ.2.1 Work together with its metalwork, supports and the like

    (unless associated with more than one installation) shall be

    classified as follows and given under an appropriateheading :

    t) Air handling installation, identifying whether ventilationsupply, ventilation extract, ventilation with heating (airheated centrally), ventilation with heating (air heated

    locally),air conditioning (air heated centrally), airconditioning (air heated locally), or foul air extract.

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    69/131

    69

    Q.3. LOCATION OF WORK

    Location of works :

    a. Internally

    b. Externallyc. In plant rooms

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    70/131

    70

    PIPE WORKSQ.7 GENERALLY1. Purpose-made pipes and purpose-made pipe fittings shall be

    described.

    2. Pipes and pipe fittings which are wrapped, coated or lined bythe manufacturer shall be so described stating the type oftreatment.

    3. Pipework required to be temporarily fixed in position,dismantled for chromium-plating or other special finishing andsubsequently refixed shall be so described.

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    71/131

    71

    PIPEWORKS

    a)Shall be supplied and installed:

    - all necessary interconnecting pipeworks between item of

    equipment- all vents and exhausts

    - all necessary pipe, valves, fittings, anchors, supports, brackets,insulation etc

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    72/131

    72

    Q.8 PIPE AND FITTING

    1. Pipes (measured over all pipe fittings, short running lengthsand branches) shall be given in metres stating the type andthe normal size. (Q.8.1)

    Purpose-made pipe shall be so described and givenseparately. Curved pipes shall be so described stating themean radius.

    Joints in the running length shall be given in the description

    stating the method of jointing.

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    73/131

    73

    Q.8 PIPE AND FITTING

    2. Flexible pipes and extensible pipes (measured as fully extended)shall each be so described. (Q.8.3)

    3. Pipes laid or fixed in ducts, trenches and chases or embedded inin-situ concrete or screeds shall each be so described. (Q.8.4)

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    74/131

    74

    Q.9. SPECIAL CONNECTIONS, ETC.

    1. Special connections and special joints in pipes shall each beenumerated separately (except where given in the description ofanother enumerated item) stating the nominal size and kind of pipeconcerned and the method of jointing. Classification shall be asfollows :

    a) Connections between pipes of differing materials anddiffering grades of the same material.

    b) Connections between pipes and appliances or

    equipment.c) Connections to existing pipes.

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    75/131

    75

    Q.10. LABOURS

    Labours on pipes (e.g. made bends, made springs, made offsets,beaded ends, ornamental ends, etc.) shall be deemed to beincluded with the pipes on which they occur.

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    76/131

    76

    Q.11 SUNDRIES6. Pipe-sleeves through walls, floors ceilings shall be

    enumerated stating the type, lengths, the nominal size andkind of pipe passing through and the type of packing required,and if to be supplied for fixing by other trades, this shall be so

    described.

    7. Wall, floor or ceiling plates shall be grouped together as platesand enumerated stating the type and size.

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    77/131

    77

    Q.12 PIPEWORK SUPPORTS

    1. Components or assemblies of components (e.g. clips,saddles, pipe-hooks, holderbats, brackets, rollers, chairs andhangers or black-plates and girder-lugs) used to fix supportsfor more than one pipe shall be enumerated separatelystating the type and size of components.

    Spring compensated components shall be so describedstating the loading and movement to be accommodated.

    MEASUREMENT RULES

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    78/131

    AIR CONDITIONING INSTALLATIONS

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    79/131

    79

    DUCTWORKQ.14 DUCTING AND FITTING

    1. Ducting (measured over all pipe fittings, short running lengthsand branches) shall be given in metres stating the type and thenormal size. Joints in the running length shall be given in the

    description stating the method of jointing.

    2. Lining ducting internally meter separatelystating the typeand the thickness of the lining material and internal size ofducting.

    3. Flexible ducting and extensible ducting (measured as fullyextended)- described and enumerated.

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    80/131

    80

    DUCTWORKQ.14 DUCTING AND FITTING

    4. Curved ducting - described and enumerated-stating meanradius. Curved rectangular ducting stated whether shaped tocurved on the wider or narrow side.

    5. Duct fitting in numbers extra over the duct in which theyoccur. Cutting and forming openings and jointing ducting tofitting shall be deemed to be included. Fitting involving achange of direction of ducting- shall be described.

