Construction Management

Two 2014

Setting up Site

Presenter Tony BosnichFeb 2014

Page 2: Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT

Out comeAccept that all sites are unique

Plan and set up site establishment accordingly

>>DEPARTMENT OF CONSTRUCTION

Page 3: Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT

Every site is unique but generally it is a matter of using a check list type of approach details based on historical details

relating to similar projects.

What are some of the items you would consider on your check list.

Write down ten items.

What do we need in order to carry out this project successfully.

>>DEPARTMENT OF CONSTRUCTION

Page 4: Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

Page 5: Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT

Public protection Survey and set out

Fences Access gates

Signage Hazard Board

Craneage Other lifting provision

Temporary works Special formwork

Site hut establishment Special false work

Loading in platform Road Load bay

Storage Set down area

Wheel wash provision Site assembly area

Silt pond Temp fire fighting provision

Temporary weather proofing Temporary services

Temporary access provision Traffic control

Scaffolding

Plant and equipment Any others to add?

Here are some,

>>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

Page 6: Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT

What are the site set up

Elements of this Picture?

Public protection

Traffic plan

Signage

Scaffolding

Environmental

Hoardings

Look at this site

>>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

Page 7: Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

Page 8: Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.
Page 9: Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT

But as part of the site set up some items will be soft.

Safety plan PPE

Quality plan Communication system

Insurances Planning /Programming

Method statements Computer set up

Agreements, contracts Copier

Site rules and requirements Documents

Inductions

Sub contractor provision

Crane and plant booking arrangements

Plant maintenance and testing provision

Any others ?

These are all considered to be hard physical items.

>>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

Page 10: Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT

There maybe be an area allocated for site establishment by the consultants.

Note also most buildings actually cover the whole site now, so the trend now is to remove MC main site establishment to exterior of site.

Most of the requirements will have already been established based on your pre contract planning, and usually only one site visit.

What is the main reason for including site set up details in the pre contract planning.

Where do we do this set up.

>>DEPARTMENT OF CONSTRUCTION

Page 11: Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT

There are no details drawn by any consultant as this is a P&G items and it is up to the Main contractor how they want to set up the site, hence it is not a detailed measured item.

Where to start?

Clear Site plan to suitable scale

Existing details

>>DEPARTMENT TITLE EDIT IN HEADER & FOOTER