CONSTRUCTION MANAGER’S REPORT Interlochen Public Library ...

13
8/9/2018 CONSTRUCTION MANAGER’S REPORT July 2018 Page 1 Safety Integrity Mentoring People Legacy Excellence Project Owner CONSTRUCTION MANAGER’S REPORT Construction Progress It is a fundamental value of Spence Brothers that safety always be a primary consideration. It is a top priority to do all in our power to provide a safe work place for all workers and to mandate the use of good safety practices. Interlochen Public Library July 2018 Project Safety

Transcript of CONSTRUCTION MANAGER’S REPORT Interlochen Public Library ...

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 1

Safety

Integrity

Mentoring

People

Legacy

Excellence

Project Owner

CONSTRUCTION MANAGER’S REPORT

Construction Progress

It is a fundamental value of Spence Brothers that safety

always be a primary consideration. It is a top priority to

do all in our power to provide a safe work place for all

workers and to mandate the use of good safety

practices.

Interlochen Public Library

July 2018

Project Safety

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 2

Week of July 1, 2018

Installation of pergola

Continuing with insulation and drywall in Study Room

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 3

Finishing drywall in the Community Room

Permanent power installation

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 4

Starting parking lot dirt work

Week of July 8, 2018Drain field installation

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 5

Force main installation from dosing tank to drain field

Installation of cedar brackets

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 6

Cedar brackets and columns installed at front entrance

Metal roof installation on north side of building

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 7

Installation of cedar brackets at Study Room

Week of July 15, 2018Pouring and forming sidewalk

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 8

Parking lot prep work

Installation of siding on Study Room Walls

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 9

Pouring sidewalks

Framing up bulkheads

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 10

Finishing drywall in Clerestory

Finishing drywall in Donor’s Hall

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 11

Week of July 22, 2018Pouring sidewalk on south side

Kitchen hood installation

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 12

Framing for the fireplace

Finishing drywall for the circulation desk

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 13

Gravel base for parking lot

Upcoming Construction Tasks

• Priming and painting

• Framing for acoustical ceilings

• Installation of permanent lighting