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    81/131

    81

    ELBOW, REDUCER AND BRANCH

    Shall be described and enumerated as extra over in which theyoccur. (Q.14.5)

    6. Providing materials, heat, bolts, nuts, washers and everything elsenecessary for making joints in ducting shall be deemed to beincluded with the items. (Q.14.6)

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    82/131

    82

    DUCTWORKQ.15 SPECIAL CONNECTION, ETC

    1. Special connection and special joints in ducting shall beenumerated separately (except where given in the description ofother enumerated item) stating size and kind of ducting concerned

    and method of jointing.

    2. Classification :a. Connection between ducting of differing materials.b. Connection between ducting and equipment stating the nature

    of the equipment.c. Isolated joints which differ from those given in the description

    of the ducting.d. Flexible connection between ducting and plant.

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    83/131

    83

    DUCTWORKQ.15 SPECIAL CONNECTION, ETC

    3. Ducting turn and splittershall be enumeratedseparatelystating the type and internal size of ducting.

    4. Nozzle outlets, test holes and covers and access door shallbeenumeratedseparately stating the size and method of

    jointing and material and thickness or gauge of the ductingand lining.

    5. Cowls, terminals, intake louvres and like shall beenumeratedseparately stating the size and type, the size of ducting.

    MEASUREMENT RULES

    BILL OF QUANTITIES DUCTWORKS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    84/131

    84

    BILL OF QUANTITIES: DUCTWORKS

    Heading:Galvanised iron duct as described with snaplock beam, pocketlock, grooved lock seam, pittsburgh lock and cross bracking forstiffening and including jointing and fixing for supply air

    Description:

    150mm x 150mm supply duct (M)

    350mm x 300mm return duct (M)

    BILL OF QUANTITIES DUCTWORKS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    85/131

    85

    BILL OF QUANTITIES: DUCTWORKSFITTING

    ELBOW

    EXTRA over for 900mm x 350mm to 900mm x 350mm galvanisediron round elbow duct including cutting and forming opening and

    jointing ducting to fitting (NO)

    REDUCER

    EXTRA over for 450mm x 350mm to 350mm x 350mm galvanisediron round reducer including cutting and forming opening and

    jointing ducting to fitting (NO)

    BRANCH

    EXTRA over for 200mm x 250mm to 400mm x 450mm to 300mm x500mm galvanised iron branch including cutting and formingopening and jointing ducting to fitting (NO)

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    86/131

    86

    Q.16 DUCTWORK SUPPORTS

    1. Components for supporting ductworks shall beenumerated- sizeand type of the components and size of ducting.

    Stating the:- Size,type of the components

    Size of the ducting

    Classification shall be as follows:- Components for supporting single runs of ducting

    Ditto multiple runs of ducting

    Combined components for supporting ducting and pipework.

    MEASUREMENT RULES

    HANGER

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    87/131

    87

    HANGER

    Hanger

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    88/131

    88

    Q.17 ALTERNATIVE METHOD OF MEASUREMENT

    1. Clause Q. 18 provide alternative method of measurement.

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    89/131

    89

    Q.18 DUCTING AND DUCTING FITTING1. Measured in metres (over all ducting fittings,short lengths and

    branches) stating the type and size.(Q.18.1)

    2. Joints and method of the jointing shall be given in the description.

    3. Flexible / extensible ducting shall be described andenumerated.(Q.18.3)

    4. Curved ducting shall be so described and enumerated stating the

    mean radius.(Q.18.4)

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    90/131

    90

    EQUIPMENT AND ANCILLARIES

    Q.19 GENERALLY

    1. Unless otherwise stated, equipment such as boiler, generators,cylinder, pumps, cooling, air handling unit, fans, refrigeratorequipment etc in numbers ( Q.19.1)

    Condenser Unit And Fan Coil, etc.

    Measured in nos (Q.19.1)

    2. Packaged item shall be described in conjunction with a

    manufacturers detailed specification (Q.19.2)

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    91/131

    91

    EQUIPMENT AND ANCILLARIES

    Q.19 GENERALLY

    3. Any limiting dimensions on the size shall be given. (Q.19.3)

    4. Electrical connection shall be given in accordance with sectionR . (Q.19.4) Section R.

    5. Platework, fuel hoppers dan supporting steelwork -accordanceSection P.

    MEASUREMENT RULES

    BILL OF QUANTITIES: ELECTRICAL

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    92/131

    92

    ELECTRICAL WORKS

    Power cabling using 4 x 50mm sq. XLPE/PVC/CU c/w 150A TPNmetalclad isolator and 150A TPN MCCB for 2 nos Air CooledChiller from ACP switchboard (at chiller plant room) (ITEM)

    ELECTRICAL WORKS

    Power cabling using 4 x 35mm sq. XLPE/PVC/CU c/w 100A TPNmetalclad isolator and 100A TPN MCCB for 3 nos chiller waterpump from ACP switchboard (at chiller plant room) (ITEM)

    BILL OF QUANTITIES: ELECTRICALWIRING

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    93/131

    93

    EQUIPMENTFIRE DAMPER

    Measured in nos. (Q.19.1)

    The related specification shall be described

    MEASUREMENT RULES

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    94/131

    94

    EQUIPMENT

    AIR DIFFUSER & AIR GRILLE

    Measured in nos.

    Stating the type, size and method of fixing.

    Described accordance with the details drawing and specificationgiven.

    MEASUREMENT RULES

    DIFFUSER

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    95/131

    95

    TYPES OF DIFFUSER

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    96/131

    96

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    97/131

    97

    DIFFUSER/COLLAR CONNECTION

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    98/131

    98

    REGISTER/COLLAR CONNECTION

    BILL OF QUANTITIES EQUIPMENTS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    99/131

    99

    BILL OF QUANTITIES: EQUIPMENTS

    DIFFUSER

    600mm x 600mm anodized extruded aluminium supply air diffusercomplete with blade damper.

    200mm x 400mm 4 way square type air diffuser , fixed tosuspended ceiling complete with all approved gasket

    BILL OF QUANTITIES EQUIPMENTS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    100/131

    100

    BILL OF QUANTITIES: EQUIPMENTS

    RETURN AIR GRILLES

    600mm x600mm extruded aluminium return air grilles

    DAMPER

    Volume control damper complete with access opening.

    Fusible link type fire damper (2 hour fire rated and approved byJabatan Bomba) complete with access opening.

    HANGER

    Hanger, constructed of 2 nos 12mm mild steel rod, 60mm longcentres, 25mm x 25mm x 5mm mild steel angels 80 long forsupply duct / return duct (no)

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    101/131

    101

    EQUIPMENT AND ANCILLLARIES

    Q.20 Anti-vibration and sound insulation

    Anti-vibration mountings for plant shall be enumerated stating thetype and the size. Anti-vibration material and sound-insulatingmaterial in plant bases shall be given in square metres stating thenature of the material and the thickness.

    SU U S

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    102/131

    102

    EQUIPMENT AND ANCILLLARIES

    Q.21 Equipment supports

    1. Equipment supports shall be enumerated and described.

    2. Particulars of the method of fixing shall be given in thedescription in accordance with clauses Q.1.5-6.

    HANGER TO DUCTWORKS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    103/131

    103

    c

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    104/131

    104

    c

    DUCTWORK SUPPORT

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    105/131

    105

    DUCTWORK SUPPORT

    ELBOW

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    106/131

    106

    ELBOW

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    107/131

    107

    Q.22 JOINTING (PENYAMBUNGAN)1. Particulars of the method of jointing shall be given

    in the description of the equipment.

    MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    108/131

    108

    EQUIPMENT AND ANCILLARIES

    Q.24 IDENTIFICATION PLATES

    Plates,discs and labels for identification plants shall be deemed to

    be included with the item concerned. (Q.24)

    Charts giving the keys shall be enumerated

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    109/131

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    110/131

    INSULATIONQ.25 GENERALLY

    1. Particulars of the following shall be given: (Q.25.1)

    Kind and quality of material Thickness of material Finish of material Method of fixing

    2. Includes smoothing the material and working aroundsupports.(Q.25.2)

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    111/131

    Q.26 INSULATION TO PIPEWORK

    1. Insulation to pipeworkmeter stating types and size ofthe pipe.

    2. Working insulation around ancillaries shall be enumeratedseparately in numbers extra over

    3. Working insulation over flanges and pipe fitting shall bedeemed.

    4. Insulation boxes shall be enumeratedseparately in

    numbers stating types of material and infill.

    AIR CONDITIONING INSTALLATIONS

    Insulation to ductwork

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    112/131

    Q.27 INSULATION TO DUCTWORK

    1. Insulation to ductwork meter stating types and size of theducting.

    2. Working insulation around ducting fittings, special fittings and

    ancillariesin numbers extra over

    AIR CONDITIONING INSTALLATIONS

    Insulation to equipment

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    113/131

    Q.28 INSULATION TO EQUIPMENT

    1. Insulation to equipment enumerated stating overall sizeof the unit. Particular shall be given of any protection to the

    insulation.

    2. Providing detachable mattressesand working insulationaround special fittingsand ancillaries shall be deemed.

    AIR CONDITIONING INSTALLATIONS

    Sundry insulation

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    114/131

    Q.29 SUNDRY INSULATION

    1. Loose insulation in trench, ducts, tank casings and like - shallbe given separately in cubic metres stating nature ofmaterials.

    2. Cellular concrete insulation in trench and ducts (groupedtogether) - shall be given in cubic metres stating mix of theconcrete.

    3. 3. Special protection or finish at opening through wall, valvechambers and the like shall each be describedenumerated.

    AIR CONDITIONING INSTALLATIONS

    BILL OF QUANTITIES: INSULATION TO

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    115/131

    115

    DUCTWORKS

    Insulation to duct works

    50 mm Thick fibreglass insulation to 200 mm X 100 mm galvanisediron ducting, with clips at 450 mm centres and covered with single

    side aluminium foil for supply air duct.

    Insulation to pipe works

    50mm Thick Aeroflax or other approved flexible expanded rubber

    compound insulation to 40mm diameter copper tubing.

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    116/131

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    117/131

    Q.30 SUNDRIES

    1. Testing each installation shall be given as an ITEM.

    stating any required qualifications, no of stage tests in

    addition to the final, purpose, instruments and appliancesrequired, special insurances etc.

    AIR CONDITIONING INSTALLATIONS

    BILL OF QUANTITIES: TESTING

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    118/131

    118

    BILL OF QUANTITIES: TESTING

    TESTING

    Upon completion allowed for testing the foregoing Air CooledChiller System air conditioning, make good any defects and leave

    the whole of the installation in perfect working order to thesatisfaction of engineer.

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    119/131

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    120/131

    BUILDERS WORK

    Q.31 GENERALLY

    1. Unless otherwise stated, all items of builders shall be givenin accordance with theappropriate section.

    2. Builders works in connection with plumbing and mechanicalengineering installations shall be grouped together under an

    appropriate heading.

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    121/131

    BUILDERS WORK

    Q.32 PARTICULARLY

    1. Excavation works.2. Inspection chamber-V.6.3. Bedding and pointing equipments or unit of equipment.4. Cutting away for and making goods after the plumbing and

    mechanical installations.

    5. Etc

    AIR CONDITIONING INSTALLATIONS

    BILL OF QUANTITIES: TESTING

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    122/131

    122

    BUILDERS WORK

    50 mm thick concrete grade 15 as base of 300 mm wide (m3)

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    123/131

    Taking off list

    TAKING OFF LIST

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    124/131

    124

    1. Preamble2. Equipment Chiller unit, water pump, water tank, AHU.3. Ducting - supply duct, return duct

    4. Ducting Fitting5. Ductwork Support6. Pipe work7. Insulation to ductwork/pipe8. Equipment - Diffuser, Grille, Damper9. Builders Work10. Electrical system11. Testing

    AIR CONDITIONING SYSTEM

    TAKING OFF LIST

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    125/131

    125

    1) Air cond Equipment (NO)- Air cooled chiller

    - Chilled water tank- Chilled water pump- Air handling unit

    2) Ducting (M)

    3) Ducting Fitting (NO)-Elbow

    -Tee

    -Branch

    4) Ducting Support (NO)

    -Hanger

    5) Pipe Work (M)

    -Refrigerant pipe

    -Suction pipe-Drain Pipe

    6) Insulation (M)-To ductwork

    - To pipe work

    7) Equipment (NO)

    -Diffuser

    -Grill

    -Damper

    8) Sundries

    9) Builders work

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    126/131

    Case study

    Fakulti Alam Bina

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    127/131

    CASE STUDY

    PROJECT TITLE

    AIR CONDITIONING INSTALLATIONS: WATER

    COOLED CHILLER SYSTEMS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    128/131

    Studio work

    Fakulti Alam Bina

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    129/131

    AIR CONDITIONING

    INSTALLATIONS CENTRAL

    SYSTEM

    PROJECT TITLE

    CADANGAN MEMBINA DAN MENYIAPKAN

    KOMPLEKS PERNIAGAAN LARKIN MALL

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    130/131

    DUCTING SYSTEM

    AIR HANDLING UNIT

    AIR COOLED CHILLERS

  • 8/2/2019 Construction Measurement III Air Conditioning Central System

    131/131

    A/C CHILLED WATER EXPANSION TANK

    CHILLED WATER PUMP

    AIR COOLED CHILLERS